EIB 20603 SUPPLY CHAIN MANAGEMENT TASK 2: MRP GROUP: 4 Student Name Id No. Muhammad Zahier Bin Mohamad Yunos 62214119468 Syarah Nadiah Binti Rosli 62212119570 Nur Najihah Binti Abdul Karim 62212119157 Nur Aishah Binti Adnan 62212119064 Nur Syazwina Binti Kamarul Azhar 62214119370 TASK 2 a) Based on the product structure tree above, determine Bills of Materials (BOM) for the quantities of B, C, D, E, and F needed to assemble 650 X's, if you have the following in inventory: Component On Hand Inventory B 150 C 85 D 67 E 114 ANSWER : B: 2 X 650 = 1300 C : 1 X 650 = 650 -150 – 85 = 1150 = 565 D : 3 X 1150 = 3450 -67 E : 1 x 1150 = 1150 E : 2 x 565 = 1130 F : 2 x 565 = 1130 = 3383 E : 4 X 3383 = 13,532 -114 = 13,418 Thus, given the amounts of on-hand inventory, 650 X will require: B: 1150 E: 15,698 (=13,418 + 1150 + 1130) D: 3383 F: 1130 C: 565 b) Consider the two product structure trees shown above, develop a MRP for item D. Given that the master schedule calls for 780 units of A in week 4 and 1850 units of C in week 6. There is a beginning inventory of 390 units of D on hand and all items have lead times of ONE week. ANSWER : Week Number 0 1 2 3 4 Quantity of A 5 6 780 Quantity of C Item A LT: 1 Week 1850 0 1 2 3 4 Gross Requirement 5 6 780 Scheduled Receipts Projected on Hand Net Requirement 780 Planned order Receipts 780 Planned order Releases Item A LT: 1 Week 780 0 1 2 3 4 5 Gross Requirement 6 1850 Scheduled Receipts Projected on Hand 4 Net Requirement 1850 Planned order Receipts 1850 Planned order Releases 1850 Times 2 “Solution – MRP for Item D” Item A LT: 1 Week 0 1 2 Gross Requirement 3 4 780 5 3700 Scheduled Receipts Projected on Hand 390 390 Net Requirement 0 390 3700 Planned order Receipts 0 390 3700 Planned order Releases 390 390. 390 0 6