PESKO Engineering Pte Ltd

advertisement
PESKO ENGINEERING PTE LTD
CO. REG. NO. 198400308D
NO2. JOO KOON ROAD, SINGAPORE 628966 TEL: 6264 8539 & 6264 8540 FAX: 6261 1410
Company Introduction
Since incorporation in 1984, PESKO Engineering Pte Ltd (PEPL) is one of the leading Electrical and
Instrumentation Contractor in Singapore. PEPL has always been to deliver the distinct core solution for
various multi disciplinary engineering services for Industries & Commercial Buildings from Construction to
Maintenance in Electrical, Instrumentation, Fire Alarm, CCTV, Card Key, Networking, Public Addressing,
Fence Intrusion Detection and Tubular scaffolding systems.
PEPL’s endeavor towards success is well supported by the effective leadership under the Directors
Mr.Khor Chor Chin and Mr.Koh Geok Koon. The management is organized by an experienced team with
clear delineation of individual responsibility and authority. The estimation, planning, scheduling, cost control,
execution, quality control/quality assurance, testing & commissioning of projects are effectively managed by
qualified, trained and experienced personnel by adopting the advanced techniques, tools and proven
standards and procedures.
PEPL is a registered in-house contractor of ExxonMobil Asia Pacific Pte Ltd and Building Control Authority.
PEPL has been executing Maintenance and Project works for Oil and Petrochemical Industry for a period of
over 25 years and has been successful in its growth with good reputation among the clients. The standard
quality of work with excellence in the areas of Health, Safety and Environment (HSE) is what made us to be
a pioneer in the industry.
We do quality endorsed business to the international quality standard ISO 9001:2008 & OHSAS 18001:2007
certification ensures our compliance with international occupational health and safety management system.
By creating an environment that encourages a commitment to quality with continuous improvement, we are
able to ensure that we remain focussed on consistently delivering value and excellence to our clients.
PEPL has an experienced & dynamic team of about 450 people that drives the company passionately
towards its goal. To us at PEPL, success is a measure of promises kept. It is the single most cherished
dream in every project that we have decided to undertake. Commitment to the cause is what has driven us in
the last two and half decades plus. And commitment is the key in times ahead. PEPL prides itself on its
traditions of engineering and process excellence & improved infrastructure facilities coupled with high
employees and customer satisfaction levels in order to position our self in the industry to serve our clients
better in terms of quality and economy.
PEPL is operating from its head office located at No.2 Joo Koon Road, Singapore in a security enabled
office premises with a large warehouse to stock materials. The site operations are facilitated with our site
offices located at Banyan Drive and ExxonMobil PAC refinery, Jurong Island.
Vision
“Provide excellent engineering services with passion and innovation to ensure customer satisfaction”
Mission
“To amplify productivity by breaking the barriers of cost, duration & technology and building bonds among
our employees and customers”
Core Values
“Customer Orientation, Wealth Creation, Employee Empowerment, Systems & Processes, Teamwork &
Co-operation, Pro-activeness and innovation”
Message from Directors
Mr. Khor Chor Chin
Managing Director
PESKO Engineering Pte Ltd
Mr. Koh Geok Koon
Managing Director
PESKO Engineering Pte Ltd
“Since its inception in 1984 as a small organization, PEPL had seen a
remarkable growth in the past two and half decades delivering quality
services to its clients based on their requirements. We always believe
that success of an organization can be achieved through customer
satisfaction and we have been executing this with the support of our
trained and skilled work force controlled by an experienced
management team. We give priority to Safety and hence got a good
reputation among our clients with proven records of Health, Safety and
Environment Management. Years to go and milestones to achieve,
PEPL keeps focusing on the factors to provide better services to our
clients. We have proven records in Health, Safety and Environment
We take immense pleasure in thanking our clients and supporters for
having a trust on us and we are working as a team to keep hold of the
trust and developing ourselves to deliver our best in the competitive
market.”
