NY State Environmental Quality Review Act (SEQR) SCOPING DOCUMENT For a Draft Environmental Impact Statement (DEIS) HUDSON STEPPE Village of Ossining, Westchester County, NY Adopted ___August 24________ 2010 SEQR CLASSIFICATION: Unlisted Action LEAD AGENCY: Village of Ossining Planning Board LIST OF INVOLVED AGENCIES • • • • Village of Ossining Planning Board Village of Ossining Village Board Westchester County Department of Health New York State Department of Environmental Conservation LIST OF INTERESTED AGENCIES • • • • • • • • • NYS Dept. of Correctional Facilities NYSDOT Region 8 Westchester County Planning Dept. Westchester County Dept. of Environmental Facilities Ossining UFSD Josette Polzella, Town of Ossining Assessor Village of Ossining Fire Headquarters Village of Ossining Environmental Committee Village of Ossining Historic Preservation Commission Introduction This Scoping Document is adopted by the Village of Ossining (hereinafter “Village”), as Lead Agency for the SEQR review of the proposed Hudson Steppe project. This document is intended to serve as the foundation for the identification of all potentially significant adverse environmental impacts that are pertinent to the proposed action, and to identify appropriate mitigation measures. It is also intended to eliminate consideration of any impacts that are irrelevant or non-significant. Scoping Document, Hudson Steppe Page 1 of 12 Description of the Proposed Action The applicant proposes to develop 188 condominium or rental units in seven residential buildings and a mix of dwelling unit types. Dwellings vary in size from 835 square feet (SF) (studio), 829 to 1050 SF 1-bedroom units, 1200 to 1700 SF 2-bedroom units, and 2038 to 2793 SF 3-bedroom units. Ten percent of the dwelling units, evenly distributed among the unit sizes, will be marketed at affordable prices. In addition, the Smith-Robinson house will be renovated to accommodate three floors (7,500 SF) of office space on the site. The proposed site development provides a total of 253 parking spaces, including 183 spaces in an underground parking facility. General Scoping Considerations The applicant will prepare a site-specific, project-specific Draft Environmental Impact Statement (DEIS) addressing all items identified in this Scoping Document. The applicant will incorporate information from other developments underway or proposed in the local area and include, where noted, discussions on cumulative adverse impacts. The applicant will follow the SEQR regulations (6NYCRR 617) for direction on the required content of a DEIS. The DEIS will assemble relevant and material facts needed to address only those potential significant adverse environmental impacts that can be reasonably anticipated due to the project. It will be clearly and concisely written in plain language that can be easily read and understood by the public. Highly technical material will be summarized and, if it must be included in its entirety, it will be referenced in the DEIS and included as an appendix. The DEIS will be written in the third person without use of the terms I, we, and our. Narrative discussions will be accompanied as appropriate for clarity by illustrative tables and graphics. All graphics will clearly identify the project area. The DEIS will group the areas of concern into relevant subject areas with each section describing the existing setting, potential impacts, and proposed mitigation to permit more efficient review. Opinions of the applicant that are unsupported by evidence will be identified as such. Preliminary Plans will accompany the DEIS as an attachment and reduced copies of pertinent plan sheets may be included in the text of the DEIS. Contents of the DEIS Cover Sheet listing title of project, location, identification as a DEIS, Lead Agency, applicant, preparer, and relevant dates (i.e. date of document preparation and spaces for dates of DEIS acceptance, public hearing, final date for acceptance of comments). A list of preparers will include the firm name, contact name, address, and phone number for all consultants who helped prepare the document. The Lead Agency and applicant will be identified with a contact name and a phone number. Scoping Document, Hudson Steppe Page 2 of 12 Table of Contents including listings of primary DEIS sections and subsections, tables, figures, drawings, and any items that may be submitted under separate cover (and identified as such), with page numbers listed for each. I. EXECUTIVE SUMMARY The Executive Summary will include a brief description of the proposed action and a listing of all identified potential environmental impacts and proposed mitigation measures. A summary will be provided of the approvals and permits required, and of the alternatives to the proposed action that are evaluated in the DEIS. The Executive Summary will only include information that is found elsewhere in the main body of the DEIS. II. DESCRIPTION OF THE SITE AND THE PROPOSED ACTION This chapter of the DEIS will describe the project site and its location within the region, the proposed project, the public need and objectives of the project sponsor, and list required approvals, reviews, and permits. A. Site Location and Description 1. A written and graphic description of the location of the project site in the context of the County of Westchester, the Village of Ossining, including tax map numbers and list of abutting property tax map numbers. The site shall be described relative to: surrounding land uses, main transportation corridors, streams, water bodies, wetlands, steep slopes (including any proposed mitigation for slope stability and soil erosive qualities), and other prominent natural and man-made features on and in the immediate vicinity of the project site. This description shall include the school district in which the site is situated. 