safe and healthy workplace - employees and visitors. comply with all relevant legislation (FMA, OSHA etc). prioritize hazard control, accident prevention and rehabilitation. Safety and health –individual & shared responsibility of ALL employees. Priority : Safety and health = production Definition of work-related accident : 4 consecutive medical leave Integrate safety and health into all aspects Maintain a safe and healthy work actions. Promote communication on safety and health. Plan, develop, implement and monitor the safety and health programs. Work in a safe and healthy manner. Encourage others - work in safe and healthy manner.• Co-operate , support and promote safety and health. Report any unsafe conditions Endeavor to reach consensus through the process of joint consultation. Jointly work with responsible for managing safety and health in FCMA. 1373 WORKERS 7 JAPANESE 9 NEPALESE 32 VIETNAMESE 86 INDONESIAN REMAINING- MALAYSIANS 6 SECTIONS ◦ ◦ ◦ ◦ ◦ ◦ ADMINISTRATIVE QUALITY CHECK PART PRODUCTION RELAY PRODUCTION KEYBOARD PRODUCTION PURCHASING EACH SECTION HAVE OWN SHC ◦ SMALL SECTION : 2 MANAGEMENT, 2 EMPLOYEES ◦ LARGE SECTION ; 4 MANAGEMENT, 4 EMPLOYEES ◦ TOTAL NUMBER OF WORKERS IN SHC – 52 WORKERS TOTAL NUMBER OF WORKERS IN SHC – 52 WORKERS ENGINEERS ARE IN EXECUTIVE LEVEL EACH SECTION(PRODUCTION RELATED) ◦ 1 OR 2 ENGINEERS OVERSEE RESPONSIBILITIES -INVESTIGATE STATION FAULTY -PROVIDE IMPROVEMENT SCHEMES FOR HAZARDOUS -SUBORDINATES SAFETY -REPORT INCIDENTS AND NEAR MISSES WITHIN 3 DAYS TO MANAGEMENT Hierarchy- based Workers to section supervisor , then to management Online softcopy reporting Emergency accidents – immediate actions then report Section engineers report within 3 days to OSH management OSH management report to DOSH within 7 days. OSH management prepare statistics on incidents every 3 months. Internal training- RM10k OSH promotion – RM 20k Maintenance – RM 40k to 50k Medical fund – RM 40k to 50k BACKGROUND ◦ A worker’s lost 3 fingers when operating injection molding machine. ◦ DOSH interfered the investigation, company engineers started up investigations and report writing. ROOT CAUSE ◦ Human behaviour, poor supervisory performance, loose rule enforcement, long working hours. ◦ Worker tends to skip precautionary step, remove hand once placed pellets. ROOT CAUSE ◦ Place pellet into machine and press 1 button only. CORRECTIVE ACTIONS ◦ Management control – enforce strict rules, tighter supervision, mandatory interwork breaks ◦ Wear PPE ◦ Engineering control – built in proximity sensors, 2 buttons- make sure both hands are out of platform. HAZARD IDENTIFICATION– INJECTION MOLDING PROCESS RISK ASSESSMENT- WORKERS’ HAND GOT CLAMPED RISK CONTROL – ◦ ELIMINATION-Ban injection molding (impossible) ◦ SUBSTITUTION – consider alternative process or automated injection molding machines ◦ ENGINEERING CONTROL – creatively modify the injection molding machine with extra safety features ◦ MANAGEMENT CONTROL- impose strict SOP and tight supervision ◦ PPE – Provide relevant PPE for workers