“PEPL stands for its commitment and quality aiming at client
satisfaction by integrating advanced techniques to serve them the best
in the industry. We are serving the construction and process industries
providing them Electrical, Instrumentation, Security systems,
Networking, Fire Alarm and scaffolding services. The services are
being offered to our clients with a dedicated workforce who are trained
and skilled to execute the Job in an effective way. The key to running
any business successfully is getting the priorities right and we are
working towards serving our clients better by understanding their
needs and deliver them excellent services. We believe that team work
is all that can bring pride to any organization and we strive hard to build
an effective team to be able to satisfy our clients with what they need”
General Info
Name of Company
:
PESKO Engineering Pte Ltd
Registration No
:
00308/1984D
Paid Up Capital
:
S$ 550,000
Head Office
:
No.2 Joo Koon Road, Singapore 628966
 6264 8539, 6264 8540, 6261 2031
 6261 1410
 peskoeng@singnet.com.sg, admin@peskoeng.com.sg
Site Offices
:
No.42, Banyan Drive, Singapore 627766
 63169683
 67952011
 adminbanyan@peskoeng.com.sg
:
1, Ayer Chawan Place, Singapore 627871 (EM Campus)
 67957598
 66864815
 pac@peskoeng.com.sg
:
Lot 2808P, MK: 34, Tembusu Avenue,
Jurong Island, Singapore (CCDS Campus)
 ccds@peskoeng.com.sg
Ware House
:
No.2 Joo Koon Road
Singapore 628966
Directors
:
Mr. Khor Chor Chin & Mr. Koh Geok Koon
BCA Registration
:
ME05 Electrical Engineering L4
Members
:
Member of the Singapore Confederation (SMA)
Member of the Association of Process Industry (ASPRI)
Our Services in Construction and Process Industries
Electrical
Domestic, Commercial & Industrial lighting and small power for both safe and zoned applications
Domestic, Commercial & Power distribution in LV, MV and HV in both safe and zoned areas
Electrical trace heating, PI/SI testing, Insulation & Hi-Pot testing
Earthing and lightning protection
Motors, EMVs, EBVs, MOVs, ESDs & SCDs
Transformers (LV, MV, HV up to 22kV)
Air-con control panel in control Room and Sub stations
Switchgears, MCCs (Up to 22kV) and auxiliary LV panel
UPS, Rectifiers, Converters, Battery Banks
Instrumentation & Analyzer
Transmitters (Temperature, Pressure, Flow & Level)
Indicators (Temperature, Pressure, Flow & Level)
Gauges (Temperature, Pressure & Level)
Control Valves, Solenoid valves, PSVs
Air lines and Hot pipes
Tubing (Metric and Imperial)
Analyzers (Gas Chromatograph, O2, H2 & Moisture)
DCS, ESD, PLC, HIPPS Systems in Control room & Satellite Instrument House
Loop checks (Hot & Cold)
Commissioning of loops
Networking and Security
CCTV Security Cameras
Fire Alarm System ( Conventional & Addressable)
FM 200 System
Card Access security systems
AFC System, GTM & TUM Installation in MRT
Fence Intrusion Detection System
Ethernet Cat 5 / 5e / 6 Networking
Fibre Optic Cabling and Patch Panel installation
Testing and Commissioning
Tubular Scaffold Works
Mobile Scaffold
Hanging Scaffold
Independent Scaffold
Key Personnel
S/N
A
B
C
D
Name
Designation
Qualification
Experience in PEPL
OFFICE
1 Khor Chor Chin
Director
Dip. (EE), Deg (ME)
30 Years
2 Koh Geok Koon
Director
Dip (EE)
30 Years
3 Kok Keuw Kuan
Admin Manager
GCE “O”
30 Years
4 Grace
Finance Manager
Dip(Business)
2.5 Years
5 Ang Tiong Hin, Peter
Sr. Project Manager
Dip (EE)
10 Years
6 Freddy Low
Business Dev. Manager
BBA, MBA
0.5 Year
7 Lee Chuan Cheng
Training Manager
ITE (EE)
25 Years
8 Jang Shuzhen
Materials coordinator
Dip (BA)
2.5 Years
1 Cheah Chen Huat
Site Manager (Scaffold)
Sec 4
10 Years
2 Wijesekara Chulani
Project Engineer
B.Sc (ME)
8 Years
3 Nay Zar
Drafter
Deg (EE)
1 Year
4 Kok Yew Wau
Supervisor
CoC/SEC1/SET1
15 Years
5 Gan Hing Bing
Supervisor
CoC/SEC1/SET1
15 Years
6 Hoo Thien Sze
Supervisor
CoC/SEC1/SET1
12 Years
7 Tan Choon Tick
Supervisor
CoC/SEC1/SET1
12 Years
1 Govindarajulu Vijay
Site Manager
MBA (IB)
3 Years
2 Chee Keng Kong
Safety Officer
GCE “O”
10 Years
3 Gan Tsian Hua
Supervisor
CoC/SEC1/SET1
12 Years
4 Wee Keng Sing
Supervisor
CoC/SEC1/SET1
11 Years
5 Periyasamy Murugesan
Supervisor
CoC/SEC1/SET1
15 Years
6 Kalai Palaniappan
Supervisor
CoC/SEC1/SET1
15 Years
7 Md Jeffri
Safety Supervisor
GCE “O”
2 Years
1 Low Lap Chee
Site Manager
NTC-3 (EE)
12 Years
2 Stambagadi Jegadheeswar
Site Coordinator
CoC/SEC1/SET1
11 Years
3 E R Rajkumar
QA/QC Engineer
BE (EE)
3 Years
4 Kaliyaperumal Vinoth Raj
Planner
Deg (EI)
2.5 Years
5 Gan Kian Boon
Supervisor
CoC/SEC1/SET1
12 Years
PROJECTS (Buildings)
JURONG SITE
PAC SITE
Contd….
