Installation Instructions - REBELLE Architectural Lighting

Threaded studs (arm end)
Ballast tray assembly
Straight arm
End cap assembly
Slot cut out
(notch side down)
Arm lock washers and
hex nuts (2 per arm)
(2) Cap screws
Orchestra head
(3) round head screws
Reflector disks
(2 halves between
Orchestra head)
Lamp
(by others)
Post top fitter
(3) set screws
(2) Swing latch screws
4.0" dia. (.125" thick wall) pole
(by others)
IMPORTANT
Disconnect power before installing fixtures. Read instructions before
starting work. This product must be installed in accordance with the
applicable installation code by a person familiar with the construction
and operation of the product and the hazards involved.
Orchestra Circle 2756A Series
ARM INSTALLATION INSTRUCTIONS
1 Remove (3) Round head screws from ballast/post top fitter.
2 Slide Ballast Assembly Tray out of fitter.
3 Attach Straight Arm to fitter using lock washers and hex nuts provided on threaded studs at end of arm. (Make sure arm is assembled with notch side down)
4 Feed ballast lamp wires (black, white and green) through hole inside fitter and down arm until wires are visible out end.
5 Lower Ballast Assembly Tray to Post Top fitter and feed power supply wires (3 wires - black, white and green) into fitter.
6 Carefully slide Ballast Assembly Tray into Post Top fitter. Keep a little tension on the wires that are coming out the end of arm while
Ballast Assembly Tray is sliding into place. Be sure not to trap or pinch wires.
7 Post Top fitter and Straight Arm Assembly may now be mounted to pole and fastened with (3) set screws provided.
ATTACHMENT OF HEAD
1 Remove (2) cap screws from End Cap Assembly.
2 Attach Orchestra head wires (black, white and green) to wires that are hanging out the end of Straight Arm.
3 End Cap Assembly now slides into end of Straight Arm and attaches with (2) cap screws that were earlier removed in step 8. Make
sure excess wire is tucked into arm.
4 Attach Reflector Disks in desired position.
5 Remove (2) swing latch screws to access lamp compartment.
6 Install lamp as specified on lamp information label.
www.rebellelighting.com
© 2010 REBELLE All rights reserved.
REV. 12/08/09
REBELLE ARCHITECTURAL LIGHTING 11475 - 201A Street, Maple Ridge, B.C. Canada V2X 0Y3
P 604.465.5739 F 604.465.9801 E info@rebellelighting.com W rebellelighting.com
Guard assembly
Lamp as specified
(by others)
Electrical tray
Post
Post
Base cover
(optional)
Hex nuts and
washers
6"
See instructions
Anchor bolts
6"
Mounting plate
Rigid conduit
(by others)
IMPORTANT
Disconnect power before installing fixtures. Read instructions before
starting work. This product must be installed in accordance with the
applicable installation code by a person familiar with the construction
and operation of the product and the hazards involved.
Orchestra Ellipse 2809B Series
ANCHOR BOLT INSTALLATION INSTRUCTIONS
1 Remove anchor bolt assembly from shipping carton.
2 Anchor bolts are to be embedded in concrete as follows. Position anchor bolts @ 90° spaced 6” apart (template provided).
Anchor bolts must protrude a 1.5” above finished concrete.
3 The appropriate rigid conduit, suitable for the application and in compliance with the local electrical code requirments, shall be
routed prior to pouring concrete.
FIXTURE INSTALLATION INSTRUCTIONS
1
Remove luminaire from shipping carton and disassemble as follows. Loosen (4) acorn nuts and remove guard assembly from bollard post. Remove (4) machine srews and remove electrical tray.
2 Align mounting plate/post assembly over embedded anchor bolts. Use shims provided as required for leveling.
3 Alternately, extra hex nuts that are provided may be used for leveling. Screw (4) hex nuts to bottom of embedded anchor bolts.
Install mounting plate/post assembly. Level as required. Grout between finished concrete surface and mounting plate.
4 Check for correct voltage then connect supply wires to electrical tray wires. Reinstall electrical tray ensuring that leads are secured
away from ground level as per applicable codes.
5 Slide 2 piece base cover (optional) over post and connect with hardware (supplied).
6 Install lamp (by others) re-install guard assembly. Energize and test as required.
REV. 12/08/09
www.rebellelighting.com
© 2010 REBELLE All rights reserved.
REBELLE ARCHITECTURAL LIGHTING 11475 - 201A Street, Maple Ridge, B.C. Canada V2X 0Y3
P 604.465.5739 F 604.465.9801 E info@rebellelighting.com W rebellelighting.com
Threaded studs (arm end)
Ballast tray assembly
Straight arm
End cap assembly
Slot cut out
(notch side down)
Arm lock washers and
hex nuts (2 per arm)
(2) Cap screws
Orchestra head
(3) round head screws
Reflector disks
(2 halves between
Orchestra head)
Lamp
(by others)
Post top fitter
(3) set screws
(2) Swing latch screws
4.0" dia. (.125" thick wall) pole
(by others)
*Orchestra Circle 2756A shown
IMPORTANT
Disconnect power before installing fixtures. Read instructions before
starting work. This product must be installed in accordance with the
applicable installation code by a person familiar with the construction
and operation of the product and the hazards involved.
Orchestra Ellipse 2810A* Series
ARM INSTALLATION INSTRUCTIONS
1 Remove (3) Round head screws from ballast/post top fitter.
2 Slide Ballast Assembly Tray out of fitter.
3 Attach Straight Arm to fitter using lock washers and hex nuts provided on threaded studs at end of arm. (Make sure arm is assembled with notch side down)
4 Feed ballast lamp wires (black, white and green) through hole inside fitter and down arm until wires are visible out end.
5 Lower Ballast Assembly Tray to Post Top fitter and feed power supply wires (3 wires - black, white and green) into fitter.
6 Carefully slide Ballast Assembly Tray into Post Top fitter. Keep a little tension on the wires that are coming out the end of arm while
Ballast Assembly Tray is sliding into place. Be sure not to trap or pinch wires.
7 Post Top fitter and Straight Arm Assembly may now be mounted to pole and fastened with (3) set screws provided.
ATTACHMENT OF HEAD
1 Remove (2) cap screws from End Cap Assembly.
2 Attach Orchestra head wires (black, white and green) to wires that are hanging out the end of Straight Arm.
3 End Cap Assembly now slides into end of Straight Arm and attaches with (2) cap screws that were earlier removed in step 8. Make
sure excess wire is tucked into arm.
4 Attach Reflector Disks in desired position.
5 Remove (2) swing latch screws to access lamp compartment.
6 Install lamp as specified on lamp information label.
www.rebellelighting.com
© 2010 REBELLE All rights reserved.
REV. 12/08/09
REBELLE ARCHITECTURAL LIGHTING 11475 - 201A Street, Maple Ridge, B.C. Canada V2X 0Y3
P 604.465.5739 F 604.465.9801 E info@rebellelighting.com W rebellelighting.com
Guard assembly with 3
locking set screws
Glass lens - threaded
Lamp as specified
(by others)
Post
Base cover
(optional)
Base cover
(optional)
8"
Hex nuts and washers
Shims
Mounting bracket
(optional)
Mounting plate
See instructions
Rigid conduit
(by others)
Anchor bolts
IMPORTANT
Disconnect power before installing fixtures. Read instructions before
starting work. This product must be installed in accordance with the
applicable installation code by a person familiar with the construction
and operation of the product and the hazards involved.
Saturna 4009 Series
ANCHOR BOLT INSTALLATION INSTRUCTIONS
1 Remove anchor bolt assembly from shipping carton.
2 Anchor bolts are to be embedded in concrete as follows. Position anchor bolts @ 90° spacing on 8” bolt circle diameter
(template provided). Anchor bolts must protrude a minumum of 1.5” above finished concrete (if using shims for leveling) or 2”
above finished concrete.
3 The appropriate rigid conduit,suitable for the application and in compliance with the local electrical code requirments,
Shall be routed prior to pouring concrete.
FIXTURE INSTALLATION INSTRUCTIONS
1 Remove luminaire from shipping carton and disassemble as follows. Loosen (3) locking set scews and remove guard assembly
and glass lens.
2 Working from bottom of fixture, connect fixture leads to supply conductors with approved wire connectors. Align mounting plate/
post assembly over embedded anchor bolts. Use shims provided as required for leveling.
3 Alternately, extra hex nuts that are provided may be used for leveling. Screw (4) hex nuts to bottom of embedded anchor bolts.
Install mounting plate/post assembly. Level as required. Grout between finished concrete surface and mounting plate.
4 Install mounting brackets on (2) sides (for optional base cover only) as shown in diagram. Install washers and hex nuts provided
with anchor bolt set and tighten securely.
5 Slide base cover (optional) over post and down to base. Secure with (2) flat head machine screws provided.
6 Install lamp (by others) re-install glass lens and guard assembly. Energize and test as required
www.rebellelighting.com
© 2010 REBELLE All rights reserved.
REV. 12/08/09
REBELLE ARCHITECTURAL LIGHTING 11475 - 201A Street, Maple Ridge, B.C. Canada V2X 0Y3
P 604.465.5739 F 604.465.9801 E info@rebellelighting.com W rebellelighting.com
Top cap
Relamping bracket
Reflector disk
Latches (3)
Lamp
(by others)
Housing
Pole
IMPORTANT
Disconnect power before installing fixtures. Read instructions before
starting work. This product must be installed in accordance with the
applicable installation code by a person familiar with the construction
and operation of the product and the hazards involved.
Saturna 4010 Series
FIXTURE INSTALLATION INSTRUCTIONS
1 Remove luminaire from shipping cartons. Remove top cap and relamping bracket from luminaire.
2 Working on housing electrical tray, select appropriate voltage leads (ensure unused taps are capped off) place housing assembly
over pole, connect supply wires to luminaire wires (black, white, green) with approved connectors (not provided) secure connections as per applicable codes.
3 Slip housing assembly over pole. Tighten (3) set screws in housing fitter to secure to pole.
4 Install reflector disk onto struts. Lower over strut, aligning notches with latches. Swing latches shut through slot and tighten nuts.
(Note: ensure latches are in up position)
5 Insert appropriate lamp (not included) into lampholder. Re-install relamping bracket (keyhole to lock in place) tighten (4) nuts. Reinstall top cap and tighten securely.
6 Energize and test as required.
www.rebellelighting.com
© 2010 REBELLE All rights reserved.
REV. 12/08/09
REBELLE ARCHITECTURAL LIGHTING 11475 - 201A Street, Maple Ridge, B.C. Canada V2X 0Y3
P 604.465.5739 F 604.465.9801 E info@rebellelighting.com W rebellelighting.com
Top cap
Relamping bracket
Reflector disk
Latches (3)
Lamp
(by others)
Housing
Junction box
Mounting plate
Arm assembly
Wiring access plate
IMPORTANT
Disconnect power before installing fixtures. Read instructions before
starting work. This product must be installed in accordance with the
applicable installation code by a person familiar with the construction
and operation of the product and the hazards involved.
Saturna 4010T Series
FIXTURE INSTALLATION INSTRUCTIONS
1 Remove luminaire from shipping cartons. Remove top cap and relamping bracket from luminaire. Remove mounting plate from
arm assembly.
2 Position mounting plate over juntion box pull supply leads through hole in mounting plate. Check for square and fasten to ears
of juntion box (temporary mounting only) permanently mount plate to wall through (4) mounting holes with appropriate hardware.
(Not provided).
3 Connect black, white and green leads (supplied) to supply leads with approved wire connectors (not provided). Push connections
securely into junction box.
4 Remove (3) screws and wiring access plate from arm assembly and put to one side.
5 Hook arm assembly over mounting plate, feed wires through arm and out bottom of access plate opening. Tighten (2) set screws
at bottom of arm assembly until arm is secure against wall.
6 Silicone seal the top and two sides of arm assembly against wall to prevent water ingress caused by uneven surface textures.
7 Working on housing electrical tray, select appropriate voltage leads (ensure unused taps are capped off) place housing assembly
over arm assembly feeding wires through bottom of access plate opening. Ensure that one strut is oriented to front position of
luminaire and tighten (3) set screws.
8 Connect black, white and green leads. Push wires into arm assembly and re-install access plate.
9 Install reflector disk onto struts. Lower over strut, aligning notches with latches. Swing latches shut through slot and tighten nuts.
(Note: ensure latches are in up position)
10 Insert appropriate lamp (not included) into lampholder. Re-install relamping bracket (keyhole to lock in place) tighten (4) nuts. Reinstall top cap and tighten securely.
11 Energize and test as required.
REV. 12/08/09
www.rebellelighting.com
© 2010 REBELLE All rights reserved.
REBELLE ARCHITECTURAL LIGHTING 11475 - 201A Street, Maple Ridge, B.C. Canada V2X 0Y3
P 604.465.5739 F 604.465.9801 E info@rebellelighting.com W rebellelighting.com
Mounting Plate
Fixture Back Plate
Driver Housing
Cage Attachment
Hardware (4)
Housing To Mounting
Plate Set Screws (2)
Strut and Disk (Cage)
Assembly
IMPORTANT
Disconnect power before installing fixtures. Read instructions before
starting work. This product must be installed in accordance with the
applicable installation code by a person familiar with the construction
and operation of the product and the hazards involved.
Must be installed by a qualified electrician.
Saturna 4012LED Series
FIXTURE INSTALLATION INSTRUCTIONS
1
Remove luminaire from carton.
2
Install mounting plate to wall surface over a recessed junction box (junction box by others).
3
Secure mounting plate to surface of wall independently from junction box (mounting hardware provided by others).
4
Connect fixture wires to supply wires with approved wire connectors and push splices securely into junction box.
5
Hook fixture back plate driver housing over mounting plate making sure no wires are pinched. Tighten set screws (2) to secure
against mounting plate. Do not over tighten but ensure assembly is secured.
6
Attach the cage assembly with cage attachment hardware (4) provided.
7
Energize and test as required.
8
For exterior / wet locations, silicone sealant should be applied to the top and down both sides to exclude water entrance.
www.rebellelighting.com
© 2014 REBELLE All rights reserved.
REV. 06/24/14
REBELLE ARCHITECTURAL LIGHTING 11475 - 201A Street, Maple Ridge, B.C. Canada V2X 0Y3
P 604.465.5739 F 604.465.9801 E info@rebellelighting.com W rebellelighting.com
Lamp
(by others)
Ballast
tray
Cast
ballast
housing
(2) 8-32
mounting
studs
4" octagon J-Box
(by others)
Universal
backstrap
Electrical
tray mounting
screws
Electrical
tray
Cast guard
or hood
J-Box screws
(by others)
Glass diffuser
with gasket
Stainless
steel screws
IMPORTANT
Disconnect power before installing fixtures. Read instructions before
starting work. This product must be installed in accordance with the
applicable installation code by a person familiar with the construction
and operation of the product and the hazards involved.
Saturna 5008 Series
FIXTURE INSTALLATION INSTRUCTIONS
1 Undo (4) stainless steel screws and remove cast hood or guard and diffuser.
2 Loosen (4) electrical tray mounting screws and remove electrical tray by pushing up and pulling tray over keyholes.
3 Secure universal backstrap (supplied in parts bag) to j-box with j-box screws aligningmounting holes at 45°.
4 Thread (2) 8-32 studs (supplied in parts bag) into backstap until it is protruding through into j-box.
5 Select voltage and cap off unused leads (on hid units only). Connect leads to supply conductors with wire nuts and push connections securely into j-box.
6 Push housing and ballast tray assembly over mounting studs through holes located on ballast tray take note of “this side up label”.
7 Install and tighten 8-32 hex nuts (supplied in parts bag) until gasket on back fixture is compressed.
8 Keyhole electrical tray over electrical mounting screws with lamp base(s) down and tighten securely.
9 Install designated lamp(s) into lampholder(s).
10 Install cast hood or guard and glass diffuser with (4) stainless steel screws.
11 Apply silicone seal around outer edge of backside of cast ballast housing to create water tight seal between fixture and mounting
surface.
REV. 12/08/09
www.rebellelighting.com
© 2010 REBELLE All rights reserved.
REBELLE ARCHITECTURAL LIGHTING 11475 - 201A Street, Maple Ridge, B.C. Canada V2X 0Y3
P 604.465.5739 F 604.465.9801 E info@rebellelighting.com W rebellelighting.com
8-32 hex nuts Cast ballast box
and washeers
8-32 mounting
studs
Universal
backstrap
Octagon J-Box
(by others)
Cast hood
Reflector
mounting
screws
Reflector
assembly
Lamp
(by others)
Cast hood
mounting screws
IMPORTANT
Disconnect power before installing fixtures. Read instructions before
starting work. This product must be installed in accordance with the
applicable installation code by a person familiar with the construction
and operation of the product and the hazards involved.
Saturna 5008C Series
FIXTURE INSTALLATION INSTRUCTIONS
1 Remove luminaire from shipping container.
2 Remove (4) flat head machine screws securing cast hood assembly and remove hood assembly.
3 Remove (4) machine screws securing reflector assembly and remove from fixture.
4 Working inside cast ballast housing select appropriate voltage leads and push leads through wire access hole in back of ballast
plate. Cap off unused leads and leave in ballast compartment.
5 Remove parts from parts bag. Thread (2) 8-32 studs into universal backstrap on 2.75” Centers. Install universal backstrap to j-box
with (2) j-box screws insuring studs are horizontally aligned.
6 Connect fixture leads and supply leads with approved wire connectors and push splices into j-box.
7 Push fixture over studs and and secure to mounting surface (follow marking instructions on inside of fixture for mounting orientation) with (2) washers and (2) hex nuts provided. Tighten securely.
8 Reinstall reflector assembly. Install designated lamp.
9 Reinstall cast hood assembly to ballast housing. Tighten screws securely to insure water tight seal.
10 Caulking may need to be applied between fixture and mounting surface to create water tight seal.
11 Energize and test as required.
REV. 12/08/09
www.rebellelighting.com
© 2010 REBELLE All rights reserved.
REBELLE ARCHITECTURAL LIGHTING 11475 - 201A Street, Maple Ridge, B.C. Canada V2X 0Y3
P 604.465.5739 F 604.465.9801 E info@rebellelighting.com W rebellelighting.com
Lamp
(by others)
Ballast
tray
Cast
ballast
housing
(2) 8-32
mounting
studs
4" octagon J-Box
(by others)
Universal
backstrap
Electrical
tray mounting
screws
Electrical
tray
Cast guard
or hood
J-Box screws
(by others)
Glass diffuser
with gasket
Stainless
steel screws
IMPORTANT
Disconnect power before installing fixtures. Read instructions before
starting work. This product must be installed in accordance with the
applicable installation code by a person familiar with the construction
and operation of the product and the hazards involved.
Saturna 5008 Series
FIXTURE INSTALLATION INSTRUCTIONS
1 Undo (4) stainless steel screws and remove cast hood or guard and diffuser.
2 Loosen (4) electrical tray mounting screws and remove electrical tray by pushing up and pulling tray over keyholes.
3 Secure universal backstrap (supplied in parts bag) to j-box with j-box screws aligningmounting holes at 45°.
4 Thread (2) 8-32 studs (supplied in parts bag) into backstap until it is protruding through into j-box.
5 Select voltage and cap off unused leads (on hid units only). Connect leads to supply conductors with wire nuts and push connections securely into j-box.
6 Push housing and ballast tray assembly over mounting studs through holes located on ballast tray take note of “this side up label”.
7 Install and tighten 8-32 hex nuts (supplied in parts bag) until gasket on back fixture is compressed.
8 Keyhole electrical tray over electrical mounting screws with lamp base(s) down and tighten securely.
9 Install designated lamp(s) into lampholder(s).
10 Install cast hood or guard and glass diffuser with (4) stainless steel screws.
11 Apply silicone seal around outer edge of backside of cast ballast housing to create water tight seal between fixture and mounting
surface.
REV. 12/08/09
www.rebellelighting.com
© 2010 REBELLE All rights reserved.
