Construction Managers General Contractors PWC-C-10654 Unlimited 1, 2, 3 RCE 1245 Oregon #62774, LBPR 6227 Washington #600 626 741 431 W. McGregor Drive Boise, Idaho 83705 208 384-0800 July 6, 2011 ADDENDUM NO.2 Ontario Middle School – Classroom/Administration Addition Ontario, Oregon PROJECT: The following addenda apply to the Project Specifications and / or Drawings for this project and shall be a part of the Contract Documents. Receipt of this Addendum must be acknowledged and dated on your bid proposals. BIDDING: rd Bid date has not changed. Submit sealed bids to the Ontario School District 8C Office, 195 Southwest 3 Avenue, Ontario, OR, on or before July 12, 2011 at 3:00 PM (MST) (Note: Bid bond is required) BIDDING REQUIRMENTS: Part A.5 – Bid Proposal Forms Bid Package # 5 – Reinforcing Steel (Supply Only) • Since this is a supply only bid package, bidders of this package are not required to have a current Oregon CCB license or to pay BOLI or Davis Bacon Wage rates. Bid Package # 6 Masonry Bid Package # 7 Building Steel – Erection Bid Package # 10 Roofing / Composite Wall Panels • Please refer to clarifications made in RFI 13 attached to this addendum. Bid Package # 7 Building Steel – Erection • Please refer to clarification made in RFI 04 attached to this addendum. This bid package to install required beams at type AC openings to be 4x4 tube steel, 15’-10”, to be supported by the tube columns on either side of the vestibule. Bid Package # 8 – Building Steel (Supply Only) • Since this is a supply only bid package, bidders of this package are not required to have a current Oregon CCB license or to pay BOLI or Davis Bacon Wage rates. • Please refer to clarification made in RFI 04 attached to this addendum. This bid package to supply required beams at type AC openings to be 4x4 tube steel, 15’-10”, to be supported by the tube columns on either side of the vestibule. Bid Package # 13 – Doors, Frames, and Hardware (Supply Only) • Since this is a supply only bid package, bidders of this package are not required to have a current Oregon CCB license or to pay BOLI or Davis Bacon Wage rates. Bid Package # 13 and #15: • Addendum #1: Delete bidding requirements stated in Addendum #1 for bid packages #13 and #15 and replace with the following: Bid Package # 13 - Doors, Frames & Hardware (Supply Only); This bid package includes supplying hardware for Section 084113 - Aluminum Framed Entrances and Storefronts. This supplier will provide all hardware as per section 087100 - Door Hardware, and will deliver all hardware to the selected contractor for Bid Package 15 - Aluminum Storefront / Curtain Wall. Successful contractor shall cooperate in all necessary and associated coordination, templates and shop drawing review to assure compatibility of all hardware with storefront systems. Ontario Middle School – Classroom / Administration Addition - Addendum 2 Page 1 of 2 Bid Package # 15 - Aluminum Storefront / Curtain Wall; This bid package includes receiving, inventory and installation of all hardware provided by Bid Package 13 – Doors, Frames & Hardware (Supply Only). Successful contractor shall cooperate in all necessary and associated coordination, templates and shop drawing review to assure compatibility of all hardware with storefront systems. Part A.6 – Site Material Handling Plan Replace Section A.6 Site Material Handling Plan in its entirety with attached A.6-1 thru A.6-7 Site Material Handling Plan including phased site layouts, utility coordination drawing and fire safety plan. Contractors please note limited access for hoisting equipment (cranes, scaffolding, etc.) and limited distance from construction fencing and building at the west end. CONDITIONS OF AGREEMENT: Part B.2 – Supplemental Documents to Consensus Doc 802 (Prevailing Wage Rate for Public Works Contract) Wage Rate Clarification: Oregon State Prevailing Wages dated January 1, 2011, as published in the specifications were in effect at the time the project was advertised, and shall be used on this project. Federal Davis Bacon Wage rates to be used on this project shall be the most current publication; “General Decision Number OR100065: 06/10/2011 OR 65. See attached or visit the following web site: http://www.gpo.gov/davisbacon/OR.html Part B.2 – Supplemental Documents to Consensus Doc 802 (Project Schedule) Insert the attached Project Schedule and Clarification Sheet. ARCHITECTURAL / MECHANICAL / ELECTRICAL / STRUCTURAL: Please see LCA Architects Addendum #2 dated June 30, 2011 (11 pages), Attached ANSWERS TO BIDDER QUESTIONS & RFI’S (REQUEST FOR INFORMATION) Meeting Minutes from the Pre Bid Meeting are attached. See attached RFI’s 04 thru 13. Answers are shown on the RFI’s as well as within LCA Architects Addendum 2. Attachments: Site Material Handling Plan Sheets A.6-1 thru A.6-7 (7 pages) June 10, 2011 Davis Bacon Rates (7 pages) Project Schedule & Clarification Sheet (22 pages) LCA Architects Addendum #2, (11 pages) Pre Bid Meeting Minutes & Sign in Sheet (8 pages) RFI 4 thru 13 (11 pages) End of Addendum No. 2 Ontario Middle School – Classroom / Administration Addition - Addendum 2 Page 2 of 2 Part A:6 Site Material Handling Plan The attached site material handling plans, utility coordination plan and fire safety plan outline the site layout, emergency evacuation, and other essential coordination items throughout all phases of construction. There will be limited capacity for material storage, therefore, the contractor shall not anticipate long term on site material storage will be available, and shall incorporate any cost impacts resulting from this requirement in their bid. Permission for site access required outside of the shown construction limits shall be submitted to CM Company, Inc. for approval a minimum of 3 working days prior to the event. No deviations will be allowed unless directed by CM Company, Inc. The following documents are included herein: • Site Material Handling Plan – Phase I Site Work • Site Material Handling Plan – Phase 2 Building • Utility Coordination Drawing • Fire Safety Plan during Construction Ontario Middle School A.6‐1 A.6 Ontario Middle School Building Addition – Site Material Handling Plan – Phase I Site Work Staff Parking Keep Clear Basketball Courts Keep Clear Unoccupied until 8/3/11 Cub Gym Unoccupied until 8/18/11 No Work this area until area until July ‐ Aug Bus Lane Job Trailers MSDS / First Aid / Water / Phones / SWPPP Staff Parking Keep Clear Discovery Parent Drop Off Parent Drop Off Enterprise Unoccupied until 8/18/11 Construction Area Coordinate staging & parking with CM Company Parent Drop Off June ‐ July ‐ Aug Challenger Unoccupied until 8/18/11 Tiger Gym Bus Lane Unoccupied until 8/18/11 Construction Area Coordinate staging and parking with CM Company Odyssey Unoccupied until 8/18/11 Dates 8/3 – Staff Returns to Discovery – All electrical & data systems to be operational 8/15‐8/17 – Registration – Coordinate location with owner 8/18 – Teachers Return 8/24 – First Day of School Safety •Gathering Areas 50’ from building •Emergency access 150’ from any point •No parking within 10’ of fire hydrant Existing Services & Shut Downs •Maintain existing systems to occupied & neighboring buildings •Pre‐schedule required shut downs •Maintain Existing Irrigation Coordination with Other Trades Coordination with Other Trades •Sequencing & scheduling to be coordinated with trades requiring access to scaffolding, hoisting equipment, roof kettle, etc. •Note Extremely Limited Crane Access and limited area at West Boundary Construction Limits / Fencing Bus Lane / Parent Drop Off & Pick UP Evacuation Gathering Area Temp Exit / Egress Emergency Access All Work to Comply with Fire Safety Plan, Erosion & Sediment Control Plan, SWPPP and Utility Coordination Drawing Exhibit A-1 to fire safety plan Existing Hydrant A.6-2 A.6 Ontario Middle School Building Addition – Site Material Handling Plan – Phase 2 Building Staff Parking Keep Clear Staff Parking Keep Clear Temp ADA Access Cub Gym Parent Drop Off Job Trailers MSDS / First Aid / Water / Phones / SWPPP Basketball Courts Keep Clear Enterprise Challenger Tiger Gym Bus Lane Dates 8/3 – Staff Returns to Discovery – All electrical & data systems to be operational 8/15‐8/17 – Registration 8/18 – Teachers Return 8/24 – First Day of School Safety •Gathering Areas 50’ from building •Emergency access 150’ from any point •No parking within 10’ of fire hydrant Existing Services & Shut Downs •Maintain existing systems to occupied & neighboring buildings •Pre‐schedule required shut downs •Maintain Existing Irrigation Coordination with Other Trades •Sequencing & scheduling to be coordinated with trades requiring access to scaffolding, hoisting equipment, roof kettle, etc. •Note Extremely Limited Crane Access and limited area at West Boundary Odyssey Maintain Access Bus Lane Discovery Parent Drop Off Construction Staging & Parking – Coordinate w/CM Co Parent Drop Off Construction Staging & Material Storage – Coordinate w/CM Co Construction Limits / Fencing Bus Lane / Parent Drop Off & Pick UP Gathering Area Temp Exit / Egress All Work to Comply with Fire Safety Plan, Erosion & Sediment Control Plan, SWPPP and Utility Coordination Drawing Exhibit A-2 to Fire Safety Plan Emergency Access Existing Hydrant A.6-3 A.6-4 A.6 Site Material Handling Plan ‐ Utility Coordination Drawing For a full size color copy contact jackiep@cmcompany.com A.6 Site Material Handling Plan – Fire Safety Plan During Construction Ontario Middle School Building Addition July 5, 2011 Due to the nature of construction activity it will be necessary to take the existing fire notification systems out of service periodically, while the new system is installed and activated. We expect to take the existing system out of commission intermittently beginning June 6, 2011 and have the new system fully operational on or before August 10, 2012. During this time, emergency evacuation plans will be in effect for all buildings. The Owner and Construction Manager shall provide one or more fire watch personnel to remain on duty during the times the building is open to the public and the existing notification system(s) are off line. During such times that the building is open to the public and existing notification system(s) are off line, it is the responsibility of Fire Watch Personnel to: 1. 2. 3. 4. 5. 6. Keep diligent watch for fires Keep diligent watch for obstructions to means of egress and other hazards Take prompt measures for remediation of hazards Initiate emergency service response and sound alarm Take prompt measures for extinguishment of fires that occur Assist in the evacuation of the public and occupants from structures to designated gathering areas Fire Safety Plan: • • • • Procedure for reporting a fire or other emergency o Sound fire alarm by initiating device o If fire alarm is temporarily out of service due to construction, reporting methods shall be: Air Horns and Verbal Communication. Procedures for notifying, relocating or evacuating occupants o Sound alarm system o Evacuate occupants & public to the buildings designated gathering areas per attached exhibits o Evacuate construction crews to designated gathering area per attached exhibits Site Material Handling Plans; Phase 1 and 2 ‐ Exhibit A‐1 and A‐2 o Occupant & Construction Crew assembly points o Locations of existing fire hydrants o Emergency Egress, Vehicle Routes & Access o Construction Limits Floor Plans for Existing Buildings o Exhibit B‐1 thru B‐6 – Occupied Buildings (Discovery, Cub Gym, Enterprise, Tiger Gym, Odyssey, Challenger) • Exits • Evacuation routes • Fire alarm pull stations • Portable fire extinguishers • Fire Alarm panel Ontario Middle School Fire Safety Plan July 5, 2011 Page 1 of 3 A.6-5 • • • List of major fire hazards associated with construction o Cutting & torching o Flammable liquids o Temporary Heat o Smoking (prohibited) Personnel responsible for maintenance of systems and equipment installed to prevent or control fires o Jim Stubbs, CM Company, Inc., or as assigned Personnel responsible for maintenance, housekeeping and controlling fuel hazard sources o Jim Stubbs, CM Company, Inc., or as assigned Fire Evacuation Plan • • • • • • • Egress routes – as defined in exhibits. Procedure to account for employees and occupants after evacuation has been complete o Gathering area as per Exhibit “A” o Head Count for Construction Crews: Jim Stubbs or Assigned Foreman o Head Count for Ontario Middle School Students & Staff: Paul Erlebach and designated employees Preferred and alternate means of notifying occupants of a fire or emergency o Existing notification system o Blow horns / verbal Means of reporting fires or emergencies to the fire department o 911 Identification and assignment of personnel who can be contacted for further information to explain duties under the plan o Jackie Phelps, CM Company, Inc. – 208‐866‐0331 o Jim Stubbs, CM Company, Inc. – 208‐941‐4543 o Bob Kohnke, First Link Safety – 208‐941‐6818 Description of the emergency alarm communication system alert tone o Fire Alarm Notification Systems (current system in building) o Air Horn There shall be a clear means of egress maintained throughout the building at all times as illustrated on the evacuation plans posted on each floor. No construction materials or obstacles shall block the designated egress path. Employee Training • • Fire Prevention Training: Employees shall be notified of fire hazards, and processes to which they are exposed. Instruct each in the proper procedures for preventing fires in the conduct of their assigned duties. Evacuation Training: o Employees to be familiar with fire alarm and evacuation signal o Assigned employees to be familiar with their assigned duties in the event of an alarm or emergency o Aware of evacuation routes, exterior assembly area and procedure for evacuation Ontario Middle School Fire Safety Plan July 5, 2011 Page 2 of 3 A.6-6 Hazard Communication • • • MSDS for all hazardous materials shall be readily available on the premises Identification of hazardous materials, cartons or packages shall be made clear Identification of rooms containing hazardous materials shall be made clear Evacuation Drills • • • • • • • • Frequency to be determined by Ontario School District and Construction Manager Leadership responsible for planning and conducting drills o Paul Erlebach, Ontario Middle School Principal or assigned Employee o Jim Stubbs, CM Company, Inc. o Bob Kohnke, First Link Safety Drills shall be held at unexpected times under varying conditions to simulate unusual conditions that occur in case of a fire Record Keeping o Identity of person conducting the drill o Date and time of the drill o Notification method used o Staff members on duty and participating o Number of occupants evacuated o Special conditions simulated o Problems encountered o Weather conditions when occupants evacuated o Time required to accomplish evacuation Notification of fire code official prior to drill Initiation to be by fire alarm system or horns Accountability – Efforts to determine if all occupants have