Chapter 8 Project Quality Management PMP, CAPM, PgMP, PMI-SP , PMI-RMP, OPM3 and PMBOK are registered marks of Project Management Institute, Inc Inov8Solutions Inc – Quality Educational Services For Professionals www.Inov8Solutions.com 8-1 Project Quality Management Contents The topics covered in this chapter are: • Define Quality Management • Quality Management processes • Quality Management terms and definitions PMP, CAPM, PgMP, PMI-SP , PMI-RMP, OPM3 and PMBOK are registered marks of Project Management Institute, Inc Inov8Solutions Inc – Quality Educational Services For Professionals www.Inov8Solutions.com 8-2 Project Quality Management Learning Objectives By the end of this chapter, you should be able to: • Explain the purpose and importance of Quality Management • Explain Project Quality Management Facts & Terms • Name the Project Quality Management Processes PMP, CAPM, PgMP, PMI-SP , PMI-RMP, OPM3 and PMBOK are registered marks of Project Management Institute, Inc Inov8Solutions Inc – Quality Educational Services For Professionals www.Inov8Solutions.com 8-3 Project Quality Management Definition Project Quality Management • Processes • Activities That determine • Quality policies • Objectives • Responsibilities So the project will • Satisfy the needs for which it was undertaken PMP, CAPM, PgMP, PMI-SP , PMI-RMP, OPM3 and PMBOK are registered marks of Project Management Institute, Inc Inov8Solutions Inc – Quality Educational Services For Professionals www.Inov8Solutions.com 8-4 Review Quiz Quality can be defined as A. Making sure the customer gets more than what they ask for B. The degree to which the project meets requirements C. Keeping the company culture in mind D. To complete the project on time PMP, CAPM, PgMP, PMI-SP , PMI-RMP, OPM3 and PMBOK are registered marks of Project Management Institute, Inc Inov8Solutions Inc – Quality Educational Services For Professionals www.Inov8Solutions.com Review Quiz Quality is ultimately the responsibility of A. The Executive Sponsors B. The Quality Manager C. The Project Manager D. The team members PMP, CAPM, PgMP, PMI-SP , PMI-RMP, OPM3 and PMBOK are registered marks of Project Management Institute, Inc Inov8Solutions Inc – Quality Educational Services For Professionals www.Inov8Solutions.com Marginal Analysis • To produce high quality (defect free) products and services is… – more expensive – less expensive Kamran note: introduce a pause after asking “Is it MORE or LESS…?” Marginal Analysis - Discover point where • Benefit equals cost • Stop improving quality beyond this point PMP, CAPM, PgMP, PMI-SP , PMI-RMP, OPM3 and PMBOK are registered marks of Project Management Institute, Inc Inov8Solutions Inc – Quality Educational Services For Professionals www.Inov8Solutions.com 8-7 What is Quality? Take a moment to give this some thought, how do you define quality? Kamran note: Put a pause here, let the student click continue button before showing the next bullet Quality is the degree to which a set of inherent characteristics fulfills requirements. Kamran note: Animate Gold Plating and Not acceptable (as text or graphics) when narrator mentions these words PMP, CAPM, PgMP, PMI-SP , PMI-RMP, OPM3 and PMBOK are registered marks of Project Management Institute, Inc Inov8Solutions Inc – Quality Educational Services For Professionals www.Inov8Solutions.com 8-8 Defect Free Choices • Path A • Build, Inspect, Fix, Inspect, Fix again, Inspect again, Fix one last time and Deliver • Quality is expensive and unreliable • Path B • Define, Measure, Analyze, Improve and Control • Quality is less expensive and more dependable • Kamran Note: Please animate this slide. Which is the right Path ? Obviously Path B PMP, CAPM, PgMP, PMI-SP , PMI-RMP, OPM3 and PMBOK are registered marks of Project Management Institute, Inc Inov8Solutions Inc – Quality Educational Services For Professionals www.Inov8Solutions.com 8-9 Quality Management Facts and Terms PMP, CAPM, PgMP, PMI-SP , PMI-RMP, OPM3 and PMBOK are registered marks of Project Management Institute, Inc Inov8Solutions Inc – Quality Educational Services For Professionals