School with 16 classrooms- Lump sum Retail showroom deadline 30 days- Lump sum Residence- Cost plus Multiplex with high aesthetics- Unit price Renovation of office- Cost plus Retail Showroom Contract Lump Sump This business agreement is executed at ----------- on 18th January 2021 by and between: M/s ABC, (hereinafter Called FIRST PARTY, Which Expression shall unless repugnant to the context or meaning therefore be deemed to include its successors-in-business, executors, administrators, and lawful assigns) AND M/s XYZ (Hereinafter Called SECOND PARTY, Which Expression shall unless repugnant to the context or meaning therefore be deemed to include its successors-in-business, executors, administrators, and lawful assigns) WHEREAS the FIRST PARTY wants to carry out the business of retailing, storing such products on the below mentioned property belonging to/leased by the SECOND PARTY. Detailed Description of Work to Be Performed ________________________ agrees to perform in a good and workmanlike manner, all work detailed in the Specifications Sheet which is annexed hereto as Exhibit A, which is incorporated herein by reference. Any modifications or alterations from the herein contained terms and conditions annexed must be done in writing. WHEREAS after mutual discussion party of FIRST PARTY selected air conditioned show room of SECOND PARTY measuring about 150 Sq. mt. located at GK-I , New Delhi as Outlet for sale on retail of said products-------------------- and therefore the parties have entered into this agreement on following terms and conditions; 1. That both the parties agree that the proposed retail showroom is to be exclusively used as retail out let for the products supplied by the party of FIRST PARTY. Any additional premises if offered by the SECOND PARTY shall be added with the mutual approval by both the parties. 2. All the renovation charges like air conditioning, flooring, ceiling, lighting and all glasswork, electric fitting, generator/inverter sets, etc. will be provided by the SECOND PARTY as per specification/instructions/drawings and requirements of the party of first part. Architect will be provided or fixed by the party of first part. 3. All interior decoration work including the wood work, wall modules, floor modules, cash counters, shall be supplied and installed at the cost of FIRST PARTY which will be subsequently adjusted between the parties as expenses. 4. That the agreement shall come into effect from ---------- The FIRST PARTY shall dispatch and deliver the goods to the SECOND PARTY on consignment basis at the showroom premises. The Freight of goods sent on consignment shall be borne by the FIRST PARTY i.e. the goods/products shall be supplied to the SECOND PARTY on F.O.R. basis. at Show room. 5. The FIRST PARTY will supply stationary/packing materials free of cost and other items required by the SECOND PARTY to facilitate the customers as and when required. 6. That all the expenses at any stage in all conditions and circumstances of advertisements will be borne and arranged by the FIRST PARTY to promote the sales of the product of the Company. 7. That this agreement is for the period of-------- from the date of opening of the showroom. Which may be extended mutually agreed on revised terms. 8. Any variation in the terms and conditions of this agreement will be done by the mutual Consent of the parties hereto, which must be reduced into writing and shall from part and parcel of this agreement. PAYMENT SCHEDULE WORK DESCRIPTION PERCENT PAYABLE OF TOTAL COST Deposit to Begin Work Electric Roughed Rough Heating System Completed Insulation Completed Plasterwork Completed Finish Heating Completed Interior Trim Installed Interior Doors Installed Cabinets & Tops Installed Concrete Floor Completed Ceramic Tile Flooring Completed Carpeting Completed Finish Electric Completed Interior Painting Completed Appliances Installed Sprinkler System Installed ________________________% ________________________% ________________________% ________________________% ________________________% ________________________% ________________________% ________________________% ________________________% ________________________% ________________________% ________________________% ________________________% ________________________% ________________________% ________________________% Completion time The works should be completed in _______30______ (months/weeks/days) from the date of this Agreement. The time period may be extended in writing by mutual consent of both the parties. Any delay in completing the construction on behalf of the constructor, within the given time period will render him liable to pay liquidated damages. @ Rs. *____________ per day which will be deducted from the payments. The first party may also cancel the contract and take recourse to such other action as deemed appropriate once the total amount of liquidated damages exceeds 2 % of the contract amount. (Note: The amount of liquidated damages per day should be determined at 0.05 % of the contract value of the works and indicated here). IN WITNESS WHEREOF the parties hereto have set their hands and seals on this the day of (FIRST WITNESSES: 1. 2. , 20 PARTY) . (SECOND PARTY)