been evacuated and accounted for Recall and Reentry – Signal to recall occupants after an evacuation shall be separate and distinct from the signal used to initiate the evacuation. Shall be under control of person in charge of the premises or the official in charge of the incident. No reentry until authorized to do so by the official in charge. Ontario Middle School Fire Safety Plan July 5, 2011 Page 3 of 3 A.6-7 Fire Safety Plan Exhibits B‐1 through B‐6 are being developed and shall be posted in their respective buildings prior to the start of school, 2012. Exhibits B-1 thru B-6 to Fire Safety Plan Page 1 of 7 General Decision Number: OR100065 06/10/2011 OR65 Superseded General Decision Number: OR20080065 State: Oregon Construction Type: Building Counties: Malheur and Wheeler Counties in Oregon. BUILDING CONSTRUCTION PROJECTS (does not include single family homes or apartments up to and including 4 stories). Modification Number 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 Publication Date 03/12/2010 04/02/2010 04/23/2010 05/14/2010 06/04/2010 07/02/2010 07/16/2010 08/06/2010 08/27/2010 10/22/2010 11/26/2010 12/31/2010 01/21/2011 01/28/2011 02/25/2011 05/13/2011 05/27/2011 06/10/2011 BROR0001-018 05/01/2011 Rates Fringes BRICKLAYER.......................$ 32.89 17.43 TILE FINISHER....................$ 21.84 9.65 TILE SETTER......................$ 28.94 12.68 ---------------------------------------------------------------CARP0001-032 06/01/2007 Rates Fringes Carpenters: Including Metal stud installation and form work..$ 27.56 13.30 ---------------------------------------------------------------CARP9001-004 06/20/2007 Rates Fringes Acoustical Ceiling Installer & Drywall Hanger.................$ 27.95 13.52 ---------------------------------------------------------------ELEC0112-016 06/01/2010 WHEELER COUNTY http://www.wdol.gov/wdol/scafiles/davisbacon/OR65.dvb 7/6/2011 Page 2 of 7 Rates Fringes Sound & Communication Technician (Low voltage wiring for alarms and low voltage wiring for computers.)...$ 24.67 8.48 ---------------------------------------------------------------ELEC0112-017 07/01/2010 WHEELER COUNTY Rates Fringes ELECTRICIAN......................$ 35.20 3%+14.23 ---------------------------------------------------------------ELEC0291-003 06/01/2010 MALHEUR COUNTY Rates Fringes ELECTRICIAN......................$ 29.81 3%+$10.62 ---------------------------------------------------------------ELEC0291-004 06/01/2010 MALHEUR COUNTY Rates Fringes ELECTRICIAN (Low voltage wiring for alarms and low voltage wiring for computers.)...$ 27.10 3%+$10.62 ---------------------------------------------------------------ENGI0701-027 01/01/2011 Rates Power equipment operators: GROUP 1.....................$ GROUP 1A....................$ GROUP 1B....................$ GROUP 2.....................$ GROUP 3.....................$ GROUP 4.....................$ GROUP 5.....................$ GROUP 6.....................$ 37.27 39.13 41.00 35.64 34.65 33.71 32.60 29.61 Fringes 12.35 12.35 12.35 12.35 12.35 12.35 12.35 12.35 POWER EQUIPMENT OPERATORS CLASSIFICATIONS GROUP 1: CRANE: Helicopter Operator, when used in erecting work; Whirley Operator, 90 ton and over; LATTICE BOOM CRANE: Operator 200 tons through 299 tons, and/or over 200 feet boom; HYDRAULIC CRANE: Hydraulic Crane Operator 90 tons through 199 tons with luffing or tower attachments GROUP 1A: HYDRAULIC CRANE: Hydraulic Operator, 200 tons and over (with luffing or tower attachment); LATTICE BOOM CRANE: Operator, 200 tons through 299 tons, with over 200 feet boom; http://www.wdol.gov/wdol/scafiles/davisbacon/OR65.dvb 7/6/2011 Page 3 of 7 GROUP 1B: LATTICE BOOM CRANE: Operator, 300 tons through 399 tons with over 200 feet boom; Operator 400 tons and over GROUP 2: CRANE: Cableway Operator, 25 tons and over; HYDRAULIC CRANE: Hydraulic crane operator 90 tons through 199 tons (without luffing or tower attachment); TOWER/WHIRLEY OPERATOR: Tower Crane Operator; Whirley Operator, under 90 tons; LATTICE BOOM CRANE: 90 through 199 tons and/or 150 to 200 feet boom; HYDRAULIC CRANE: Hydraulic crane operator, 50 tons through 89 tons (with luffing or tower attachment); BLADE: Auto Grader;Blade Operator-Robotic; Bulldozer: Over 120,000 lbs and above; Bulldozer: D-10, D-11 and similar type; Loader: 120,000 lbs and above; Excavator: over 130,000 lbs and above GROUP 3: HYDRAULIC CRANE: Hydraulic crane operator, 50 tons through 89 tons (without luffing or tower attachment); LATTICE BOOM CRANES: Lattice Boom Crane-50 through 89 tons (and less than 150 feet boom); Bulldozer: over 70,000 lbs up to and including 120,000; Loader: 60,000 lbs and less than 120,000 lbs; Excavator: over 80,000 lbs through 130,000 lbs GROUP 4: CRANE: Hydraulic Crane Operator, under 50 tons; LATTICE BOOM CRANE OPERATOR: Lattice Boom Crane Operator, under 50 tons; TRACKHOE/BACKHOE-ROBOTIC: up to and including 20,0000 lbs. with any or all attachments; BLADE: Blade operator; Tractor operator with boom attachment; DRILLING: Churm Drill and Earth Boring Machine Operator; Directional Drill Operator over 20,000 lbs pullback; CRANE: Chicago boom and similar types; Boom type lifting device, 5 ton capacity or less; Asphalt Paver; Mechanic; Bulldozer: over 20,000 lbs and more than 100 horse and up to 70,000 lbs; Loader: 25,000 lbs and less than 60,000 lbs; Screed; Excavator: over 20,000 lbs through 80,000 lbs. GROUP 5: TRACKHOE/BACKHOE-HYDRAULIC: up to and including 20,000 lbs.; Open wheeled type; DRILLING: Churm Drill and Earth Boring Machine Operator; Directional Drill Operator less than 20,000 lbs pullback; Concrete Pumper; Concrete Paver; forlkift over 5 ton; Bulldozer: 20,000 lbs or less, or 100 horse or less; Loader: ruber tired type, less than 25,000 lbs; Roller GROUP 6: LOADERS: (less than 1 cu yd.); Oiler; Crane oiler; forklift; Broom; Roller (Non-Asphalt) ---------------------------------------------------------------IRON0029-013 07/01/2010 Rates Fringes IRONWORKER (Reinforcing and Structural)......................$ 33.62 19.60 ---------------------------------------------------------------LABO0001-030 06/01/2008 Rates Fringes Laborers: (Mason http://www.wdol.gov/wdol/scafiles/davisbacon/OR65.dvb 7/6/2011 Page 4 of 7 Tender-Cement/Concrete)..........$ 25.75 11.25 ---------------------------------------------------------------LABO0001-031 06/01/2008 Rates Fringes Laborers: (Mason Tender-Brick)...$ 25.75 11.25 ---------------------------------------------------------------LABO0003-017 06/01/2010 Rates Laborers: GROUP 1.....................$ 25.25 GROUP 4.....................$ 26.80 GROUP 5.....................$ 21.99 Fringes 12.07 12.07 12.07 LABORER CLASSIFICATIONS GROUP 1: Form-Stripping GROUP 4: Grade Checker, Pipelayer GROUP 5: Flagger ---------------------------------------------------------------PAIN0055-023 07/01/2009 Rates Fringes Painters: Brush, Roller and Spray.....$ 18.59 7.24 ---------------------------------------------------------------PAIN0055-026 08/01/2010 Rates Fringes DRYWALL FINISHER/TAPER...........$ 31.76 11.68 ---------------------------------------------------------------* PLAS0555-006 06/01/2011 Rates Fringes CEMENT MASON/CONCRETE FINISHER...$ 31.24 15.59 ---------------------------------------------------------------PLUM0290-016 04/01/2011 WHEELER COUNTY Rates Fringes Plumbers and Pipefitters.........$ 36.69 20.09 ---------------------------------------------------------------PLUM0296-008 06/01/2010 MALHEUR COUNTY Rates Fringes Plumbers and Pipefitters.........