www.Inov8Solutions.com 8-10 Errors & Rework • Overworking project team • Employee Attrition • Errors • Rework • Rushing quality inspections • Errors PMP, CAPM, PgMP, PMI-SP , PMI-RMP, OPM3 and PMBOK are registered marks of Project Management Institute, Inc Inov8Solutions Inc – Quality Educational Services For Professionals www.Inov8Solutions.com 8-11 Quality Vs. Grade Quality is the degree to which a set of inherent characteristics fulfill requirements Grade is a category or rank used to distinguish items that have the same functional use, but do not share the same requirements for quality. For example: different hammers may need to withstand different amounts of force Low Quality level not meeting quality requirements is always a problem, but low Grade is not a problem E.g., Tires manufactured for speed racing are of higher Grade when compared to normal driving tires. PMP, CAPM, PgMP, PMI-SP , PMI-RMP, OPM3 and PMBOK are registered marks of Project Management Institute, Inc Inov8Solutions Inc – Quality Educational Services For Professionals www.Inov8Solutions.com 8-12 Precision Vs. Accuracy Precision means values of repeated measurements are clustered ; have little scatter Accuracy means that measured value is very close to the true value Precise measurements are not necessarily accurate and Accurate measurements are not necessarily precise Kamran note: Please use similar image, above images were googled for your reference. Picture 2 is an example of precise, picture 3 an example of accurate. Can also use a bulls eye image(picture 4) to show accuracy PMP, CAPM, PgMP, PMI-SP , PMI-RMP, OPM3 and PMBOK are registered marks of Project Management Institute, Inc Inov8Solutions Inc – Quality Educational Services For Professionals www.Inov8Solutions.com 8-13 Quality Management Terms Customer Satisfaction • Conformance to requirements • Project produces intended product • Fitness for use • Product or service must satisfy real needs Prevention Vs. Inspection • Cost of preventing mistakes is much less than cost of correcting them when they are found by inspection • Quality must be planned in, not inspected in PMP, CAPM, PgMP, PMI-SP , PMI-RMP, OPM3 and PMBOK are registered marks of Project Management Institute, Inc Inov8Solutions Inc – Quality Educational Services For Professionals www.Inov8Solutions.com 8-14 Gold Plating Giving the customer extras • Functionality • Quality • Scope • Performance PMP, CAPM, PgMP, PMI-SP , PMI-RMP, OPM3 and PMBOK are registered marks of Project Management Institute, Inc Inov8Solutions Inc – Quality Educational Services For Professionals www.Inov8Solutions.com 8-15 Kaizen Kaizen or Continuous Improvement • Synonymous terms • Kaizen • • Kai = Change Zen = Good or Make better • To continuously improve upon • Three step process • • • • Identify ways to make improvements Implement changes Measure impact of changes Toyota Production System (TPS) • • • Muri = Overburden Mura = Unevenness Muda = Wasteful Kamran Note: animate graphic so parts appear gradually (and perhaps disappear/fade out). See if you can find graphics for muri, mura and moda. PMP, CAPM, PgMP, PMI-SP , PMI-RMP, OPM3 and PMBOK are registered marks of Project Management Institute, Inc Inov8Solutions Inc – Quality Educational Services For Professionals www.Inov8Solutions.com 8-16 Just In Time Just in time (JIT) • Decrease of inventory • Decrease in investment in inventory • Forces attention to quality • Narration note: JIT is pronounced as a word jit, do not spell letters Jay, eye, tee PMP, CAPM, PgMP, PMI-SP , PMI-RMP, OPM3 and PMBOK are registered marks of Project Management Institute, Inc Inov8Solutions Inc – Quality Educational Services For Professionals www.Inov8Solutions.com 8-17 Cost of Quality (COQ) Method of determining the cost incurred to ensure quality, includes cost of • • Conformance • Prevention and appraisal costs • Quality planning • Quality control • Quality assurance Non-conformance • Failure costs • Rework – products, components or processes • Warranty work and waste • Reputation PMP, CAPM, PgMP, PMI-SP , PMI-RMP, OPM3 and PMBOK are registered