Pharmacy Management System ISP-19-004 Pharmart Pharmacy 01 Introduction 1.1 problem Specification, 1.2 Solution Outline, 1.3 Key Benefits 02 Objectives 03 Procedures 3.1 Flow of the project, 3.2 Project Plan 04 Personnel & Facilities 05 Hardware,Software requirements 06 Budget Our Team Style 1.Introduction 1. Problem Specification Current System • • • • • • • • • • Since four years supplies and distributes drugs to customers Manual searching of medicine on shelf Maintain stock details manually Maintain staff details manually Calculate total bill manually No registry about regular customers No registry about frequent prescriptions Retrieving previous data is not clear No proper re-ordering process Supplier details are handled manually Problems of the Current System • • • • • • • • • Information maintenance difficulties Lack of high performance Lack of accuracy Reduced efficiency Improper stock handling Improper staff handling Improper supplier handling Unsatisfied customers Reducing frequent customers 1.2 Solution Outline Staff Management Owner Supplier and Order Management Pharmacist Stock Management Cashier Bill and Sales Management 1.2.1. High Level Architecture Diagram 1.3 Key Benefits • • • • • • • • • Make the management of the organization easy Improves Service Retrieve Better Information Improves Integrity and Security Increases productivity and profitability Offers centralized data storage facility as well as easy and interactive retrieval of data Improves usability Maintains proper stock Improves performance of the system 2. Objectives Stock Returns Stock details Supplier details Staff details & Staff Salaries Cash Billing Financial Management 3.Procedures 3.1 Methodology Project Plan • • • • Total time duration for the project is twelve weeks. Divide project activities according to the System development Life Cycle. Complete all the tasks within the allocated time. Finish the project in time. Requirement Analysis • • • • During the 1st week. Gather Requirements. Feasibility study. Analyze requirements. 85% Design • • • • Time duration- 2nd week to 5th week. Logical Design. Interface design. Database design. Development • • • • Time Duration – 5th week to 11th week. Front End development. Backend development. Database Connection Development. 35% 65% 45% Testing and Exception Handling • • • • During Last week Test database connection. Test the software with sample data. Handle all exceptions. Plan Summary Testing & Exception Handling Design 1 Week Requirements Analysis 4 Weeks 6 Weeks Development 1 Week 12 Weeks 3.2 Gantt Chart Figure 3.2.1 4.Personnel and Facilities • • • • • Consists of a group of 04 members System consists of 04 main CRUD functions Each member develops his/her prioritized CRUD function Every member should handle their function from “End – to – End” Each member should cover all the stages of the SDLC 01 Project Role Wijayawardena G.C.S Medicine Management Involved Recourses • Adding medicine details and maintain a proper stock • Update medicine details Involved Recourses 03 03 04 Project Role Wickramaratne U.I Sasanka H.D Staff Management Project Role Sales Management Malshani H.N Project Role Supplier Management • Create a record of staff members • Update staff member details Involved Recourses • Add prescription details and calculate total dose • View the calculated total bill • Update prescription table and stock Involved Recourses • Add suppliers to supplier table • Delete suppliers • View medicine details • Delete unwanted medicine details • Delete unwanted member details • View stored member details • Add new drugs to current prescription • Delete • Request orders • Update supplier table 5. Hardware, Software Requirements Software & Hardware Requirements • “C# language” is used to implement as it’s a “Desktop Application” • C# is one of the most acceptable, organized and popular language • Efficient in erasing and removing garbage in the system • Consists of strong memory backup • Rich class libraries Implementation Software Requirements Visual Studio MySQL MS Office Excel My SQL WAMP Hardware Requirements Run 2.6 GHz Intel Dual Core or equivalent 2 GB Memory 1.5 GB of free disk space Software Requirements Windows XP or Higher My SQL server Hardware Requirements Client 2.0 GHz Pentium Dual Core or higher 2GB of RAM 800x600 minimum resolution or higher 6. Budget Project Title: Pharmart Pharmacy Management System Duration of Project : 13 Weeks Nature of expenditure/ Item Quantity Amount in Rs. DIRECT COSTS Hardware and Software OS for Laptops Additional storage 10000.00 8000.00 security applications 22’’ touch screen Workstation Pc tower Ups device Development Costs Developer cost Testing cost 1200.00 25000.00 50000.00 25000.00 Direct Costs 179,200.00 50000.00 10000.00 179,200.00 INDIRECT COSTS Maintenance 10000.00 GRAND TOTAL (total direct costs + Indirect costs) 189,200.00 189,200.00 189,200.00 7.Reference https://www.slideshare.net/HabtamuAsmare/pharmacymanagement-system-requirement-analysis-and-elicitaiondocument (Accessed on 14th July 2019) https://www.youtube.com/watch?v=g-lGXf_9C08 (Accessed on 14th July 2019) https://www.youtube.com/watch?v=oqg7Q8mYS1Y (Accessed on 14th July 2019) https://accesspharmacy.mhmedical.com/content.aspx?bo okid=509&sectionid=41096248 (Accessed on 14th July 2019) Thank You