2. A brief description of the environmental setting of the site, and the natural resources identified thereon and in the adjoining areas. This description shall include a brief history of site use, current uses of the site and/or past activities and man-made facilities thereon. In addition a brief description of the flora and fauna of the area and including any rare or endangered species or other significant natural communities identified by the New York Natural Heritage Program. 3. Identification of any easements, rights-of-way, restrictions, special district boundaries or other legal devices affecting the subject property’s development potential. 4. Description of the existing infrastructure serving the project site and/or its immediate environs, including existing site access, road network, available utilities such as gas, electric, telephone, and cable, storm sewer, as well as central water and sewer facilities. B. Description of the Proposed Action Scoping Document, Hudson Steppe Page 3 of 12 1. Written and detailed description of the proposed action, including the proposed use, design, layout, phasing and construction schedule, and provision for emergency access and available resources, as well as vehicular and pedestrian circulation in and around the site. 2. Identify zoning and describe existing land uses for the project site and adjoining properties. 3. Discuss compliance with all applicable Zoning requirements and other criteria set forth in the Village of Ossining Code. The DEIS will indicate the extent to which any modifications or waivers of such standards and other criteria, any variances from such regulations, or any zone text changes that would be required to carry out the project as proposed and an evaluation of why such deviation is needed and would be appropriate. 4. Describe “green” building technologies incorporated into the project. 5. The provision of adequate parking and sidewalks within the proposed development will be discussed. 6. Management of fill export and import will be discussed, and a construction phasing plan will be described. C. Project Purpose and Need 1. Discuss the purpose or objective of the project sponsor. 2. Identify the public need for the proposed action, including consideration of consistency with adopted policies and/or plans as set forth within adopted local and regional land use and community development plans. D. Approvals, Reviews and Permits 1. List all required approvals, reviews, and permits required, by agency, to implement the proposed action together with the status of each application, including the creation or expansion of water, sewer, drainage or other municipal districts if required by the project. 2. List all Involved Agencies and known Interested Parties for DEIS distribution. III. ENVIRONMENTAL SETTING, IMPACTS, MITIGATION This section of the DEIS will identify the existing environmental conditions, potential impacts of the action, and proposed mitigation measures as appropriate for each of the major issues identified in this Scoping Document. Sufficient detail should be provided so that reviewers are able to gain an understanding of current conditions and impacts. Special effort should be made to explain technical information in lay language with supporting tables and maps. Proposed and potential mitigation measures for identified adverse environmental impacts should indicate which mitigation measures have been incorporated into the plans as well as those which have not, and the reasons therefore. Scoping Document, Hudson Steppe Page 4 of 12 The format or organization of this section will include the following subsection headings for each topic or impact issue to provide a meaningful presentation of the environmental issues that allows the reader to focus on individual impact issues: Existing Conditions Potential Impacts Mitigation Measures A. Soils and Topography The existing surficial and bedrock geology of the site will be described. Although the site has been substantially developed and impacted, underlying soils characteristics will be discussed and quantified to the extent necessary to identify the proper stormwater management and soil erosive qualities and to the extent necessary for the completion of NYSDEC General Permit GP-0-10-001. If prominent and/or unique features are present at the site, these features should be identified on a map. The design of the project should be accomplished to avoid and or minimize impacts to bedrock and disturbance of substantial rock outcroppings whenever and wherever possible. If rock material is proposed to be removed to complete the grading process for this project, the nature and amount of the rock and/or soil likely to be encountered, and the method of rock and/or soil removal should be identified (i.e., ripping, blasting, or hammering), with the impacts and mitigation measures discussed, including discussion of how much material is to be removed and the method of removal. There will be discussion of ensuring import of clean fill to the site for project development. Any permits and authorizations required prior to blasting shall be clearly identified. The DEIS will provide a soil erosion and sediment control plan that will consist of a text description and plan details of specific designs to be implemented during and postconstruction. A topographic survey based on a two-foot contour interval will be prepared. Existing topography will be mapped based on the following slope categories: 0-15%, 15-25%, and 25% and greater. Slope descriptions will include a listing of these slope categories as a percentage of the total site area. A comparison of existing and proposed topography will be evaluated. The following will be described: a. A preliminary cut and fill analysis, including