Uploaded by A vantejkay

ANSWER (Group4) Task 2 - MRP

advertisement
EIB 20603 SUPPLY CHAIN MANAGEMENT
TASK 2: MRP
GROUP: 4
Student Name
Id No.
Muhammad Zahier Bin Mohamad Yunos
62214119468
Syarah Nadiah Binti Rosli
62212119570
Nur Najihah Binti Abdul Karim
62212119157
Nur Aishah Binti Adnan
62212119064
Nur Syazwina Binti Kamarul Azhar
62214119370
TASK 2
a) Based on the product structure tree above, determine Bills of Materials (BOM) for the
quantities of B, C, D, E, and F needed to assemble 650 X's, if you have the following
in inventory:
Component
On Hand Inventory
B
150
C
85
D
67
E
114
ANSWER :
B: 2 X 650 = 1300
C : 1 X 650 = 650
-150
– 85
= 1150
= 565
D : 3 X 1150 = 3450
-67
E : 1 x 1150 = 1150
E : 2 x 565 = 1130
F : 2 x 565 = 1130
= 3383
E : 4 X 3383 = 13,532
-114
= 13,418
Thus, given the amounts of on-hand inventory, 650 X will require:
B: 1150
E: 15,698 (=13,418 + 1150 + 1130)
D: 3383
F: 1130
C: 565
b) Consider the two product structure trees shown above, develop a MRP for item D. Given that
the master schedule calls for 780 units of A in week 4 and 1850 units of C in week 6. There is
a beginning inventory of 390 units of D on hand and all items have lead times of ONE week.
ANSWER :
Week Number
0
1
2
3
4
Quantity of A
5
6
780
Quantity of C
Item A LT: 1 Week
1850
0
1
2
3
4
Gross Requirement
5
6
780
Scheduled Receipts
Projected on Hand
Net Requirement
780
Planned order Receipts
780
Planned order Releases
Item A LT: 1 Week
780
0
1
2
3
4
5
Gross Requirement
6
1850
Scheduled Receipts
Projected on Hand
4
Net Requirement
1850
Planned order Receipts
1850
Planned order Releases
1850
Times 2
“Solution – MRP for Item D”
Item A LT: 1 Week
0
1
2
Gross Requirement
3
4
780
5
3700
Scheduled Receipts
Projected on Hand
390
390
Net Requirement
0
390
3700
Planned order Receipts
0
390
3700
Planned order Releases
390
390.
390
0
6
Download