PESKO ENGINEERING PTE LTD CO. REG. NO. 198400308D NO2. JOO KOON ROAD, SINGAPORE 628966 TEL: 6264 8539 & 6264 8540 FAX: 6261 1410 Company Introduction Since incorporation in 1984, PESKO Engineering Pte Ltd (PEPL) is one of the leading Electrical and Instrumentation Contractor in Singapore. PEPL has always been to deliver the distinct core solution for various multi disciplinary engineering services for Industries & Commercial Buildings from Construction to Maintenance in Electrical, Instrumentation, Fire Alarm, CCTV, Card Key, Networking, Public Addressing, Fence Intrusion Detection and Tubular scaffolding systems. PEPL’s endeavor towards success is well supported by the effective leadership under the Directors Mr.Khor Chor Chin and Mr.Koh Geok Koon. The management is organized by an experienced team with clear delineation of individual responsibility and authority. The estimation, planning, scheduling, cost control, execution, quality control/quality assurance, testing & commissioning of projects are effectively managed by qualified, trained and experienced personnel by adopting the advanced techniques, tools and proven standards and procedures. PEPL is a registered in-house contractor of ExxonMobil Asia Pacific Pte Ltd and Building Control Authority. PEPL has been executing Maintenance and Project works for Oil and Petrochemical Industry for a period of over 25 years and has been successful in its growth with good reputation among the clients. The standard quality of work with excellence in the areas of Health, Safety and Environment (HSE) is what made us to be a pioneer in the industry. We do quality endorsed business to the international quality standard ISO 9001:2008 & OHSAS 18001:2007 certification ensures our compliance with international occupational health and safety management system. By creating an environment that encourages a commitment to quality with continuous improvement, we are able to ensure that we remain focussed on consistently delivering value and excellence to our clients. PEPL has an experienced & dynamic team of about 450 people that drives the company passionately towards its goal. To us at PEPL, success is a measure of promises kept. It is the single most cherished dream in every project that we have decided to undertake. Commitment to the cause is what has driven us in the last two and half decades plus. And commitment is the key in times ahead. PEPL prides itself on its traditions of engineering and process excellence & improved infrastructure facilities coupled with high employees and customer satisfaction levels in order to position our self in the industry to serve our clients better in terms of quality and economy. PEPL is operating from its head office located at No.2 Joo Koon Road, Singapore in a security enabled office premises with a large warehouse to stock materials. The site operations are facilitated with our site offices located at Banyan Drive and ExxonMobil PAC refinery, Jurong Island. Vision “Provide excellent engineering services with passion and innovation to ensure customer satisfaction” Mission “To amplify productivity by breaking the barriers of cost, duration & technology and building bonds among our employees and customers” Core Values “Customer Orientation, Wealth Creation, Employee Empowerment, Systems & Processes, Teamwork & Co-operation, Pro-activeness and innovation” Message from Directors Mr. Khor Chor Chin Managing Director PESKO Engineering Pte Ltd Mr. Koh Geok Koon Managing Director PESKO Engineering Pte Ltd “Since its inception in 1984 as a small organization, PEPL had seen a remarkable growth in the past two and half decades delivering quality services to its clients based on their requirements. We always believe that success of an organization can be achieved through customer satisfaction and we have been executing this with the support of our trained and skilled work force controlled by