an analysis of the disposal of excess cut or the import of fill materials, if fill is required, as well as identification of areas where cut will reach the water table and contingency plans to deal with discharge of groundwater to the surface. b. In areas identified for stormwater infiltration, test pits and percolation tests will be conducted to confirm the adequacy of the soils. c. Conformance with the applicable NYS SPDES General Permit for Construction Activity will be discussed. Scoping Document, Hudson Steppe Page 5 of 12 d. Describe in detail provisions for successfully working with the steep slopes on the property including temporary measures and permanent measures. e. If blasting will likely occur, the discussion should not only include mitigation measures that address ways in which blasting will be controlled, it should also address ways of reducing and avoiding the need for blasting. f. If excess earth materials will need to be removed from the site, estimate the number of tons and truck trips necessary to carry out the construction and identify the routes the trucks will take. B. Surface Water and Ground Water Resources 1. Surface water features will be mapped and described, including 100-year floodplain, wetlands and watercourses on the site, if any. A drainage study, defining existing and post-development peak rates and flow volume of stormwater runoff and stormwater quality treatment during the statistical 2-, 10-, and 100-year, 24-hour Type III storm events, will be submitted. The results of this study will be summarized in the DEIS text and all supporting calculations will be presented in an appendix to the DEIS. 2. Pre- and post-development stormwater runoff quality and outline of treatment methods per current NYSDEC Design Standards and local regulations shall be presented, including discussion of whether quantity control measures and/or improvement to existing facilities are required. 3. The DEIS will include a stormwater management plan for the development, and there will be discussion of compliance with local stormwater management regulation (Chapter 227 Stormwater Management and Erosion and Sediment Control) and NYSDEC general permits. 4. The access to, ownership of, and responsibility for maintenance requirements during construction and long term maintenance of any stormwater management facilities shall be discussed. 5. The DEIS will describe if any quantity controls as described by the General Permit are required and if any improvements to the existing Village stormwater management facilities to accommodate the development are required. C. Water Supply and Wastewater Systems 1. Water Supply System: a. Calculate water demand for the project based on Department of Health multipliers. The preliminary design for the proposed water supply system (water storage tank, delivery issues, pressure zones, distribution around the site, and any on-going upgrades planned by the water supplier) shall be clearly explained with provision for both domestic and fire flow capacities. Administrative issues relating to the water supply system and water district shall be addressed. Discuss potential cumulative impacts associated with this project in combination with other proposed or approved projects in the water supply system. Long-term ownership and maintenance of the system will be discussed. Scoping Document, Hudson Steppe Page 6 of 12 b. Pressure and flow of the existing water main will be determined and discussed to ensure adequacy and proposed connections and required improvements will be dicussed. 2. Wastewater Disposal System: a. Estimate the potential sewage generation from the proposed project. Identify the sewer district which includes the site and the location where the sewage is treated and discharged. b. Address any potential sewerage limitations that may apply to the project. c. Discuss mitigation measures including water conservation to reduce sewage flows, or upgrades required to the system, if any. d. Include discussion of potential cumulative impacts associated with this project in combination with other proposed or approved projects in the wastewater system. e. Long-term ownership and maintenance of the system will be discussed. D. Land Use and Zoning 1. Land Use a. Describe existing land uses of the subject property and adjoining properties. b. Discuss the compatibility of the proposed project with the character of the adjoining area. c. Discuss potential impacts on adjacent land uses. d. Describe the construction schedule and construction phasing. Discuss impacts on adjacent land uses associated with proposed construction activities, including access to the site for construction vehicles, effects of construction traffic on adjacent roadways, construction staging and management of fill export and import. Discuss mitigation measures to minimize the need to transport demolition material off-site. 2. Zoning a. Describe existing zoning of the project site and adjoining properties. b. Discuss conformance of the proposed action with the most recent Comprehensive Plan for the Village of Ossining, and pending Plans where applicable. c. Demonstrate compliance with all zoning requirements and other applicable criteria set forth in the Village Code. Indicate the extent to which any modifications or waivers of such standards and other criteria or any variances from such regulations would be required to carry out the project as proposed, and an evaluation of why such deviation would be appropriate. Describe any density bonuses sought and the incentives that are associated with those density bonuses including the affordable housing. Scoping Document, Hudson Steppe Page 7 of 12 e. Conforms to the LWRP and its associated local program and policies. E. Transportation 1. Existing Conditions. a. A description of the