REBELLE ARCHITECTURAL LIGHTING 11475 - 201A Street, Maple Ridge, B.C. Canada V2X 0Y3
P 604.465.5739 F 604.465.9801 E info@rebellelighting.com W rebellelighting.com
13"
5009H
HOOD
Concrete
block
Splay trim
Housing
Guard
5009
GUARD
Glass
Lamp
(by others)
5009C
CUT OFF
Electrical
tray
J-Box
Mounting
hardware
Trim
adapter
Brick
face
Silicone seal
Mortar
IMPORTANT
Disconnect power before installing fixtures. Read instructions before
starting work. This product must be installed in accordance with the
applicable installation code by a person familiar with the construction
and operation of the product and the hazards involved.
Saturna 5009 Series
HOUSING INSTALLATION - CONCRETE BLOCK
BRICK FACE
ELECTRICAL TRAY AND FACEPLATE INSTALLATION
1 Remove housing assembly from shipping container.
1 Remove electrical tray assembly from shipping carton.
2 Cut opening in concrete block wall to suit housing size.
2 Remove internal j-box cover from housing and pull out supply
J-box should be below unit. Not on top or sides. Secure to wall through (4) holes located in housing. Round
housing trim should extend 1” out from wall.
wires. Thread electrical white, black and ground leads from
ballast tray through j-box cover and connect to appropriate
supply leads.
3 Install supply wiring per applicable code requirements.
3 Push all splices into j-box and re-attach cover plate.
4 Install trim adapter to existing trim on housing allowing
4 Install ballast tray and secure with nuts provided.
required brick thickness extension from wall. Seal trim
adapter to trim at housing with silicone.
5 Remove faceplate assembly from shipping carton. Install splay
5 Install brick face. Mortar between brick and adapter trim
trim with screws provided. Silicone seal may be required to
seal between brick face and splay trim.
to create flat surface for splay trim to seal against.
6 Install electrical tray with screws provided and insert lamp as
required.
7 Install faceplate to splay trim with (4) screws provided.
8 Energize and test as required.
REV. 12/09/09
www.rebellelighting.com
© 2010 REBELLE All rights reserved.
REBELLE ARCHITECTURAL LIGHTING 11475 - 201A Street, Maple Ridge, B.C. Canada V2X 0Y3
P 604.465.5739 F 604.465.9801 E info@rebellelighting.com W rebellelighting.com
13"
Housing
pour box
5009H
HOOD
Concrete form
(by others)
5009
GUARD
Housing
pour box
Faceplate and
mounting screws
Concrete
(by others)
Glass
Studs and
wing nuts
Lamp
(by others)
5009C
CUT OFF
Figure 2
Electrical
tray
Spacing to
center line
Spacing to
center line
Splay trim
Height to
center line
J-Box
Figure 1
IMPORTANT
Disconnect power before installing fixtures. Read instructions before
starting work. This product must be installed in accordance with the
applicable installation code by a person familiar with the construction
and operation of the product and the hazards involved.
Saturna 5009 Series
HOUSING INSTALLATION - CONCRETE POUR
1 Remove housing from shipping carton. Lay out center
ELECTRICAL TRAY AND FACEPLATE INSTALLATION
1 Remove electrical tray from shipping carton.
line of luminaire positions on concrete form. (Fig.1)
2 Remove internal j-box cover from housing and pull out supply
2 Position template (provided) over marked center line
luminaire spacings (make sure template is level and
arrows are in the up an down position). Drill 1/4” holes
through form. (Fig.1)
wires. Thread electrical white, black and ground leads from
ballast tray thru j-box cover and connect to appropriate supply
leads.
3 Push all splices into j-box and re-attach cover plate.
3 Install housing on concrete side of form using 3” long
studs and wing nuts (provided). Ensure that j-box is
properly oriented. J-box down or on back. (fig.2) Check
that unit is level.
4 Install ballast tray and secure with nuts provided.
5 Remove faceplate assembly from shipping carton. Install splay
4 If tile or other surface treatment is used the housing
trim with screws provided. Caulking may be required to seal
splay trim to mounting surface.
position must be adjusted to suit prior to pouring concrete.
6 Install electrical tray/reflector with screws provided and insert
lamp as required.
5 Install conduit as required and pull supply circuit wires
7 Coat screws with white grease and install faceplate to splay
per applicable electrical codes.
trim with (4) screws provided.
6 Remove wing nuts and studs after concrete is cured
and before forms are stripped.
8 Energize and test as required.
REV. 12/08/09
www.rebellelighting.com
© 2010 REBELLE All rights reserved.
REBELLE ARCHITECTURAL LIGHTING 11475 - 201A Street, Maple Ridge, B.C. Canada V2X 0Y3
P 604.465.5739 F 604.465.9801 E info@rebellelighting.com W rebellelighting.com
13"
Housing
Housing
5009H
HOOD
Stud construction
(by others)
Faceplate and
mounting screws
Blocking
(by others)
Glass
5009
GUARD
1/2" sheeting
(by others)
Lamp
(by others)
Electrical tray
5009C
CUT OFF
HOLLOW WALL INSTALLATION
FOR COMPACT FLUORESCENT
UNITS. HID UNITS MUST BE
ORDERED SPECIAL FOR
HOLLOW WALL CONSTRUCTION
Housing
Splay trim
Stud construction
(by others)
J-Box
Blocking
(by others)
Screws/nails as required
(by others)
Wall board
thickness
Note #3
IMPORTANT
Disconnect power before installing fixtures. Read instructions before
starting work. This product must be installed in accordance with the
applicable installation code by a person familiar with the construction
and operation of the product and the hazards involved.
Saturna 5009 Series
HOUSING INSTALLATION - HOLLOW WALL
ELECTRICAL TRAY AND FACEPLATE INSTALLATION
1 Remove housing assembly from shipping container.
1 Remove electrical tray assembly from shipping carton.
2 Position housing in stud construction to keep at least
2 Remove internal j-box cover from housing and pull out supply
1/2” clearance around unit except at mounting points.
wires. Thread electrical white, black and ground leads from
ballast tray through j-box cover and connect to appropriate
supply leads.
3 Make sure front edge of housing protrudes enough to
be flush with finishing wall plane.
3 Push all splices into j-box and re-attach cover plate.
4 J-box should be below unit. Not on top or sides.
4 Install ballast tray and secure with nuts provided.
5 Install supply wiring per applicable code require5 Remove faceplate assembly from shipping carton. Install splay
ments.
trim with screws provided.
Notes:
These units are listed/certified as non-ic recessed
units. They are meant to be installed with 1/2” space
around the recessed housing, except at point of
mounting contact. Insulation must be kept away from
housing by a minumum of 3 inches. The ballasts are
thermally protected to guard against misuse.
6 Install electrical tray with screws provided and insert lamp as
required.
7 Install faceplate to splay trim with (4) screws provided.
8 Energize and test as required.
REV. 03/27/13
www.rebellelighting.com
© 2010 REBELLE All rights reserved. R10.1
REBELLE ARCHITECTURAL LIGHTING 11475 - 201A Street, Maple Ridge, B.C. Canada V2X 0Y3
P 604.465.5739 F 604.465.9801 E info@rebellelighting.com W rebellelighting.com
13"
5009H
HOOD
Concrete
block
Splay trim
Housing
Guard
5009
GUARD
Glass
Lamp
(by others)
5009C
CUT OFF
Electrical
tray
J-Box
Mounting
hardware
Trim
adapter
Brick
face
Silicone seal
Mortar
IMPORTANT
Disconnect power before installing fixtures. Read instructions before
starting work. This product must be installed in accordance with the
applicable installation code by a person familiar with the construction
and operation of the product and the hazards involved.
Saturna 5009 Series
HOUSING INSTALLATION - CONCRETE BLOCK
BRICK FACE
ELECTRICAL TRAY AND FACEPLATE INSTALLATION
1 Remove housing assembly from shipping container.
1 Remove electrical tray assembly from shipping carton.
2 Cut opening in concrete block wall to suit housing size.
2 Remove internal j-box cover from housing and pull out supply
3 Install supply wiring per applicable code requirements.
3 Push all splices into j-box and re-attach cover plate.
4 Install trim adapter to existing trim on housing allowing
4 Install ballast tray and secure with nuts provided.
J-box should be below unit. Not on top or sides. Secure to wall through (4) holes located in housing. Round
housing trim should extend 1” out from wall.
required brick thickness extension from wall. Seal trim
adapter to trim at housing with silicone.
5 Install brick face. Mortar between brick and adapter trim
to create flat surface for splay trim to seal against.
wires. Thread electrical white, black and ground leads from
ballast tray through j-box cover and connect to appropriate
supply leads.
5 Remove faceplate assembly from shipping carton. Install splay
trim with screws provided. Silicone seal may be required to
seal between brick face and splay trim.
6 Install electrical tray with screws provided and insert lamp as
required.
7 Install faceplate to splay trim with (4) screws provided.
8 Energize and test as required.
REV. 12/09/09
www.rebellelighting.com
© 2010 REBELLE All rights reserved.
REBELLE ARCHITECTURAL LIGHTING 11475 - 201A Street, Maple Ridge, B.C. Canada V2X 0Y3
P 604.465.5739 F 604.465.9801 E info@rebellelighting.com W rebellelighting.com
13"
Housing
pour box
5009H
HOOD
Concrete form
(by others)
5009
GUARD
Housing
pour box
Faceplate and
mounting screws
Concrete
(by others)
Glass
Studs and
wing nuts
Lamp
(by others)
5009C
CUT OFF
Figure 2
Electrical
tray
Spacing to
center line
Spacing to
center line
Splay trim
Height to
center line
J-Box
Figure 1
IMPORTANT
Disconnect power before installing fixtures. Read instructions before
starting work. This product must be installed in accordance with the
applicable installation code by a person familiar with the construction
and operation of the product and the hazards involved.
Saturna 5009 Series
HOUSING INSTALLATION - CONCRETE POUR
1 Remove housing from shipping carton. Lay out center
line of luminaire positions on concrete form. (Fig.1)
2 Position template (provided) over marked center line
luminaire spacings (make sure template is level and
arrows are in the up an down position). Drill 1/4” holes
through form. (Fig.1)
3 Install housing on concrete side of form using 3” long
studs and wing nuts (provided). Ensure that j-box is
properly oriented. J-box down or on back. (fig.2) Check
that unit is level.
4 If tile or other surface treatment is used the housing
position must be adjusted to suit prior to pouring concrete.
5 Install conduit as required and pull supply circuit wires
per applicable electrical codes.
6 Remove wing nuts and studs after concrete is cured
and before forms are stripped.
ELECTRICAL TRAY AND FACEPLATE INSTALLATION
1 Remove electrical tray from shipping carton.
2 Remove internal j-box cover from housing and pull out supply
wires. Thread electrical white, black and ground leads from
ballast tray thru j-box cover and connect to appropriate supply
leads.
3 Push all splices into j-box and re-attach cover plate.
4 Install ballast tray and secure with nuts provided.
5 Remove faceplate assembly from shipping carton. Install splay
trim with screws provided. Caulking may be required to seal
splay trim to mounting surface.
6 Install electrical tray/reflector with screws provided and insert
lamp as required.
7 Coat screws with white grease and install faceplate to splay
trim with (4) screws provided.
8 Energize and test as required.
REV. 12/08/09
www.rebellelighting.com
© 2010 REBELLE All rights reserved.
REBELLE ARCHITECTURAL LIGHTING 11475 - 201A Street, Maple Ridge, B.C. Canada V2X 0Y3
P 604.465.5739 F 604.465.9801 E info@rebellelighting.com W rebellelighting.com
13"
Housing
Housing
5009H
HOOD
Stud construction
(by others)
Blocking
(by others)
5009
GUARD
1/2" sheeting
(by others)
Faceplate and
mounting screws
Glass
Lamp
(by others)
Electrical tray
5009C
CUT OFF
HOLLOW WALL INSTALLATION
FOR COMPACT FLUORESCENT
UNITS. HID UNITS MUST BE
ORDERED SPECIAL FOR
HOLLOW WALL CONSTRUCTION
Housing
Splay trim
Stud construction
(by others)
Blocking
(by others)
Splay trim
Screws/nails as required
(by others)
Wall board
thickness
Note #3
IMPORTANT
Disconnect power before installing fixtures. Read instructions before
starting work. This product must be installed in accordance with the
applicable installation code by a person familiar with the construction
and operation of the product and the hazards involved.
Saturna 5009 Series
HOUSING INSTALLATION - HOLLOW WALL
ELECTRICAL TRAY AND FACEPLATE INSTALLATION
1 Remove housing assembly from shipping container.
1 Remove electrical tray assembly from shipping carton.
2 Position housing in stud construction to keep at least
2 Remove internal j-box cover from housing and pull out supply
1/2” clearance around unit except at mounting points.
3 Make sure front edge of housing protrudes enough to
be flush with finishing wall plane.
4 J-box should be below unit. Not on top or sides.
5 Install supply wiring per applicable code requirements.
wires. Thread electrical white, black and ground leads from
ballast tray through j-box cover and connect to appropriate
supply leads.
3 Push all splices into j-box and re-attach cover plate.
4 Install ballast tray and secure with nuts provided.
5 Remove faceplate assembly from shipping carton. Install splay
trim with screws provided.
Notes:
These units are listed/certified as non-ic recessed
units. They are meant to be installed with 1/2” space
around the recessed housing, except at point of
mounting contact. Insulation must be kept away from
housing by a minumum of 3 inches. The ballasts are
thermally protected to guard against misuse.
6 Install electrical tray with screws provided and insert lamp as
required.
7 Install faceplate to splay trim with (4) screws provided.
8 Energize and test as required.
REV. 12/08/09
www.rebellelighting.com
© 2010 REBELLE All rights reserved.
REBELLE ARCHITECTURAL LIGHTING 11475 - 201A Street, Maple Ridge, B.C. Canada V2X 0Y3
P 604.465.5739 F 604.465.9801 E info@rebellelighting.com W rebellelighting.com
13"
5009H
HOOD
Concrete
block
Splay trim
Housing
Guard
5009
GUARD
Glass
Lamp
(by others)
5009C
CUT OFF
Electrical
tray
J-Box
Mounting
hardware
Trim
adapter
Brick
face
Silicone seal
Mortar
IMPORTANT
Disconnect power before installing fixtures. Read instructions before
starting work. This product must be installed in accordance with the
applicable installation code by a person familiar with the construction
and operation of the product and the hazards involved.
Saturna 5009 Series
HOUSING INSTALLATION - CONCRETE BLOCK
BRICK FACE
ELECTRICAL TRAY AND FACEPLATE INSTALLATION
1 Remove housing assembly from shipping container.
1 Remove electrical tray assembly from shipping carton.
2 Cut opening in concrete block wall to suit housing size.
2 Remove internal j-box cover from housing and pull out supply
3 Install supply wiring per applicable code requirements.
3 Push all splices into j-box and re-attach cover plate.
4 Install trim adapter to existing trim on housing allowing
4 Install ballast tray and secure with nuts provided.
J-box should be below unit. Not on top or sides. Secure to wall through (4) holes located in housing. Round
housing trim should extend 1” out from wall.
required brick thickness extension from wall. Seal trim
adapter to trim at housing with silicone.
5 Install brick face. Mortar between brick and adapter trim
to create flat surface for splay trim to seal against.
wires. Thread electrical white, black and ground leads from
ballast tray through j-box cover and connect to appropriate
supply leads.
5 Remove faceplate assembly from shipping carton. Install splay
trim with screws provided. Silicone seal may be required to
seal between brick face and splay trim.
6 Install electrical tray with screws provided and insert lamp as
required.
7 Install faceplate to splay trim with (4) screws provided.
8 Energize and test as required.
REV. 12/09/09
www.rebellelighting.com
© 2010 REBELLE All rights reserved.
REBELLE ARCHITECTURAL LIGHTING 11475 - 201A Street, Maple Ridge, B.C. Canada V2X 0Y3
P 604.465.5739 F 604.465.9801 E info@rebellelighting.com W rebellelighting.com
13"
Housing
pour box
5009H
HOOD
Concrete form
(by others)
5009
GUARD
Housing
pour box
Faceplate and
mounting screws
Concrete
(by others)
Glass
Studs and
wing nuts
Lamp
(by others)
5009C
CUT OFF
Figure 2
Electrical
tray
Spacing to
center line
Spacing to
center line
Splay trim
Height to
center line
J-Box
Figure 1
IMPORTANT
Disconnect power before installing fixtures. Read instructions before
starting work. This product must be installed in accordance with the
applicable installation code by a person familiar with the construction
and operation of the product and the hazards involved.
Saturna 5009 Series
HOUSING INSTALLATION - CONCRETE POUR
1 Remove housing from shipping carton. Lay out center
line of luminaire positions on concrete form. (Fig.1)
2 Position template (provided) over marked center line
luminaire spacings (make sure template is level and
arrows are in the up an down position). Drill 1/4” holes
through form. (Fig.1)
3 Install housing on concrete side of form using 3” long
studs and wing nuts (provided). Ensure that j-box is
properly oriented. J-box down or on back. (fig.2) Check
that unit is level.
4 If tile or other surface treatment is used the housing
position must be adjusted to suit prior to pouring concrete.
5 Install conduit as required and pull supply circuit wires
per applicable electrical codes.
6 Remove wing nuts and studs after concrete is cured
and before forms are stripped.
ELECTRICAL TRAY AND FACEPLATE INSTALLATION
1 Remove electrical tray from shipping carton.
2 Remove internal j-box cover from housing and pull out supply
wires. Thread electrical white, black and ground leads from
ballast tray thru j-box cover and connect to appropriate supply
leads.
3 Push all splices into j-box and re-attach cover plate.
4 Install ballast tray and secure with nuts provided.
5 Remove faceplate assembly from shipping carton. Install splay
trim with screws provided. Caulking may be required to seal
splay trim to mounting surface.
6 Install electrical tray/reflector with screws provided and insert
lamp as required.
7 Coat screws with white grease and install faceplate to splay
trim with (4) screws provided.
8 Energize and test as required.
REV. 12/08/09
www.rebellelighting.com
© 2010 REBELLE All rights reserved.
REBELLE ARCHITECTURAL LIGHTING 11475 - 201A Street, Maple Ridge, B.C. Canada V2X 0Y3
P 604.465.5739 F 604.465.9801 E info@rebellelighting.com W rebellelighting.com
13"
Housing
Housing
5009H
HOOD
Stud construction
(by others)
Blocking
(by others)
5009
GUARD
1/2" sheeting
(by others)
Faceplate and
mounting screws
Glass
Lamp
(by others)
Electrical tray
5009C
CUT OFF
HOLLOW WALL INSTALLATION
FOR COMPACT FLUORESCENT
UNITS. HID UNITS MUST BE
ORDERED SPECIAL FOR
HOLLOW WALL CONSTRUCTION
Housing
Splay trim
Stud construction
(by others)
Blocking
(by others)
Splay trim
Screws/nails as required
(by others)
Wall board
thickness
Note #3
IMPORTANT
Disconnect power before installing fixtures. Read instructions before
starting work. This product must be installed in accordance with the
applicable installation code by a person familiar with the construction
and operation of the product and the hazards involved.
Saturna 5009 Series
HOUSING INSTALLATION - HOLLOW WALL
ELECTRICAL TRAY AND FACEPLATE INSTALLATION
1 Remove housing assembly from shipping container.
1 Remove electrical tray assembly from shipping carton.
2 Position housing in stud construction to keep at least
2 Remove internal j-box cover from housing and pull out supply
1/2” clearance around unit except at mounting points.
3 Make sure front edge of housing protrudes enough to
be flush with finishing wall plane.
4 J-box should be below unit. Not on top or sides.
5 Install supply wiring per applicable code requirements.
wires. Thread electrical white, black and ground leads from
ballast tray through j-box cover and connect to appropriate
supply leads.
3 Push all splices into j-box and re-attach cover plate.
4 Install ballast tray and secure with nuts provided.
5 Remove faceplate assembly from shipping carton. Install splay
trim with screws provided.
Notes:
These units are listed/certified as non-ic recessed
units. They are meant to be installed with 1/2” space
around the recessed housing, except at point of
mounting contact. Insulation must be kept away from
housing by a minumum of 3 inches. The ballasts are
thermally protected to guard against misuse.
6 Install electrical tray with screws provided and insert lamp as
required.
7 Install faceplate to splay trim with (4) screws provided.
8 Energize and test as required.
REV. 12/08/09
www.rebellelighting.com
© 2010 REBELLE All rights reserved.