S/N
E
F
Name
Designation
Qualification
Experience in PEPL
SCP SITE
1 Wong Yoon Fah
Site Manager
Deg (EE)
4 Years
2 Kannupillai Chinnasamy
Site Coordinator
CoC/SEC1/SET1
12 Years
3 Maclid Ronald Mondala
QA/QC Engineer
Deg (EE)
2.5 Years
4 Lim Hey Chiew
Supervisor
CoC/SEC1/SET1
15 Years
1 Vadamalai Senthil Kumar
Project Control Manager
BE (EI)
3 Years
2 Muthukumar Murugesan
Construction Manager
BE (EE)
3 Years
3 Kannan Prabhakaran
Planning Engineer
BE (EI)
2.5 Years
4 Jayaraman Samynathan
QA/QC Engineer
BE (EI)
2.5 Years
5 Panneer Selvam Rajesh
Project Engineer
M.Sc. (EI)
2.5 Years
6 Thangavelu Arivazhagan
Project Engineer
BE (EI)
2.5 Years
7 Manoharan Pratap
Instrument Engineer
BE(EI)
2.5 Years
8 Devaraj Saravanan
Material Co-ordinator
Dip (EE)
2.5 Years
PROJECTS (Oil/Petro)
Overall Organisation Chart
Our Clientele
We focus on growing businesses. Our growing clientele continues to give us the opportunity to equip
ourselves to match the change in the international standards and to implement them in our future endeavors.
We look at every new assignment as a chance to grow, to challenge ourselves, to give our clients more than
they demand for, and to push the boundaries of what's possible. Some of our valuable Clientele is listed
below:
Mainland, Singapore
ExxonMobil Asia Pacific Pte Ltd
Foster Wheeler Asia Pacific Pte.Ltd
Marina Bay Sands Resort & Casino
Singapore Mass Rapid Transit (SMRT)
Jacobs Engineering Group Inc
Johnson Controls (S) Pte Ltd
HSL Construction Pte Ltd
Siemens
Kandenko
Hitachi
SONY Corporation
TAC Controls
The Singapore Armed Forces
SingTel Telecom Pte Ltd
Schneider Electric
Republic Polytechnic
PT. Kertas Kraft Aceh (Persero)
BHG (Singapore) Pte Ltd
TECH Semiconductor (S) Pte Ltd
Honeywell Pte Ltd
Seiyu
Resources Development Ltd
Overseas
Kandenko, Maldives
Jubail Commercial Port, Saudi Arabia
Island, Singapore
ExxonMobil Asia Pacific Pte Ltd
Foster Wheeler Asia Pacific Pte.Ltd
CCD Singapore Pte Ltd
JGC Corporation
Chevron Corporation
Mitsui Chemicals Asia Pacific Ltd
Jacobs Engineering Group Inc
Punj Lloyd Pte Ltd
HSL Construction Pte Ltd
ABB
ELPRO Engineering Pte Ltd
Hai Leck Engineering Pte Ltd
Our Supporters
PESKO’s service excellence is being supported by the following experts in various sectors.
Supporters
Sing Leck Engineering
Presco Scaffolding & Services Pte Ltd
Multiheight Scaffolding Pte Ltd
Industrial Services (Pte) Limited
Cue Star Industry (S) Pte Ltd
Sixty Six Switchgears Co Pte Ltd
SWTS Pte Ltd
Johnson Controls (S) Pte Ltd
Patent Engineering Co Pte Ltd
Federal Fire Engineering Pte Ltd
Huationg Asia Pacific Pte Ltd
Professional Engineers
J.M. Pang & Seah (Pte) Ltd.