following area roadways, including general descriptions of existing geometry, lane widths and traffic controls at the intersections listed below. Manual turning traffic movement counts at the following intersections for the weekday morning and weekday afternoon peak hours. (Data collected within last five years, if verified by recent count data, can be used in the analysis.) i. ii. iii. iv. v. vi. vii. viii. ix. x. xi. xii. xiii. xiv. U.S. Route 9 and Main Street/Church Street U.S. Route 9 and Waller Avenue and Emwilton Place U.S. Route 9 and Broad Avenue U.S. Route 9 and James Street Main Street and Spring Street Spring Street and Waller Avenue Spring Street and Academy Place Spring Street and Broad Avenue Main Street and State Street State Street and Academy Place State Street and Broad Avenue State Street and James Street Spring Street and Lafayette Avenue Hunter Street at both ends b. Capacity analyses for existing conditions at each of the intersections noted above following procedures from the “Highway Capacity Manual”. c. Traffic volumes should reflect typical conditions on area roads when the proposed development would be at full build-out. Peak hour volumes should be graphically shown for each intersection (one figure for each peak hour showing all intersections) for the weekday morning and weekday afternoon peak hours. Counts will be made when school is in session. 2. Potential Impacts. a. Determine background traffic volumes, including an appropriate growth factor, plus other proposed or approved/ unbuilt projects at the time of the study (to account for cumulative impacts). b. Calculate site-generated peak hour traffic (based on trip generation information from the Institute of Transportation Engineers) and distributed onto area roadways (shown graphically) based on existing travel patterns. Scoping Document, Hudson Steppe Page 8 of 12 c. Capacity analyses for future background conditions calculated for each study intersection. d. Combined traffic volume projections based on background traffic volumes and added site-generated traffic as described above. e. Capacity analyses of future combined traffic conditions as noted above and compared to capacity results for existing and background traffic conditions at each study intersection. f. Identify the population expected to be served for mass transit and their mode of transportation to that mass transit (i.e. whether they will be driving to the train station or actually walking), and discuss means by which pedestrian access to mass transit will be facilitated. g. Discuss the proposed improvements to facilitate pedestrian access to nearby MTA Station. 3. a. Mitigation. Mitigation in the form of recommendations for roadway and intersection improvements, traffic controls, signal modification, timing revision, future monitoring shall be discussed. b. Discuss benefits of access to mass transit and on-site automated parking. c. Discuss the ways in which the project will facilitate bicycle and pedestrian access for residents. F. Aesthetic Resources 1. Describe the visual character of the project site environs through the use of narrative text and one or more of the following: aerial photographs, plans, sections, visual sight line profiles. Provide a viewshed map showing important points from which this site can be viewed within ½ mile using the NYSDEC Program Policy, Assessing and Mitigating Visual Impacts, DEP-00-2 as a guideline. The analysis will describe: a. The existing visual character as viewed from public roads or properties, including main structures on the site, and visuals to and from the Hudson River. b. The change in visual character resulting from implementation of the proposed action compared to existing visual character and existing approvals. Also includes a detailed description of the proposed streetscape. c. Mitigation measures proposed to lessen an adverse visual impact of the proposed action including but not limited to such matters as architectural design, landscaping, preservation of existing vegetation, and ”fit” with the existing topography. d. Include discussion of potential cumulative impacts associated with this project in combination with other proposed or approved projects in the visual study area. Scoping Document, Hudson Steppe Page 9 of 12 e. Discuss consistency with the NYS Coastal Management Program and LWRP. G. Historic and Archaeological Resources 1. Contact the New York State Office of Parks, Recreation and Historic Preservation (OPRHP) to determine the presence of and potential impact on historic and archaeological resources that may be located on the project site, as well as the Ossining Historical Society. 2. Describe the findings of any cultural resource investigation if same is required by OPRHP standards and describe any historic, architectural, and archaeological survey data if applicable. 3. Discuss mitigation measures proposed or alternatives considered as deemed advisable by the professional archaeologist or OPRHP. 4. With regard to the Smith Robinson House, describe the preservation work that needs to be done and its anticipated results. This will include consulting with a professional architect with historic preservation specialty and provide a thorough historic and architectural survey that defines the area of potential effect on historic resources as well as detail any potential impacts that the project could have on the integrity of the SmithRobinson House. 5. Discussion of any rare species or significant natural communities on the site. H. Community Facilities and Services 1. The proposed project may create the need for additional community services including police protection, fire protection, emergency medical services, education, and public recreation/open space facilities. Each existing service area will be described as to its existing capacity. (Water and sewer services and distribution are addressed separately in another section.) Describe how the site plan will adequately provide emergency service access to the residences and that the site plan meets NYS fire codes. 