an experienced management team. We give priority to Safety and hence got a good reputation among our clients with proven records of Health, Safety and Environment Management. Years to go and milestones to achieve, PEPL keeps focusing on the factors to provide better services to our clients. We have proven records in Health, Safety and Environment We take immense pleasure in thanking our clients and supporters for having a trust on us and we are working as a team to keep hold of the trust and developing ourselves to deliver our best in the competitive market.” “PEPL stands for its commitment and quality aiming at client satisfaction by integrating advanced techniques to serve them the best in the industry. We are serving the construction and process industries providing them Electrical, Instrumentation, Security systems, Networking, Fire Alarm and scaffolding services. The services are being offered to our clients with a dedicated workforce who are trained and skilled to execute the Job in an effective way. The key to running any business successfully is getting the priorities right and we are working towards serving our clients better by understanding their needs and deliver them excellent services. We believe that team work is all that can bring pride to any organization and we strive hard to build an effective team to be able to satisfy our clients with what they need” General Info Name of Company : PESKO Engineering Pte Ltd Registration No : 00308/1984D Paid Up Capital : S$ 550,000 Head Office : No.2 Joo Koon Road, Singapore 628966 6264 8539, 6264 8540, 6261 2031 6261 1410 peskoeng@singnet.com.sg, admin@peskoeng.com.sg Site Offices : No.42, Banyan Drive, Singapore 627766 63169683 67952011 adminbanyan@peskoeng.com.sg : 1, Ayer Chawan Place, Singapore 627871 (EM Campus) 67957598 66864815 pac@peskoeng.com.sg : Lot 2808P, MK: 34, Tembusu Avenue, Jurong Island, Singapore (CCDS Campus) ccds@peskoeng.com.sg Ware House : No.2 Joo Koon Road Singapore 628966 Directors : Mr. Khor Chor Chin & Mr. Koh Geok Koon BCA Registration : ME05 Electrical Engineering L4 Members : Member of the Singapore Confederation (SMA) Member of the Association of Process Industry (ASPRI) Our Services in Construction and Process Industries Electrical Domestic, Commercial & Industrial lighting and small power for both safe and zoned applications Domestic, Commercial & Power distribution in LV, MV and HV in both safe and zoned areas Electrical trace heating, PI/SI testing, Insulation & Hi-Pot testing Earthing and lightning protection Motors, EMVs, EBVs, MOVs, ESDs & SCDs Transformers (LV, MV, HV up to 22kV) Air-con control panel in control Room and Sub stations Switchgears, MCCs (Up to 22kV) and auxiliary LV panel UPS, Rectifiers, Converters, Battery Banks Instrumentation & Analyzer Transmitters (Temperature, Pressure, Flow & Level) Indicators (Temperature, Pressure, Flow & Level) Gauges (Temperature, Pressure & Level) Control Valves, Solenoid valves, PSVs Air lines and Hot pipes Tubing (Metric and Imperial) Analyzers (Gas Chromatograph, O2, H2 & Moisture) DCS, ESD, PLC, HIPPS Systems in Control room & Satellite Instrument House Loop checks (Hot & Cold) Commissioning of loops Networking and Security CCTV Security Cameras Fire Alarm System ( Conventional & Addressable) FM 200 System Card Access security systems AFC System, GTM & TUM Installation in MRT Fence Intrusion Detection System Ethernet Cat 5 / 5e / 6 Networking Fibre Optic Cabling and Patch Panel installation Testing and Commissioning Tubular Scaffold Works Mobile Scaffold Hanging Scaffold Independent Scaffold Key Personnel S/N A B C D Name Designation Qualification Experience in PEPL OFFICE 1 Khor Chor Chin Director Dip. (EE), Deg (ME) 30 Years 2 Koh Geok Koon Director Dip (EE) 30 Years 3 Kok Keuw Kuan Admin Manager GCE “O” 30 Years 4 Grace Finance Manager Dip(Business) 2.5 Years 5 Ang Tiong Hin, Peter Sr. Project Manager Dip (EE) 