$ 25.58 11.92 ---------------------------------------------------------------- http://www.wdol.gov/wdol/scafiles/davisbacon/OR65.dvb 7/6/2011 Page 5 of 7 SHEE0016-019 07/01/2009 WHEELER COUNTY Rates Fringes Sheet Metal Worker Excluding HVAC Duct Installation................$ 34.42 16.92 ---------------------------------------------------------------SHEE0213-006 01/01/2008 MALHEUR COUNTY Rates Fringes Sheet metal worker (Including HVAC duct installation)..........$ 23.41 11.74 ---------------------------------------------------------------SUOR2009-049 11/09/2009 Rates LABORER: Fringes Common or General......$ 20.21 5.83 SHEET METAL WORKER (Installation of Metal Roofs Only)............................$ 23.65 6.33 SPRINKLER FITTER (Fire Sprinklers)......................$ 25.00 8.29 ---------------------------------------------------------------TEAM0037-008 06/01/2009 Rates Truck drivers: GROUP 1.....................$ GROUP 2.....................$ GROUP 3.....................$ GROUP 4.....................$ GROUP 5.....................$ GROUP 6.....................$ GROUP 7.....................$ 26.90 27.02 27.15 27.41 27.63 27.79 27.99 Fringes 12.75 12.75 12.75 12.75 12.75 12.75 12.75 TRUCK DRIVERS CLASSIFICATIONS GROUP 1: Dump trucks, side, end and bottom dumps: up to and including 10 cu. yds. GROUP 2: Dump trcuks/articulated dumps 6 cu to 10 cu.; GROUP 3: Dump trucks, side, end and bottom dumps: over 10 cu. yds. and including 30 cu. yds., includes articulated dump trucks GROUP 4: Dump trucks, side, end and bottom dumps: over 30 cu. yds. and including 50 cu. yds. and includes articulated dump trucks http://www.wdol.gov/wdol/scafiles/davisbacon/OR65.dvb 7/6/2011 Page 6 of 7 GROUP 5: Dump trucks, side, end and bottom dumps: over 50 cu. yds. and including 60 cu. yds. and includes articulated dump trucks GROUP 6: Dump trucks, side, end and bottom dumps: over 60 cu. yds. and including 80 cu. yds. and includes articulated dump trucks GROUP 7: Dump trucks, side, end and bottom dumps: over 80 cu. yds. and including 100 cu. yds., includes articulated dump trucks ---------------------------------------------------------------WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental. ======================================================== Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29 CFR 5.5(a)(1)(ii)). ----------------------------------------------------------------In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing. ----------------------------------------------------------------WAGE DETERMINATION APPEALS PROCESS 1.) Has there been an initial decision in the matter? This can be: * an existing published wage determination * a survey underlying a wage determination * a Wage and Hour Division letter setting forth a position on a wage determination matter * a conformance (additional classification and rate) ruling On survey related matters, initial contact, including for summaries of surveys, should be with the Wage and Hour Regional for the area in which the survey was conducted because those Regional have responsibility for the Davis-Bacon survey program. If response from this http://www.wdol.gov/wdol/scafiles/davisbacon/OR65.dvb requests Office Offices the 7/6/2011 Page 7 of 7 initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed. With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to: Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to: Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue. 3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to: Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 4.) All decisions by the Administrative Review Board are final. END OF GENERAL DECISION http://www.wdol.gov/wdol/scafiles/davisbacon/OR65.dvb 7/6/2011 Ontario Middle School Building Addition Bid Schedule Clarifications Holidays: Holiday (no work) Days are scheduled as follows: July 4, 2011 – Independence Day September 5, 2011 – Labor Day November 24 and 25, 2011 – Thanksgiving December 26, 2011 – Christmas January 2, 2012 – New Year May 28, 2012 – Memorial Day July 4, 2012 – Independence Day September 3, 2012 – Labor Day Material Delivery: Material delivery dates shown reflect the date materials are to be readily available for delivery to site. All material deliveries are to be strictly coordinated and / or staggered according to progress and coordination with other trades. Schedule all deliveries with CM Company’s superintendent and available on site space. Stored materials may be billed for with proper insurance. Submittal Section: Submittal and material delivery activity is shown for ‘most’ materials. There are other submittals required; all trades are to submit per specification section requirements. Early Site Work: All affected trades are invited to inspect current progress with the Early Site Work Package. On site contact is Jim Stubbs at 208‐941‐4543. Short Interval Schedules: Areas and scheduling will be further defined and sequenced during construction with the use of Short Interval Schedules developed by CM Company and the input of active trades. B:2 Project Schedule See "Bid Schedule Clarifications" after last page of the schedule Activity ID Activity Description AREA Orig Rem Dur Dur % Early Start Early Finish Late Start Late Finish J J 06JUL11 12:48 2011 S O A N D J F M 2012 A M J J A General Conditions 00221 Obtain Building Permit GC 1 0 00001 Bid Project GC 1 1 00011 Recomm to Award / Notice to Proceed GC 8 00012 Recomm to Award / NTP to Concrete Contractor GC 00021 Contracts, Insurance, Bonds 01305 100 20JUN11A 30JUN11A 20JUN11A 30JUN11A Obtain Building Permit 0 12JUL11* 12JUL11 12JUL11* 12JUL11 Bid Project 8 0 13JUL11 22JUL11 13JUL11 22JUL11 Recomm to Award / Notice to Proceed 2 2 0 13JUL11 14JUL11 13JUL11 14JUL11 Recomm to Award / NTP to Concrete Contractor GC 5 5 0 25JUL11 29JUL11 25JUL11 29JUL11 Early Site work Complete GC 0 0 0 19AUG11* 00561 Coordination drawings GC 10 10 0 06SEP11 19SEP11 04OCT11 17OCT11 01431 Owner Equipment / Phones / Computers / Servers GC 5 5 0 20JUN12 26JUN12 23JUL12 27JUL12 Owner Equipment / Phones / Computers / Servers 09999 Project Complete GC 0 0 0 27JUL12 27JUL12 Project Complete 08888 Weather Days GC 10 10 0 30JUL12 10AUG12 30JUL12 10AUG12 01AUG11 19AUG11* Contracts, Insurance, Bonds Early Site work Complete Coordination drawings Weather Days Early Site Work Completion (NE Lot & Roundabout) 01301 Curb & Gutter / Conc Required for Early Asphalt ESW 10 10 0 19JUL11 01AUG11 19JUL11 01302 Prep & Pave Early Work (NE Lot, Round About) ESW 5 5 0 02AUG11 08AUG11 02AUG11 08AUG11 01303 Light Poles, Striping, Signage at NE Lot & Round ESW 4 4 0 09AUG11 12AUG11 09AUG11 12AUG11 01304 Landscaping & Irrigation as Req. at NE Lot ESW 5 5 0 15AUG11 19AUG11 15AUG11 19AUG11 Curb & Gutter / Conc Required for Early Asphalt INCLUDES NE LOT & ROUND ABOUT Prep & Pave Early Work (NE Lot, Round About) THIS ACTIVITY PART OF EARLY SITE WORK PKG Light Poles, Striping, Signage at NE Lot & Round THIS ACTIVITY PART OF EARLY SITE WORK PKG Start Date Finish Date Data Date Run Date 19JUN11 10AUG12 20JUN11 06JUL11 12:48 Early Bar Float Bar Progress Bar Critical Activity © Primavera Systems, Inc. 1113 CM Company, Inc. Landscaping & Irrigation as Req. at NE Lot Sheet 1 of 21 Date Revision 05JUL11Bid Schedule Ontario Middle School Building Addition Bid Schedule The First Thing We Build, Is Your Trust CheckedApproved JP B:2 Project Schedule See "Bid Schedule Clarifications" after last page of the schedule Activity ID Activity Description AREA Orig Rem Dur Dur % Early Start Early Finish Late Start Late Finish J J 06JUL11 12:48 A 2011 S O N D J