K L Au & Associates
DJW & Associates
W M Leow & Associates
Vendors
Swagelok
Nishio Rent All Singapore Pte Ltd
AKCO
AEG Power solutions
Acez Instruments Pte Ltd
Tai Sin Electric Limited
NOAH
CSE transformers
Lanbridge
Premier Networx
Gexpro
Elecspec
Lim kim Hai
Ever green
Lysaght
Aggreko
Vanjoo
HILTI
Certifications of excellence
OHSAS 18001:2007
ITE CERTIFIED OJT CENTRE
ISO 9001:2008
bizSAFE STAR CERTIFICATE
Safety Awards & Recognitions
Award from Mobil Oil S’pore Pte Ltd in recognition of two years w/o LTI in June 1999
Certificates of Appreciation from ExxonMobil Asia Pacific Pte Ltd (EM) for contribution to CSWC
safety activities & outstanding safety achievements in 2001 and 2002
Achievement Award from EM for contribution towards the successful completion of ACS
replacement project in 2003 – 2004
Special Recognition Award from EM for one of the co-organizers of the TA Safety corner w/o any
recordable injuries in July 2007
President’s Safety Award from EM for contribution towards GREEF Asia Pacific winning the
President’s Award in 2008
Certificate of Appreciation from EM Singapore Refinery, for invaluable service and participation in
the President’s Challenge 2008
Recognition Award from EM Singapore Refinery Facilities for participation in Loss Prevention
System (LPS) in 2008
Certificate of Appreciation from Singapore Armed Forces for Support & Contribution towards SAFVertans League in 2009
Distinguished Defence Partner Award from Singapore Ministry of Defence for Outstanding
contribution towards National Defence in July 2009
Contractor of the Month Award from Foster Wheeler & Worley Parsons (FWP) for SPT-IRF Jurong
Project in January and October 2009
Recognition Award from FWP-EM for supports to achieve 1 million Safe Man-hours for SPT-IRF
Jurong Project in 2009
SHE Recognition Award from FWP for effort & supports to FWP-SPT Project in attaining the SHE
Achievements for Jurong Project in 2009
Certificate of Appreciation from Singapore Armed Force for honorable and valuable to the SAF
Veterans League in support of Total Defence & National Security and in support of the War against
Terrorism in 2010
Work History
CLIENT
1.
ExxonMobil Asia
Pacific Pte Ltd
E&I Service and
Installation Works
Jurong Site Maintenance
SCP Site Maintenance
PAC Site Maintenance
Status: On Going
2.
Foster Wheeler
Asia Pacific Pte
Ltd
Singapore HydroDesulfurization
project-OSBL
Facilities
Electrical and Instrumentation works at
PAC/PESEK Refinery
Status: On Going ETC: December 2012
4,500,000.00
3.
CCD Singapore
Pte Ltd
CCDS Project,
Tembusu Ave
Erection of CM2 Plant, OSBL Facilities
and other ancillaries
Status: On Going ETC: March 2013
8,500,000.00
4.
FWP Joint
Venture Pte Ltd
SPT
Electrical & Instrumentation startup work
Status: Completed
SPNG Project
E&I Installation Works
Status: Completed
SHDS ISBL Temp
Facilities
Electrical Installation works
Status: Completed
5.
6.
7.
Jacobs
Engineering
Group Inc.
JGSP Pte Ltd &
Hai Leck Engrg’
Pte Ltd
Foster Wheeler
Asia Pacific Pte
Ltd
JOB TITLE
SHDS OSBL
Enabling
DESCRIPTION
PROJECT VALUE
(S$)
S/N
Electrical, Instrumentation & CCTV
installation works
Status: Completed
Installation of AFC & GTM equipments in
MRT stations
Status: On Going
Installation of Electrical, PA and Fire
Alarm systems
Status: On Going
12,000,000.00
500,000.00
1,420,000.00
241,662.00
300,000.00
8.
SMRT Trains
Limited
Maintenance &
Upgrading Proj.
9.
Marina Bay
Sands Resort &
Casino
MBS Project
10.
Punj Lloyd Pte Ltd
SAR-R E&I Works
E&I Installation Works
Status: Completed May 2011
11.
JES & HSL Const
Pte Ltd
SHDS Project
Electrical and CCTV security system
installation
Status: Completed Jun 2011
12.
FWP Joint
Venture Pte Ltd
EI-04 Main E&I
Works
E&I Installation and Fire Proofing Works
Status: Completed Jan 2011
16,971,929.28
13.
Siemens
MBFC
Install BMS, PA, Security, Telephone, MA
TV, Intercom (ELV)
Status: Completed 2011
4,500,000.00
14.
Kandenko
Marina Bay Sands
IR
Install DCS Box (Package 6401)
Status: Completed 2010
500,000.00
15.
Johnson Controls
Marina Bay Sands
IR
Install Fire Alarm Package (7020)
Status: Completed 2011
700,000.00
Kandenko
Marina Bay Sands
IR
Supply and install H.T, cable support and
install cable tray and ladder package
(7050)
Status: Completed 2010
16.