REBELLE ARCHITECTURAL LIGHTING 11475 - 201A Street, Maple Ridge, B.C. Canada V2X 0Y3
P 604.465.5739 F 604.465.9801 E info@rebellelighting.com W rebellelighting.com
13"
5009H
HOOD
Concrete
block
Splay trim
Housing
Guard
5009
GUARD
Glass
Lamp
(by others)
5009C
CUT OFF
Electrical
tray
J-Box
Mounting
hardware
Trim
adapter
Brick
face
Silicone seal
Mortar
IMPORTANT
Disconnect power before installing fixtures. Read instructions before
starting work. This product must be installed in accordance with the
applicable installation code by a person familiar with the construction
and operation of the product and the hazards involved.
Saturna 5009 Series
HOUSING INSTALLATION - CONCRETE BLOCK
BRICK FACE
ELECTRICAL TRAY AND FACEPLATE INSTALLATION
1 Remove housing assembly from shipping container.
1 Remove electrical tray assembly from shipping carton.
2 Cut opening in concrete block wall to suit housing size.
2 Remove internal j-box cover from housing and pull out supply
3 Install supply wiring per applicable code requirements.
3 Push all splices into j-box and re-attach cover plate.
4 Install trim adapter to existing trim on housing allowing
4 Install ballast tray and secure with nuts provided.
J-box should be below unit. Not on top or sides. Secure to wall through (4) holes located in housing. Round
housing trim should extend 1” out from wall.
required brick thickness extension from wall. Seal trim
adapter to trim at housing with silicone.
5 Install brick face. Mortar between brick and adapter trim
to create flat surface for splay trim to seal against.
wires. Thread electrical white, black and ground leads from
ballast tray through j-box cover and connect to appropriate
supply leads.
5 Remove faceplate assembly from shipping carton. Install splay
trim with screws provided. Silicone seal may be required to
seal between brick face and splay trim.
6 Install electrical tray with screws provided and insert lamp as
required.
7 Install faceplate to splay trim with (4) screws provided.
8 Energize and test as required.
REV. 12/09/09
www.rebellelighting.com
© 2010 REBELLE All rights reserved.
REBELLE ARCHITECTURAL LIGHTING 11475 - 201A Street, Maple Ridge, B.C. Canada V2X 0Y3
P 604.465.5739 F 604.465.9801 E info@rebellelighting.com W rebellelighting.com
13"
Housing
pour box
5009H
HOOD
Concrete form
(by others)
5009
GUARD
Housing
pour box
Faceplate and
mounting screws
Concrete
(by others)
Glass
Studs and
wing nuts
Lamp
(by others)
5009C
CUT OFF
Figure 2
Electrical
tray
Spacing to
center line
Spacing to
center line
Splay trim
Height to
center line
J-Box
Figure 1
IMPORTANT
Disconnect power before installing fixtures. Read instructions before
starting work. This product must be installed in accordance with the
applicable installation code by a person familiar with the construction
and operation of the product and the hazards involved.
Saturna 5009 Series
HOUSING INSTALLATION - CONCRETE POUR
1 Remove housing from shipping carton. Lay out center
line of luminaire positions on concrete form. (Fig.1)
2 Position template (provided) over marked center line
luminaire spacings (make sure template is level and
arrows are in the up an down position). Drill 1/4” holes
through form. (Fig.1)
3 Install housing on concrete side of form using 3” long
studs and wing nuts (provided). Ensure that j-box is
properly oriented. J-box down or on back. (fig.2) Check
that unit is level.
4 If tile or other surface treatment is used the housing
position must be adjusted to suit prior to pouring concrete.
5 Install conduit as required and pull supply circuit wires
per applicable electrical codes.
6 Remove wing nuts and studs after concrete is cured
and before forms are stripped.
ELECTRICAL TRAY AND FACEPLATE INSTALLATION
1 Remove electrical tray from shipping carton.
2 Remove internal j-box cover from housing and pull out supply
wires. Thread electrical white, black and ground leads from
ballast tray thru j-box cover and connect to appropriate supply
leads.
3 Push all splices into j-box and re-attach cover plate.
4 Install ballast tray and secure with nuts provided.
5 Remove faceplate assembly from shipping carton. Install splay
trim with screws provided. Caulking may be required to seal
splay trim to mounting surface.
6 Install electrical tray/reflector with screws provided and insert
lamp as required.
7 Coat screws with white grease and install faceplate to splay
trim with (4) screws provided.
8 Energize and test as required.
REV. 12/08/09
www.rebellelighting.com
© 2010 REBELLE All rights reserved.
REBELLE ARCHITECTURAL LIGHTING 11475 - 201A Street, Maple Ridge, B.C. Canada V2X 0Y3
P 604.465.5739 F 604.465.9801 E info@rebellelighting.com W rebellelighting.com
13"
Housing
Housing
5009H
HOOD
Stud construction
(by others)
Blocking
(by others)
5009
GUARD
1/2" sheeting
(by others)
Faceplate and
mounting screws
Glass
Lamp
(by others)
Electrical tray
5009C
CUT OFF
HOLLOW WALL INSTALLATION
FOR COMPACT FLUORESCENT
UNITS. HID UNITS MUST BE
ORDERED SPECIAL FOR
HOLLOW WALL CONSTRUCTION
Housing
Splay trim
Stud construction
(by others)
Blocking
(by others)
Splay trim
Screws/nails as required
(by others)
Wall board
thickness
Note #3
IMPORTANT
Disconnect power before installing fixtures. Read instructions before
starting work. This product must be installed in accordance with the
applicable installation code by a person familiar with the construction
and operation of the product and the hazards involved.
Saturna 5009 Series
HOUSING INSTALLATION - HOLLOW WALL
ELECTRICAL TRAY AND FACEPLATE INSTALLATION
1 Remove housing assembly from shipping container.
1 Remove electrical tray assembly from shipping carton.
2 Position housing in stud construction to keep at least
2 Remove internal j-box cover from housing and pull out supply
1/2” clearance around unit except at mounting points.
3 Make sure front edge of housing protrudes enough to
be flush with finishing wall plane.
4 J-box should be below unit. Not on top or sides.
5 Install supply wiring per applicable code requirements.
wires. Thread electrical white, black and ground leads from
ballast tray through j-box cover and connect to appropriate
supply leads.
3 Push all splices into j-box and re-attach cover plate.
4 Install ballast tray and secure with nuts provided.
5 Remove faceplate assembly from shipping carton. Install splay
trim with screws provided.
Notes:
These units are listed/certified as non-ic recessed
units. They are meant to be installed with 1/2” space
around the recessed housing, except at point of
mounting contact. Insulation must be kept away from
housing by a minumum of 3 inches. The ballasts are
thermally protected to guard against misuse.
6 Install electrical tray with screws provided and insert lamp as
required.
7 Install faceplate to splay trim with (4) screws provided.
8 Energize and test as required.
REV. 12/08/09
www.rebellelighting.com
© 2010 REBELLE All rights reserved.
REBELLE ARCHITECTURAL LIGHTING 11475 - 201A Street, Maple Ridge, B.C. Canada V2X 0Y3
P 604.465.5739 F 604.465.9801 E info@rebellelighting.com W rebellelighting.com
Wall Surface
Recessed Junction Box
(By Others)
Wall Plate, used when a 4”
Octagon Junction Box is
present. If a 2” x 4” Switch
Box is used this part is
optional.
Mounting Plate with Outboard
Mounting Holes, Provided for
Securing Independently from
the Junction Box
IMPORTANT
Disconnect power before installing fixtures. Read instructions before
starting work. This product must be installed in accordance with the
applicable installation code by a person familiar with the construction
and operation of the product and the hazards involved.
Must be installed by a qualified electrician.
Streamline Mini
Head/Lamp
Compartment
and Driver Box
Streamline 6000 LED Series
FIXTURE INSTALLATION INSTRUCTIONS
1 Remove luminaire from shipping carton
2 Install mounting plate to wall surface over a recessed junction box (junction box by others).
3 Secure mounting plate to surface of wall independently from junction box. (Mounting hardware provided by others)
4 Connect fixture wires to supply wires with approved wire connectors and push splices securely into junction box.
5 Hook fixture head with driver housing over mounting plate making sure no wires are pinched. Tighten set screws (2) to secure
against mounting plate. Do not overtighten but ensure assembly is secured.
6 Energize and test as required.
7 For exterior or wet locations, silicone sealant should be applied to the top and down both sides where the fixture meets the
mounting surface to exclude water entrance.
REV. 12/08/09
www.rebellelighting.com
© 2010 REBELLE All rights reserved.
REBELLE ARCHITECTURAL LIGHTING 11475 - 201A Street, Maple Ridge, B.C. Canada V2X 0Y3
P 604.465.5739 F 604.465.9801 E info@rebellelighting.com W rebellelighting.com
4" Recessed octagon
J-Box (by others)
Ballast
box cover
Captive flat head
machine screws (8)
Mounting screws
(by others)
Lens frame
Mounting
plate
Lamp
(by others)
Housing
Mounting set
screws (2)
Ballast box
Adjustment
set screws (2)
Adjustment nuts (2)
Mounting plate detail
IMPORTANT
Disconnect power before installing fixtures. Read instructions before
starting work. This product must be installed in accordance with the
applicable installation code by a person familiar with the construction
and operation of the product and the hazards involved.
Streamline 6001/6004 Series
FIXTURE INSTALLATION INSTRUCTIONS
1 Remove luminaire from shipping carton
2 Undo (8) flat head shipping screws and remove ballast box cover and lens frame.
3 Position mounting plate over 4” junction box checking for level horizontal installation.
4 Secure mounting plate to mounting surface independant from junction box with (4) mounting screws.
5 Working inside ballast box select appropriate voltage leads and push leads through wire access hole in back of ballast box. Cap
off unused leads and leave in ballast box.
6 Connect fixture leads to supply leads with approved wire connections and push supply leads and splices securely into junction
box.
7 Hook fixture at back of ballast box over mounting plate making sure that no wires are pinched.
8 Tighten (2) mounting set screws until fixture is secure against mounting surface.
9 Caulking must be applied between fixture and mounting surface to create water tight seal.
10 Loosen adjustment nuts (2) and alignment set screws. Adjust cast housing to desired angle (+/- 15°) and re-tighten adjustment
nuts then set screws.
11 Install designated lamp into lampholder.
12 Re-install ballast box cover and lens frame, making sure there are no obstructions between gasket and frame that will interfere
with seal. Tighten flat head machine screws (4 on each cover) in a circular pattern to insure a uniform pressure against gaskets.
Tighten to 5ft/lbs torque to create water tight seal.
13 Energize and test as required.
REV. 12/08/09
www.rebellelighting.com
© 2010 REBELLE All rights reserved.
REBELLE ARCHITECTURAL LIGHTING 11475 - 201A Street, Maple Ridge, B.C. Canada V2X 0Y3
P 604.465.5739 F 604.465.9801 E info@rebellelighting.com W rebellelighting.com
Captive flat head
machine screws (8)
Ballast
box cover
Lens frame
Lamp
(by others)
Mounting screws Mounting
plate
(by others)
Housing
4" recessed
octagon J-Box
(by others)
Ballast box
Mounting set
screws (2)
Adjustment
nuts (4)
Mounting plate detail
IMPORTANT
Disconnect power before installing fixtures. Read instructions before
starting work. This product must be installed in accordance with the
applicable installation code by a person familiar with the construction
and operation of the product and the hazards involved.
Streamline 6002/6005 Series
FIXTURE INSTALLATION INSTRUCTIONS
1 Remove luminaire from shipping carton
2 Undo (8) flat head shipping screws and remove ballast box cover and lens frame.
3 Position mounting plate over 4” junction box checking for level horizontal installation.
4 Secure mounting plate to mounting surface independant from junction box with (4) mounting screws.
5 Working inside ballast box select appropriate voltage leads and push leads through wire access hole in back of ballast box. Cap
off unused leads and leave in ballast box.
6 Connect fixture leads to supply leads with approved wire connections and push supply leads and splices securely into junction
box.
7 Hook fixture at back of ballast box over mounting plate making sure that no wires are pinched.
8 Tighten (2) mounting set screws until fixture is secure against mounting surface.
9 Caulking must be applied between fixture and mounting surface to create water tight seal.
10 Loosen adjustment nuts (2) and alignment set screws. Adjust cast housing to desired angle (+/- 15°) and re-tighten adjustment
nuts then set screws.
11 Install designated lamp into lampholder.
12 Re-install ballast box cover and lens frame, making sure there are no obstructions between gasket and frame that will interfere
with seal. Tighten flat head machine screws (4 on each cover) in a circular pattern to insure a uniform pressure against gaskets.
Tighten to 8ft/lbs torque to create water tight seal.
13 Energize and test as required.
REV. 12/08/09
www.rebellelighting.com
© 2010 REBELLE All rights reserved.
REBELLE ARCHITECTURAL LIGHTING 11475 - 201A Street, Maple Ridge, B.C. Canada V2X 0Y3
P 604.465.5739 F 604.465.9801 E info@rebellelighting.com W rebellelighting.com
4" Recessed octagon
J-Box (by others)
Ballast
box cover
Captive flat head
machine screws (8)
Mounting screws
(by others)
Lens frame
Mounting
plate
Lamp
(by others)
Housing
Mounting set
screws (2)
Ballast box
Adjustment
set screws (2)
Adjustment nuts (2)
Mounting plate detail
IMPORTANT
Disconnect power before installing fixtures. Read instructions before
starting work. This product must be installed in accordance with the
applicable installation code by a person familiar with the construction
and operation of the product and the hazards involved.
Streamline 6001/6004 Series
FIXTURE INSTALLATION INSTRUCTIONS
1 Remove luminaire from shipping carton
2 Undo (8) flat head shipping screws and remove ballast box cover and lens frame.
3 Position mounting plate over 4” junction box checking for level horizontal installation.
4 Secure mounting plate to mounting surface independant from junction box with (4) mounting screws.
5 Working inside ballast box select appropriate voltage leads and push leads through wire access hole in back of ballast box. Cap
off unused leads and leave in ballast box.
6 Connect fixture leads to supply leads with approved wire connections and push supply leads and splices securely into junction
box.
7 Hook fixture at back of ballast box over mounting plate making sure that no wires are pinched.
8 Tighten (2) mounting set screws until fixture is secure against mounting surface.
9 Caulking must be applied between fixture and mounting surface to create water tight seal.
10 Loosen adjustment nuts (2) and alignment set screws. Adjust cast housing to desired angle (+/- 15°) and re-tighten adjustment
nuts then set screws.
11 Install designated lamp into lampholder.
12 Re-install ballast box cover and lens frame, making sure there are no obstructions between gasket and frame that will interfere
with seal. Tighten flat head machine screws (4 on each cover) in a circular pattern to insure a uniform pressure against gaskets.
Tighten to 5ft/lbs torque to create water tight seal.
13 Energize and test as required.
REV. 12/08/09
www.rebellelighting.com
© 2010 REBELLE All rights reserved.
REBELLE ARCHITECTURAL LIGHTING 11475 - 201A Street, Maple Ridge, B.C. Canada V2X 0Y3
P 604.465.5739 F 604.465.9801 E info@rebellelighting.com W rebellelighting.com
Captive flat head
machine screws (8)
Ballast
box cover
Lens frame
Lamp
(by others)
Mounting screws Mounting
plate
(by others)
Housing
4" recessed
octagon J-Box
(by others)
Ballast box
Mounting set
screws (2)
Adjustment
nuts (4)
Mounting plate detail
IMPORTANT
Disconnect power before installing fixtures. Read instructions before
starting work. This product must be installed in accordance with the
applicable installation code by a person familiar with the construction
and operation of the product and the hazards involved.
Streamline 6002/6005 Series
FIXTURE INSTALLATION INSTRUCTIONS
1 Remove luminaire from shipping carton
2 Undo (8) flat head shipping screws and remove ballast box cover and lens frame.
3 Position mounting plate over 4” junction box checking for level horizontal installation.
4 Secure mounting plate to mounting surface independant from junction box with (4) mounting screws.
5 Working inside ballast box select appropriate voltage leads and push leads through wire access hole in back of ballast box. Cap
off unused leads and leave in ballast box.
6 Connect fixture leads to supply leads with approved wire connections and push supply leads and splices securely into junction
box.
7 Hook fixture at back of ballast box over mounting plate making sure that no wires are pinched.
8 Tighten (2) mounting set screws until fixture is secure against mounting surface.
9 Caulking must be applied between fixture and mounting surface to create water tight seal.
10 Loosen adjustment nuts (2) and alignment set screws. Adjust cast housing to desired angle (+/- 15°) and re-tighten adjustment
nuts then set screws.
11 Install designated lamp into lampholder.
12 Re-install ballast box cover and lens frame, making sure there are no obstructions between gasket and frame that will interfere
with seal. Tighten flat head machine screws (4 on each cover) in a circular pattern to insure a uniform pressure against gaskets.
Tighten to 8ft/lbs torque to create water tight seal.
13 Energize and test as required.
REV. 12/08/09
www.rebellelighting.com
© 2010 REBELLE All rights reserved.
REBELLE ARCHITECTURAL LIGHTING 11475 - 201A Street, Maple Ridge, B.C. Canada V2X 0Y3
P 604.465.5739 F 604.465.9801 E info@rebellelighting.com W rebellelighting.com
Flat head
mounting screws (8)
Lens and
lens frame
Cast ballast
box cover
1/4" mounting
screws (by others)
Mounting
plate (arm)
J-Box screws
(by others)
4" octagon
J-Box (by others)
Cantilever arm
Lamp
(by others)
Hex
nuts (6)
Cast housing
Mounting set
screws - fixture(2)
Mounting
plate(fixture)
Mounting set
screws - arm (2)
Cast
ballast box
Alignment
set screws (2)
Mounting plate detail
IMPORTANT
Adjustment
bolts (2)
Disconnect power before installing fixtures. Read instructions before
starting work. This product must be installed in accordance with the
applicable installation code by a person familiar with the construction
and operation of the product and the hazards involved.
Streamline 6007/6010 Series
FIXTURE INSTALLATION INSTRUCTIONS
1 Install mounting plate (arm), with notch up, to 4” junction box with (2) machine screws supplied with junction box.
2 Secure mounting plate (arm) with (4) 1/4” mounting screws to mounting surface independent from junction box.
3 Check fixture voltage and supply voltage are correct. Connect 12” leads (supplied with cantilever arm assembly) to supply with
approved wire connectors and push splices securely into junction box.
4 Hook cantilever arm assembly over mounting plate feeding 12” leads through wiring hole in arm assembly making sure no wires
are pinched. Tighten mounting set screws until arm assembly is secure against mounting surface.
5 Caulking may be required for irregular mounting surfaces, or if surface prevents arm from seating against wall mounting plate.
6 Undo (8 captive) flat head mounting screws and remove cast ballast box cover and lens & lens frame from fixture.
7 Install mounting plate (fixture) with notch up to arm assembly with hex nuts supplied.
8 Connect fixture leads to 12” supply leads with approved wire connectors and push splices securely into cast ballast box.
9 Hook fixture at back of cast ballast box over mounting plate making sure that no wire are pinched.
10 Tighten (2) mounting set screws until fixture is secure against mounting surface.
11 Loosen adjustment nuts (2) and alignment set screws. Adjust cast housing to desired angle (+/- 15°) and re-tighten adjustment
nuts then set screws.
12 Install desingated lamp into lampholder
13 Re-install ballast box cover and lens frame, making sure there are no obstructions between gasket and frame that will interfere
with seal. Tighten flat head machine screws (4 on each cover) in a circular pattern to ensure a uniform pressure against gaskets.
Tighten to 5 ft/lbs to create watertight seal.
14 Energize and test as required.
www.rebellelighting.com
© 2010 REBELLE All rights reserved.