marks of Project Management Institute, Inc Inov8Solutions Inc – Quality Educational Services For Professionals www.Inov8Solutions.com 8-18 Total Quality Management (TQM) Key words • Continuously improve • Quality of products • Business practices • At every level of the organization The entire organization has responsibilities relating to quality. PMP, CAPM, PgMP, PMI-SP , PMI-RMP, OPM3 and PMBOK are registered marks of Project Management Institute, Inc Inov8Solutions Inc – Quality Educational Services For Professionals www.Inov8Solutions.com 8-19 Quality Management End of Facts and Terms PMP, CAPM, PgMP, PMI-SP , PMI-RMP, OPM3 and PMBOK are registered marks of Project Management Institute, Inc Inov8Solutions Inc – Quality Educational Services For Professionals www.Inov8Solutions.com 8-20 Project Quality Management Processes Process Process Group Plan Quality Management Planning Performa Quality Assurance Executing Control Quality Monitoring and Controlling PMP, CAPM, PgMP, PMI-SP , PMI-RMP, OPM3 and PMBOK are registered marks of Project Management Institute, Inc Inov8Solutions Inc – Quality Educational Services For Professionals www.Inov8Solutions.com Project Quality Management Processes As mentioned in previous slide, Project Quality Management includes below processes: • Plan Quality Management Process • The process of identifying quality requirements and/or standards for the project and product, and documenting how the project will demonstrate compliance • Perform Quality Assurance Process • The process of auditing the quality requirements and the results from quality control measurements to ensure appropriate quality standards and operational definitions are used • Control Quality Process • The process of monitoring and recording results of executing the quality activities to assess performance and recommend necessary changes Kamran note: display main headings without definitions. Definitions to be displayed when narration discusses them. PMP, CAPM, PgMP, PMI-SP , PMI-RMP, OPM3 and PMBOK are registered marks of Project Management Institute, Inc Inov8Solutions Inc – Quality Educational Services For Professionals www.Inov8Solutions.com 8-22 Review Quiz Which of the following is not one of the Quality Management processes? A. Review Quality Planning B. Plan Quality Management C. Performed Quality Assurance D. Control Quality PMP, CAPM, PgMP, PMI-SP , PMI-RMP, OPM3 and PMBOK are registered marks of Project Management Institute, Inc Inov8Solutions Inc – Quality Educational Services For Professionals www.Inov8Solutions.com Plan Quality Management Plan Quality Management process • Identifying • • Quality requirements Standards • Documenting • How the project will demonstrate compliance Kamran note: Animate no-surprises via some graphic display following when the narrator says “Here is the full definition again.” Plan Quality Definition Process of identifying quality requirements and/or standards for the project and product, and documenting how the project will demonstrate compliance. PMP, CAPM, PgMP, PMI-SP , PMI-RMP, OPM3 and PMBOK are registered marks of Project Management Institute, Inc Inov8Solutions Inc – Quality Educational Services For Professionals www.Inov8Solutions.com 8-24 Plan Quality Management Considerations • Performed in parallel with other planning processes • Project Manager is responsible for the quality of the product or the Project • Senior Management has the ultimate responsibility for quality in the organization as a whole • Impact of poor quality results in: – – – – Lower customer satisfaction Increased cost of the product Increased risk Low Morale PMP, CAPM, PgMP, PMI-SP , PMI-RMP, OPM3 and PMBOK are registered marks of Project Management Institute, Inc Inov8Solutions Inc – Quality Educational Services For Professionals www.Inov8Solutions.com 8-25 Plan Quality Management Inputs and Outputs Kamran note: Please take text from attached graphic and animate in an Exercise format, where we let students Drag and drop input/output in correct boxes Let’s discuss this on our next call PMP, CAPM, PgMP, PMI-SP , PMI-RMP, OPM3 and PMBOK