Sr. No. Following Drawings to be submitted along with Offer 1 COMPLIANCE ON THE TECHNICAL SPECIFICATION (G.T.P. AS PER ABOVE FORMAT) 2 MANUFACTURING QUALITY PLAN (MQP) 3 TYPE TEST REPORT OF AVAILABLE / EXISTING SIMILAR TYPE / CONSTRUCTION, SIMILAR OR HIGHER RATING OF THE TRANSFORMER (NOT BE OLDER THAN 5 YEARS) Sr. No. Following Drawings to be submitted post award of contract 1 GA OF TRANSFORMER 2 BOM & MAKE LIST 3 RATING & DIAGRAM PLATE 4 HV CABLE BOX 5 LV CABLE BOX 6 GA OF MARSHALLING BOX 7 MARSHALLING BOX WIRING DIAGRAM PLATE 8 FOUNDATION PLAN 9 HV BUSHING DRAWING 10 LV BUSHING DRAWING 11 EARTH SHIELD BUSHING DRAWING 12 INSTALLATION and O&M MANUAL 13 TRANSFORMER COOLING CALCULATION 14 FACTORY ACCEPTANCE TEST (FAT) PROCEDURE