Grade Level: Grade 11 Subject: TLE (EIM NC II- 640 Hours) Week of the Most Essential Learning competencies Lesson Exemplar/ LR developer Quarter/ Grading Learning resources Period available QUARTER 1 LESSON: INSTALL ELECTRICAL LIGHTNING SYSTEMS, AUXILIARY OUTLETS AND LIGHTNING FIXTURES Link (if available online) Assessment (provide a link if online) LO 2. Install electrical lightning systems, auxiliary outlets and lighting fixture TLE-Module 1 Learners Material, IA-Electrical Installation and Maintenance First Edition 2018 Authors: Marino Cueto and Roman Cabusora / DepEd-Bureau of Learning Resources 2.1 Select appropriate electrical tools, equipment and material for specific Information Sheet 2.1 Wires and Cable Self-Check 2.1 Wire and Cables 2.2 Apply suitable wiring method for the job Information Sheet 2.2 Common Electrical Symbols Self-Check 2.2 Analyze Electrical Symbols 2.3 Install electrical wiring systems using different types of wiring methods Circuit with one bulb controlled by surface or flush type single pole switch Circuit using 3-way switches in two location Information Sheet 2.3 Wiring Diagram Activity Sheet 2.1 Wiring Diagram Information Sheet 2.4 Flexible 1 Week of the Quarter/ Grading Period Most Essential Learning competencies Combination of lightning and convenience Lesson Exemplar/ Learning resources available Armored Cable Wiring LR developer Link (if available online) Assessment (provide a link if online) Self-Check 2.4 Flexible Armored Cale Wiring Activity Sheet 2.2 Flexible Armored Cale Wiring Installation Activity Sheet 2.3 Flexible Armored Cale Wiring Installation Information Sheet 2.5 Non- Metallic Sheathed Cable Self-Check 2.5 Non- Metallic Sheathed Cable Information Sheet 2.6 Flexible Metallic Tubing (FMT) Self-Check 2.6 Flexible Metallic Tubing (FMT) Activity Sheet 2.4 Cut Flexible Metallic Tubing Activity Sheet 2.4 Install Flexible Metallic Tubing (FMT) 2 Week of the Quarter/ Grading Period Most Essential Learning competencies Lesson Exemplar/ Learning resources available LR developer Link (if available online) Assessment (provide a link if online) QUARTER 2 LESSON: INSTALL ELECTRICAL LIGHTING SYSTEMS, AUXILIARY OUTLETS AND LIGHTING FIXTURES LO2.Install electrical lighting systems, auxiliary outlets and lighting fixtures TLE-Module 1 Learners Material, IA-Electrical Installation and Maintenance First Edition 2018 1.1 Select appropriate electrical tools equipment and materials for the specific job Information Sheet 2.7 Rigid Steel Conduit Information Sheet 2.8 Intermediate Metallic Tubing (IMT) Authors: Marino Cueto and Roman Cabusora / DepEd-Bureau of Learning Resources Self-Check 2.7 Rigid Steel Conduit Activity Sheets 2.7 Rigid Steel Conduit (Elbow Bend) 3 Week of the Quarter/ Grading Period Most Essential Learning competencies Lesson Exemplar/ Learning resources available Information Sheet 2.9 Ra Act 7832 1.2 Apply suitable wiring method for the job Anti Electric and 1.3 Install electrical wiring systems using different types Electric of wiring methods Transmission Circuit with one bulb controlled by surface Line/Materials or flush type single pole switch Pilferage Act Of Circuit using 3-way switches in two locations 1994 Combination of lighting and convenience LR developer Link (if available online) Assessment (provide a link if online) Activity Sheets 2.8 Rigid Steel Conduit (Offset Bend) Activity Sheets 2.9 Install Rigid Steel Conduit Self-Check 2.8 Intermediate Metallic Tubing Activity Sheets 2.10 Install Intermediate Metallic Tubing (IMT) Self-Check 2.9 Republic Act No. 7832 QUARTER 3 LESSONS: INSTALL WIRING DEVICES FOR FLOOR AND GROUND FAULT CURRENT INTERRUPTING OUTLETS LO1: Select the wiring devices used for floor and ground fault interrupter Interpret plan/ drawing for the selection of wiring devices based on job requirement Identify the correct quantity of wiring martials Information Sheet 1.1 Interpret Electrical Wiring Plan Authors: Marino Cueto and Roman Cabusora / DepEd-Bureau Self-Check 1.1 Interpret Electrical Wiring Plan 4 Week of the Quarter/ Grading Period Most Essential Learning competencies and devices to be used based on job requirement Select tools and equipment to be used based on the job requirement Select appropriate Personal Protective Equipment (PPE) Lesson Exemplar/ LR developer Learning resources available Information Sheet of Learning 1.2 Type of Wiring Resources Devices Information Sheet 1.3 Select Tools and Equipment Link (if available online) Assessment (provide a link if online) Self-Check 1.2 Type of Wiring Devices Self-Check 1.3 Select Tools and Equipment Activity Sheet 1.1 Select Tools and Equipment LO2: Install the wiring devices for floor and ground fault current interrupter based on PEC standard Interpret plan/drawing based on the job requirement Install the wiring devices for floor and ground fault current interrupter in accordance with the PEC Observed safety procedure in installing the wiring devices for the floor and ground fault current interrupter in accordance with OHS the procedures Information Sheet 2.1 PEC Provision in installing electrical boxes Self-Check 2.1 Electrical Boxes Activity Sheet 2.1 Installing Box in Finished Space Activity Sheet 2.2 Installing Electrical Boxes in Wiring Board Information Sheet 2.2 NEC Provisions on Installing Wiring Boxes Activity Sheet 2.3 Installation of Wiring Devices for Floor and Ground 5 Week of the Quarter/ Grading Period Most Essential Learning competencies Lesson Exemplar/ Learning resources available LR developer Link (if available online) Assessment (provide a link if online) Fault Current Interrupting Outlets QUARTER 4 LESSONS: INSTALL WIRING DEVICES FOR FLOOR AND GROUND FAULT CURRENT INTERRUPTING OUTLETS TLE-Module 1 Authors: Learners Material, Marino Cueto IA-Electrical and Roman Installation and Cabusora / Maintenance DepEd-Bureau First Edition 2018 of Learning Resources Information Sheet 2.3 Observe Safety Procedures Activity Sheet 6 Week of the Quarter/ Grading Period Most Essential Learning competencies Lesson Exemplar/ Learning resources available LR developer Link (if available online) Assessment (provide a link if online) 7 8