are registered marks of Project Management Institute, Inc Inov8Solutions Inc – Quality Educational Services For Professionals www.Inov8Solutions.com Plan Quality Management Tools And Techniques • Cost Benefit Analysis • Cost of Quality (COQ) • Control Charts • Kamran note: please copy graphic sighting source as wikipedia PMP, CAPM, PgMP, PMI-SP , PMI-RMP, OPM3 and PMBOK are registered marks of Project Management Institute, Inc Inov8Solutions Inc – Quality Educational Services For Professionals www.Inov8Solutions.com 8-27 Tools and Techniques Continued • • • • • Benchmarking Design of Experiments (DOE) Statistical Sampling Flowcharting Quality Management Methodologies PMP, CAPM, PgMP, PMI-SP , PMI-RMP, OPM3 and PMBOK are registered marks of Project Management Institute, Inc Inov8Solutions Inc – Quality Educational Services For Professionals www.Inov8Solutions.com 8-28 Additional Quality Planning Tools Some additional tools you might consider for your projects •Brainstorming •Affinity diagrams •Force field analysis •Nominal group techniques •Matrix diagrams •Prioritization matrices PMP, CAPM, PgMP, PMI-SP , PMI-RMP, OPM3 and PMBOK are registered marks of Project Management Institute, Inc Inov8Solutions Inc – Quality Educational Services For Professionals www.Inov8Solutions.com 8-29 Perform Quality Assurance Definition • Auditing Quality requirements • Auditing results from Quality Control Measurements • Ensures proper use of • appropriate quality standards • operational definitions Key points • Quality Assurance group • Continuous process improvement • Eliminates activities that do not add value • Increase process efficiency PMP, CAPM, PgMP, PMI-SP , PMI-RMP, OPM3 and PMBOK are registered marks of Project Management Institute, Inc Inov8Solutions Inc – Quality Educational Services For Professionals www.Inov8Solutions.com 8-30 Perform Quality Assurance Inputs and Outputs Kamran note: Please take text from attached graphic and animate in an Exercise format, where we let students Drag and drop input/output in correct boxes Let’s discuss this on our next call PMP, CAPM, PgMP, PMI-SP , PMI-RMP, OPM3 and PMBOK are registered marks of Project Management Institute, Inc Inov8Solutions Inc – Quality Educational Services For Professionals www.Inov8Solutions.com Perform Quality Assurance Tools and Techniques • • • • Quality Audits Process Analysis Plan Quality tools and techniques Perform Quality Control tools and techniques PMP, CAPM, PgMP, PMI-SP , PMI-RMP, OPM3 and PMBOK are registered marks of Project Management Institute, Inc Inov8Solutions Inc – Quality Educational Services For Professionals www.Inov8Solutions.com 8-32 Perform Quality Assurance Tools and Techniques Plan Quality tools and techniques • In Plan Quality Management used to • Determine requirements, procedures and standards • In Perform Quality Assurance used to • Help assess whether the practices and procedures are being followed as planned PMP, CAPM, PgMP, PMI-SP , PMI-RMP, OPM3 and PMBOK are registered marks of Project Management Institute, Inc Inov8Solutions Inc – Quality Educational Services For Professionals www.Inov8Solutions.com 8-33 Perform Quality Assurance Tools and Techniques Control Quality tools and techniques • In Control Quality used • To measure the deliverables according to the plan quality document • In Perform Quality Assurance used • To decide if the measurements meet the planned requirements and standards PMP, CAPM, PgMP, PMI-SP , PMI-RMP, OPM3 and PMBOK are registered marks of Project Management Institute, Inc Inov8Solutions Inc – Quality Educational Services For Professionals www.Inov8Solutions.com 8-34 Control Quality Definition Purpose of Control Quality Process • Monitoring • results of executing the quality activities • Recording • results of executing the quality activities • Purpose • Assess performance • Recommend changes PMP, CAPM, PgMP, PMI-SP , PMI-RMP, OPM3 and PMBOK are registered marks of Project Management Institute, Inc Inov8Solutions Inc – Quality Educational Services For Professionals www.Inov8Solutions.com 8-35 Control Quality Considerations • • • • • Performed throughout the life of the project Mainly during Monitoring and Controlling Standards include project processes and product goals Checks deliverables and results Identifies causes of poor process or product quality and recommends action to eliminate them • Deals with Statistical activities like Sampling and Probability to evaluate quality control outputs PMP, CAPM, PgMP, PMI-SP , PMI-RMP, OPM3 and PMBOK are registered marks of Project Management Institute, Inc Inov8Solutions Inc – Quality Educational Services For Professionals www.Inov8Solutions.com 8-36 Control Quality Inputs and Outputs Kamran note: Please take text from attached graphic and animate in an Exercise format, where we let students Drag and drop input/output in correct boxes Let’s discuss this on our next call PMP, CAPM, PgMP, PMI-SP , PMI-RMP, OPM3 and PMBOK are registered marks of Project Management Institute, Inc Inov8Solutions Inc – Quality Educational Services For Professionals www.Inov8Solutions.com Quality Control Terms PMP, CAPM, PgMP, PMI-SP , PMI-RMP, OPM3 and PMBOK are registered marks of Project Management Institute, Inc Inov8Solutions Inc – Quality Educational Services For Professionals www.Inov8Solutions.com Prevention Vs. Inspection • Prevention • Keeping errors out of the process • Inspection • Keeping errors out of the hands of the customer PMP, CAPM, PgMP, PMI-SP , PMI-RMP, OPM3 and PMBOK are registered marks of Project Management Institute, Inc Inov8Solutions Inc – Quality Educational Services For Professionals www.Inov8Solutions.com 8-39 Attribute Vs. Variable Sampling • Attribute Sampling • Also called Discrete • result either confirms or does not confirm • Variable Sampling • Also called continuous • result is rated on a continuous scale that measures degree of conformity PMP, CAPM, PgMP, PMI-SP , PMI-RMP, OPM3 and PMBOK are registered marks of Project Management Institute, Inc Inov8Solutions Inc – Quality Educational Services For Professionals www.Inov8Solutions.com 8-40 Tolerance Vs. Control Limits • Tolerances • specified range of acceptable results • Control limits • thresholds, which can indicate whether process is out of control PMP, CAPM, PgMP, PMI-SP , PMI-RMP, OPM3 and PMBOK are registered marks of Project Management Institute, Inc Inov8Solutions Inc – Quality Educational Services For Professionals www.Inov8Solutions.com 8-41 Mutually Exclusive Events that cannot occur in a single instance E.g. flipping a coin once can result either in a head or a tail PMP, CAPM, PgMP, PMI-SP , PMI-RMP, OPM3 and PMBOK are registered marks of Project Management Institute, Inc Inov8Solutions Inc – Quality Educational Services For Professionals www.Inov8Solutions.com 8-42 Probability Likelihood of something to happen. Expressed as a percentage. Kamran Note: see if you can put some graphics here, have a red and a blue ball each labeled 45% and 55% respectively. PMP, CAPM, PgMP, PMI-SP , PMI-RMP, OPM3 and PMBOK are registered marks of Project Management Institute, Inc Inov8Solutions Inc – Quality Educational Services For Professionals www.Inov8Solutions.com 8-43 Normal Distribution Most common probability density distribution chart that is in the shape of a bell curve and is used to measure variations PMP, CAPM, PgMP, PMI-SP , PMI-RMP, OPM3 and PMBOK are registered marks of Project Management Institute, Inc Inov8Solutions Inc – Quality Educational Services For Professionals www.Inov8Solutions.com 8-44 Standard Deviation • Standard Deviation – It is a measure of how far the values are from the mean • 3 or 6 sigma – Represents the level of quality that a company aims to achieve – 6 Sigma is near elimination of defects from the process PMP, CAPM, PgMP, PMI-SP , PMI-RMP, OPM3 and PMBOK are registered marks of Project Management Institute, Inc Inov8Solutions Inc – Quality Educational Services For Professionals www.Inov8Solutions.com 8-45 Quality Control Tools Cause and effect Diagram • Ishikawa • Fishbone diagram Kamran, this diagram was taken from wikipedia, please mention source PMP, CAPM, PgMP, PMI-SP , PMI-RMP, OPM3 and PMBOK are registered marks of Project