REV. 12/08/09
REBELLE ARCHITECTURAL LIGHTING 11475 - 201A Street, Maple Ridge, B.C. Canada V2X 0Y3
P 604.465.5739 F 604.465.9801 E info@rebellelighting.com W rebellelighting.com
Flat head
mounting screws (8)
Lens and
lens frame
Cast ballast
box cover
J-Box screws
Mounting (by others)
4" octagon
plate (arm)
J-Box (by others)
1/4" mounting
screws (by others)
Lamp
(by others)
Cantilever arm
Cast
housing
Hex
nuts (6)
Mounting set
screws - fixture (2)
Cast
ballast box
Mounting
plate (fixture)
Mounting
set screws - arm (2)
Mounting plate detail
IMPORTANT
Disconnect power before installing fixtures. Read instructions before
starting work. This product must be installed in accordance with the
applicable installation code by a person familiar with the construction
and operation of the product and the hazards involved.
Adjustment bolts (4)
Streamline 6008/6011 Series
FIXTURE INSTALLATION INSTRUCTIONS
1 Install mounting plate (arm), with notch up, to 4” junction box with (2) machine screws supplied with junction box.
2 Secure mounting plate (arm) with (4) 1/4” mounting screws to mounting surface independent from junction box.
3 Check fixture voltage and supply voltage are correct. Connect 12” leads (supplied with cantilever arm assembly) to supply with
approved wire connectors and push splices securely into junction box.
4 Hook cantilever arm assembly over mounting plate feeding 12” leads through wiring hole in arm assembly making sure no wires
are pinched. Tighten mounting set screws until arm assembly is secure against mounting surface.
5 Caulking may be required for irregular mounting surfaces, or if surface prevents arm from seating against wall mounting plate.
6 Undo (8 captive) flat head mounting screws and remove cast ballast box cover and lens & lens frame from fixture.
7 Install mounting plate (fixture) with notch up to arm assembly with hex nuts supplied.
8 Connect fixture leads to 12” supply leads with approved wire connectors and push splices securely into cast ballast box.
9 Hook fixture at back of cast ballast box over mounting plate making sure that no wire are pinched.
10 Tighten (2) mounting set screws until fixture is secure against mounting surface.
11 Loosen adjustment nuts (4) and alignment set screws. Adjust cast housing to desired angle (+/- 15°) and re-tighten adjustment
nuts then set screws.
12 Install desingated lamp into lampholder
13 Re-install ballast box cover and lens frame, making sure there are no obstructions between gasket and frame that will interfere
with seal. Tighten flat head machine screws (4 on each cover) in a circular pattern to ensure a uniform pressure against gaskets.
Tighten to 8 ft/lbs to create watertight seal.
14 Energize and test as required.
www.rebellelighting.com
© 2010 REBELLE All rights reserved.
REV. 12/08/09
REBELLE ARCHITECTURAL LIGHTING 11475 - 201A Street, Maple Ridge, B.C. Canada V2X 0Y3
P 604.465.5739 F 604.465.9801 E info@rebellelighting.com W rebellelighting.com
Flat head
mounting screws (8)
Lens and
lens frame
Cast ballast
box cover
1/4" mounting
screws (by others)
Mounting
plate (arm)
J-Box screws
(by others)
4" octagon
J-Box (by others)
Cantilever arm
Lamp
(by others)
Hex
nuts (6)
Cast housing
Mounting set
screws - fixture(2)
Mounting
plate(fixture)
Mounting set
screws - arm (2)
Cast
ballast box
Alignment
set screws (2)
Mounting plate detail
IMPORTANT
Adjustment
bolts (2)
Disconnect power before installing fixtures. Read instructions before
starting work. This product must be installed in accordance with the
applicable installation code by a person familiar with the construction
and operation of the product and the hazards involved.
Streamline 6007/6010 Series
FIXTURE INSTALLATION INSTRUCTIONS
1 Install mounting plate (arm), with notch up, to 4” junction box with (2) machine screws supplied with junction box.
2 Secure mounting plate (arm) with (4) 1/4” mounting screws to mounting surface independent from junction box.
3 Check fixture voltage and supply voltage are correct. Connect 12” leads (supplied with cantilever arm assembly) to supply with
approved wire connectors and push splices securely into junction box.
4 Hook cantilever arm assembly over mounting plate feeding 12” leads through wiring hole in arm assembly making sure no wires
are pinched. Tighten mounting set screws until arm assembly is secure against mounting surface.
5 Caulking may be required for irregular mounting surfaces, or if surface prevents arm from seating against wall mounting plate.
6 Undo (8 captive) flat head mounting screws and remove cast ballast box cover and lens & lens frame from fixture.
7 Install mounting plate (fixture) with notch up to arm assembly with hex nuts supplied.
8 Connect fixture leads to 12” supply leads with approved wire connectors and push splices securely into cast ballast box.
9 Hook fixture at back of cast ballast box over mounting plate making sure that no wire are pinched.
10 Tighten (2) mounting set screws until fixture is secure against mounting surface.
11 Loosen adjustment nuts (2) and alignment set screws. Adjust cast housing to desired angle (+/- 15°) and re-tighten adjustment
nuts then set screws.
12 Install desingated lamp into lampholder
13 Re-install ballast box cover and lens frame, making sure there are no obstructions between gasket and frame that will interfere
with seal. Tighten flat head machine screws (4 on each cover) in a circular pattern to ensure a uniform pressure against gaskets.
Tighten to 5 ft/lbs to create watertight seal.
14 Energize and test as required.
www.rebellelighting.com
© 2010 REBELLE All rights reserved.
REV. 12/08/09
REBELLE ARCHITECTURAL LIGHTING 11475 - 201A Street, Maple Ridge, B.C. Canada V2X 0Y3
P 604.465.5739 F 604.465.9801 E info@rebellelighting.com W rebellelighting.com
Flat head
mounting screws (8)
Lens and
lens frame
Cast ballast
box cover
J-Box screws
Mounting (by others)
4" octagon
plate (arm)
J-Box (by others)
1/4" mounting
screws (by others)
Lamp
(by others)
Cantilever arm
Cast
housing
Hex
nuts (6)
Mounting set
screws - fixture (2)
Cast
ballast box
Mounting
plate (fixture)
Mounting
set screws - arm (2)
Mounting plate detail
IMPORTANT
Disconnect power before installing fixtures. Read instructions before
starting work. This product must be installed in accordance with the
applicable installation code by a person familiar with the construction
and operation of the product and the hazards involved.
Adjustment bolts (4)
Streamline 6008/6011 Series
FIXTURE INSTALLATION INSTRUCTIONS
1 Install mounting plate (arm), with notch up, to 4” junction box with (2) machine screws supplied with junction box.
2 Secure mounting plate (arm) with (4) 1/4” mounting screws to mounting surface independent from junction box.
3 Check fixture voltage and supply voltage are correct. Connect 12” leads (supplied with cantilever arm assembly) to supply with
approved wire connectors and push splices securely into junction box.
4 Hook cantilever arm assembly over mounting plate feeding 12” leads through wiring hole in arm assembly making sure no wires
are pinched. Tighten mounting set screws until arm assembly is secure against mounting surface.
5 Caulking may be required for irregular mounting surfaces, or if surface prevents arm from seating against wall mounting plate.
6 Undo (8 captive) flat head mounting screws and remove cast ballast box cover and lens & lens frame from fixture.
7 Install mounting plate (fixture) with notch up to arm assembly with hex nuts supplied.
8 Connect fixture leads to 12” supply leads with approved wire connectors and push splices securely into cast ballast box.
9 Hook fixture at back of cast ballast box over mounting plate making sure that no wire are pinched.
10 Tighten (2) mounting set screws until fixture is secure against mounting surface.
11 Loosen adjustment nuts (4) and alignment set screws. Adjust cast housing to desired angle (+/- 15°) and re-tighten adjustment
nuts then set screws.
12 Install desingated lamp into lampholder
13 Re-install ballast box cover and lens frame, making sure there are no obstructions between gasket and frame that will interfere
with seal. Tighten flat head machine screws (4 on each cover) in a circular pattern to ensure a uniform pressure against gaskets.
Tighten to 8 ft/lbs to create watertight seal.
14 Energize and test as required.
www.rebellelighting.com
© 2010 REBELLE All rights reserved.
REV. 12/08/09
REBELLE ARCHITECTURAL LIGHTING 11475 - 201A Street, Maple Ridge, B.C. Canada V2X 0Y3
P 604.465.5739 F 604.465.9801 E info@rebellelighting.com W rebellelighting.com
Lens frame and
machine screws (4)
Ballast box cover and
machine screws (4)
Hub with mounting
plates attached
Housing
Ballast box
Mounting
set screws (2)
Canopy
Mounting bolts
(by others)
Canopy cover
Adjustment
nuts (2)
Adjustment set
screws (2)
Stem
IMPORTANT
Disconnect power before installing fixtures. Read instructions before
starting work. This product must be installed in accordance with the
applicable installation code by a person familiar with the construction
and operation of the product and the hazards involved.
Streamline 6016 Series
ANCHOR BOLT INSTALLATION INSTRUCTIONS
1 Remove luminaires, hub assembly, canopy assembly and stem from shipping cartons.
2 Remove canopy cover from canopy. Position canopy over j-box, pull supply leads into canopy and fasten canopy to mounting
surface independent of j-box with (4) bolts suitable for load application (not supplied).
3 Slide canopy cover over stem and thread stem and hub assembly into hanger bracket inside canopy. Connect leads supplied to
supply leads with approved wire connector and push splices into j-box. Thread leads through stem and down to hub assembly.
4 Working on luminaire remove (8) machine screws, ballast box cover and lens frame cover.
5 Working inside ballast box select appropriate voltage leads and push leads through wire access hole in back of ballast box. Cap
off unused leads and leave in ballast box.
6 Connect fixture leads and supply leads inside hub with approved wire connectors and push splices into hub.
7 Hook fixture at back of ballast box over mounting plate, attached to hub, making sure that no wires are pinched.
8 Repeat for second fixture.
9 Tighten (2) mounting set screws until fixture is secure against hub. If fixture is misaligned it can be adjusted by loosening mounting
plate screws and sliding mounting plate up or down on slotted holes to desired position.
10 Caulking may need to be applied between fixture and hub to create water tight seal.
11 Loosen adjustment nuts (2) and alignment set screws. Adjust housing to desired angle (+/- 15°) and re-tighten adjustment nuts
then set screws.
12 Install designated lamp into lampholder (lamp not supplied).
13 Re-install ballast box cover and lens frame, making sure there are no obstructions between gasket and frame that will interfere
with seal. Tighten flat head machine screws (4 on each cover) in a circular pattern to ensure a uniform pressure against gaskets.
Tighten to 5 ft/lbs torque to create watertight seal.
14 Energize and test as required.
REV. 12/08/09
www.rebellelighting.com
© 2010 REBELLE All rights reserved.
REBELLE ARCHITECTURAL LIGHTING 11475 - 201A Street, Maple Ridge, B.C. Canada V2X 0Y3
P 604.465.5739 F 604.465.9801 E info@rebellelighting.com W rebellelighting.com
Lens frame and
machine screws (4)
Ballast box cover
and machine screws (4)
Hub with mounting
plates attached
Ballast box
Housing
Canopy
Mounting set
screws (2)
Mounting bolts
(by others)
Adjustment
nuts (4)
Canopy cover
Stem
IMPORTANT
Disconnect power before installing fixtures. Read instructions before
starting work. This product must be installed in accordance with the
applicable installation code by a person familiar with the construction
and operation of the product and the hazards involved.
Streamline 6017 Series
ANCHOR BOLT INSTALLATION INSTRUCTIONS
1 Remove luminaires, hub assembly, canopy assembly and stem from shipping cartons.
2 Remove canopy cover from canopy. Position canopy over j-box, pull supply leads into canopy and fasten canopy to mounting
surface independent of j-box with (4) bolts suitable for load application (not supplied).
3 Slide canopy cover over stem and thread stem and hub assembly into hanger bracket inside canopy. Connect leads supplied to
supply leads with approved wire connector and push splices into j-box. Thread leads through stem and down to hub assembly.
4 Working on luminaire remove (8) machine screws, ballast box cover and lens frame cover.
5 Working inside ballast box select appropriate voltage leads and push leads through wire access hole in back of ballast box. Cap
off unused leads and leave in ballast box.
6 Connect fixture leads and supply leads inside hub with approved wire connectors and push splices into hub.
7 Hook fixture at back of ballast box over mounting plate, attached to hub, making sure that no wires are pinched.
8 Repeat for second fixture.
9 Tighten (2) mounting set screws until fixture is secure against hub. If fixture is misaligned it can be adjusted by loosening mounting
plate screws and sliding mounting plate up or down on slotted holes to desired position.
10 Caulking may need to be applied between fixture and hub to create water tight seal.
11 Loosen adjustment nuts (4). Adjust housing to desired angle (+/- 15°) and re-tighten.
12 Install designated lamp into lampholder (lamp not supplied).
13 Re-install ballast box cover and lens frame, making sure there are no obstructions between gasket and frame that will interfere
with seal. Tighten flat head machine screws (4 on each cover) in a circular pattern to ensure a uniform pressure against gaskets.
Tighten to 8 ft/lbs torque to create watertight seal.
14 Energize and test as required.
REV. 12/08/09
www.rebellelighting.com
© 2010 REBELLE All rights reserved.
REBELLE ARCHITECTURAL LIGHTING 11475 - 201A Street, Maple Ridge, B.C. Canada V2X 0Y3
P 604.465.5739 F 604.465.9801 E info@rebellelighting.com W rebellelighting.com
Ballast box
Housing
Mounting plate
Post adapter
Lamp
(by others)
Post fitter
Lens frame and
machine screws (4)
Ballast box cover
and machine screws (4)
Post
(by others)
Adjustment
nuts (4)
Mounting
set screws (2)
IMPORTANT
Disconnect power before installing fixtures. Read instructions before
starting work. This product must be installed in accordance with the
applicable installation code by a person familiar with the construction
and operation of the product and the hazards involved.
Streamline 6019/6021 Series
ANCHOR BOLT INSTALLATION INSTRUCTIONS
1 Remove luminaires, post adaptor/post fitter from shipping cartons.
2 Route supply conductors up post. Connect 24” pigtails (supplied) to supply conductors with approved wire splices and hang leads
out top of pole.
3 Position post adaptor/post fitter assembly over top of pole. Thread leads up through fitter and out through appropriate wire access
holes located in mounting plate. Secure supply conductors to post fitter as per appicable code requirements.
4 Working on luminaire remove (8) machine screws, ballast box cover and lens frame cover.
5 Working inside ballast box select appropriate voltage leads and push leads through wire access hole in back of ballast box. Cap
off unused leads and leave in ballast box.
6 Connect fixture leads and supply leads with approved wire connectors and push splices into post adaptor.
7 Hook fixture at back of ballast box over mounting plate, attached to post adaptor, making sure that no wires are pinched.
8 Repeat for second fixture.
9 Tighten (2) mounting set screws until fixture is secure against post adaptor. If fixture is misaligned it can be adjusted by loosening
mounting plate screws and sliding mounting plate up or down on slotted holes to desired position.
10 Caulking may need to be applied between fixture and hub to create water tight seal.
11 Loosen adjustment nuts (4) adjust housing to desired angle (+/- 15°) and re-tighten adjustment nuts.
12 Install designated lamp into lampholder (lamp not supplied).
13 Re-install ballast box cover and lens frame, making sure there are no obstructions between gasket and frame that will interfere
with seal. Tighten flat head machine screws (4 on each cover) in a circular pattern to ensure a uniform pressure against gaskets.
Tighten to 8 ft/lbs torque to create watertight seal.
14 Energize and test as required.
REV. 12/08/09
www.rebellelighting.com
© 2010 REBELLE All rights reserved.
REBELLE ARCHITECTURAL LIGHTING 11475 - 201A Street, Maple Ridge, B.C. Canada V2X 0Y3
P 604.465.5739 F 604.465.9801 E info@rebellelighting.com W rebellelighting.com
Ballast box
Housing
Mounting plate
Post adapter
Lamp
(by others)
Post fitter
Lens frame and
machine screws (4)
Ballast box cover
and machine screws (4)
Post
(by others)
Adjustment
nuts (4)
Mounting
set screws (2)
IMPORTANT
Disconnect power before installing fixtures. Read instructions before
starting work. This product must be installed in accordance with the
applicable installation code by a person familiar with the construction
and operation of the product and the hazards involved.
Streamline 6019/6021 Series
ANCHOR BOLT INSTALLATION INSTRUCTIONS
1 Remove luminaires, post adaptor/post fitter from shipping cartons.
2 Route supply conductors up post. Connect 24” pigtails (supplied) to supply conductors with approved wire splices and hang leads
out top of pole.
3 Position post adaptor/post fitter assembly over top of pole. Thread leads up through fitter and out through appropriate wire access
holes located in mounting plate. Secure supply conductors to post fitter as per appicable code requirements.
4 Working on luminaire remove (8) machine screws, ballast box cover and lens frame cover.
5 Working inside ballast box select appropriate voltage leads and push leads through wire access hole in back of ballast box. Cap
off unused leads and leave in ballast box.
6 Connect fixture leads and supply leads with approved wire connectors and push splices into post adaptor.
7 Hook fixture at back of ballast box over mounting plate, attached to post adaptor, making sure that no wires are pinched.
8 Repeat for second fixture.
9 Tighten (2) mounting set screws until fixture is secure against post adaptor. If fixture is misaligned it can be adjusted by loosening
mounting plate screws and sliding mounting plate up or down on slotted holes to desired position.
10 Caulking may need to be applied between fixture and hub to create water tight seal.
11 Loosen adjustment nuts (4) adjust housing to desired angle (+/- 15°) and re-tighten adjustment nuts.
12 Install designated lamp into lampholder (lamp not supplied).
13 Re-install ballast box cover and lens frame, making sure there are no obstructions between gasket and frame that will interfere
with seal. Tighten flat head machine screws (4 on each cover) in a circular pattern to ensure a uniform pressure against gaskets.
Tighten to 8 ft/lbs torque to create watertight seal.
14 Energize and test as required.
REV. 12/08/09
www.rebellelighting.com
© 2010 REBELLE All rights reserved.
REBELLE ARCHITECTURAL LIGHTING 11475 - 201A Street, Maple Ridge, B.C. Canada V2X 0Y3
P 604.465.5739 F 604.465.9801 E info@rebellelighting.com W rebellelighting.com
Shroud assembly
Mounting screws
Mounting plate
Electrical tray
J-box screws
(by others)
4" octagon j-box
(by others)
Lamp (by others)
Set screws
IMPORTANT
Disconnect power before installing fixtures. Read instructions before
starting work. This product must be installed in accordance with the
applicable installation code by a person familiar with the construction
and operation of the product and the hazards involved.
Streamline 6030D Series
INSTALLATION INSTRUCTIONS
1 Remove fixture from shipping carton.
2 Loosen (2) set screws and remove shroud assembly from fixture.
3 Remove (2) mounting screws and electrical tray from mounting plate.
4 Remove (2) j-box screws from j-box.
5 Pull supply leads through grommet in mounting plate and position mounting plate over j-box. Install (2) j-box screws through
mounting plate and into j-box. Check for level then tighten j-box screws. Alternately (4) outboard mounting holes can be used
instead j-box screws.
6 Attach electrical tray leads (black, white & green) to supply leads with wire nuts (by others) and push connections securely into
j-box.
7 Install appropriate lamp (see lamp label information).
8 Install shroud assembly and tighten set screws until secure.
9 Energize and test as required.
REV. 12/08/09
www.rebellelighting.com
© 2010 REBELLE All rights reserved.
REBELLE ARCHITECTURAL LIGHTING 11475 - 201A Street, Maple Ridge, B.C. Canada V2X 0Y3
P 604.465.5739 F 604.465.9801 E info@rebellelighting.com W rebellelighting.com
Set screws
Mounting screws
Electrical tray
J-box screws
(by others)
Mounting plate
4" octagon j-box
(by others)
Shroud assembly
Lamp (by others)
IMPORTANT
Disconnect power before installing fixtures. Read instructions before
starting work. This product must be installed in accordance with the
applicable installation code by a person familiar with the construction
and operation of the product and the hazards involved.
Streamline 6030U Series
INSTALLATION INSTRUCTIONS
1 Remove fixture from shipping carton.
2 Loosen (2) set screws and remove shroud assembly from fixture.
3 Remove (2) mounting screws and electrical tray from mounting plate.
4 Remove (2) j-box screws from j-box.
5 Pull supply leads through grommet in mounting plate and position mounting plate over j-box. Install (2) j-box screws through
mounting plate and into j-box. Check for level then tighten j-box screws. Alternately (4) outboard mounting holes can be used
instead j-box screws.