10 Years 6 Freddy Low Business Dev. Manager BBA, MBA 0.5 Year 7 Lee Chuan Cheng Training Manager ITE (EE) 25 Years 8 Jang Shuzhen Materials coordinator Dip (BA) 2.5 Years 1 Cheah Chen Huat Site Manager (Scaffold) Sec 4 10 Years 2 Wijesekara Chulani Project Engineer B.Sc (ME) 8 Years 3 Nay Zar Drafter Deg (EE) 1 Year 4 Kok Yew Wau Supervisor CoC/SEC1/SET1 15 Years 5 Gan Hing Bing Supervisor CoC/SEC1/SET1 15 Years 6 Hoo Thien Sze Supervisor CoC/SEC1/SET1 12 Years 7 Tan Choon Tick Supervisor CoC/SEC1/SET1 12 Years 1 Govindarajulu Vijay Site Manager MBA (IB) 3 Years 2 Chee Keng Kong Safety Officer GCE “O” 10 Years 3 Gan Tsian Hua Supervisor CoC/SEC1/SET1 12 Years 4 Wee Keng Sing Supervisor CoC/SEC1/SET1 11 Years 5 Periyasamy Murugesan Supervisor CoC/SEC1/SET1 15 Years 6 Kalai Palaniappan Supervisor CoC/SEC1/SET1 15 Years 7 Md Jeffri Safety Supervisor GCE “O” 2 Years 1 Low Lap Chee Site Manager NTC-3 (EE) 12 Years 2 Stambagadi Jegadheeswar Site Coordinator CoC/SEC1/SET1 11 Years 3 E R Rajkumar QA/QC Engineer BE (EE) 3 Years 4 Kaliyaperumal Vinoth Raj Planner Deg (EI) 2.5 Years 5 Gan Kian Boon Supervisor CoC/SEC1/SET1 12 Years PROJECTS (Buildings) JURONG SITE PAC SITE Contd…. S/N E F Name Designation Qualification Experience in PEPL SCP SITE 1 Wong Yoon Fah Site Manager Deg (EE) 4 Years 2 Kannupillai Chinnasamy Site Coordinator CoC/SEC1/SET1 12 Years 3 Maclid Ronald Mondala QA/QC Engineer Deg (EE) 2.5 Years 4 Lim Hey Chiew Supervisor CoC/SEC1/SET1 15 Years 1 Vadamalai Senthil Kumar Project Control Manager BE (EI) 3 Years 2 Muthukumar Murugesan Construction Manager BE (EE) 3 Years 3 Kannan Prabhakaran Planning Engineer BE (EI) 2.5 Years 4 Jayaraman Samynathan QA/QC Engineer BE (EI) 2.5 Years 5 Panneer Selvam Rajesh Project Engineer M.Sc. (EI) 2.5 Years 6 Thangavelu Arivazhagan Project Engineer BE (EI) 2.5 Years 7 Manoharan Pratap Instrument Engineer BE(EI) 2.5 Years 8 Devaraj Saravanan Material Co-ordinator Dip (EE) 2.5 Years PROJECTS (Oil/Petro) Overall Organisation Chart Our Clientele We focus on growing businesses. Our growing clientele continues to give us the opportunity to equip ourselves to match the change in the international standards and to implement them in our future endeavors. We look at every new assignment as a chance to grow, to challenge ourselves, to give our clients more than they demand for, and to push the boundaries of what's possible. Some of our valuable Clientele is listed below: Mainland, Singapore ExxonMobil Asia Pacific Pte Ltd Foster Wheeler Asia Pacific Pte.Ltd Marina Bay Sands Resort & Casino Singapore Mass Rapid Transit (SMRT) Jacobs Engineering Group Inc Johnson Controls (S) Pte Ltd HSL Construction Pte Ltd Siemens Kandenko Hitachi SONY Corporation TAC Controls The Singapore Armed Forces SingTel Telecom Pte Ltd Schneider Electric Republic Polytechnic PT. Kertas Kraft Aceh (Persero) BHG (Singapore) Pte Ltd TECH Semiconductor (S) Pte Ltd Honeywell Pte Ltd Seiyu Resources Development Ltd Overseas Kandenko, Maldives Jubail Commercial Port, Saudi Arabia Island, Singapore ExxonMobil Asia Pacific Pte Ltd Foster Wheeler Asia Pacific Pte.Ltd CCD Singapore Pte Ltd JGC Corporation Chevron Corporation Mitsui Chemicals Asia Pacific Ltd Jacobs Engineering Group Inc Punj Lloyd Pte Ltd HSL Construction Pte Ltd ABB ELPRO Engineering Pte Ltd Hai Leck Engineering Pte Ltd Our Supporters PESKO’s service excellence is being supported by the following experts in various sectors. Supporters Sing Leck Engineering Presco Scaffolding & Services Pte Ltd Multiheight Scaffolding Pte Ltd Industrial Services (Pte) Limited Cue Star Industry (S) Pte Ltd Sixty Six Switchgears Co Pte Ltd SWTS Pte Ltd Johnson Controls (S) Pte Ltd Patent Engineering Co Pte Ltd Federal Fire Engineering Pte Ltd Huationg Asia Pacific Pte Ltd Professional Engineers J.M. Pang & Seah (Pte) Ltd. K L Au & Associates DJW & Associates W M Leow & Associates Vendors Swagelok Nishio Rent All