F M 2012 A M J J A Building Shell to Dry In 00031 Excavate, form & pour Exterior footings SHELL 9 9 0 01AUG11 11AUG11 01AUG11 11AUG11 Excavate, form & pour Exterior footings 00035 Bring Fire / Water Lines to bldg & stub for conn SHELL 9 9 0 01AUG11 11AUG11 10AUG11 22AUG11 Bring Fire / Water Lines to bldg & stub for conn 00030 Provide Temp Weather Prot & Barricaides at Tiger SHELL 5 5 0 01AUG11 05AUG11 29AUG11 02SEP11 Provide Temp Weather Prot & Barricaides at Tiger 00032 MEP Underslab Rough Ins prior to Interior Footin SHELL 4 4 0 10AUG11 15AUG11 10AUG11 15AUG11 MEP Underslab Rough Ins prior to Interior Footin 00481 Demo / dry in @ Exist Bldg - RI for Roof Drains SHELL 10 10 0 12AUG11 25AUG11 06SEP11 Demo / dry in @ Exist Bldg - RI for Roof Drains 00491 Relocate Existing HVAC Unit at Tiger Gym SHELL 5 5 0 12AUG11 18AUG11 06SEP11 00061 Interior Footings & Foundations SHELL 10 10 0 16AUG11 29AUG11 16AUG11 29AUG11 Interior Footings & Foundations 00471 Demolition & Temp Partitions at Tiger Gym SHELL 5 5 0 19AUG11 25AUG11 13SEP11 Demolition & Temp Partitions at Tiger Gym 19SEP11 Includes Dry In. COORDINATE WORK WITH TIGER GYM OCCUPANCY OFF HOURS MAY BE REQUIRED 12SEP11 19SEP11 Relocate Existing HVAC Unit at Tiger Gym See Notes 2 & 9 on A1.0 COORDINATE WORK WITH TIGER GYM OCCUPANCY OFF HOURS WORK MAY BE REQUIRED. 0032 Form & Place Foundation Walls SHELL 10 10 0 23AUG11 06SEP11 23AUG11 06SEP11 00041 Finish Underslab MEP Rough Ins SHELL 8 8 0 30AUG11 09SEP11 31AUG11 12SEP11 0033 Waterproofing SHELL 2 2 0 07SEP11 08SEP11 07SEP11 08SEP11 Waterproofing 0034 Place Found. Insulation & Backfill Found. Walls SHELL 2 2 0 09SEP11 12SEP11 09SEP11 12SEP11 Place Found. Insulation & Backfill Found. Walls 00051 Prep, Pour, Cure Slab (block out sloped slabs) SHELL 5 5 0 13SEP11 19SEP11 13SEP11 19SEP11 Prep, Pour, Cure Slab (block out sloped slabs) Form & Place Foundation Walls with all rebar, anchor bolts, hold downs Start Date Finish Date Data Date Run Date 19JUN11 10AUG12 20JUN11 06JUL11 12:48 Includes compaction, vapor barrier, reinforcing and concrete placement Early Bar Float Bar Progress Bar Critical Activity © Primavera Systems, Inc. Finish Underslab MEP Rough Ins 1113 CM Company, Inc. Sheet 2 of 21 Date Revision 05JUL11Bid Schedule Ontario Middle School Building Addition Bid Schedule The First Thing We Build, Is Your Trust CheckedApproved JP B:2 Project Schedule Activity ID See "Bid Schedule Clarifications" after last page of the schedule Activity Description AREA Orig Rem Dur Dur % Early Start Early Finish Late Start Late Finish J J 06JUL11 12:48 A 2011 S O N D J F M 2012 A M 00071 Structural CMU 1st Flr Bearing & Full Height SHELL Wal 20 20 0 20SEP11 17OCT11 20SEP11 17OCT11 Structural CMU 1st Flr Bearing & Full Height Wal 00091 Steel Embeds w/CMU SHELL 20 20 0 20SEP11 17OCT11 20SEP11 17OCT11 Steel Embeds w/CMU 00241 MEP Rough in at CMU SHELL 20 20 0 20SEP11 17OCT11 20SEP11 17OCT11 MEP Rough in at CMU 00101 Pour sloped slabs 1st Floor SHELL 2 2 0 20SEP11 21SEP11 11JAN12 12JAN12 Pour sloped slabs 1st Floor 00081 HM Frames with Structural CMU SHELL 15 15 0 27SEP11 17OCT11 27SEP11 17OCT11 00121 Structural Steel First Floor SHELL 10 10 0 18OCT11 31OCT11 18OCT11 31OCT11 00191 Exterior Steel Stud Framing 1st Floor SHELL 8 8 0 25OCT11 03NOV11 25OCT11 03NOV11 Exterior Steel Stud Framing 1st Floor 00301 Exterior Flashing & Ledgers SHELL 8 8 0 25OCT11 03NOV11 25OCT11 03NOV11 Exterior Flashing & Ledgers 00302 Sun Shade Supports SHELL 8 8 0 25OCT11 03NOV11 25OCT11 03NOV11 Sun Shade Supports 00201 Exterior Gyp Bd Sheathing 1st Floor SHELL 8 8 0 31OCT11 09NOV11 31OCT11 09NOV11 00131 Decking - 2nd Floor SHELL 5 5 0 10NOV11 16NOV11 10NOV11 16NOV11 00141 Shear Studs, Rebar, WWF for 2nd Floor Slabs SHELL 5 5 0 17NOV11 23NOV11 17NOV11 23NOV11 00151 2nd Floor Slabs MEP Rough In's SHELL 5 5 0 17NOV11 23NOV11 17NOV11 23NOV11 J J A HM Frames with Structural CMU Structural Steel First Floor Include Roof Ledgers Exterior Gyp Bd Sheathing 1st Floor Decking - 2nd Floor Shear Studs, Rebar, WWF for 2nd Floor Slabs COORDINATE WITH MEP TRADES 2nd Floor Slabs MEP Rough In's COORDINATE WITH CONCRETE / STEEL TRADES 00142 Concrete at Lobby 101 Bench & Beams SHELL 3 3 0 17NOV11 21NOV11 21NOV11 23NOV11 00171 Place/cure 2nd Fl Slabs (blockout sloped slabs) SHELL 5 5 0 28NOV11 02DEC11 28NOV11 02DEC11 Place/cure 2nd Fl Slabs (blockout sloped slabs) 00161 Install Steel Stairs SHELL 3 3 0 28NOV11 30NOV11 27FEB12 Install Steel Stairs Start Date Finish Date Data Date Run Date 19JUN11 10AUG12 20JUN11 06JUL11 12:48 Early Bar Float Bar Progress Bar Critical Activity © Primavera Systems, Inc. 1113 Concrete at Lobby 101 Bench & Beams 29FEB12 CM Company, Inc. Sheet 3 of 21 Date Revision 05JUL11Bid Schedule Ontario Middle School Building Addition Bid Schedule The First Thing We Build, Is Your Trust CheckedApproved JP B:2 Project Schedule See "Bid Schedule Clarifications" after last page of the schedule Activity ID Activity Description AREA Orig Rem Dur Dur % Early Start Early Finish Late Start Late Finish J J 06JUL11 12:48 A 2011 S O N D J F M 2012 A M J J A 00182 CMU 2nd Floor SHELL 10 10 0 05DEC11 16DEC11 05DEC11 16DEC11 CMU 2nd Floor 00184 HM Frames w/CMU - 2nd Floor SHELL 10 10 0 05DEC11 16DEC11 05DEC11 16DEC11 HM Frames w/CMU - 2nd Floor 00185 MEP Rough In w/CMU 2nd Floor SHELL 10 10 0 05DEC11 16DEC11 05DEC11 16DEC11 MEP Rough In w/CMU 2nd Floor 00311 Steel Embeds & Supports w/CMU 2nd Floor SHELL 10 10 0 05DEC11 16DEC11 05DEC11 16DEC11 Steel Embeds & Supports w/CMU 2nd Floor 00181 Place sloped slabs 2nd fl & stair treads SHELL 2 2 0 05DEC11 06DEC11 01MAR12 02MAR12 Place sloped slabs 2nd fl & stair treads 00582 Clean & Apply Water Repellents to CMU 1st SHELL Floor 7 7 0 07DEC11 15DEC11 04JAN12 12JAN12 Clean & Apply Water Repellents to CMU 1st Floor 00183 Structural Steel - 2nd Floor SHELL 8 8 0 19DEC11 29DEC11 19DEC11 29DEC11 00197 Frame Exterior Struc. Steel Stud Walls 2nd SHELL Fl 8 8 0 30DEC11 11JAN12 30DEC11 11JAN12 Frame Exterior Struc. Steel Stud Walls 2nd Fl 00198 Exterior Flashing & Ledgers SHELL 8 8 0 30DEC11 11JAN12 30DEC11 11JAN12 Exterior Flashing & Ledgers 00188 Exterior Sheathing 2nd Floor SHELL 7 7 0 06JAN12 16JAN12 06JAN12 16JAN12 00291 Set Trusses SHELL 5 5 0 17JAN12 23JAN12 17JAN12 23JAN12 Set Trusses 00261 Steel Supports for Solar Panels & RTUs SHELL 5 5 0 19JAN12 25JAN12 19JAN12 25JAN12 Steel Supports for Solar Panels & RTUs 00262 Roof Decking SHELL 5 5 0 26JAN12 01FEB12 26JAN12 01FEB12 Roof Decking 00321 Exterior Insulation Board / Bldg Wrap SHELL 10 10 0 30JAN12 10FEB12 30JAN12 10FEB12 Exterior Insulation Board / Bldg Wrap 00331 Metal Flashing / Windows SHELL 10 10 0 30JAN12 10FEB12 30JAN12 10FEB12 Metal Flashing / Windows 00263 Welding Inspection SHELL 1 1 0 02FEB12 02FEB12 02FEB12 02FEB12 Welding Inspection Start Date Finish Date Data Date Run Date 19JUN11 10AUG12 20JUN11 06JUL11 12:48 Early Bar Float Bar Progress Bar Critical Activity © Primavera Systems, Inc. 1113 CM Company, Inc. Structural Steel - 2nd Floor Exterior Sheathing 2nd Floor Sheet 4 of 21 Date Revision 05JUL11Bid Schedule Ontario Middle School Building Addition Bid Schedule The First Thing We Build, Is Your Trust CheckedApproved JP B:2 Project Schedule See "Bid Schedule Clarifications" after last page of the schedule Activity ID Activity Description AREA Orig Rem Dur Dur % Early Start Early Finish Late Start Late Finish J J 06JUL11 12:48 A 2011 S O N D J F M 2012 A M J J A 00281 Framing at bldg connection / parapet wall SHELL 3 3 0 02FEB12 06FEB12 03FEB12 07FEB12 00401 Roof Curbs SHELL 3 3 0 03FEB12 