6 Attach electrical tray leads (black, white & green) to supply leads with wire nuts (by others) and push connections securely into
j-box.
7 Install appropriate lamp (see lamp label information).
8 Install shroud assembly and tighten set screws until secure.
9 Energize and test as required.
REV. 12/08/09
www.rebellelighting.com
© 2010 REBELLE All rights reserved.
REBELLE ARCHITECTURAL LIGHTING 11475 - 201A Street, Maple Ridge, B.C. Canada V2X 0Y3
P 604.465.5739 F 604.465.9801 E info@rebellelighting.com W rebellelighting.com
Lens (lay-in)
Lamp (by others)
J-box screws
(by others)
Mounting plate
3" x 2" Recessed j-box
(by others)
Shroud assembly
Cover plate for 4"
octagon j-box (optional)
Set screws
5"
IMPORTANT
Mounting plate
Disconnect power before installing fixtures. Read instructions before
starting work. This product must be installed in accordance with the
applicable installation code by a person familiar with the construction
and operation of the product and the hazards involved.
Streamline 6032Z Series
INSTALLATION INSTRUCTIONS
1 Remove fixture from shipping carton.
2 Loosen (2) set screws and remove mounting plate from fixture.
3 Remove (2) j-box screws from j-box.
4 Pull supply leads through grommet in mounting plate and position mounting plate over j-box. Install (2) j-box screws through
mounting plate and into j-box. Check for level then tighten j-box screws. Alternately (4) outboard mounting holes can be used
instead j-box screws.
5 Attach electrical tray leads (black, white & green) to supply leads with wire nuts (by others) and push connections securely into
j-box.
6 Install shroud assembly and tighten set screws until secure.
7 Install appropriate lamp (see lamp label information).
8 Energize and test as required.
REV. 12/08/09
www.rebellelighting.com
© 2010 REBELLE All rights reserved.
REBELLE ARCHITECTURAL LIGHTING 11475 - 201A Street, Maple Ridge, B.C. Canada V2X 0Y3
P 604.465.5739 F 604.465.9801 E info@rebellelighting.com W rebellelighting.com
Housing
Mounting hardware
(by others)
Backplate
Octagon J-Box
(by others)
Lamp
(by others)
Frame
hardware
Set
screws
Frame
(with glass)
IMPORTANT
Disconnect power before installing fixtures. Read instructions before
starting work. This product must be installed in accordance with the
applicable installation code by a person familiar with the construction
and operation of the product and the hazards involved.
CYL-003 7000 Series
INSTALLATION INSTRUCTIONS
1 Remove luminaire from shipping container.
2 Loosen (2) set screws and remove backplate from luminaire.
3 Place backplate over junction box and pull supply leads through opening in backplate. Secure backplate to wall as required
(mounting hardware not provided).
4 Select appropriate voltage leads and cap off unused leads and leave in ballast compartment.
5 Connect fixture leads and supply leads with approved wire connectors and push splices securely into j-box.
6 Hook fixture over backplate making sure not to pinch wires. Secure to mounting backplate with (2) set screws provided. Tighten
securely.
7 Remove frame hardware (3 flat head machine screws) and remove frame.
8 Install designated lamp and reinstall frame assembly with frame hardware. Tighten securely
9 Caulking may need to be applied between fixture and mounting surface to create water tight seal.
10 Energize and test as required.
REV. 12/08/09
www.rebellelighting.com
© 2010 REBELLE All rights reserved.
REBELLE ARCHITECTURAL LIGHTING 11475 - 201A Street, Maple Ridge, B.C. Canada V2X 0Y3
P 604.465.5739 F 604.465.9801 E info@rebellelighting.com W rebellelighting.com
Housing
Mounting hardware
(by others)
Backplate
Octagon J-Box
(by others)
Lamp
(by others)
Frame
hardware
Set
screws
Frame
(with glass)
IMPORTANT
Disconnect power before installing fixtures. Read instructions before
starting work. This product must be installed in accordance with the
applicable installation code by a person familiar with the construction
and operation of the product and the hazards involved.
CYL-003 7010 Series
INSTALLATION INSTRUCTIONS
1 Remove luminaire from shipping container.
2 Loosen (2) set screws and remove backplate from luminaire.
3 Place backplate over junction box and pull supply leads through opening in backplate. Secure backplate to wall as required
(mounting hardware not provided).
4 Select appropriate voltage leads and cap off unused leads and leave in ballast compartment.
5 Connect fixture leads and supply leads with approved wire connectors and push splices securely into j-box.
6 Hook fixture over backplate making sure not to pinch wires. Secure to mounting backplate with (2) set screws provided. Tighten
securely.
7 Remove frame hardware (3 flat head machine screws) and remove frame.
8 Install designated lamp and reinstall frame assembly with frame hardware. Tighten securely.
9 Caulking may need to be applied between fixture and mounting surface to create water tight seal. (Caulk along top and sides leave bottom open)
10 Energize and test as required.
REV. 12/08/09
www.rebellelighting.com
© 2010 REBELLE All rights reserved.
REBELLE ARCHITECTURAL LIGHTING 11475 - 201A Street, Maple Ridge, B.C. Canada V2X 0Y3
P 604.465.5739 F 604.465.9801 E info@rebellelighting.com W rebellelighting.com
Housing
Mounting hardware
(by others)
Backplate
Octagon J-Box
(by others)
Lamp
(by others)
Set
screws
Frame
hardware
Frame
(with glass)
IMPORTANT
Disconnect power before installing fixtures. Read instructions before
starting work. This product must be installed in accordance with the
applicable installation code by a person familiar with the construction
and operation of the product and the hazards involved.
CYL-003 7100 Series
INSTALLATION INSTRUCTIONS
1 Remove luminaire from shipping container.
2 Loosen (2) set screws and remove backplate from luminaire.
3 Place backplate over junction box and pull supply leads through opening in backplate. Secure backplate to wall as required
(mounting hardware not provided).
4 Select appropriate voltage leads and cap off unused leads and leave in ballast compartment.
5 Connect fixture leads and supply leads with approved wire connectors and push splices securely into j-box.
6 Hook fixture over backplate making sure not to pinch wires. Secure to mounting backplate with (2) set screws provided. Tighten
securely.
7 Remove frame hardware (3 flat head machine screws) and remove frame.
8 Install designated lamp and reinstall frame assembly with frame hardware. Tighten securely.
9 Caulking may need to be applied between fixture and mounting surface to create water tight seal.
10 Energize and test as required.
REV. 12/08/09
www.rebellelighting.com
© 2010 REBELLE All rights reserved.
REBELLE ARCHITECTURAL LIGHTING 11475 - 201A Street, Maple Ridge, B.C. Canada V2X 0Y3
P 604.465.5739 F 604.465.9801 E info@rebellelighting.com W rebellelighting.com
Octagon J-Box
(by others)
Crossbar hangstraight
assembly
J-Box screws (2)
Canopy
Hangstraight ring
Stem
Luminaire
Lamp
(by others)
Glass frame
Glass frame
screws (3)
IMPORTANT
Disconnect power before installing fixtures. Read instructions before
starting work. This product must be installed in accordance with the
applicable installation code by a person familiar with the construction
and operation of the product and the hazards involved.
CYL-003 7200 Series
INSTALLATION INSTRUCTIONS
1 Remove luminaire from shipping container.
2 Select appropriate voltage leads and cap off unused leads and thread out coupler at top of luminaire.
3 Thread leads through stem and screw in stem to luminaire, lock stem with hex nut provided.
4 Place hangstraight ring and canopy over stem and wires as shown above. Thread crossbar hangstraight assembly on to top of
stem and secure tightly.
5 Attach crossbar hangstraight assembly to j-box with j-box screws.
6 Connect fixture leads and supply conductors with approved wire connectors and push splices securely into j-box.
7 Push canopy up to ceiling and attach with hangstraight ring.
8 Remove glass frame hardware (3 flat head machine screws) and remove glass frame.
9 Install designated lamp and reinstall frame assembly. Tighten securely.
10 Energize and test as required.
REV. 12/08/09
www.rebellelighting.com
© 2010 REBELLE All rights reserved.
REBELLE ARCHITECTURAL LIGHTING 11475 - 201A Street, Maple Ridge, B.C. Canada V2X 0Y3
P 604.465.5739 F 604.465.9801 E info@rebellelighting.com W rebellelighting.com
Octagon J-Box
(by others)
Crossbar hangstraight
assembly
J-Box screws (2)
Canopy
Hangstraight ring
Stem
Luminaire
Lamp
(by others)
Glass frame
Glass frame
screws (3)
IMPORTANT
Disconnect power before installing fixtures. Read instructions before
starting work. This product must be installed in accordance with the
applicable installation code by a person familiar with the construction
and operation of the product and the hazards involved.
CYL-003 7200 Series
INSTALLATION INSTRUCTIONS
1 Remove luminaire from shipping container.
2 Select appropriate voltage leads and cap off unused leads and thread out coupler at top of luminaire.
3 Thread leads through stem and screw in stem to luminaire, lock stem with hex nut provided.
4 Place hangstraight ring and canopy over stem and wires as shown above. Thread crossbar hangstraight assembly on to top of
stem and secure tightly.
5 Attach crossbar hangstraight assembly to j-box with j-box screws.
6 Connect fixture leads and supply conductors with approved wire connectors and push splices securely into j-box.
7 Push canopy up to ceiling and attach with hangstraight ring.
8 Remove glass frame hardware (3 flat head machine screws) and remove glass frame.
9 Install designated lamp and reinstall frame assembly. Tighten securely.
10 Energize and test as required.
REV. 12/08/09
www.rebellelighting.com
© 2010 REBELLE All rights reserved.
REBELLE ARCHITECTURAL LIGHTING 11475 - 201A Street, Maple Ridge, B.C. Canada V2X 0Y3
P 604.465.5739 F 604.465.9801 E info@rebellelighting.com W rebellelighting.com
Shade w/ universal joints
1/4-20 cap screws w/locking nut
Lens frame
Universal joints
Machined for 5/8" wrench
Lamp (by others)
Arm
Figure 1
Housing
Fitter
Front View
Split pin or 1/4-20x1" set screw
1/4-20x1/2" set screws
Pole (see pole guide) or Arm
assembly (for 7600T)
Figure 2
Exploded View
Bottom View
Arm (3) assembly
Housing assembly
Shade assembly
IMPORTANT
Disconnect power before installing fixtures. Read instructions before
starting work. This product must be installed in accordance with the
applicable installation code by a person familiar with the construction
and operation of the product and the hazards involved.
CYL-003 7600/7601 Series
INSTALLATION INSTRUCTIONS
1 Remove luminaire from shipping carton and lay out parts. (lamp housing assembly, shade assembly, arm assemblies & parts bag)
2 Place shade assembly (top down) on flat surface. Make sure (3) universal joints connections (on shade assembly) are loose
enough so that they can be turned by hand for adjustment at step 4.
3 Place housing assembly on flat surface (fitter end down). Thread (3) arm assembies to housing assembly. Tighten arms with 5/8”
wrench at top end of arm assembly. Universal joints at top of arm assemby should still be loose enough to turn by hand.
4 Position housing assembly/arm assembly over shade assembly (see bottom view) Align and connect universal joints (see fig.
2) using cap screws and hex nuts (provided in parts bag) After lamp housing assembly / arm assemblies are joined tighten cap
screws holding universal joints to shade assembly.
5 Select appropriate fixture voltage and cap off unused leads. Connect fixture leads to supply leads and secure as required. Posi-
tion fixture over pole (see exploded view) making sure fitter slides to bottom. Tighten 5 set screws attached to fitter evenly making
sure fixture is aligned vertically.
6 To secure luminaire to pole drill remaining hole in fitter (see exploded view) through into pole. Drill 0.250” dia. hole and insert
1/4x1” split pin (provided in parts bag) through fitter and into pole until pin is flush with fitter. Alternately drill 0.201” dia. through into
pole and tap 1/4-20 , thread 1/4-20x1” set screw (provided in parts bag) through fitter and into pole. (Anti-rotation stop)
7 Remove lens frame from housing assembly by loosening (2) set screws in frame (see exploded view). Insert designated lamp (by
others) and re-install lens frame tightening set screw securely.
8 Energize and test as required.
REV. 12/02/09
www.rebellelighting.com
© 2010 REBELLE All rights reserved.
REBELLE ARCHITECTURAL LIGHTING 11475 - 201A Street, Maple Ridge, B.C. Canada V2X 0Y3
P 604.465.5739 F 604.465.9801 E info@rebellelighting.com W rebellelighting.com
Fixture Assembly
Arm
Mounting plate
Wall plate
Junction box
(by others)
Arm Assembly
Wiring access plate
Mounting bolts
(by others)
IMPORTANT
Disconnect power before installing fixtures. Read instructions before
starting work. This product must be installed in accordance with the
applicable installation code by a person familiar with the construction
and operation of the product and the hazards involved.
CYL-003 7600T Series
ARM INSTALLATION INSTRUCTIONS
1 Remove arm assembly from shipping carton and lay out parts.
2 Position mounting plate over junction box, pull supply leads through access hole in wall plate. Install wall plate, independent of
junction box, with (4) mounting bolts (not supplied). Mounting bolt size and backing to be determined by installer per installation.
3 Attach arm assembly by connecting (3) leads provided (black white & ground) to supply leads with appoved wire connectors and
push connections into junction box. Hook arm assembly over wall plate and secure with (2) set screws located at bottom of mounting plate.
4 Remove (3) screws securing wiring access plate and remove access plate. Pull (3) leads (black white & ground) through bottom of
access plate opening.
5 Feed (3) leads attached to fixture assembly through arm assembly and out bottom of wiring access hole. Slide fixture assembly
over arm assembly and attach per fixture instuctions.
6 Connect (3) sets of leads with approved wire connectors and push connections up into arm assembly. Reinstall wiring access
plate.
7 Follow fixture installation instructions to complete installation (7600T_pg2).
8 Energize and test as required.
REV. 12/08/09
www.rebellelighting.com
© 2010 REBELLE All rights reserved.
REBELLE ARCHITECTURAL LIGHTING 11475 - 201A Street, Maple Ridge, B.C. Canada V2X 0Y3
P 604.465.5739 F 604.465.9801 E info@rebellelighting.com W rebellelighting.com
Shade w/ universal joints
1/4-20 cap screws w/locking nut
Lens frame
Universal joints
Machined for 5/8" wrench
Lamp (by others)
Arm
Figure 1
Housing
Fitter
Front View
Split pin or 1/4-20x1" set screw
1/4-20x1/2" set screws
Pole (see pole guide) or Arm
assembly (for 7600T)
Figure 2
Exploded View
Bottom View
Arm (3) assembly
Housing assembly
Shade assembly
IMPORTANT
Disconnect power before installing fixtures. Read instructions before
starting work. This product must be installed in accordance with the
applicable installation code by a person familiar with the construction
and operation of the product and the hazards involved.
CYL-003 7600T Series
FIXTURE INSTALLATION INSTRUCTIONS
1 Remove luminaire from shipping carton and lay out parts. (lamp housing assembly, shade assembly, arm assemblies & parts bag)
2 Place shade assembly (top down) on flat surface. Make sure (3) universal joints connections (on shade assembly) are loose
enough so that they can be turned by hand for adjustment at step 4.
3 Place housing assembly on flat surface (fitter end down). Thread (3) arm assembies to housing assembly. Tighten arms with 5/8”
wrench at top end of arm assembly. Universal joints at top of arm assemby should still be loose enough to turn by hand.
4 Position housing assembly/arm assembly over shade assembly (see bottom view) Align and connect universal joints (see fig.
2) using cap screws and hex nuts (provided in parts bag) After lamp housing assembly / arm assemblies are joined tighten cap
screws holding universal joints to shade assembly.
5 Select appropriate fixture voltage and cap off unused leads. Connect fixture leads to supply leads and secure as required. Posi-
tion fixture over pole (see exploded view) making sure fitter slides to bottom. Tighten 5 set screws attached to fitter evenly making
sure fixture is aligned vertically.
6 To secure luminaire to pole drill remaining hole in fitter (see exploded view) through into pole. Drill 0.250” dia. hole and insert
1/4x1” split pin (provided in parts bag) through fitter and into pole until pin is flush with fitter. Alternately drill 0.201” dia. through into
pole and tap 1/4-20 , thread 1/4-20x1” set screw (provided in parts bag) through fitter and into pole. (Anti-rotation stop)
7 Remove lens frame from housing assembly by loosening (2) set screws in frame (see exploded view). Insert designated lamp (by
others) and re-install lens frame tightening set screw securely.
8 Energize and test as required.
REV. 12/02/09
www.rebellelighting.com
© 2010 REBELLE All rights reserved.
REBELLE ARCHITECTURAL LIGHTING 11475 - 201A Street, Maple Ridge, B.C. Canada V2X 0Y3
P 604.465.5739 F 604.465.9801 E info@rebellelighting.com W rebellelighting.com
Shade w/ universal joints
1/4-20 cap screws w/locking nut
Lens frame
Universal joints
Machined for 5/8" wrench
Lamp (by others)
Arm
Figure 1
Housing
Fitter
Front View
Split pin or 1/4-20x1" set screw
1/4-20x1/2" set screws
Pole (see pole guide) or Arm
assembly (for 7600T)
Figure 2
Exploded View
Bottom View
Arm (3) assembly
Housing assembly
Shade assembly
IMPORTANT
Disconnect power before installing fixtures. Read instructions before
starting work. This product must be installed in accordance with the
applicable installation code by a person familiar with the construction
and operation of the product and the hazards involved.
CYL-003 7600/7601 Series
INSTALLATION INSTRUCTIONS
1 Remove luminaire from shipping carton and lay out parts. (lamp housing assembly, shade assembly, arm assemblies & parts bag)
2 Place shade assembly (top down) on flat surface. Make sure (3) universal joints connections (on shade assembly) are loose
enough so that they can be turned by hand for adjustment at step 4.
3 Place housing assembly on flat surface (fitter end down). Thread (3) arm assembies to housing assembly. Tighten arms with 5/8”
wrench at top end of arm assembly. Universal joints at top of arm assemby should still be loose enough to turn by hand.
4 Position housing assembly/arm assembly over shade assembly (see bottom view) Align and connect universal joints (see fig.
2) using cap screws and hex nuts (provided in parts bag) After lamp housing assembly / arm assemblies are joined tighten cap
screws holding universal joints to shade assembly.
5 Select appropriate fixture voltage and cap off unused leads. Connect fixture leads to supply leads and secure as required. Posi-
tion fixture over pole (see exploded view) making sure fitter slides to bottom. Tighten 5 set screws attached to fitter evenly making
sure fixture is aligned vertically.
6 To secure luminaire to pole drill remaining hole in fitter (see exploded view) through into pole. Drill 0.250” dia. hole and insert
1/4x1” split pin (provided in parts bag) through fitter and into pole until pin is flush with fitter. Alternately drill 0.201” dia. through into
pole and tap 1/4-20 , thread 1/4-20x1” set screw (provided in parts bag) through fitter and into pole. (Anti-rotation stop)
7 Remove lens frame from housing assembly by loosening (2) set screws in frame (see exploded view). Insert designated lamp (by
others) and re-install lens frame tightening set screw securely.
8 Energize and test as required.
REV. 12/02/09
www.rebellelighting.com
© 2010 REBELLE All rights reserved.
REBELLE ARCHITECTURAL LIGHTING 11475 - 201A Street, Maple Ridge, B.C. Canada V2X 0Y3
P 604.465.5739 F 604.465.9801 E info@rebellelighting.com W rebellelighting.com
9.75"
Housing
Faceplate
12"
Housing
Lamp (by others)
Concrete form
(by others)
Electrical tray
Mounting
bracket
Spacing to center line Spacing to center line
Electrical tray
mounting screws
Concrete
(by others)
J-Box (optional
rear mount)
Height to
center line
Figure 2
Figure 1
IMPORTANT
Disconnect power before installing fixtures. Read instructions before
starting work. This product must be installed in accordance with the
applicable installation code by a person familiar with the construction
and operation of the product and the hazards involved.