Singapore Pte Ltd AKCO AEG Power solutions Acez Instruments Pte Ltd Tai Sin Electric Limited NOAH CSE transformers Lanbridge Premier Networx Gexpro Elecspec Lim kim Hai Ever green Lysaght Aggreko Vanjoo HILTI Certifications of excellence OHSAS 18001:2007 ITE CERTIFIED OJT CENTRE ISO 9001:2008 bizSAFE STAR CERTIFICATE Safety Awards & Recognitions Award from Mobil Oil S’pore Pte Ltd in recognition of two years w/o LTI in June 1999 Certificates of Appreciation from ExxonMobil Asia Pacific Pte Ltd (EM) for contribution to CSWC safety activities & outstanding safety achievements in 2001 and 2002 Achievement Award from EM for contribution towards the successful completion of ACS replacement project in 2003 – 2004 Special Recognition Award from EM for one of the co-organizers of the TA Safety corner w/o any recordable injuries in July 2007 President’s Safety Award from EM for contribution towards GREEF Asia Pacific winning the President’s Award in 2008 Certificate of Appreciation from EM Singapore Refinery, for invaluable service and participation in the President’s Challenge 2008 Recognition Award from EM Singapore Refinery Facilities for participation in Loss Prevention System (LPS) in 2008 Certificate of Appreciation from Singapore Armed Forces for Support & Contribution towards SAFVertans League in 2009 Distinguished Defence Partner Award from Singapore Ministry of Defence for Outstanding contribution towards National Defence in July 2009 Contractor of the Month Award from Foster Wheeler & Worley Parsons (FWP) for SPT-IRF Jurong Project in January and October 2009 Recognition Award from FWP-EM for supports to achieve 1 million Safe Man-hours for SPT-IRF Jurong Project in 2009 SHE Recognition Award from FWP for effort & supports to FWP-SPT Project in attaining the SHE Achievements for Jurong Project in 2009 Certificate of Appreciation from Singapore Armed Force for honorable and valuable to the SAF Veterans League in support of Total Defence & National Security and in support of the War against Terrorism in 2010 Work History CLIENT 1. ExxonMobil Asia Pacific Pte Ltd E&I Service and Installation Works Jurong Site Maintenance SCP Site Maintenance PAC Site Maintenance Status: On Going 2. Foster Wheeler Asia Pacific Pte Ltd Singapore HydroDesulfurization project-OSBL Facilities Electrical and Instrumentation works at PAC/PESEK Refinery Status: On Going ETC: December 2012 4,500,000.00 3. CCD Singapore Pte Ltd CCDS Project, Tembusu Ave Erection of CM2 Plant, OSBL Facilities and other ancillaries Status: On Going ETC: March 2013 8,500,000.00 4. FWP Joint Venture Pte Ltd SPT Electrical & Instrumentation startup work Status: Completed SPNG Project E&I Installation Works Status: Completed SHDS ISBL Temp Facilities Electrical Installation works Status: Completed 5. 6. 7. Jacobs Engineering Group Inc. JGSP Pte Ltd & Hai Leck Engrg’ Pte Ltd Foster Wheeler Asia Pacific Pte Ltd JOB TITLE SHDS OSBL Enabling DESCRIPTION PROJECT VALUE (S$) S/N Electrical, Instrumentation & CCTV installation works Status: Completed Installation of AFC & GTM equipments in MRT stations Status: On Going Installation of Electrical, PA and Fire Alarm systems Status: On Going 12,000,000.00 500,000.00 1,420,000.00 241,662.00 300,000.00 8. SMRT Trains Limited Maintenance & Upgrading Proj. 9. Marina Bay Sands Resort & Casino MBS Project 10. Punj Lloyd Pte Ltd SAR-R E&I Works E&I Installation Works Status: Completed May 2011 11. JES & HSL Const Pte Ltd SHDS Project Electrical and CCTV security system installation Status: Completed Jun 2011 12. FWP Joint Venture Pte Ltd EI-04 Main E&I Works E&I Installation and Fire Proofing Works Status: Completed Jan 2011 16,971,929.28 13. Siemens MBFC Install BMS, PA, Security, Telephone, MA TV, Intercom (ELV) Status: Completed 2011 4,500,000.00 14. Kandenko Marina Bay Sands IR Install DCS Box (Package 6401) Status: Completed 2010 500,000.00 15. Johnson Controls Marina Bay Sands IR Install Fire Alarm Package (7020) Status: Completed 2011 700,000.00 Kandenko Marina Bay Sands IR Supply and install H.T, cable support and install cable tray and ladder package (7050) Status: Completed 2010 16. 