Management Institute, Inc Inov8Solutions Inc – Quality Educational Services For Professionals www.Inov8Solutions.com 8-46 Fishbone Diagram • Fishbone Diagram – Diagram illustrates how various causes and sub causes relate to create potential problems – Creative way to look at the causes of a problem – Helps stimulate thinking, organizes thoughts and generates discussion – Can be used to explore the factors that will results in a desired future outcome – Identifies the main categories of causes – Identifies causes influencing the fact by category PMP, CAPM, PgMP, PMI-SP , PMI-RMP, OPM3 and PMBOK are registered marks of Project Management Institute, Inc Inov8Solutions Inc – Quality Educational Services For Professionals www.Inov8Solutions.com 8-47 Quality Control Tools • Flowchart (used in both Plan Quality Management/Control Quality process) • Histogram • Pareto Chart • Run Chart • Scatter Diagram • Control Chart Kamran note: please show basic example diagrams PMP, CAPM, PgMP, PMI-SP , PMI-RMP, OPM3 and PMBOK are registered marks of Project Management Institute, Inc Inov8Solutions Inc – Quality Educational Services For Professionals www.Inov8Solutions.com 8-48 Pareto Chart • Type of histogram – – – – – Information in priority order Focus attention on most critical issues Prioritizes potential causes of the problems Separates the critical few from the uncritical many Problems causing the greatest number of defects are to be fixed first Vilfredo Pareto developed the 80/20 principle, adapted by Joseph Juran who stated that 80% of the problems are due to 20% of the causes PMP, CAPM, PgMP, PMI-SP , PMI-RMP, OPM3 and PMBOK are registered marks of Project Management Institute, Inc Inov8Solutions Inc – Quality Educational Services For Professionals www.Inov8Solutions.com 8-49 PMP, CAPM, PgMP, PMI-SP , PMI-RMP, OPM3 and PMBOK are registered marks of Project Management Institute, Inc Inov8Solutions Inc – Quality Educational Services For Professionals www.Inov8Solutions.com 8-50 Quality Control Techniques • Checklist – Contains a list of items to inspect or a picture of the item to be inspected with space to note any defects found • Statistical sampling – Inspection of sample of a population – Analysis of sample of a population has the following advantages • • • • Inspection is quicker Cost is less Be constructive When a general opinion that there are not many defects PMP, CAPM, PgMP, PMI-SP , PMI-RMP, OPM3 and PMBOK are registered marks of Project Management Institute, Inc Inov8Solutions Inc – Quality Educational Services For Professionals www.Inov8Solutions.com 8-51 Control Charts • Graphic displays of results over time • Determines if process is in control • Samples taken, variables measured and attributes found PMP, CAPM, PgMP, PMI-SP , PMI-RMP, OPM3 and PMBOK are registered marks of Project Management Institute, Inc Inov8Solutions Inc – Quality Educational Services For Professionals www.Inov8Solutions.com 8-52 Control Chart Terminology – Upper and Lower Control Limits • Acceptable range of variation of a process • shows as two dashed lines on a control chart – Mean • Line in the middle of the control chart • shows middle of the range of acceptable variation of the processes PMP, CAPM, PgMP, PMI-SP , PMI-RMP, OPM3 and PMBOK are registered marks of Project Management Institute, Inc Inov8Solutions Inc – Quality Educational Services For Professionals www.Inov8Solutions.com 8-53 Control Chart Terminology Continued – Specification Limits • Customers expectations or contractual requirements for performance and quality • Can appear either inside or outside of the control limits • Are not calculated based on the control limits but are inputs from the customer PMP, CAPM, PgMP, PMI-SP , PMI-RMP, OPM3 and PMBOK are registered marks of Project Management Institute, Inc Inov8Solutions Inc – Quality Educational Services For Professionals www.Inov8Solutions.com 8-54 Control Chart Analysis • Out of Control – Process is out of state of statistical control under either of two circumstances • A data point falls outside of the upper or lower control limit or • Non-random data