07FEB12 03FEB12 07FEB12 Roof Curbs 00411 Fall Protection Anchors SHELL 3 3 0 03FEB12 07FEB12 03FEB12 07FEB12 Fall Protection Anchors 00421 Roof Hatch / Ladders SHELL 3 3 0 03FEB12 07FEB12 03FEB12 07FEB12 Roof Hatch / Ladders 00351 Brick Veneer SHELL 15 15 0 06FEB12 24FEB12 06FEB12 24FEB12 Brick Veneer 00592 Clean & Apply Water Repellents to CMU 2nd Floor SHELL 7 7 0 06FEB12 14FEB12 08FEB12 16FEB12 00282 Sheathing at Parapet Wall (roof side) SHELL 2 2 0 07FEB12 08FEB12 08FEB12 09FEB12 Sheathing at Parapet Wall (roof side) 00601 Roofing System - Dry In SHELL 7 7 0 08FEB12 16FEB12 08FEB12 16FEB12 Roofing System - Dry In 00431 Complete Roofing System / Walking Paths SHELL 10 10 0 17FEB12 01MAR12 24APR12 07MAY12 Complete Roofing System / Walking Paths 00602 Clean & Apply Water Repellents to Veneer SHELL 7 7 0 20FEB12 28FEB12 20FEB12 28FEB12 Clean & Apply Water Repellents to Veneer 01391 Windows / Glazing SHELL 15 15 0 20FEB12 09MAR12 27FEB12 16MAR12 00341 Storefronts & Curtain Walls SHELL 15 15 0 27FEB12 16MAR12 27FEB12 16MAR12 00361 Exterior Metal Faced Paneling SHELL 20 20 0 27FEB12 23MAR12 26MAR12 20APR12 Exterior Metal Faced Paneling 01071 Exterior Signage / Letters SHELL 2 2 0 27FEB12 28FEB12 20JUN12 21JUN12 Exterior Signage / Letters 01031 Knox Box SHELL 1 1 0 27FEB12 27FEB12 21JUN12 21JUN12 Knox Box 00441 Roof Top Equipment, Solar Panels SHELL 10 10 0 02MAR12 15MAR12 08MAY12 21MAY12 Framing at bldg connection / parapet wall Clean & Apply Water Repellents to CMU 2nd Floor Coordinate all roof penetrations Start Date Finish Date Data Date Run Date 19JUN11 10AUG12 20JUN11 06JUL11 12:48 Early Bar Float Bar Progress Bar Critical Activity © Primavera Systems, Inc. 1113 CM Company, Inc. Windows / Glazing Storefronts & Curtain Walls Roof Top Equipment, Solar Panels Sheet 5 of 21 Date Revision 05JUL11Bid Schedule Ontario Middle School Building Addition Bid Schedule The First Thing We Build, Is Your Trust CheckedApproved JP B:2 Project Schedule See "Bid Schedule Clarifications" after last page of the schedule Activity ID Activity Description AREA Orig Rem Dur Dur % Early Start Early Finish Late Start Late Finish J J 06JUL11 12:48 A 2011 S O N J F M 2012 A M J J A 00371 Exterior Flashing, Coping Caps, Trim SHELL 5 5 0 02MAR12 08MAR12 08JUN12 01121 Electrical Panels & Gear SHELL 20 20 0 09MAR12 05APR12 20MAR12 16APR12 00521 Elevator Equipment Room Rough In SHELL 5 5 0 09MAR12 15MAR12 26JUN12 00451 Utility Hook up to RTU's & Solar Panels SHELL 5 5 0 16MAR12 22MAR12 22MAY12 29MAY12 01381 Exterior Doors & Hardware / Lock up Bldg SHELL 3 3 0 19MAR12 21MAR12 04APR12 06APR12 Exterior Doors & Hardware / Lock up Bldg 01141 Exterior Light Fixtures & Trim SHELL 3 3 0 26MAR12 28MAR12 23APR12 25APR12 Exterior Light Fixtures & Trim 00381 Exterior Caulking, Sealants, Trim SHELL 5 5 0 26MAR12 30MAR12 15JUN12 21JUN12 Exterior Caulking, Sealants, Trim 01021 Sun Shades SHELL 2 2 0 26MAR12 27MAR12 20JUN12 21JUN12 01131 Electrical Feeds / Pull Wiring SHELL 15 15 0 06APR12 26APR12 17APR12 07MAY12 Electrical Feeds / Pull Wiring 00531 Steel / Ladder for Elevator SHELL 1 1 0 09APR12 09APR12 02JUL12 02JUL12 Steel / Ladder for Elevator 00541 Install Elevator SHELL 5 5 0 10APR12 16APR12 03JUL12 10JUL12 Install Elevator 00551 Elevator Finishes & Trim SHELL 5 5 0 17APR12 23APR12 11JUL12 17JUL12 00821 Stair Well Finishes SHELL 7 7 0 24APR12 02MAY12 09JUL12 17JUL12 Stair Well Finishes 01461 Stair Treds SHELL 7 7 0 24APR12 02MAY12 09JUL12 17JUL12 Stair Treds 01101 Plumbing Commissioning, Testing, Start Up SHELL 4 4 0 02JUL12 06JUL12 24JUL12 27JUL12 Plumbing Commissioning, Testing, Start Up 01111 HVAC Commissioning, Testing, Balancing Start Up 4 4 0 12JUL12 17JUL12 24JUL12 27JUL12 HVAC Commissioning, Testing, Balancing Start Up Start Date Finish Date Data Date Run Date 19JUN11 10AUG12 20JUN11 06JUL11 12:48 SHELL Early Bar Float Bar Progress Bar Critical Activity © Primavera Systems, Inc. 1113 14JUN12 D Exterior Flashing, Coping Caps, Trim Electrical Panels & Gear 02JUL12 CM Company, Inc. Elevator Equipment Room Rough In Utility Hook up to RTU's & Solar Panels Sun Shades Elevator Finishes & Trim Sheet 6 of 21 Date Revision 05JUL11Bid Schedule Ontario Middle School Building Addition Bid Schedule The First Thing We Build, Is Your Trust CheckedApproved JP B:2 Project Schedule Activity ID 00921 See "Bid Schedule Clarifications" after last page of the schedule Activity Description Fire Alarm Programming & Testing AREA Orig Rem Dur Dur % Early Start Early Finish Late Start Late Finish SHELL 3 3 0 18JUL12 20JUL12 25JUL12 27JUL12 J J 06JUL11 12:48 A 2011 S O N D J F M 2012 A M J J A Fire Alarm Programming & Testing First Floor 00581 Layout Interior SS Walls 1st Fl 1 2 2 0 05DEC11 06DEC11 30DEC11 03JAN12 00251 Interior Steel Stud Framing 1st Flr 1 10 10 0 16DEC11 30DEC11 13JAN12 26JAN12 Interior Steel Stud Framing 1st Flr 00271 Wood Backing 1st Flr 1 15 15 0 16DEC11 09JAN12 27FEB12 16MAR12 Wood Backing 1st Flr 00701 HM Door Frames w/Framing 1st Flr 1 15 15 0 16DEC11 09JAN12 27FEB12 16MAR12 HM Door Frames w/Framing 1st Flr 00641 Fire Sprinkler Rough In 1st Flr 1 20 20 0 03JAN12 30JAN12 27JAN12 23FEB12 00621 HVAC Rough In 1st Flr 1 20 20 0 17JAN12 13FEB12 10FEB12 08MAR12 HVAC Rough In 1st Flr 00631 Plumbing Rough In 1st Flr 1 20 20 0 17JAN12 13FEB12 10FEB12 08MAR12 Plumbing Rough In 1st Flr 00611 Electrical / Special Systems Rough In 1st Flr 1 15 15 0 17FEB12 08MAR12 17FEB12 08MAR12 01161 Camera / Security Rough In 1st Fl 1 15 15 0 17FEB12 08MAR12 17FEB12 08MAR12 Camera / Security Rough In 1st Fl 01181 Sound System Rough In 1st Fl 1 15 15 0 17FEB12 08MAR12 17FEB12 08MAR12 Sound System Rough In 1st Fl 01201 Access Control Rough In 1st Fl 1 15 15 0 17FEB12 08MAR12 27FEB12 16MAR12 Access Control Rough In 1st Fl 00651 Rough In Inspections 1st Flr 1 1 1 0 09MAR12 09MAR12 09MAR12 09MAR12 00661 Interior Insulation / Vapor Retarders 1st Flr 1 8 8 0 12MAR12 21MAR12 12MAR12 21MAR12 00671 Sheetrock & Taping 1st Flr 1 15 15 0 19MAR12 06APR12 19MAR12 06APR12 Start Date Finish Date Data Date Run Date 19JUN11 10AUG12 20JUN11 06JUL11 12:48 Early Bar Float Bar Progress Bar Critical Activity © Primavera Systems, Inc. 1113 CM Company, Inc. Layout Interior SS Walls 1st Fl Fire Sprinkler Rough In 1st Flr Electrical / Special Systems Rough In 1st Flr Rough In Inspections 1st Flr Interior Insulation / Vapor Retarders 1st Flr Sheetrock & Taping 1st Flr Sheet 7 of 21 Date Revision 05JUL11Bid Schedule Ontario Middle School Building Addition Bid Schedule The First Thing We Build, Is Your Trust CheckedApproved JP B:2 Project Schedule See "Bid Schedule Clarifications" after last page of the schedule Activity ID Activity Description AREA Orig Rem Dur Dur % Early Start Early Finish Late Start Late Finish J J 06JUL11 12:48 A 2011 S O N D J F M 2012 A M J J A 01361 Fire Riser / Backflow Assembly 1 5 5 0 29MAR12 04APR12 29MAR12 04APR12 00681 Finish Taping (Level 5) Prepare for Paint 1st 1 Fl 10 10 0 02APR12 13APR12 17APR12 30APR12 Finish Taping (Level 5) Prepare for Paint 1st Fl 00931 Fire Sprinkler Test Prior to Finishes 1 2 2 0 05APR12 06APR12 05APR12 06APR12 Fire Sprinkler Test Prior to Finishes 00761 Prepare / Stain Concrete, Seal Concrete 1st Flr 1 10 10 0 09APR12 20APR12 09APR12 20APR12 Prepare / Stain Concrete, Seal Concrete 1st Flr 00751 Ceramic Tile 1st Flr 1 7 7 0 09APR12 17APR12 19JUN12 27JUN12 00711 Guard Railings & Ladders 1st Flr 1 5 5 0 09APR12 13APR12 11JUL12 17JUL12 Guard Railings & Ladders 1st Flr 00791 Floor Protection 1st Flr 1 1 1 0 23APR12 23APR12 23APR12 23APR12 Floor Protection 1st Flr 00691 