1,000,000.00 10,800,000.00 4,170,000.00 700,000.00 1,189,000.00 17. Kandenko Marina Bay Sands IR Infrastructure project Status: Completed 2010 300,000.00 18. BHG Heeren Electrical, Fire protects and Air-Con Status: Completed 2010 620,000.00 S/N CLIENT JOB TITLE DESCRIPTION STATUS 19. Siemens Fusion Polis Install security system Status: Completed 2009 500,000.00 20. Siemens Fusion Polis Install Security System at A*Star Status: Completed 2009 300,000.00 21. TAC Controls Changi North Way Install BMS System Status: Completed 2009 22. Siemens GSK Install PA system and fireman intercom Status: Completed 2008 356,000.00 23. Honeywell Pte Ltd Changi Business Park Vista Install Fire Alarm System Status: Completed 2008 455,000.00 24. Siemens Siltronic (Samsung Wafer) Install Fire Alarm Cabling Status: Completed 2008 590,000.00 25. Kandenko Maldives Supply and install gas detector, flame detector and diesel day tank level control Status: Completed 2008 600,000.00 26. Kandenko Maldives Installation work for generators Status: Completed 2008 720,000.00 27. ExxonMobil Asia Pacific Pte Ltd FIDS System Installation of FIDS System Status: Completed 2008 392,000.00 28. ExxonMobil Asia Pacific Pte Ltd B-605 Incineration E & I Installation Works Status: Completed 2008 300,000.00 29. ExxonMobil Asia Pacific Pte Ltd Substation Main #A Revamp Electrical Installation Works Status: Completed 2007 507,910.00 30. ExxonMobil Asia Pacific Pte Ltd Annunciator Relocation Instrumentation Installation Works Status: Completed 2007 180,147.00 31. Jacobs Engineering Group Inc. MOGAS Dye Injection Facility E & I Installation Works Status: Completed 2007 168,000.00 32. Seiyu Bishan Junction # 8 Electrical Works Status: Completed 2007 345,000.00 33. Kandenko Changi Airport Electrical Installation Works Status: Completed 2007 450,000.00 34. Kandenko Banyan Tree Resort,Maldives Supply & Install Fire Alarm, ESE System Status: Completed 2007 295,000.00 450,000.000 35. Foster Wheeler Asia Pacific Pte Ltd SPT Naphtha Tankage Facility E & I Installation Works Status: Completed 2006 36. Foster Wheeler Asia Pacific Pte Ltd Substation #B2 upgrading Electrical Installation Works Status: Completed 2006 S/N CLIENT JOB TITLE DESCRIPTION 37. Republic Polytechnic ELVS Install ELV System Status: Completed 2006 38. Foster Wheeler Sub Station Upgrading Upgrading of Sub-station work Status: Completed 2006 39. Mobil Oil Singapore Pte Ltd Pioneer Road Oil Refinery & Pulau Pesek 40. Resources Development Ltd Marina Centre to Marina South 41. PT. Kertas Kraft Aceh (Persero) Waterwaste Treatment Plant Supply labour, cables and conduits for installation of CCTV and fencing at Mobil Oil Refinery Status: Completed Dismantling and Assembly of Batching Plants Status: Completed Installation of 2000kVA 6.6kV/380 V Transformer Control Panels & Site Installation Status: Completed 2,780,000.00 600,000.00 STATUS 256,000.000 430,000.00 350,00.000 450,000.00 689,000.00 Industry Best Practices The following best practices are being followed by PEPL that enable us to deliver best quality in the works which has set a milestone in PEPLs long drive. Task specific Skills training Work flow analysis and required changes (organizational) Work order system Planned preventive maintenance tasks/procedures set by Client Detailed level planning Inventory and purchasing integration Computerized Work management system Construction Measurement System (CMS) Management reporting/performance measurement and tracking Contact Us PESKO ENGINEERING PTE LTD No.2 Joo Koon Road, Singapore 628966 Tel: 6264 8539, 6264 8540, 6261 2031 Fax: 6261 1410 E-Mail: peskoeng@singnet.com.sg, admin@peskoeng.com.sg Website: www.peskoeng.com.sg