points that are still within the upper or lower control limits, such as rule of seven • Rule of Seven – Rule of thumb or heuristic – Refers to non-random data points grouped together in a series that total seven on one side of mean • Assignable Cause – Data point or rule of seven that requires investigation to determine the cause of variation PMP, CAPM, PgMP, PMI-SP , PMI-RMP, OPM3 and PMBOK are registered marks of Project Management Institute, Inc Inov8Solutions Inc – Quality Educational Services For Professionals www.Inov8Solutions.com 8-55 Control Chart Example Identify • Upper control limit • Lower control limit • Mean • Rule of seven PMP, CAPM, PgMP, PMI-SP , PMI-RMP, OPM3 and PMBOK are registered marks of Project Management Institute, Inc Inov8Solutions Inc – Quality Educational Services For Professionals www.Inov8Solutions.com Control Chart Answers Kamran note, please animate by showing arrows and bubbles to show answers PMP, CAPM, PgMP, PMI-SP , PMI-RMP, OPM3 and PMBOK are registered marks of Project Management Institute, Inc Inov8Solutions Inc – Quality Educational Services For Professionals www.Inov8Solutions.com Chapter Summary 1. Project Quality Management Definitions • Marginal analysis, quality vs. grade, precision vs. accuracy, gold plating 2. Project Quality Management Facts and Terms • Kaizen, JIT, Cost of Quality, Total Quality Management PMP, CAPM, PgMP, PMI-SP , PMI-RMP, OPM3 and PMBOK are registered marks of Project Management Institute, Inc Inov8Solutions Inc – Quality Educational Services For Professionals www.Inov8Solutions.com 8-58 Chapter Summary 3. Project Quality Management processes • Plan Quality Management • • Perform Quality Assurance • • Cost Benefit Analysis, benchmarking, Design of Experiments, statistical sampling, flowcharting Quality Audits, Process Analysis Control Quality • Ishikawa, Histograms, Pareto chart, run chart, scatter diagram, control charts PMP, CAPM, PgMP, PMI-SP , PMI-RMP, OPM3 and PMBOK are registered marks of Project Management Institute, Inc Inov8Solutions Inc – Quality Educational Services For Professionals www.Inov8Solutions.com 8-59 End of Chapter Quiz Question 1: A fishbone diagram is also known as: A. Tailbone diagram B. Ishikawa diagram C. Results diagram D. Pareto diagram PMP, CAPM, PgMP, PMI-SP , PMI-RMP, OPM3 and PMBOK are registered marks of Project Management Institute, Inc Inov8Solutions Inc – Quality Educational Services For Professionals www.Inov8Solutions.com End of Chapter Quiz Question 2: Who is responsible for ensuring quality on the project? A. Customer B. Project Manager C. Chief Executive Officer D. Project Sponsor PMP, CAPM, PgMP, PMI-SP , PMI-RMP, OPM3 and PMBOK are registered marks of Project Management Institute, Inc Inov8Solutions Inc – Quality Educational Services For Professionals www.Inov8Solutions.com End of Chapter Quiz Question 3: A Pareto diagram is a type of: A. Scatter plot B. Ishikawa diagram C. Histogram D. Planning tool PMP, CAPM, PgMP, PMI-SP , PMI-RMP, OPM3 and PMBOK are registered marks of Project Management Institute, Inc Inov8Solutions Inc – Quality Educational Services For Professionals www.Inov8Solutions.com End of Chapter Quiz Question 4: The Quality Management process that is part of the Executing process group is: A. Plan Quality Management B. Ensure Quality C. Control Quality D. Perform Quality Assurance PMP, CAPM, PgMP, PMI-SP , PMI-RMP, OPM3 and PMBOK are registered marks of Project Management Institute, Inc Inov8Solutions Inc – Quality Educational Services For Professionals www.Inov8Solutions.com End of Chapter Quiz Question 5: The customer discovered quality issues in the online application developed by the project team. In order to please the customer, the project manager suggests adding extra features to the application. This is an example of: A. Total Quality Management B. Cost of Quality C. Gold plating D. Successful project management PMP, CAPM, PgMP, PMI-SP , PMI-RMP, OPM3 and PMBOK are registered marks of Project Management Institute, Inc Inov8Solutions Inc – Quality Educational Services For Professionals www.Inov8Solutions.com