Painting 1st Flr 1 10 10 0 24APR12 07MAY12 24APR12 07MAY12 Painting 1st Flr 00721 Ceiling Grid 1st Flr 1 10 10 0 01MAY12 14MAY12 01MAY12 14MAY12 00731 Rough In Cable Tray & Sunshades w/Grid 1st Flr 1 10 10 0 01MAY12 14MAY12 31MAY12 13JUN12 00842 Cable Tray 1st Floor 1 5 5 0 01MAY12 07MAY12 07JUN12 13JUN12 00741 Projector Mounts 1st Flr 1 10 10 0 01MAY12 14MAY12 19JUN12 02JUL12 00831 Light Fixtures 1st Flr 1 10 10 0 08MAY12 21MAY12 08MAY12 21MAY12 00861 HVAC Rough in w/Grid 1st Flr 1 10 10 0 08MAY12 21MAY12 08MAY12 21MAY12 HVAC Rough in w/Grid 1st Flr 01371 Fire Sprinkler - Drop Thru Grid 1st Flr 1 10 10 0 08MAY12 21MAY12 08MAY12 21MAY12 Fire Sprinkler - Drop Thru Grid 1st Flr 01451 Interior Storefront / Glazing Systems 1 10 10 0 08MAY12 21MAY12 15JUN12 Start Date Finish Date Data Date Run Date 19JUN11 10AUG12 20JUN11 06JUL11 12:48 COORDINATE WORK AREAS WITH TAPING ACTIVITIES Early Bar Float Bar Progress Bar Critical Activity © Primavera Systems, Inc. Fire Riser / Backflow Assembly 1113 Ceramic Tile 1st Flr Ceiling Grid 1st Flr Rough In Cable Tray & Sunshades w/Grid 1st Flr Cable Tray 1st Floor Projector Mounts 1st Flr Light Fixtures 1st Flr 28JUN12 CM Company, Inc. Interior Storefront / Glazing Systems Sheet 8 of 21 Date Revision 05JUL11Bid Schedule Ontario Middle School Building Addition Bid Schedule The First Thing We Build, Is Your Trust CheckedApproved JP B:2 Project Schedule See "Bid Schedule Clarifications" after last page of the schedule Activity ID Activity Description AREA Orig Rem Dur Dur % Early Start Early Finish Late Start Late Finish J J 06JUL11 12:48 A 2011 S O N D J F M 2012 A M J J A 00871 Plumbing Fixtures / Trim 1st Flr Restrooms 1 5 5 0 08MAY12 14MAY12 06JUL12 12JUL12 Plumbing Fixtures / Trim 1st Flr Restrooms 00771 Cabinetry, Work Stations, Millwork/Trim 1st 1 Flr 15 15 0 15MAY12 05JUN12 15MAY12 05JUN12 Cabinetry, Work Stations, Millwork/Trim 1st Flr 00841 Data Cabling 1st Flr 1 10 10 0 15MAY12 29MAY12 14JUN12 27JUN12 Data Cabling 1st Flr 00971 Toilet Partitions, Accessories 1st Flr 1 3 3 0 15MAY12 17MAY12 13JUL12 17JUL12 Toilet Partitions, Accessories 1st Flr 00891 Electrical & Special Systems Trim 1st Flr 1 5 5 0 17MAY12 23MAY12 06JUL12 12JUL12 Electrical & Special Systems Trim 1st Flr 01151 Sound System Trim / Programming 1st Fl 1 5 5 0 17MAY12 23MAY12 11JUL12 17JUL12 Sound System Trim / Programming 1st Fl 01171 Camera / Security Trim & Programming 1st 1 Fl 5 5 0 17MAY12 23MAY12 11JUL12 17JUL12 Camera / Security Trim & Programming 1st Fl 00811 Carpeting & Floor Covering / Base 1st Flr 1 7 7 0 22MAY12 31MAY12 20JUN12 28JUN12 Carpeting & Floor Covering / Base 1st Flr 01001 Lockers 1st Flr 1 5 5 0 22MAY12 29MAY12 26JUN12 02JUL12 01061 Folding Door 1st Flr 1 2 2 0 22MAY12 23MAY12 16JUL12 17JUL12 Folding Door 1st Flr 00901 Data Cabling Plates / Trim 1st Flr 1 5 5 0 30MAY12 05JUN12 11JUL12 17JUL12 Data Cabling Plates / Trim 1st Flr 00981 Interior Doors & Hardware 1st Flr 1 5 5 0 01JUN12 07JUN12 29JUN12 06JUL12 Interior Doors & Hardware 1st Flr 00941 Ceiling Tile 1st Flr 1 3 3 0 01JUN12 05JUN12 03JUL12 06JUL12 Ceiling Tile 1st Flr 00961 Interior Specialties 1st Flr 1 5 5 0 01JUN12 07JUN12 09JUL12 13JUL12 Interior Specialties 1st Flr Lockers 1st Flr Visual Display Boards, Projector Screens, FEC, Signs, Corner Guards, Wall Protection 00801 Start Date Finish Date Data Date Run Date Entry Mats 1st Flr 19JUN11 10AUG12 20JUN11 06JUL11 12:48 1 2 Early Bar Float Bar Progress Bar Critical Activity © Primavera Systems, Inc. 2 1113 0 01JUN12 04JUN12 19JUL12 20JUL12 CM Company, Inc. Entry Mats 1st Flr Sheet 9 of 21 Date Revision 05JUL11Bid Schedule Ontario Middle School Building Addition Bid Schedule The First Thing We Build, Is Your Trust CheckedApproved JP B:2 Project Schedule Activity ID See "Bid Schedule Clarifications" after last page of the schedule Activity Description AREA Orig Rem Dur Dur % Early Start Early Finish Late Start Late Finish J J 06JUL11 12:48 A 2011 S O N D J F M 2012 A M J J A 01081 Residential Appliances 1st Flr 1 1 1 0 01JUN12 01JUN12 20JUL12 20JUL12 Residential Appliances 1st Flr 01011 Projectors & Trim 1st Flr 1 5 5 0 06JUN12 12JUN12 09JUL12 13JUL12 Projectors & Trim 1st Flr 00772 Plumbing Trim at Cabinetry 1 5 5 0 06JUN12 12JUN12 11JUL12 17JUL12 Plumbing Trim at Cabinetry 00911 Fire Alarm Devices, Trim 1st Flr 1 5 5 0 06JUN12 12JUN12 11JUL12 17JUL12 Fire Alarm Devices, Trim 1st Flr 00951 Fire Sprinkler Trim 1st Flr 1 5 5 0 06JUN12 12JUN12 11JUL12 17JUL12 Fire Sprinkler Trim 1st Flr 00991 Interior Glazing 1st Flr 1 5 5 0 08JUN12 14JUN12 09JUL12 13JUL12 Interior Glazing 1st Flr 01211 Access Control Devices, Trim & Programming 1st F 1 5 5 0 08JUN12 14JUN12 11JUL12 17JUL12 Access Control Devices, Trim & Programming 1st F 01421 Owner Furnishings 1st Flr 1 5 5 0 13JUN12 19JUN12 16JUL12 20JUL12 Owner Furnishings 1st Flr 01091 Roller Shades / Window Coverings 1st Flr 1 5 5 0 15JUN12 21JUN12 16JUL12 20JUL12 Roller Shades / Window Coverings 1st Flr 01221 Final Inspections 1st Floor 1 3 3 0 15JUN12 19JUN12 18JUL12 20JUL12 Final Inspections 1st Floor 01411 Clean Up / Punch List 1st Flr 1 5 5 0 22JUN12 28JUN12 23JUL12 27JUL12 Clean Up / Punch List 1st Flr 01441 First Floor Complete 1 0 0 0 28JUN12 27JUL12 First Floor Complete Second Floor 2-0001 Layout Interior SS Walls 2nd Floor 2 2 2 0 02FEB12 03FEB12 06FEB12 2-0002 Interior Steel Stud Framing 2nd Floor 2 8 8 0 06FEB12 15FEB12 05MAR12 14MAR12 Interior Steel Stud Framing 2nd Floor 2-0003 Wood Backing 2nd Floor 2 8 8 0 06FEB12 15FEB12 09APR12 Wood Backing 2nd Floor Start Date Finish Date Data Date Run Date 19JUN11 10AUG12 20JUN11 06JUL11 12:48 Early Bar Float Bar Progress Bar Critical Activity © Primavera Systems, Inc. 1113 CM Company, Inc. 07FEB12 Layout Interior SS Walls 2nd Floor 18APR12 Sheet 10 of 21 Date Revision 05JUL11Bid Schedule Ontario Middle School Building Addition Bid Schedule The First Thing We Build, Is Your Trust CheckedApproved JP B:2 Project Schedule Activity ID See "Bid Schedule Clarifications" after last page of the schedule Activity Description AREA Orig Rem Dur Dur % Early Start Early Finish Late Start Late Finish J J 06JUL11 12:48 A 2011 S O N J F M 2012 A M J J A 2-0004 HM Door Frames w/Framing 2nd Floor 2 8 8 0 06FEB12 15FEB12 09APR12 2-0005 Fire Sprinkler Rough In 2nd Floor 2 10 10 0 16FEB12 29FEB12 15MAR12 28MAR12 2-0009 HVAC Rough In 2nd Floor 2 15 15 0 23FEB12 14MAR12 22MAR12 11APR12 HVAC Rough In 2nd Floor 2-0010 Plumbing Rough In 2nd Floor 2 15 15 0 23FEB12 14MAR12 22MAR12 11APR12 Plumbing Rough In 2nd Floor 2-0007 Fire Sprinkler Test Prior to Finishes 2nd Floor 2 1 1 0 01MAR12 01MAR12 08MAY12 08MAY12 Fire Sprinkler Test Prior to Finishes 2nd Floor 2-0008 Electrical / Special Systems Rough In 2nd Floor 2 15 15 0 09MAR12 29MAR12 22MAR12 11APR12 Electrical / Special Systems Rough In 2nd Floor 2-0011 Camera / Security Rough In 2nd Floor 2 15 15 0 09MAR12 29MAR12 22MAR12 11APR12 Camera / Security Rough In 2nd Floor 2-0012 Sound System Rough In 2nd Floor 2 15 15 0 09MAR12 29MAR12 22MAR12 11APR12 Sound System Rough In 2nd Floor 2-0013 Access Control Rough In 2nd Floor 2 15 15 0 09MAR12 29MAR12 29MAR12 18APR12 Access Control Rough In 2nd Floor 2-0014 Rough In Inspections 2nd Floor 2 1 1 0 30MAR12 30MAR12 12APR12 12APR12 Rough In Inspections 2nd Floor 2-0015 Interior Insulation / Vapor Retarders 2nd Floor 2 8 8 0 02APR12 11APR12 13APR12 24APR12 Interior Insulation / Vapor Retarders 2nd Floor 2-0016 Sheetrock & Taping 2nd Floor 2 14 14 0 09APR12 26APR12 19APR12 08MAY12 Sheetrock & Taping 2nd Floor 2-0017 Finish Taping (Level 5) Prepare