ADDENDUM NO. 1 TO EASTERLY/WESTERLY POWER QUALITY STUDY (EWPQS) PROJECT RFP FOR THE NORTHEAST OHIO REGIONAL SEWER DISTRICT DECEMBER 14, 2015 PROPOSALS DUE: 4:30 P.M. (OFFICIAL LOCAL TIME) ON WEDNESDAY, DECEMBER 23, 2015 Addendum No.1 consists of three (3) pages: ATTENTION BIDDERS The following, as additions to and modifications in the Request for Proposal, will be included in, and become part of the Easterly/Westerly Power Quality Study (EWPQS) Project. Proposers are, therefore, instructed to take the following into account in rendering any Proposal for this work. I. PRE-PROPOSAL CONFERENCE A. A pre-proposal conference was held on December 8, 2015 in the First Floor Training Room at the George J. McMonagle (GJM) Administration Building, 3900 Euclid Ave., Cleveland, OH 44115. A list of attendees who signed in at the meeting and the presentation have been uploaded onto the project Share File site and can be accessed there (https://neorsd.sharefile.com/i/iede16d6e5cd4339a). The meeting convened at 10:00 AM, with the Project Manager, Bruce Buchanan introducing himself. B. NEORSD began the meeting with Bruce Buchanan introducing the project and the schedule of events for the proposal and interview process. Some of the key dates discussed were as follows; i. Deadline for Questions : December 16, 2015, 3:30pm ii. Proposals Due : December 23, 2015, 4:30pm iii. Design Notice to Proceed : April 2016 II. MBE/WBE/SBE Participation A. The NEORSD’s Business Opportunity Program is on the NEORSD web page as well as the certified list of MBE/WBE companies. The Project’s goal for Business ADDENDUM 1; Easterly/Westerly Power Quality Study Page 1 PPS_02_8 – Rev 11/12 Opportunity participation is 5% for any combination of MBE and/or WBE firms plus an additional 10% for any combination of any type of SBE firms registered with the District. If you have any questions or concerns, please call Ms. Tiffany Jordan, Contract Compliance Officer at (216) 881-6600. B. Bruce Buchanan stated that verbal questions would be accepted at the preproposal meeting. After the pre-proposal meeting, all questions must be submitted to Bruce Buchanan in writing by 3:30 PM, on December 16, 2015. They may be sent by email to BuchananH@neorsd.org, with a cc to HoffmanG@neorsd.org. Answers to questions will be issued via Addendum to the list of attendees from the conference if warranted. III. QUESTIONS AND COMMENTS A. The meeting was opened to questions from the attendees. The following are the questions asked at the meeting and answers to those questions: Q1. What type of content are you expecting in the Basis of Design Report (BODR)? A1. The intent of the BODR is to afford the Consultant the opportunity to explain their approach and methods of data collection required to complete the study. By reviewing this document prior to the start of data collection, the District can make sure that the study will cover the areas that they feel are of greatest importance. Q2. Will Plant staff be available to assist in opening panels and installing any metering equipment? A2. No. Due to the daily activities required to operate these facilities, the District cannot supply labor to work hand in hand with the consultants. District personnel will be available to review and authorize equipment shut down requests but the Consultant should have team members that are qualified electricians to open panels and install equipment. There are many qualified electrical contractors in our area who have worked at District facilities in the past and are familiar with District safety procedures. Please refer to the District’s Business Opportunity Program Certified Directory for a listing of all registered M/W/SBE electrical contractors. Even though it is not a contract requirement to use registered M/W/SBE electrical contractors, this list is a good reference source to utilize. B. The following are questions that have been asked after the meeting and answers to those questions: Q3. Can you provide the name of the contractor who currently provides routine electrical testing for the District facilities? ADDENDUM 1; Easterly/Westerly Power Quality Study Page 2 PPS_02_8 – Rev 11/12 A3. The District doesn’t currently employ a single contractor to perform testing. However, in the past, High Voltage Maintenance, Eaton Services and Great Lakes Testing have all performed in that role on other contracts. Q4. Page 11 notes that the consultant should include a preliminary list of drawings. Is this required in this proposal? A4. No. Since this project is a study, a list of drawings is not required. Q5. Page 12 calls for both a risk register and a construction approach? Are both items required in this proposal? A5. For purposes of this RFP, please provide a description of your firms approach to risk in lieu of a formal risk register or construction approach. Q6. Should the team include an allowance of hours to cover the 6 month monitoring as well as an allowance of hours to cover the contractor that will support the team with the field investigations? A6. Yes. IV. REQUEST FOR PROPOSAL A. Page 1 of 15, List of additional information ADD “Contract EFPI-5 (Aerated Grit Facilities); dated November 2012” B. Page 1 of 15, List of additional information DELETE “Easterly Master Single Line Diagram; dated February 2015” and ADD “Easterly Master Single Line Diagram; dated December 2015” C. Page 12 of 15, Section 4.4 “Technical Approach” DELETE the last sentence of the first paragraph “In the Proposal, the consultant is requested to demonstrate their project understanding, provide a design risk register, and sequence of construction to meet the District’s objectives.” and ADD “In the Proposal, the consultant is requested to provide a narrative to demonstrate their project understanding. Include key activities and approaches that improve the chances of project success along with key issues and challenges and how they will be addressed. In addition, the consultant should explain their approach to managing risk, as well as providing internal quality control in order to meet the District’s objectives.” D. Page 11 of 15, Section 4.4.1 “Project Understanding” DELETE the last sentence of the first paragraph “The consultant should include a preliminary list of drawings the team feels will be necessary to successfully deliver the Project.” E. Page 12 of 15, DELETE section 4.4.2 “Risk Identification” in its entirety. F. Page 12 of 15, DELETE section 4.4.3 “Construction Approach” in its entirety. END OF ADDENDUM NO. 1 ADDENDUM 1; Easterly/Westerly Power Quality Study Page 3 PPS_02_8 – Rev 11/12