Sightlines 1185 Series
ELECTRICAL TRAY AND FACEPLATE INSTALLATION
HOUSING INSTALLATION - CONCRETE POUR
1 Remove housing from shipping carton. Lay out center
line of luminaire positions on concrete. Form (fig.1)
2 Position template (provided) over marked center line
luminaire spacings (make sure template is level) drill
1/8” holes through form. (Fig.1)
3 Install housing on concrete side of form. Secure to
form thru 1/8” holes using wire (supplied by others).
Ensure that j-box is properly oriented. J-box down or
on back (fig.2) Check that unit is level.
4 If tile or other surface treatment is used the housing
position must be adjusted to suit prior to pouring.
5 Install 1/2” NPT conduit as required and pull supply
circuit wires per applicable electrical codes.
6 Conduits must be sealed or plugged at all entry points
as per applicable electrical code.
1
Remove electrical tray from shipping carton.
2
Remove internal j-box cover from housing and pull out supply
wires. Thread electrical white, black and ground leads through
J-box cover and connect to appropriate supply leads.
3
Push all splices into j-box and re-attach cover plate.
4
Install electrical tray with screws provided and insert lamp as
required.
5
Remove faceplate assembly from shipping carton.
6
Before continuing mounting surface must be smooth and flat
to allow gasket to make good contact for a water tight seal.
7
Coat screws with white grease and install faceplate to housing
anchor nuts.
8
Energize and test as required.
7 Remove wire ties after concrete is cured and before
forms are stripped.
REV. 06/28/10
www.rebellelighting.com
© 2010 REBELLE All rights reserved.
REBELLE ARCHITECTURAL LIGHTING 11475 - 201A Street, Maple Ridge, B.C. Canada V2X 0Y3
P 604.465.5739 F 604.465.9801 E info@rebellelighting.com W rebellelighting.com
9.75"
Housing
Faceplate
12"
Lamp (by others)
HOLLOW WALL INSTALLATION
FOR COMPACT FLUORESCENT
UNITS ONLY.
Electrical tray
Electrical tray
mounting screws
Housing
Blocking (by others)
1/2" sheeting (by others)
Screws/nails as required
(by others)
Blocking (by others)
J-Box (optional
rear mount)
1/2" sheeting (by others)
Screws/nails as required
(by others)
Wall board thickness
note #3
IMPORTANT
Disconnect power before installing fixtures. Read instructions before
starting work. This product must be installed in accordance with the
applicable installation code by a person familiar with the construction
and operation of the product and the hazards involved.
Sightlines 1185 Series
HOUSING INSTALLATION - HOLLOW WALL
ELECTRICAL TRAY AND FACEPLATE INSTALLATION
1
Remove housing assembly from shipping container.
1 Remove electrical tray from shipping carton.
2
Position housing in stud construction to keep at
least 1/2” clearance around unit except at mounting
points.
2 Remove internal j-box cover from housing and pull out supply
3
Make sure front edge of housing protrudes enough
to be flush with finishing wall plane.
3 Push all splices into j-box and re-attach cover plate.
4
J-box should be either below unit or at the back. Not
on top or sides.
5
Install supply wiring per applicable code requirements
Notes:
These units are listed/certified as non-ic recessed
units. They are meant to be installed with 1/2” space
around the recessed housing, except at point of
mounting contact. Insulation must be kept away from
housing by a minumum of 3 inches. The ballasts are
thermally protected to guard against misuse.
wires. Thread electrical white, black and ground leads through
j-box cover and connect to appropriate supply leads.
4 Install electrical tray with screws provided and insert lamp as
required.
5 Remove faceplate assembly from shipping carton.
6 Before continuing mounting surface must be smooth and flat to
allow gasket to make good contact for a water tight seal
7 Coat screws with white grease and install faceplate to housing
anchor nuts.
8 Energize and test as required.
REV. 08/12/10
www.rebellelighting.com
© 2010 REBELLE All rights reserved.
REBELLE ARCHITECTURAL LIGHTING 11475 - 201A Street, Maple Ridge, B.C. Canada V2X 0Y3
P 604.465.5739 F 604.465.9801 E info@rebellelighting.com W rebellelighting.com
14.5"
Housing
8"
Concrete form
(by others)
Concrete
(by others)
Studs and wing
nuts
Housing
Faceplate
mounting screws
Faceplate
Lamp
(by others)
Electrical tray
mounting screws
Electrical tray
Figure 2
J-Box (optional
rear mount)
Spacing to center line
Height to
center line
Spacing to center line
Figure 1
IMPORTANT
Disconnect power before installing fixtures. Read instructions before
starting work. This product must be installed in accordance with the
applicable installation code by a person familiar with the construction
and operation of the product and the hazards involved.
Sightlines 1572/1976 Series
HOUSING INSTALLATION - CONCRETE POUR
1 Remove housing from shipping carton. Lay out center
line of luminaire positions on concrete form. (Fig.1)
2 Position template (provided) over marked center line
luminaire spacings (make sure template is level) drill
1/4” holes through form. (Fig.1)
3 Install housing on concrete side of form using 3” long
studs and wing nuts (provided). Ensure that j-box is
properly oriented down or on back (fig.2). Check that
unit is level.
4 If tile or other surface treatment is used the housing
ELECTRICAL TRAY AND FACEPLATE INSTALLATION
1 Remove electrical tray from shipping carton.
2 Remove internal j-box cover from housing and pull out supply
wires. Thread electrical white, black and ground leads through
j-box cover and connect to appropriate supply leads.
3 Push all splices into j-box and re-attach cover plate.
4 Install electrical tray with screws provided and insert lamp as
required.
5 Remove faceplate assembly from shipping carton.
position must be adjusted to suit prior to pouring concrete.
6 Before continuing mounting surface must be smooth and flat to
5 Install 1/2” NPT conduit as required and pull supply
7 Coat screws with white grease and install faceplate to housing
6 Conduits must be sealed or plugged at all entry points
8 Energize and test as required.
circuit wires per applicable electrical codes.
as per applicable electrical code.
allow gasket to make good contact for a water tight seal.
anchor nuts.
7 Remove wing nuts and studs after concrete is cured
before the forms are stripped.
REV. 06/28/10
www.rebellelighting.com
© 2010 REBELLE All rights reserved.
REBELLE ARCHITECTURAL LIGHTING 11475 - 201A Street, Maple Ridge, B.C. Canada V2X 0Y3
P 604.465.5739 F 604.465.9801 E info@rebellelighting.com W rebellelighting.com
14.5"
8"
Housing
Housing
Stud construction
(by others)
Faceplace
mounting screws
1/2" sheeting
(by others
Faceplate
Screws/nails
as required
(by others)
Lamp
(by others)
Electrical tray
mounting screws
Electrical
tray
HOLLOW WALL INSTALLATION
FOR COMPACT FLUORESCENT
UNITS ONLY.
J-Box (optional
rear mount)
1/2" sheeting
(by others
Stud construction
(by others)
Blocking
(by others)
Blocking
(by others)
Wall board
thickness
IMPORTANT
Disconnect power before installing fixtures. Read instructions before
starting work. This product must be installed in accordance with the
applicable installation code by a person familiar with the construction
and operation of the product and the hazards involved.
Sightlines 1572/1976 Series
HOUSING INSTALLATION - HOLLOW WALL
1 Remove housing assembly from the shipping container.
2 Position housing in stud construction to keep at
least 1/2” clearance around unit except at mounting points.
3 Make sure front edge of housing protrudes enough
to be flush with finishing wall plane.
4 J-box should be either below unit or at the back.
Not on top or sides.
ELECTRICAL TRAY AND FACEPLATE INSTALLATION
1 Remove electrical tray from shipping carton.
2 Remove internal j-box cover from housing and pull out supply
wires. Thread electrical white, black and ground leads through
J-box cover and connect to appropriate supply leads.
3 Push all splices into j-box and re-attach cover plate.
4 Install electrical tray with screws provided and insert lamp as
required.
5 Remove faceplate assembly from shipping carton.
5 Install supply wiring per applicable code require-
6 Before continuing mounting surface must be smooth and flat to
Notes:
These units are listed/certified as non-ic recessed
units. They are meant to be installed with 1/2”
space around the recessed housing, except at point
of mounting contact. Insulation must be kept away
from housing by a minimum of 3 inches.
The ballasts are thermally protected to guard
against misuse.
7 Coat screws with white grease and install faceplate to housing
ments.
allow gasket to make good contact for a water tight seal.
anchor nuts.
8 Install faceplate to housing anchor nuts.
9 Energize and test as required.
REV. 08/12/10
www.rebellelighting.com
© 2010 REBELLE All rights reserved.
REBELLE ARCHITECTURAL LIGHTING 11475 - 201A Street, Maple Ridge, B.C. Canada V2X 0Y3
P 604.465.5739 F 604.465.9801 E info@rebellelighting.com W rebellelighting.com
9"
9"
Housing
Housing
Concrete form
(by others)
Concrete
(by others)
Studs and
wing nuts
Spacing to
center line
Faceplate
mounting screws
Faceplate
Lamp
(by others)
Electrical
tray
Electrical tray
mounting screws
Spacing to
center line
Height to
center line
J-Box (optional
rear mount)
Figure 1
IMPORTANT
Disconnect power before installing fixtures. Read instructions before
starting work. This product must be installed in accordance with the
applicable installation code by a person familiar with the construction
and operation of the product and the hazards involved.
Sightlines 1573 Series
HOUSING INSTALLATION - CONCRETE POUR
1 Remove housing from shipping carton. Lay out center
line of luminaire positions on concrete. Form (fig.1)
2 Position template (provided) over marked center line
luminaire spacings (make sure template is level) drill
1/4” holes through form. (Fig.1)
3 Install housing on concrete side of form using 3” long
studs and wing nuts (provided). Ensure that j-box is
properly oriented. J-box down or on back (fig.2) Check
that unit is level.
4 If tile or other surface treatment is used the housing
position must be adjusted to suit prior to pouring.
5 Install 1/2” NPT conduit as required and pull supply
ELECTRICAL TRAY AND FACEPLATE INSTALLATION
1 Remove electrical tray from shipping carton.
2 Remove internal j-box cover from housing and pull out supply
wires. Thread electrical white, black and ground leads through
J-box cover and connect to appropriate supply leads.
3 Push all splices into j-box and re-attach cover plate.
4 Install electrical tray with screws provided and insert lamp as
required.
5 Remove faceplate assembly from shipping carton.
6 Before continuing mounting surface must be smooth and flat to
allow gasket to make good contact for a water tight seal.
circuit wires per applicable electrical codes.
7 Coat screws with white grease and install faceplate to housing
Conduits must be sealed or plugged at all entry points
as per applicable electrical code.
8 Energize and test as required.
anchor nuts.
7 Remove wing nuts and studs after concrete is cured
and before forms are stripped.
REV. 08/12/10
www.rebellelighting.com
© 2010 REBELLE All rights reserved.
REBELLE ARCHITECTURAL LIGHTING 11475 - 201A Street, Maple Ridge, B.C. Canada V2X 0Y3
P 604.465.5739 F 604.465.9801 E info@rebellelighting.com W rebellelighting.com
9"
Housing
9"
Faceplate
mounting
screws
Housing
Faceplate
Lamp
(by others)
Stud construction
(by others)
Electrical
tray
Blocking
(by others)
Electrical tray
mounting
screws
1/2" sheeting
(by others)
J-Box
(optional rear
mount)
Housing
Blocking
(by others)
Stud
construction
(by others)
1/2" sheeting
(by others)
Wall board
thickness
Note #3
HOLLOW WALL INSTALLATION
FOR COMPACT FLUORESCENT
UNITS ONLY.
IMPORTANT
Disconnect power before installing fixtures. Read instructions before
starting work. This product must be installed in accordance with the
applicable installation code by a person familiar with the construction
and operation of the product and the hazards involved.
Sightlines 1573 Series
HOUSING INSTALLATION - HOLLOW WALL
1 Remove housing assembly from shipping container.
2 Position housing in stud construction to keep at
least 1/2” clearance around unit except at mounting points.
3 Make sure front edge of housing protrudes enough
to be flush with finishing wall plane.
4 J-box should be either below unit or at the back.
Not on top or sides.
ELECTRICAL TRAY AND FACEPLATE INSTALLATION
1 Remove electrical tray from shipping carton.
2 Remove internal j-box cover from housing and pull out supply
wires. Thread electrical white, black and ground leads through
J-box cover and connect to appropriate supply leads.
3 Push all spices into j-box and re-attach cover plate.
4 Install electrical tray with screws provided and insert lamp as
required.
5 Remove faceplate assembly from shipping carton.
5 Install supply wiring per applicable code require-
6 Before continuing mounting surface must be smooth and flat to
Notes:
These units are listed/certified as non-ic recessed
units. They are meant to be installed with 1/2”
space around the recessed housing, except at
point of mounting contact. Insulation must be kept
away from housing by a minumum of 3 inches. The
ballasts are thermally protected to guard against
misuse.
7 Coat screws with white grease and install faceplate to housing
ments.
allow gasket to make good contact for a water tight seal.
anchor nuts.
8 Energize and test as required.
REV. 08/12/10
www.rebellelighting.com
© 2010 REBELLE All rights reserved.
REBELLE ARCHITECTURAL LIGHTING 11475 - 201A Street, Maple Ridge, B.C. Canada V2X 0Y3
P 604.465.5739 F 604.465.9801 E info@rebellelighting.com W rebellelighting.com
9.5"
Housing
Concrete form
(by others)
Housing
Faceplate
mounting screws
Concrete
(by others)
Faceplate
Faceplate
Concrete
(by others)
Electrical tray
Electrical tray
mounting screws
Figure 2
Spacing to
center line
Spacing to
center line
Height to
center line
J-Box (optional
rear mount)
Figure 1
IMPORTANT
Disconnect power before installing fixtures. Read instructions before
starting work. This product must be installed in accordance with the
applicable installation code by a person familiar with the construction
and operation of the product and the hazards involved.
Sightlines 1573R Series
HOUSING INSTALLATION - CONCRETE POUR
1 Remove housing from shipping carton. Lay out center
line of luminaire positions on concrete. Form (fig.1)
2 Position template (provided) over marked center line
luminaire spacings (make sure template is level) drill
1/4” holes through form. (Fig.1)
3 Install housing on concrete side of form using 3” long
studs and wing nuts (provided). Ensure that j-box
is properly oriented - J-box down or on back (fig.2)
Check that unit is level.
4 If tile or other surface treatment is used the housing
position must be adjusted to suit prior to pouring.
5 Install 1/2” npt conduit as required and pull supply circuit wires per applicable electrical codes.
6 Conduits must be sealed or plugged at all entry points
as per applicable electrical code.
ELECTRICAL TRAY AND FACEPLATE INSTALLATION
1 Remove electrical tray from shipping carton.
2 Remove internal j-box cover from housing and pull out supply
wires. Thread electrical white, black and ground leads through
J-box cover and connect to appropriate supply leads.
3 Push all splices into j-box and re-attach cover plate.
4 Install electrical tray with screws provided and insert lamp as
required.
5 Remove faceplate assembly from shipping carton.
6 Before continuing mounting surface must be smooth and flat to
allow gasket to make good contact for a water tight seal.
7 Coat screws with white grease and install faceplate to housing
anchor nuts.
8 Energize and test as required.
7 Remove wing nuts and after concrete is cured before
the forms are stripped.
REV. 08/12/10
www.rebellelighting.com
© 2010 REBELLE All rights reserved.
REBELLE ARCHITECTURAL LIGHTING 11475 - 201A Street, Maple Ridge, B.C. Canada V2X 0Y3
P 604.465.5739 F 604.465.9801 E info@rebellelighting.com W rebellelighting.com
Housing
9.5"
Housing
Faceplate
mounting
screws
Stud construction
(by others)
Faceplate
Blocking
(by others)
Lamp
(by others)
1/2" sheeting
(by others)
Electrical tray
Electrical tray
mounting screws
HOLLOW WALL INSTALLATION
FOR COMPACT FLUORESCENT
UNITS ONLY.
Housing
Stud construction
(by others)
J-Box (optional
rear mount)
Blocking
(by others)
1/2" sheeting
(by others)
Wall board
thickness
Note #3
IMPORTANT
Disconnect power before installing fixtures. Read instructions before
starting work. This product must be installed in accordance with the
applicable installation code by a person familiar with the construction
and operation of the product and the hazards involved.
Sightlines 1573R Series
HOUSING INSTALLATION - HOLLOW WALL
ELECTRICAL TRAY AND FACEPLATE INSTALLATION
1 Remove housing assembly from shipping container.
1 Remove electrical tray from shipping carton.
2 Position housing in stud construction to keep at least
2 Remove internal j-box cover from housing and pull out supply
1/2” clearance around unit except at mounting points.
3 Make sure front edge of housing protrudes enough to
be flush with finishing wall plane.
wires. Thread electrical white, black and ground leads through
J-box cover and connect to appropriate supply leads.
3 Push all splices into j-box and re-attach cover plate.
4 J-box should be either below unit or at the back. Not
4 Install electrical tray with screws provided and insert lamp as
5 Install supply wiring per applicable code require-
5 Remove faceplate assembly from shipping carton.
on top or sides.
ments.
required.
6 Before continuing mounting surface must be smooth and flat to
Notes:
These units are listed/certified as non-ic recessed
units. They are meant to be installed with 1/2” space
around the recessed housing, except at point of
mounting contact. Insulation must be kept away from
housing by a minumum of 3 inches. The ballasts are
thermally protected to guard against misuse.
allow gasket to make good contact for a water tight seal.
7 Coat screws with white grease and install faceplate to housing
anchor nuts.
8 Energize and test as required.
REV. 08/12/10
www.rebellelighting.com
© 2010 REBELLE All rights reserved.
REBELLE ARCHITECTURAL LIGHTING 11475 - 201A Street, Maple Ridge, B.C. Canada V2X 0Y3
P 604.465.5739 F 604.465.9801 E info@rebellelighting.com W rebellelighting.com
8.75"
Housing
4.25"
Concrete form
(by others)
Studs and
wing nuts
Housing
Faceplate
Concrete
(by others)
Figure 2
Lamp
(by others)
Electrical tray
Spacing to
center line
Spacing to
center line
Height to
center line
J-Box rear
mount
(optional
bottom mount)
Figure 1
IMPORTANT
Disconnect power before installing fixtures. Read instructions before
starting work. This product must be installed in accordance with the
applicable installation code by a person familiar with the construction
and operation of the product and the hazards involved.
Sightlines 1635 Series
HOUSING INSTALLATION - CONCRETE POUR
1 Remove housing from shipping carton. Lay out center
ELECTRICAL TRAY AND FACEPLATE INSTALLATION
1 Remove electrical tray from shipping carton.
line of luminaire positions on concrete form. (Fig.1)
2 Remove internal j-box cover from housing and pull out supply
2 Position template (provided) over marked center line
luminaire spacings (make sure template is level) drill
1/4” holes through form. (Fig.1)
wires. Thread electrical white, black and ground leads through
J-box cover and connect to appropriate supply leads.
3 Push all splices into j-box and re-attach cover plate.
3 Install housing on concrete side of form using 3” long
studs and wing nuts (provided) . Ensure that j-box is
properly oriented - J-Box on back or down position
(fig.2) Check that unit is level.
4 Install electrical tray with screws provided and insert lamp as
required.
5 Remove faceplate assembly from shipping carton.
4 If tile or other surface treatment is used the housing
position must be adjusted to suit prior to pouring concrete.
6 Before continuing mounting surface must be smooth and flat to
5 Install 1/2” NPT conduit as required and pull supply
7 Coat screws with white grease and install faceplate to housing
circuit wires per applicable electrical codes.
6 Conduits must be sealed or plugged at all entry points
allow gasket to make good contact for a water tight seal.
anchor nuts.
8 Energize and test as required.
as per applicable electrical code.
7 Remove wing nuts and studs after concrete is cured
before the forms are stripped.
REV. 02/05/13
www.rebellelighting.com
© 2010 REBELLE All rights reserved.