1,000,000.00
10,800,000.00
4,170,000.00
700,000.00
1,189,000.00
17.
Kandenko
Marina Bay Sands
IR
Infrastructure project
Status: Completed 2010
300,000.00
18.
BHG
Heeren
Electrical, Fire protects and Air-Con
Status: Completed 2010
620,000.00
S/N
CLIENT
JOB TITLE
DESCRIPTION
STATUS
19.
Siemens
Fusion Polis
Install security system
Status: Completed 2009
500,000.00
20.
Siemens
Fusion Polis
Install Security System at A*Star
Status: Completed 2009
300,000.00
21.
TAC Controls
Changi North Way
Install BMS System
Status: Completed 2009
22.
Siemens
GSK
Install PA system and fireman intercom
Status: Completed 2008
356,000.00
23.
Honeywell Pte Ltd
Changi Business
Park Vista
Install Fire Alarm System
Status: Completed 2008
455,000.00
24.
Siemens
Siltronic (Samsung
Wafer)
Install Fire Alarm Cabling
Status: Completed 2008
590,000.00
25.
Kandenko
Maldives
Supply and install gas detector, flame
detector and diesel day tank level control
Status: Completed 2008
600,000.00
26.
Kandenko
Maldives
Installation work for generators
Status: Completed 2008
720,000.00
27.
ExxonMobil Asia
Pacific Pte Ltd
FIDS System
Installation of FIDS System
Status: Completed 2008
392,000.00
28.
ExxonMobil Asia
Pacific Pte Ltd
B-605 Incineration
E & I Installation Works
Status: Completed 2008
300,000.00
29.
ExxonMobil Asia
Pacific Pte Ltd
Substation Main #A
Revamp
Electrical Installation Works
Status: Completed 2007
507,910.00
30.
ExxonMobil Asia
Pacific Pte Ltd
Annunciator
Relocation
Instrumentation Installation Works
Status: Completed 2007
180,147.00
31.
Jacobs
Engineering
Group Inc.
MOGAS Dye
Injection Facility
E & I Installation Works
Status: Completed 2007
168,000.00
32.
Seiyu
Bishan Junction # 8
Electrical Works
Status: Completed 2007
345,000.00
33.
Kandenko
Changi Airport
Electrical Installation Works
Status: Completed 2007
450,000.00
34.
Kandenko
Banyan Tree
Resort,Maldives
Supply & Install Fire Alarm, ESE System
Status: Completed 2007
295,000.00
450,000.000
35.
Foster Wheeler
Asia Pacific Pte
Ltd
SPT Naphtha
Tankage Facility
E & I Installation Works
Status: Completed 2006
36.
Foster Wheeler
Asia Pacific Pte
Ltd
Substation #B2
upgrading
Electrical Installation Works
Status: Completed 2006
S/N
CLIENT
JOB TITLE
DESCRIPTION
37.
Republic
Polytechnic
ELVS
Install ELV System
Status: Completed 2006
38.
Foster Wheeler
Sub Station
Upgrading
Upgrading of Sub-station work
Status: Completed 2006
39.
Mobil Oil
Singapore Pte Ltd
Pioneer Road Oil
Refinery & Pulau
Pesek
40.
Resources
Development Ltd
Marina Centre to
Marina South
41.
PT. Kertas Kraft
Aceh (Persero)
Waterwaste
Treatment Plant
Supply labour, cables and conduits for
installation of CCTV and fencing at Mobil
Oil Refinery
Status: Completed
Dismantling and Assembly of Batching
Plants
Status: Completed
Installation of 2000kVA 6.6kV/380 V
Transformer Control Panels & Site
Installation
Status: Completed
2,780,000.00
600,000.00
STATUS
256,000.000
430,000.00
350,00.000
450,000.00
689,000.00
Industry Best Practices
The following best practices are being followed by PEPL that enable us to deliver best quality in the works
which has set a milestone in PEPLs long drive.
Task specific Skills training
Work flow analysis and required changes (organizational)
Work order system
Planned preventive maintenance tasks/procedures set by Client
Detailed level planning
Inventory and purchasing integration
Computerized Work management system
Construction Measurement System (CMS)
Management reporting/performance measurement and tracking
Contact Us
PESKO ENGINEERING PTE LTD
No.2 Joo Koon Road,
Singapore 628966
Tel: 6264 8539, 6264 8540, 6261 2031
Fax: 6261 1410
E-Mail: peskoeng@singnet.com.sg, admin@peskoeng.com.sg
Website: www.peskoeng.com.sg
Download