2. The impact of the proposed project on each service area will be estimated, according to generally accepted multipliers. 3. Mitigation measures will be discussed including increasing the capacity of affected community service areas as a result of the proposed action. 4. Address intermunicipal services (for example police or fire response), if any, and any administrative concerns related to the project site. 5. Recreation/open space: Describe the recreational, open space, and green space provided by the project in comparison to existing recreational, open space, and green space on the site, and describe whether the recreation space will be public or private, active or passive or whether there will be any restrictions such as conservation easements or other encumbrances. Scoping Document, Hudson Steppe Page 10 of 12 6. Include discussion of potential cumulative impacts associated with this project in combination with other proposed or approved projects as may affect community facilities and services. 7. Include discussion of impacts on schools in the district. I. Fiscal Impact Analysis 1. A fiscal impact analysis will be undertaken to ascertain the potential fiscal impacts associated with the increased demand on municipal services generated by the project. 2. The fiscal impact analysis will be on the cost and revenue implications of the project for each service taxing district affected by the proposed action. The fiscal impact analysis will be based on generally accepted methods and their application. The market value for proposed residences will be described, as it is the basis for property tax revenues. 3. Mitigation measures, if necessary, will be presented that minimize the fiscal impact of the proposed action. J. Noise and Air Resources 1. The DEIS will qualitatively evaluate the potential construction-related impacts to noise levels and air resources and will identify appropriate mitigations to reduce them, including the noise to be generated by site clearing, truck traffic, blasting and rock excavation, and the potential post-development noise to the surrounding neighborhood, if any. 2. Potential environmental impacts anticipated due to the construction of the proposed project, hours of construction operations, including noise and traffic, air quality, dust blasting, chipping and impacts on the surrounding area should be described, including the potential damage (and remedial measures to be taken to correct damage) to Village roads from construction traffic, and the prevention of mud and gravel from being tracked onto Village roads. 3. Discuss the noise and air impacts of the truck traffic along the identified truck routes. 4. Discuss the lighting on site and how it would potentially affect neighboring properties. 5. Discuss any environmental justice issues that may exist in this location. 6. Describe how the proposed action will utilize energy conservation measures and a summary on how those measures will reduce the overall carbon emissions of a project this size when implemented. IV. UNAVOIDABLE ADVERSE IMPACTS This section of the DEIS will list the impacts that are likely to occur despite mitigation measures, and will compare in summary form the beneficial and adverse implications of these unavoidable impacts. Discussion will include short term construction impacts. Scoping Document, Hudson Steppe Page 11 of 12 1. There should be a description of methods of recycling waste and natural materials on site during construction. 2. Describe the construction schedule and any limitation to the amount of acreage of disturbed soil exposed at any one time. V. ALTERNATIVES This section of the DEIS will evaluate and compare alternatives to the proposed action, which are listed below. The evaluation and comparison will include a conceptual plan and a tabular comparison of quantified impacts in addition to text. The following alternatives will be studied: A. The “No Action” Alternative as required under 6 NYCRR 617.9.b.5. B. Development Under the Previous Approvals. C. Development under a reduced unit count assuming that no density bonuses were provided beyond the affordable housing density bonus. VI. IRREVERSIBLE AND IRRETRIEVABLE COMMITMENT OF RESOURCES Identification of those natural and man-made resources consumed, converted or otherwise made unavailable for future use as a consequence of the proposed action. VII. GROWTH INDUCING ASPECTS Potential growth-inducing aspects, including short and long term, primary and secondary/indirect impacts, generated by the project will be described, including but not limited to impacts on population, support facilities and development potential, and mitigation measures discussed, if necessary. VIII. EFFECTS ON THE USE AND CONSERVATION OF ENERGY RESOURCES A description of the effect of the proposed action on the short and long term use and conservation of energy resources will be provided including ways to reduce inefficient or unnecessary consumption during construction and long term operation. IX. APPENDICES The appendices will include a list of all underlying studies and reports relied upon in preparing the DEIS, technical exhibits and studies and background information relevant to the proposed action such as the adopted Scoping Document and other relevant SEQR documents, and relevant correspondence. Highly technical information may be included in the DEIS digitally (on a compact disk) where that information is not needed by the layman to understand the narrative discussion of that subject. Scoping Document, Hudson Steppe Page 12 of 12