REBELLE ARCHITECTURAL LIGHTING 11475 - 201A Street, Maple Ridge, B.C. Canada V2X 0Y3
P 604.465.5739 F 604.465.9801 E info@rebellelighting.com W rebellelighting.com
Housing
8.75"
Screws/nails as
required (by others)
Stud construction
(by others)
4.25"
Housing
Blocking
(by others)
1/2" sheeting
(by others)
Faceplate
Lamps
(by others)
Electrical tray
Housing
Stud construction
(by others)
Blocking
(by others)
1/2" sheeting
(by others)
J-Box rear
mount
(optional
bottom mount)
Wall board
thickness
IMPORTANT
Disconnect power before installing fixtures. Read instructions before
starting work. This product must be installed in accordance with the
applicable installation code by a person familiar with the construction
and operation of the product and the hazards involved.
Sightlines 1635 Series
HOUSING INSTALLATION - HOLLOW WALL
1 Remove housing assembly from the shipping con-
ELECTRICAL TRAY AND FACEPLATE INSTALLATION
1 Remove electrical tray from shipping carton.
tainer.
2 Remove internal j-box cover from housing and pull out supply
2 Position housing in stud construction to keep at least
1/2” clearance around unit except at mounting points.
3 Make sure front edge of housing protrudes enough to
wires. Thread electrical white, black and ground leads through
j-box cover and connect to appropriate supply leads.
3 Push all splices into j-box and re-attach cover plate.
be flush with finishing wall plane.
4 Install electrical tray with screws provided and insert lamp as
4 J-box should be either below unit or at the back. Not
required.
on top or sides.
5 Remove faceplate assembly from shipping carton.
5 Install supply wiring per applicable code requirements.
6 Before continuing mounting surface must be smooth and flat to
allow gasket to make good contact for a water tight seal.
Notes:
These units are listed/certified as non-ic recessed
units. They are meant to be installed with 1/2” space
around the recessed housing, except at point of
mounting contact. Insulation must be kept away from
housing by a minimum of 3 inches. The ballasts are
thermally protected to guard against misuse.
7 Coat screws with white grease and install faceplate to housing
anchor nuts.
8 Install faceplate to housing anchor nuts.
9 Energize and test as required.
REV. 02/05/13
www.rebellelighting.com
© 2010 REBELLE All rights reserved.
REBELLE ARCHITECTURAL LIGHTING 11475 - 201A Street, Maple Ridge, B.C. Canada V2X 0Y3
P 604.465.5739 F 604.465.9801 E info@rebellelighting.com W rebellelighting.com
11"
Housing
6"
Housing
Concrete form
(by others)
Concrete
(by others)
Studs and wing
nuts
Faceplate
mounting
screws
Faceplate
Lamps
(by others)
Figure 2
Spacing to
center line
Electrical tray
Spacing to
center line
Electrical tray
mounting screws
Height to
center line
J-Box (optional
rear mount)
Figure 1
IMPORTANT
Disconnect power before installing fixtures. Read instructions before
starting work. This product must be installed in accordance with the
applicable installation code by a person familiar with the construction
and operation of the product and the hazards involved.
Sightlines 1645 Series
HOUSING INSTALLATION - CONCRETE POUR
1 Remove housing from shipping carton. Lay out center
line of luminaire positions on concrete form. (Fig.1)
2 Position template (provided) over marked center line
luminaire spacings (make sure template is level) drill
1/4” holes through form. (Fig.1)
3 Install housing on concrete side of form using 3” long
studs and wing nuts (provided). Ensure that j-box is
properly oriented down or on back (fig.2) Check that
unit is level.
4 If tile or other surface treatment is used the housing
ELECTRICAL TRAY AND FACEPLATE INSTALLATION
1 Remove electrical tray from shipping carton.
2 Remove internal j-box cover from housing and pull out supply
wires. Thread electrical white, black and ground leads through
j-box cover and connect to appropriate supply leads.
3 Push all splices into j-box and re-attach cover plate.
4 Install electrical tray with screws provided and insert lamp as
required.
5 Remove faceplate assembly from shipping carton.
position must be adjusted to suit prior to pouring concrete.
6 Before continuing mounting surface must be smooth and flat to
5 Install 1/2” NPT conduit as required and pull supply
7 Coat screws with white grease and install faceplate to housing
6 Conduits must be sealed or plugged at all entry points
8 Energize and test as required.
circuit wires per applicable electrical codes.
as per applicable electrical code.
allow gasket to make good contact for a water tight seal.
anchor nuts.
7 Remove wing nuts and studs after concrete is cured
before the forms are stripped.
REV. 06/28/10
www.rebellelighting.com
© 2010 REBELLE All rights reserved.
REBELLE ARCHITECTURAL LIGHTING 11475 - 201A Street, Maple Ridge, B.C. Canada V2X 0Y3
P 604.465.5739 F 604.465.9801 E info@rebellelighting.com W rebellelighting.com
11"
Housing
6"
Stud construction
(by others)
Housing
Blocking
(by others)
1/2" sheeting
(by others)
Faceplate
mounting screws
Screws/nails
as required
Faceplate
Lamps
(by others)
Electrical tray
Electrical tray
mounting screws
HOLLOW WALL INSTALLATION
FOR COMPACT FLUORESCENT
UNITS ONLY.
Housing
J-Box (optional
rear mount)
Stud construction
(by others)
Blocking
(by others)
1/2" sheeting
(by others)
Wall board
thickness
IMPORTANT
Disconnect power before installing fixtures. Read instructions before
starting work. This product must be installed in accordance with the
applicable installation code by a person familiar with the construction
and operation of the product and the hazards involved.
Sightlines 1645 Series
HOUSING INSTALLATION - HOLLOW WALL
1 Remove housing assembly from the shipping container.
2 Position housing in stud construction to keep at least
1/2” clearance around unit except at mounting points.
3 Make sure front edge of housing protrudes enough to
be flush with finishing wall plane.
4 J-box should be either below unit or at the back. Not
on top or sides.
5 Install supply wiring per applicable code requirements.
ELECTRICAL TRAY AND FACEPLATE INSTALLATION
1 Remove electrical tray from shipping carton.
2 Remove internal j-box cover from housing and pull out supply
wires. Thread electrical white, black and ground leads through
J-box cover and connect to appropriate supply leads.
3 Push all splices into j-box and re-attach cover plate.
4 Install electrical tray with screws provided and insert lamp as
required.
5 Remove faceplate assembly from shipping carton.
6 Before continuing mounting surface must be smooth and flat to
allow gasket to make good contact for a water tight seal.
Notes:
These units are listed/certified as non-ic recessed
units. They are meant to be installed with 1/2” space
around the recessed housing, except at point of
mounting contact. Insulation must be kept away from
housing by a minimum of 3 inches. The ballasts are
thermally protected to guard against misuse.
7 Coat screws with white grease and install faceplate to housing
anchor nuts.
8 Install faceplate to housing anchor nuts.
9 Energize and test as required.
REV. 08/12/10
www.rebellelighting.com
© 2010 REBELLE All rights reserved.
REBELLE ARCHITECTURAL LIGHTING 11475 - 201A Street, Maple Ridge, B.C. Canada V2X 0Y3
P 604.465.5739 F 604.465.9801 E info@rebellelighting.com W rebellelighting.com
14.5"
Housing
8"
Concrete form
(by others)
Concrete
(by others)
Studs and wing
nuts
Housing
Faceplate
mounting screws
Faceplate
Lamp
(by others)
Electrical tray
mounting screws
Electrical tray
Figure 2
J-Box (optional
rear mount)
Spacing to center line
Height to
center line
Spacing to center line
Figure 1
IMPORTANT
Disconnect power before installing fixtures. Read instructions before
starting work. This product must be installed in accordance with the
applicable installation code by a person familiar with the construction
and operation of the product and the hazards involved.
Sightlines 1572/1976 Series
HOUSING INSTALLATION - CONCRETE POUR
1 Remove housing from shipping carton. Lay out center
line of luminaire positions on concrete form. (Fig.1)
2 Position template (provided) over marked center line
luminaire spacings (make sure template is level) drill
1/4” holes through form. (Fig.1)
3 Install housing on concrete side of form using 3” long
studs and wing nuts (provided). Ensure that j-box is
properly oriented down or on back (fig.2). Check that
unit is level.
4 If tile or other surface treatment is used the housing
ELECTRICAL TRAY AND FACEPLATE INSTALLATION
1 Remove electrical tray from shipping carton.
2 Remove internal j-box cover from housing and pull out supply
wires. Thread electrical white, black and ground leads through
j-box cover and connect to appropriate supply leads.
3 Push all splices into j-box and re-attach cover plate.
4 Install electrical tray with screws provided and insert lamp as
required.
5 Remove faceplate assembly from shipping carton.
position must be adjusted to suit prior to pouring concrete.
6 Before continuing mounting surface must be smooth and flat to
5 Install 1/2” NPT conduit as required and pull supply
7 Coat screws with white grease and install faceplate to housing
6 Conduits must be sealed or plugged at all entry points
8 Energize and test as required.
circuit wires per applicable electrical codes.
as per applicable electrical code.
allow gasket to make good contact for a water tight seal.
anchor nuts.
7 Remove wing nuts and studs after concrete is cured
before the forms are stripped.
REV. 06/28/10
www.rebellelighting.com
© 2010 REBELLE All rights reserved.
REBELLE ARCHITECTURAL LIGHTING 11475 - 201A Street, Maple Ridge, B.C. Canada V2X 0Y3
P 604.465.5739 F 604.465.9801 E info@rebellelighting.com W rebellelighting.com
14.5"
8"
Housing
Housing
Stud construction
(by others)
Faceplace
mounting screws
1/2" sheeting
(by others
Faceplate
Screws/nails
as required
(by others)
Lamp
(by others)
Electrical tray
mounting screws
Electrical
tray
HOLLOW WALL INSTALLATION
FOR COMPACT FLUORESCENT
UNITS ONLY.
J-Box (optional
rear mount)
1/2" sheeting
(by others
Stud construction
(by others)
Blocking
(by others)
Blocking
(by others)
Wall board
thickness
IMPORTANT
Disconnect power before installing fixtures. Read instructions before
starting work. This product must be installed in accordance with the
applicable installation code by a person familiar with the construction
and operation of the product and the hazards involved.
Sightlines 1572/1976 Series
HOUSING INSTALLATION - HOLLOW WALL
1 Remove housing assembly from the shipping container.
2 Position housing in stud construction to keep at
least 1/2” clearance around unit except at mounting points.
3 Make sure front edge of housing protrudes enough
to be flush with finishing wall plane.
4 J-box should be either below unit or at the back.
Not on top or sides.
ELECTRICAL TRAY AND FACEPLATE INSTALLATION
1 Remove electrical tray from shipping carton.
2 Remove internal j-box cover from housing and pull out supply
wires. Thread electrical white, black and ground leads through
J-box cover and connect to appropriate supply leads.
3 Push all splices into j-box and re-attach cover plate.
4 Install electrical tray with screws provided and insert lamp as
required.
5 Remove faceplate assembly from shipping carton.
5 Install supply wiring per applicable code require-
6 Before continuing mounting surface must be smooth and flat to
Notes:
These units are listed/certified as non-ic recessed
units. They are meant to be installed with 1/2”
space around the recessed housing, except at point
of mounting contact. Insulation must be kept away
from housing by a minimum of 3 inches.
The ballasts are thermally protected to guard
against misuse.
7 Coat screws with white grease and install faceplate to housing
ments.
allow gasket to make good contact for a water tight seal.
anchor nuts.
8 Install faceplate to housing anchor nuts.
9 Energize and test as required.
REV. 08/12/10
www.rebellelighting.com
© 2010 REBELLE All rights reserved.
REBELLE ARCHITECTURAL LIGHTING 11475 - 201A Street, Maple Ridge, B.C. Canada V2X 0Y3
P 604.465.5739 F 604.465.9801 E info@rebellelighting.com W rebellelighting.com
11"
3"
Housing
Housing
Concrete form
(by others)
Faceplate
Studs and wing nuts
Lamp
(by others)
1/2" NPT
conduit entry
Electrical tray
Concrete
(by others)
Spacing to
center line
Height to
center line
Spacing to
center line
Figure 1
IMPORTANT
Disconnect power before installing fixtures. Read instructions before
starting work. This product must be installed in accordance with the
applicable installation code by a person familiar with the construction
and operation of the product and the hazards involved.
Sightlines 2400 Series
HOUSING INSTALLATION - CONCRETE POUR
1 Remove housing from shipping carton. Lay out center
line of luminaire positions on concrete form. (Fig.1)
2 Position template (provided) over marked center line
luminaire spacings (make sure template is level) drill
1/4” holes through form. (Fig.1)
3 Install housing on concrete side of form using 3” long
studs and wing nuts (provided) (fig.2) Check that unit
is level.
4 If tile or other surface treatment is used the housing
ELECTRICAL TRAY AND FACEPLATE INSTALLATION
1 Remove electrical tray from shipping carton.
2 Pull out supply wires and connect appropriate supply leads to
electrical tray input.
3 Push all spices securely into box.
4 Install electrical tray with screws provided and insert lamp as
required.
5 Remove faceplate assembly from shipping carton.
position must be adjusted to suit prior to pouring concrete.
6 Before continuing mounting surface must be smooth and flat to
5 Install 1/2” NPT conduit as required and pull supply
7 Coat screws with white grease and install faceplate to housing
6 Conduits must be sealed or plugged at all entry points
8 Energize and test as required.
circuit wires per applicable electrical codes.
as per applicable electrical code.
allow gasket to make good contact for a water tight seal.
anchor nuts.
7 Remove wing nuts and studs after concrete is cured
before the forms are stripped.
REV. 06/28/10
www.rebellelighting.com
© 2010 REBELLE All rights reserved.
REBELLE ARCHITECTURAL LIGHTING 11475 - 201A Street, Maple Ridge, B.C. Canada V2X 0Y3
P 604.465.5739 F 604.465.9801 E info@rebellelighting.com W rebellelighting.com
11"
3"
Housing
Faceplate
Lamp
(by others)
Housing
Stud construction
(by others)
Electrical tray
Blocking
(by others)
1/2" sheeting
(by others)
Screws/nails
as required
(by others)
Housing
Blocking
(by others)
Stud construction
(by others)
1/2" sheeting
(by others)
Wall board
thickness
IMPORTANT
Disconnect power before installing fixtures. Read instructions before
starting work. This product must be installed in accordance with the
applicable installation code by a person familiar with the construction
and operation of the product and the hazards involved.
Sightlines 2400 Series
HOUSING INSTALLATION - HOLLOW WALL
1 Remove housing assembly from the shipping container.
2 Position housing in stud construction to keep at least
1/2” clearance around unit except at mounting points.
3 Make sure front edge of housing protrudes enough to
be flush with finishing wall plane.
4 Install supply wiring per applicable code requirements.
ELECTRICAL TRAY AND FACEPLATE INSTALLATION
1 Remove electrical tray from shipping carton.
2 Pull out supply wires and connect appropriate supply leads to
electrical tray input.
3 Push all splices into j-box and re-attach cover plate.
4 Install electrical tray with screws provided and insert lamp as
required.
5 Remove faceplate assembly from shipping carton.
6 Before continuing mounting surface must be smooth and flat to
allow gasket to make good contact for a water tight seal.
Notes:
These units are listed/certified as non-ic recessed
units. They are meant to be installed with 1/2” space
around the recessed housing, except at point of
mounting contact. Insulation must be kept away from
housing by a minimum of 3 inches. The ballasts are
thermally protected to guard against misuse.
7 Coat screws with white grease and install faceplate to housing
anchor nuts.
8 Install faceplate to housing anchor nuts.
9 Energize and test as required.
REV. 08/12/10
www.rebellelighting.com
© 2010 REBELLE All rights reserved.
REBELLE ARCHITECTURAL LIGHTING 11475 - 201A Street, Maple Ridge, B.C. Canada V2X 0Y3
P 604.465.5739 F 604.465.9801 E info@rebellelighting.com W rebellelighting.com
cast top with center lock up
removable strap
NOTE
These installation instructions also apply
to the head only "HO" 2868 version.
prismatic glass, threaded
globe, tempered
lamp (as ordered)
clear polycarbonate shield
(if fitted)
tie rods (2)
reflector - polished and
lacquered cast aluminum
supply leads
electrical tray assembly
leads (30" long)
base casting
s/s set screws
bollard shaft 1/4" thick
cold rolled steel
ground plate
grout
(by others)
stainless steel set screws
(4)
leveling nuts
hex nuts, lock washers and
flat washers
concrete base
(by others)
cast base and
ground plate
anchor bolts
conduit
(by others)
anchor bolt set with washer
and leveling nut
2.5"
conduit
(by others)
concrete base
Figure 2
Bollard Assembly
Figure 1
Base Assembly
IMPORTANT
Disconnect power before installing fixtures. Read instructions before
starting work. This product must be installed in accordance with the
applicable installation code by a person familiar with the construction
and operation of the product and the hazards involved.
Sightlines 2868 Series
FIXTURE INSTALLATION INSTRUCTIONS
1 Anchor bolts should be set into concrete base as outlined in the Rebelle (2868) Anchor Bolt Installation Guide prior to bollard
installation.
2 Install nuts followed by a flat washer on each anchor bolt.
3 Insert ground plate and base casting onto anchor bolts followed by a flat washer, lock washer and nut. Level the top edge of base
casting by adjusting bottom nuts. Progressively tighten upper nuts evenly while keeping base casting level.
4 To install bollard lay bollard on horizontally on soft cloth next to the installed base casting with open end facing the base. Pull wires
out of the bollard riser and make connections to field wires (green to ground, white to common, black to voltage). (Ensure internal
ballast connections and field supply are compatible prior to installation.)
5 Feed wires into riser and place bollard over the base casting.
6 Thread 1/4 - 20 set screws into riser and align with locking recess in base casting. Progressively and evenly tighten set screws to
base casting.
7 Grout between ground plate and concrete base as required leaving a channel in the grout to allow for internal drainage.
8 To install lamp remove top casting (1/4 Hex Key) along with anchor nut strap (1/2 wrench) Unscrew glass globe from fitter and
install lamp checking the wattage and type against the lamp label. WARNING: HID and compact fluorescent lamps may contain
mercury. For disposal guidance refer to www.lamprecycle.org.
REV. 06.21.12
www.rebellelighting.com
© 2012 REBELLE All rights reserved.
REBELLE ARCHITECTURAL LIGHTING 11475 - 201A Street, Maple Ridge, B.C. Canada V2X 0Y3
P 604.465.5739 F 604.465.9801 E info@rebellelighting.com W rebellelighting.com
Template Orientation
Reference Line
Keep parallel to street
or walkway
Template
Clear area
for conduit
(Ø3" Ref.)
Ø4 1/2" BCD - standard bollard (lit and unlit)
Ø5 1/2" BCD - barricade tenon bollard (lit and unlit)
NOTE
Vertical reflector uprights align
with anchor bolt holes and shaft
set screws into base casting.
Anchor Bolt
Setting
anchor bolt (4)
projection 2 1/2"
flat washer and
nut (4)
template (1)
leveling nuts with
flat washers
anchor bolts (4)
ø1/2" x 12
conduit
(by others)
*Typical Installation
in Cement
Typical Installation
in Earth
*Concrete base is to be designed in accordance with local conditions (by others).
*Drainage channel through grout is required to drain bollard interior.
IMPORTANT
Disconnect power before installing fixtures. Read instructions before
starting work. This product must be installed in accordance with the
applicable installation code by a person familiar with the construction
and operation of the product and the hazards involved.
Sightlines 2868 Series
ANCHOR BOLT INSTALLATION INSTRUCTION GUIDE
1 Anchor bolt sets are provided with each unit along with a setting template for every eight units.
2 Install the anchor bolts and template as shown and secure in position while concrete is poured around them.
3 Template is removed prior to installing bollard units onto anchor bolts.
REV. 06.21.12
www.rebellelighting.com
© 2012 REBELLE All rights reserved.
