Uploaded by aiman daniel

Assignment 1 and 2

advertisement
Bachelor of Mechanical Engineering
Department of Mechanical Engineering
Assignment 1 MEMB 453/4013 Sem 2 2020/2021
Jan/Feb 2021
Assignment 1 (10 marks)
Case Study : Fukushima Nuclear Power Plant Disaster due to earthquake and tsunami
This is a case study article.
1.
2.
3.
4.
5.
Please find out and explain on the discontinuities that were investigated by VT.
Concepts and methods used in VT inspection after the disaster.
Findings from the disaster.
Suggest your own method and give justification for improvement.
Lessons learnt.
Assignment 2 (20 marks)
Case Study : Chernobyl Nuclear Power Plant Disaster and Fukushima Power Plant
Disaster
This is a case study article.
1.
2.
3.
4.
5.
Please find out and explain on the discontinuities that were investigated by PT.
Concepts and methods used in PT inspection after the disaster.
Findings from the disaster.
Suggest your own method and give justification for improvement.
Lessons learnt.
Download