Buy a second-hand house after the kitchen renovation will inevitably become obsolete, while not intended to co-own. Old kitchen renovation also some behind the times, this time a lot of people would think were old kitchen remodeling, for everyone in this small series to introduce tricks under the old kitchen remodeling and kitchen remodeling old who precautions. There is a need, can be a lot of attention. The whole cabinet collocation Renovation of existing homes in the past, most of the cabinet is made by the decoration company site. Although appropriate in size, functional design, and quality. There will be unsatisfactory because most of the decoration company considered in broad terms is not comprehensive, details on hardware using the parts often of poorer quality, spent a year or so there will be creaking sound. For the old house before, it is only required to make the decoration on the line, thus overlooking many of the key factors. Today, even the old house, also have to buy a whole set of cabinets, this kitchen only be counted on is the upgrading of the kitchen. Will be the selection of the entire cabinet to select that color from the bright colors dominated, such as orange, bright yellow, navy, etc. can increase the visual sense of space, optimistic style choices from modern minimalist version. Any sophisticated design may affect the visual effects, OTC glass or metal material should be a good option, because of the small space, so the cabinet is specially designed to be reasonable, Container handling is essential, but can be a good use of space possible. Designed according to local conditions: In general, old house sub-station will be designed with a female, how to play its role, the designers will have more room to play. If the old house emissions flue is not very good, then the best way is to put it into the workplace. The exhaust pipe to the outdoors overcast directly from us. The stove and range hood have arranged the table in the shade. Such cooking fumes will be wiped out, and the kitchen cabinets can be put down more, the design can also be more subtle and reasonable. Also, this design can also be considered to make an open kitchen, as long as the wall is not load-bearing walls, you can easily open kitchen so that one can increase the ductility of the living space, it also can be helpful overall kitchen displayed. Old Kitchen Remodeling Considerations: Tips 1: The internal structure of the old kitchen is relatively complicated. In addition to your kitchen cabinet manufacturers to be measured, but also look at the original location of the various pipes is appropriate, such as an inappropriate need to change, it will give out a drawing decoration company, to make the necessary reform by drawing from the construction team. Tips 2: Gas pipeline reconstruction in the old kitchen to be careful. Both pipes are closed due to random changes. If you had to change, it must be approved property company. When changes due to the highly specialized, as well as facilitate future maintenance, generally designated by the gas company or the property company specific company responsible for the changes. Tips 3: Old houses are single-channel water supply, so when the kitchen renovation, good can add a hot water pipe. Also, the average family bathroom is relatively small, only the washing machine in the kitchen, which must be followed by a water pipe, while increasing floor drains. Need to be reminding, restricted structures, the water cannot be changed. Tips 4: The old kitchen remodeling, you want to move to another wall gas meters from its original position, and the wall has a cabinet installation, there is no place to install gas meters. At this time only in the cabinet floor holes, the gas meter cupboard hidden in them, but this way, the problem is difficult to detect, easy to leave a security risk. Tips 5: Does the closed water test? Before doing for drainage improvement, it is recommended to space closed water test, and then to acceptance by the relevant property. If you find leaks, you can locate the property resolved. Leakage least after transformation, the responsibility not good Tips 6: Kitchen location planned. To pre-construction planning is better than the length of the wall of the pipe in the wall at the size should take into account the size of the paving brick wall, especially after the wall directly connected to the faucet and other sanitary ware pipe conduit. Also, to try to avoid the pipe conduit into the wall, burst water pipes to prevent future leaks influence electricity. Tips 7: The inlet and outlet a good bit. Out of the outlet of accurate positioning is important, in addition to customized according to personal habits. We need to look at the kitchen and bathroom distance between the layouts. When second-hand housing renovation, also need to consider whether to retain the original position and out of the outlet. Tips 8: Test the water pressure test. After water installation, after conventional hot and cold water shall pressure test, generally 6-8kg appropriate, test strength should not be less than 0.6MPa, time of 20-30 minutes. If no leakage occurs to maintain the pressure, pressure does not drop count as qualified. Tips 9: Painted to drainage improvement trend graph. After the construction must be accurate to draw a diagram of the transformation of water supply and drainage and keep, especially the laying of underground house, to solve the future water leakage and other problems. Tips 10: After sealing groove waterproof. The pressure test is completed, after a real draw for drainage improvement trend graph, you can seal groove. After sealing groove walls and the floor must be well water, bathroom wall waterproof degree should do 180cm, waterproof wall of the kitchen to do 50cm, wall and floor to do the waterproof layer to prevent future appeared “sweating surface "of the situation. Look at the top ten considerations, let you in the kitchen refurbishment process of detours, let your smart kitchen Face!