REBELLE ARCHITECTURAL LIGHTING 11475 - 201A Street, Maple Ridge, B.C. Canada V2X 0Y3
P 604.465.5739 F 604.465.9801 E info@rebellelighting.com W rebellelighting.com
cast top with center lock up
removable strap
prismatic glass, threaded
globe, tempered
lamp (as required)
tie rods (2)
reflector - polished and
lacquered cast aluminum
electrical tray assembly
2"
leads (30" long)
shaft to tenon
bolt attachment
5" long (4)
angles for shaft
attachment to tenon
barricade tenon
assembly
10"
bollard shaft 1/4" thick
cold rolled steel
conduit
(by others)
hex nuts, lock washers and
flat washers
ground plate
grout
(by others)
tenon to shaft bolt
attachment
leveling nuts
barricade tenon
assembly
concrete base
(by others)
ground plate
anchor bolts
anchor bolt set with washer
and leveling nut
2.5"
conduit
(by others)
Figure 1
Barricade Base Assembly
Figure 2
Barricade Bollard Assembly
IMPORTANT
Disconnect power before installing fixtures. Read instructions before starting work. This product must be
installed in accordance with the applicable installation code by a person familiar with the construction and
operation of the product and the hazards involved.
Sightlines 2868 Series
BARRICADE MOUNT FIXTURE INSTALLATION INSTRUCTIONS
1
Anchor bolts should be set into concrete base as outlined in the Rebelle (2868) Anchor Bolt Installation Guide prior to bollard and
barricade tenon installation.
2
Thread a hex nut and flat washer onto each anchor bolt (for leveling use)
3
Install barricade tenon and thread flat washer, lock washer and nut onto each anchor bolt. Loosely level tenon with leveling tools and
progressively tighten each locking nut while ensuring tenon remains level.
4
Remove top cap casting with center bolt along with retaining strap and set aside head reflector sleeve.
5
Remove head shaft, head reflector sleeve and unscrew threaded glass and set aside.
6
Set aside the cast reflector and loosen the two nuts that secure the electrical tray.
7
The electrical tray can be removed as a complete unit without removing tierods.
8
Install barricade bollard shaft onto the four studs using flat washers, lock washers and nuts. Working inside the 8" diameter shaft
requires sockets with universal joint drivers or other such tool.
9
Pull field wires through shaft and attach (green to ground, white to common and black to voltage) to electrical tray leads. Re-install
electrical tray in position and tighten mounting units.
10
Re-install cast reflector in position and insert lamp as indicated on the lamp label. Install threaded globe.
11
Drop head shaft with head reflector in position and lock in place with nuts that secure the retainer strap spanning the tie rods.
12
Install top cap casting with center bolt, sealing washer and flat washer. 1/4" Hex key required.
13
Energize luminaire.
14
Grout between concrete base and fixture ground plate leaving a channel to allow for internal drainage.
15
WARNING: HID and compact fluorescent lamps may contain mercury. For disposal guidance refer to lamprecycle.org
REV. 06.21.12
www.rebellelighting.com
© 2012 REBELLE All rights reserved.
REBELLE ARCHITECTURAL LIGHTING 11475 - 201A Street, Maple Ridge, B.C. Canada V2X 0Y3
P 604.465.5739 F 604.465.9801 E info@rebellelighting.com W rebellelighting.com
Housing
Mounting bars
(optional item)
Lamp
(by others)
J-Box
Electrical
tray
Adjustable
brackets
Reflector
Faceplate
Housing
Ceiling surface
Ceiling
thickness
2.0" max
IMPORTANT
Disconnect power before installing fixtures. Read instructions before
starting work. This product must be installed in accordance with the
applicable installation code by a person familiar with the construction
and operation of the product and the hazards involved.
Sightlines 8000 Series
HOUSING INSTALLATION - NON IC
ELECTRICAL TRAY AND FACEPLATE INSTALLATION
1 Remove housing assembly from shipping container.
1 Remove electrical tray from shipping carton.
2 There must be a 9.0" round opening to accept housing
2 Select required voltage and cap off unused taps.
trim.
3 Install electrical tray to housing assembly with (3) screws pro3 Position housing in ceiling opening making sure housing trim is flush with ceiling surface. Secure housing to
ceilingjoists with mounting bars and adjust mounting
brackets.
vided. Route sleeved wires to j-box. Secure wire to housing
with cable ties (supplied).
4 Connect fixture leads to supply leadsa and push all through
splices into j-box and attach cover plate.
4 When installing in suspended t-bar ceiling, secure
mounting bars to main supports and wire to ceiling
members as required.
5 Install reflector with hex nuts.
6 Lamp as required.
5 Install supply wiring as per applicable code require7 Remove faceplate assembly with (3) screws (provided). Ceil-
ments.
Notes:
These units are listed/certified as non-ic recessed units.
They are meant to be installed with 1/2" space around
the recessed housing, except at point of mounting contact. Insulation must be kept away from housing by a
minimum of 3". The ballasts are thermally protected to
guard against misuse.
ing surface must be flat to ensure water tight seal.
8 Energize and test as required.
REV. 12/09/09
www.rebellelighting.com
© 2010 REBELLE All rights reserved.
REBELLE ARCHITECTURAL LIGHTING 11475 - 201A Street, Maple Ridge, B.C. Canada V2X 0Y3
P 604.465.5739 F 604.465.9801 E info@rebellelighting.com W rebellelighting.com
Spacing to
center line
Spacing to
center line
Housing
Lamp
(by others)
J-Box
Reflector
Figure 1
Electrical
tray
Faceplate
Housing
J-Box
Concrete form
(by others)
Studs and
wing nuts
Figure 2
IMPORTANT
Disconnect power before installing fixtures. Read instructions before
starting work. This product must be installed in accordance with the
applicable installation code by a person familiar with the construction
and operation of the product and the hazards involved.
Sightlines 8000 Series
HOUSING INSTALLATION - CONCRETE POUR
1 Remove housing from shipping carton. Lay out center
ELECTRICAL TRAY AND FACEPLATE INSTALLATION
1 Remove electrical tray from shipping carton.
line of luminaire positions on concrete. Form (fig.1)
2 Select required voltage and cap off unused leads.
2 Position template (provided) over marked center line
luminaire spacings (make sure template is level) drill
3/16” holes through form. (Fig.1)
3 Install electrical tray to housing assembly with (3) screws provided. Route sleeved wires to j-box. Secure wire to housing
with cable ties (supplied).
3 Install housing on concrete side of form using 3” long
4 Connect fixture leads to to supply leads and push all spices
studs and wing nuts (see fig.2)
into j-box and attach cover plate.
4 If other surface treatment is used the housing position
5 Install reflector with hex nuts.
must be adjusted to suit prior to pouring.
5 Install 1/2” NPT conduit as required and pull supply cir-
6 Lamp as required.
cuit wires per applicable electrical codes.
7 Remove faceplate assembly from shipping carton.
6 Remove wing nuts and studs after concrete is cured
before the forms are stripped.
8 Secure to housing assembly with (3) screws (provided). Ceiling surface must be flat to insure water tight seal.
9 Energize and test as required.
REV. 12/09/09
www.rebellelighting.com
© 2010 REBELLE All rights reserved.
REBELLE ARCHITECTURAL LIGHTING 11475 - 201A Street, Maple Ridge, B.C. Canada V2X 0Y3
P 604.465.5739 F 604.465.9801 E info@rebellelighting.com W rebellelighting.com
Fixed mounting
slotted bracket
Mounting bar
hangers #1207 - optional
horizontal adjustment
Electrical tray
assembly
Housing assembly
Adjustable butterfly
brackets
Trim assembly
(includes
reflector)
Approx.
Clearance
8.0"
J-Box with
coverplates
Ceiling
thickness
1 3/4" max
7.75"
9.00"
14" MIN
24 MAX"
#1287 Mounting
bars (optional)
IMPORTANT
Disconnect power before installing fixtures. Read instructions before
starting work. This product must be installed in accordance with the
applicable installation code by a person familiar with the construction
and operation of the product and the hazards involved.
Sightlines 8000 Series
HOUSING INSTALLATION - NON IC
ELECTRICAL TRAY INSTALLATION
1
Remove housing assembly from shipping container.
Make sure parts bag containing mounting bracket and
hardware is available.
1
2
The mounting bracket accepts a variety of mounting
rails. The #1287 adjustable bar hangers are useful for
many installations but must be ordered separately.
The electrical tray comes in two components, the heat
sink with the Fortimo module and the driver plate with
the driver. A dedicated cable connects the module to the
driver and preconnected set of wires in a sleeve connects
the driver to the J-Box.
2
Housing must be positioned in the required location and
adjusted to position with the underside of the housing
level with the underside of the finished ceiling.
Install the heat sink / module by inserting it through the
housing opening and attaching the heat sink with the
screws provided.
3
The driver plate and driver need to mount to the housing
angle with the module to driver cable connected and wire
tied in place with the driver to J-Box cable routed and
tied in place as well. The driver plate has keyhole slots to
mate with screws in the housing angle.
4
Connect fixture leads to appropriate supply leads and insert into J-Box. Attach cover plate. Test.
3
4
The mounting bracket carriage bolts and wing nuts
should be installed to allow vertical adjustment of the
housing after the ceiling is in place.
5
Pull supply wiring into J-Box as per applicable electrical
code requirements (90ºC). J-Box box is suitable for
branch circuit conductors (4 IN and 4 OUT).
6
If mounting is suspended T-Bar ceiling construction, the
#1287 Bar Hangers can hook over the vertical leg of
T-Bar and can be supported independently of the T-Bar
ceiling.
Notes:
These units are listed/certified as non-ic recessed units. They are meant to
be installed with 1/2" space around the recessed housing, except at point of
mounting contact. Insulation must be kept away from housing by a minimum
of 3".
REV. 03/18/13
www.rebellelighting.com
© 2013 REBELLE All rights reserved.
REBELLE ARCHITECTURAL LIGHTING 11475 - 201A Street, Maple Ridge, B.C. Canada V2X 0Y3
P 604.465.5739 F 604.465.9801 E info@rebellelighting.com W rebellelighting.com
VANDAL RESISTANT TRIM ASSEMBLY
Trim / Reflector
Assembly
Trim Detail
IMPORTANT
Disconnect power before installing fixtures. Read instructions before
starting work. This product must be installed in accordance with the
applicable installation code by a person familiar with the construction
and operation of the product and the hazards involved.
Sightlines 8000 Series
TRIM INSTALLATION
1 Trim assembly is separately packaged ready for installation once the finished ceiling is complete (finished opening should be 9”ø.)
2 Trim is fully gasketed at lens and ceiling surface. Top of
reflector mates with bottom of Fortimo module.
3 Trim has three #8 - 32 stainless cap screws (9/64" hex
key) that are captivated to trim with Nylon washers.
Screws thread into spring nuts on housing plaster ring.
REV. 04/11/13
www.rebellelighting.com
© 2013 REBELLE All rights reserved.
REBELLE ARCHITECTURAL LIGHTING 11475 - 201A Street, Maple Ridge, B.C. Canada V2X 0Y3
P 604.465.5739 F 604.465.9801 E info@rebellelighting.com W rebellelighting.com
Wall Surface
Mounting Plate
with LED Driver
Recessed 4”
Octagon J-Box
(By Others)
Housing Assembly
IMPORTANT
Disconnect power before installing fixtures.
Read instructions before starting work. This
product must be installed in accordance with
the applicable installation code by a person
familiar with the construction and operation
of the product and the hazards involved.
MUST BE INSTALLED BY A QUALIFIED
ELECTRICIAN.
Flat Head Screws from
Wall Canopy
Tessera 3100 Wall Mount
INSTALLATION INSTRUCTIONS
This luminaire is designed to fit over a recessed Junction Box (J-box by others) that has a minimum cubic inch volume
capacity of 15. Example: Iberville 1004, 1504, 54151 or 55151. The power supply or driver is designed to recessed into the
J-box and consumes 4.5 cubic inch of volume.
1. Remove Luminaire from carton.
2. Remove (2) flat head screws located on the wall canopy that hold the fixture to mounting plate.
Disconnect the blue and red LED leads from the lever nut.
3. Connect black, white and green leads from the driver to the supply wires located in the junction box with approved wire nuts
(not supplied).
4. Mounting plate is designed to attach to the ears of the junction box with the #8-32 x 1/2” LG screws that are provided with the
outlet box. Tuck the supply connections and wires carefully into the outlet box before attaching the mounting plate. Ensure no
wires are pinched.
5. Re-attach the blue and red LED leads to the lever nut. When attaching the housing assembly the lever nut should be flat in
order to fit into the wall canopy compartment.
6. Attach the housing assembly to the wall mounting plate with (2) screws removed in step 2.
7. Energize and test as required.
8. This fixture is supply with an LED as specified for the project and is self contained.
9. For exterior / wet locations, silicone sealant should be applied to the top and down both sides to exclude water entrance.
Sealant between wall surface and housing canopy.
www.rebellelighting.com
© 2016 REBELLE All rights reserved.
REBELLE ARCHITECTURAL LIGHTING 11475 - 201A Street, Maple Ridge, B.C. Canada V2X 0Y3
P 604.465.5739 F 604.465.9801 E info@rebellelighting.com W rebellelighting.com
Wall Surface
Mounting Plate
with LED Driver
Recessed 4”
Octagon J-Box
(By Others)
Housing Assembly
IMPORTANT
Disconnect power before installing fixtures.
Read instructions before starting work. This
product must be installed in accordance with
the applicable installation code by a person
familiar with the construction and operation
of the product and the hazards involved.
MUST BE INSTALLED BY A QUALIFIED
ELECTRICIAN.
Flat Head Screws from
Wall Canopy
Tessera 3101 Wall Mount
INSTALLATION INSTRUCTIONS
This luminaire is designed to fit over a recessed Junction Box (J-box by others) that has a minimum cubic inch volume
capacity of 15. Example: Iberville 1004, 1504, 54151 or 55151. The power supply or driver is designed to recessed into the
J-box and consumes 4.5 cubic inch of volume.
1. Remove Luminaire from carton.
2. Remove (2) flat head screws located on the wall canopy that hold the fixture to mounting plate.
Disconnect the blue and red LED leads from the lever nut.
3. Connect black, white and green leads from the driver to the supply wires located in the junction box with approved wire nuts
(not supplied).
4. Mounting plate is designed to attach to the ears of the junction box with the #8-32 x 1/2” LG screws that are provided with the
outlet box. Tuck the supply connections and wires carefully into the outlet box before attaching the mounting plate. Ensure no
wires are pinched.
5. Re-attach the blue and red LED leads to the lever nut. When attaching the housing assembly the lever nut should be flat in
order to fit into the wall canopy compartment.
6. Attach the housing assembly to the wall mounting plate with (2) screws removed in step 2.
7. Energize and test as required.
8. This fixture is supply with an LED as specified for the project and is self contained.
9. For exterior / wet locations, silicone sealant should be applied to the top and down both sides to exclude water entrance.
Sealant between wall surface and housing canopy.
www.rebellelighting.com
© 2016 REBELLE All rights reserved.
REBELLE ARCHITECTURAL LIGHTING 11475 - 201A Street, Maple Ridge, B.C. Canada V2X 0Y3
P 604.465.5739 F 604.465.9801 E info@rebellelighting.com W rebellelighting.com
Ceiling Surface
Recessed 4”
Octagon J-Box
(By Others)
IMPORTANT
Disconnect power before installing fixtures.
Read instructions before starting work. This
product must be installed in accordance with
the applicable installation code by a person
familiar with the construction and operation
of the product and the hazards involved.
Mounting
Plate with
LED Driver
MUST BE INSTALLED BY A QUALIFIED
ELECTRICIAN.
Flat Head Screws from
Ceiling Canopy
Housing Assembly
Tessera 3121 Ceiling Mount
INSTALLATION INSTRUCTIONS
This luminaire is designed to fit over a recessed Junction Box (J-box by others) that has a minimum cubic inch volume
capacity of 15. Example: Iberville 1004, 1504, 54151 or 55151. The power supply or driver is designed to recessed into the
J-box and consumes 4.5 cubic inch of volume.
1. Remove luminaire from carton.
2. Remove (2) flat head screws located on the wall canopy that hold the fixture to mounting plate.
Disconnect the blue and red LED leads from the lever nut.
3. Connect black, white and green leads from the driver to the supply wires located in the junction box with approved wire nuts
(not supplied).
4. Mounting plate is designed to attach to the ears of the junction box with the #8-32 x 1/2” LG screws that are provided with the
outlet box. Tuck the supply connections and wires carefully into the outlet box before attaching the mounting plate. Ensure no
wires are pinched.
5. Re-attach the blue and red LED leads to the lever nut. When attaching the housing assembly the lever nut should be flat in
order to fit into the ceiling canopy compartment.
6. Attach the housing assembly to the ceiling mounting plate with (2) screws removed in step 2.
7. Energize and test as required.
8. This fixture is supply with an LED as specified for the project and is self contained.
9. For exterior / wet locations, silicone sealant should be applied around the ceiling canopy to exclude water entrance.
Sealant between wall surface and housing canopy.
www.rebellelighting.com
© 2016 REBELLE All rights reserved.
REBELLE ARCHITECTURAL LIGHTING 11475 - 201A Street, Maple Ridge, B.C. Canada V2X 0Y3
P 604.465.5739 F 604.465.9801 E info@rebellelighting.com W rebellelighting.com
Set Screws (2) from
Driver/Wall Canopy
Double Housing
Assembly with
Driver Canopy
IMPORTANT
Recessed 4”
Octagon J-Box
(By Others)
Mounting Plate
Disconnect power before installing fixtures.
Read instructions before starting work. This
product must be installed in accordance with
the applicable installation code by a person
familiar with the construction and operation
of the product and the hazards involved.
MUST BE INSTALLED BY A QUALIFIED
ELECTRICIAN.
Wall Surface
Tessera 3203 Wall Mount
INSTALLATION INSTRUCTIONS
1. Remove luminaire from carton.
2. Loosen (2) set screws located on the bottom side of the driver / wall canopy. Remove mounting plate.
3. Position mounting plate over a standard 4” octagon junction box (J-Box by others) ensure mounting plate is centered.
4. Attach mounting plate independently from junction box through 7/32” holes provided in plate.
5. Connect the black and white wire leads from LED drivers to the supply leads from the J-box and push these connections
carefully into J-box.
6. The housing assembly hooks over mounting plate and is secured with (2) sets screws loosened in step 2. Do not over tighten,
but ensure assembly is secured against wall surface.
7. Energize and test as required.
8. This fixture is supplied with an LED as specified for the project and is self contained.
9. For exterior / wet locations, silicone sealant should be applied to the top and down both sides to exclude water entrance.
Sealant between wall surface and housing canopy.
www.rebellelighting.com
© 2016 REBELLE All rights reserved.
REBELLE ARCHITECTURAL LIGHTING 11475 - 201A Street, Maple Ridge, B.C. Canada V2X 0Y3
P 604.465.5739 F 604.465.9801 E info@rebellelighting.com W rebellelighting.com
Wall Surface
Recessed 4”
Octagon J-Box
(By Others)
Mounting Plate
Double Housing
Assembly with
Driver Canopy
IMPORTANT
Disconnect power before installing fixtures.
Read instructions before starting work. This
product must be installed in accordance with
the applicable installation code by a person
familiar with the construction and operation
of the product and the hazards involved.
Set Screws (2) from
Driver/Wall Canopy
MUST BE INSTALLED BY A QUALIFIED
ELECTRICIAN.
Tessera 3204 Wall Mount
INSTALLATION INSTRUCTIONS
1. Remove luminaire from carton.
2. Loosen (2) set screws located on the bottom side of the driver / wall canopy. Remove mounting plate.
3. Position mounting plate over a standard 4” octagon junction box (J-Box by others) ensure mounting plate is centered.
4. Attach mounting plate independently from junction box through 7/32” holes provided in plate.
5. Connect the black and white wire leads from LED drivers to the supply leads from the J-box and push these connections
carefully into J-box.
6. The housing assembly hooks over mounting plate and is secured with (2) sets screws loosened in step 2. Do not over tighten,
but ensure assembly is secured against wall surface.
7. Energize and test as required.
8. This fixture is supplied with an LED as specified for the project and is self contained.
9. For exterior / wet locations, silicone sealant should be applied to the top and down both sides to exclude water entrance.
Sealant between wall surface and housing canopy.
www.rebellelighting.com
© 2016 REBELLE All rights reserved.
REBELLE ARCHITECTURAL LIGHTING 11475 - 201A Street, Maple Ridge, B.C. Canada V2X 0Y3
P 604.465.5739 F 604.465.9801 E info@rebellelighting.com W rebellelighting.com