for Paint 2nd Fl 2 10 10 0 19APR12 02MAY12 09MAY12 22MAY12 Finish Taping (Level 5) Prepare for Paint 2nd Fl 2-0018 Ceramic Tile 2nd Floor 2 7 7 0 26APR12 04MAY12 28JUN12 2-0019 Prepare / Stain Concrete, Seal Concrete 2nd Flo 2 5 5 0 27APR12 03MAY12 09MAY12 15MAY12 2-0020 Guard Railings & Ladders 2nd Floor 2 5 5 0 27APR12 03MAY12 13JUL12 Start Date Finish Date Data Date Run Date 19JUN11 10AUG12 20JUN11 06JUL11 12:48 HM Door Frames w/Framing 2nd Floor Fire Sprinkler Rough In 2nd Floor 09JUL12 Ceramic Tile 2nd Floor Prepare / Stain Concrete, Seal Concrete 2nd Flo COORDINATE WORK AREAS WITH TAPING ACTIVITIES Early Bar Float Bar Progress Bar Critical Activity © Primavera Systems, Inc. 18APR12 D 1113 CM Company, Inc. 19JUL12 Guard Railings & Ladders 2nd Floor Sheet 11 of 21 Date Revision 05JUL11Bid Schedule Ontario Middle School Building Addition Bid Schedule The First Thing We Build, Is Your Trust CheckedApproved JP B:2 Project Schedule Activity ID See "Bid Schedule Clarifications" after last page of the schedule Activity Description AREA Orig Rem Dur Dur % Early Start Early Finish Late Start Late Finish J J 06JUL11 12:48 A 2011 S O N D J F M 2012 A M J J A 2-0021 Floor Protection 2nd Floor 2 1 1 0 04MAY12 04MAY12 16MAY12 16MAY12 Floor Protection 2nd Floor 2-0022 Painting 2nd Floor 2 10 10 0 04MAY12 17MAY12 16MAY12 30MAY12 Painting 2nd Floor 2-0024 Ceiling Grid 2nd Floor 2 8 8 0 11MAY12 22MAY12 23MAY12 04JUN12 Ceiling Grid 2nd Floor 2-0023 Cable Tray 2nd Floor 2 5 5 0 11MAY12 17MAY12 21JUN12 27JUN12 Cable Tray 2nd Floor 2-0026 Rough In Cable Tray & Sunshades w/Grid 2nd Floor 2 10 10 0 11MAY12 24MAY12 26JUN12 10JUL12 Rough In Cable Tray & Sunshades w/Grid 2nd Floor 2-0027 Projector Mounts 2nd Floor 2 10 10 0 11MAY12 24MAY12 26JUN12 10JUL12 Projector Mounts 2nd Floor 2-0030 HVAC Rough in w/Grid 2nd Floor 2 10 10 0 17MAY12 31MAY12 30MAY12 12JUN12 HVAC Rough in w/Grid 2nd Floor 2-0031 Fire Sprinkler - Drop Thru Grid 2nd Floor 2 10 10 0 17MAY12 31MAY12 30MAY12 12JUN12 Fire Sprinkler - Drop Thru Grid 2nd Floor 2-0029 Plumbing Fixtures / Trim 2nd Floor Restrooms 2 5 5 0 18MAY12 24MAY12 10JUL12 16JUL12 Plumbing Fixtures / Trim 2nd Floor Restrooms 2-0032 Light Fixtures 2nd Floor 2 10 10 0 22MAY12 05JUN12 30MAY12 12JUN12 Light Fixtures 2nd Floor 2-0033 Toilet Partitions, Accessories 2nd Floor 2 3 3 0 25MAY12 30MAY12 17JUL12 19JUL12 Toilet Partitions, Accessories 2nd Floor 2-0028 Data Cabling 2nd Floor 2 10 10 0 30MAY12 12JUN12 28JUN12 12JUL12 Data Cabling 2nd Floor 2-0036 Electrical & Special Systems Trim 2nd Floor 2 5 5 0 01JUN12 07JUN12 13JUL12 19JUL12 Electrical & Special Systems Trim 2nd Floor 2-0037 Sound System Trim / Programming 2nd Floor 2 5 5 0 01JUN12 07JUN12 13JUL12 19JUL12 Sound System Trim / Programming 2nd Floor 2-0038 Camera / Security Trim & Programming 2nd Floor 2 5 5 0 01JUN12 07JUN12 13JUL12 19JUL12 Camera / Security Trim & Programming 2nd Floor 2-0039 Cabinetry, Work Stations, Millwork/Trim 2nd 2 Floo 11 11 0 06JUN12 20JUN12 06JUN12 20JUN12 Cabinetry, Work Stations, Millwork/Trim 2nd Floo Start Date Finish Date Data Date Run Date 19JUN11 10AUG12 20JUN11 06JUL11 12:48 Early Bar Float Bar Progress Bar Critical Activity © Primavera Systems, Inc. 1113 CM Company, Inc. Sheet 12 of 21 Date Revision 05JUL11Bid Schedule Ontario Middle School Building Addition Bid Schedule The First Thing We Build, Is Your Trust CheckedApproved JP B:2 Project Schedule Activity ID See "Bid Schedule Clarifications" after last page of the schedule Activity Description AREA Orig Rem Dur Dur % Early Start Early Finish Late Start Late Finish J J 06JUL11 12:49 A 2011 S O N D J F M 2012 A M J J A 2-0040 Lockers 2nd Floor 2 5 5 0 06JUN12 12JUN12 03JUL12 10JUL12 Lockers 2nd Floor 2-0034 Data Cabling Plates / Trim 2nd Floor 2 5 5 0 13JUN12 19JUN12 13JUL12 19JUL12 Data Cabling Plates / Trim 2nd Floor 2-0103 Epoxy Tops at Labs - 2nd Floor 2 8 8 0 15JUN12 26JUN12 15JUN12 26JUN12 Epoxy Tops at Labs - 2nd Floor 2-0047 Plumbing Trim at Cabinetry 2nd Floor 2 5 5 0 21JUN12 27JUN12 13JUL12 19JUL12 Plumbing Trim at Cabinetry 2nd Floor 2-0104 Plumbing Trim at Labs / Epoxy Tops 2nd Floor 2 5 5 0 25JUN12 29JUN12 25JUN12 29JUN12 Plumbing Trim at Labs / Epoxy Tops 2nd Floor 2-0041 Carpeting & Floor Covering / Base 2nd Floor 2 7 7 0 02JUL12 11JUL12 02JUL12 11JUL12 Carpeting & Floor Covering / Base 2nd Floor 2-0042 Interior Doors & Hardware 2nd Floor 2 5 5 0 09JUL12 13JUL12 09JUL12 13JUL12 Interior Doors & Hardware 2nd Floor 2-0043 Ceiling Tile 2nd Floor 2 3 3 0 09JUL12 11JUL12 11JUL12 13JUL12 Ceiling Tile 2nd Floor 2-0044 Interior Specialties 2nd Floor 2 5 5 0 09JUL12 13JUL12 16JUL12 20JUL12 Interior Specialties 2nd Floor Visual Display Boards, Projector Screens, FEC, Signs, Corner Guards, Wall Protection 2-0046 Appliances 2nd Floor 2 1 1 0 09JUL12 09JUL12 23JUL12 23JUL12 Appliances 2nd Floor 2-0048 Fire Alarm Devices, Trim 2nd Floor 2 4 4 0 12JUL12 17JUL12 16JUL12 19JUL12 Fire Alarm Devices, Trim 2nd Floor 2-0049 Fire Sprinkler Trim 2nd Floor 2 4 4 0 12JUL12 17JUL12 16JUL12 19JUL12 Fire Sprinkler Trim 2nd Floor 2-0050 Projectors & Trim 2nd Floor 2 5 5 0 12JUL12 18JUL12 16JUL12 20JUL12 Projectors & Trim 2nd Floor 2-0051 Interior Glazing 2nd Floor 2 5 5 0 12JUL12 18JUL12 17JUL12 23JUL12 Interior Glazing 2nd Floor 2-0054 Roller Shades / Window Coverings 2nd Floor 2 5 5 0 12JUL12 18JUL12 17JUL12 23JUL12 Roller Shades / Window Coverings 2nd Floor Start Date Finish Date Data Date Run Date 19JUN11 10AUG12 20JUN11 06JUL11 12:49 Early Bar Float Bar Progress Bar Critical Activity © Primavera Systems, Inc. 1113 CM Company, Inc. Sheet 13 of 21 Date Revision 05JUL11Bid Schedule Ontario Middle School Building Addition Bid Schedule The First Thing We Build, Is Your Trust CheckedApproved JP B:2 Project Schedule Activity ID See "Bid Schedule Clarifications" after last page of the schedule Activity Description AREA Orig Rem Dur Dur % Early Start Early Finish Late Start Late Finish J J 06JUL11 12:49 A 2011 S O N D J F M 2012 A M J J A 2-0052 Access Control Devices, Trim & Programming 2nd F 2 4 4 0 16JUL12 19JUL12 16JUL12 19JUL12 Access Control Devices, Trim & Programming 2nd F 2-0053 Owner Furnishings 2nd Floor 2 5 5 0 19JUL12 25JUL12 23JUL12 27JUL12 Owner Furnishings 2nd Floor 2-0055 Final Inspections 2nd Floor 2 2 2 0 20JUL12 23JUL12 20JUL12 23JUL12 Final Inspections 2nd Floor 2-0056 Clean Up / Punch List 2nd Floor 2 4 4 0 24JUL12 27JUL12 24JUL12 27JUL12 Clean Up / Punch List 2nd Floor 2-0057 Second Floor Complete 2 0 0 0 27JUL12 27JUL12 Second Floor Complete 10 10 0 09MAR12 22MAR12 Tiger Gym Upgrades 01051 Fire Alarm Upgrades at Tiger TIGER 11JUL12 24JUL12 Fire Alarm Upgrades at Tiger CONTRACTOR TO COORDINATE WITH GYM OCCUPANCY. OFF HOURS WORK MAY BE REQUIRED 00571 Required Abatement at Tiger TIGER 10 10 0 11JUN12* 22JUN12 11JUN12* 22JUN12 Required Abatement at Tiger WORK TO BE COORDINATED WITH OCCUPANCY - DO NOT START TILL SCHOOL GETS OUT. ASSUMES THERE WILL BE NO ABATEMENET REQUIRED FOR EARLY DEMO 00511 New Flooring in Lobby at Tiger TIGER 7 7 0 25JUN12 03JUL12 05JUL12 13JUL12 New Flooring in Lobby at Tiger 00501 Hardware & Door Upgrades at Tiger Gym TIGER 10 10 0 05JUL12 18JUL12 16JUL12 27JUL12 Hardware & Door Upgrades at Tiger Gym 00502 Tiger Gym Upgrades Complete TIGER 0 0 0 18JUL12 27JUL12 Tiger Gym Upgrades Complete Remaining Site Work 01331 Re-Grade, Clean Up, Prep for Curb & Gutter SITE 10 10 0 29MAR12 11APR12 26APR12 09MAY12 01342 Elect Conduits & Remaining Storm Drain SE SITE Lot 10 10 0 12APR12 25APR12 10MAY12 23MAY12 Elect Conduits & Remaining Storm Drain SE Lot 01332 Curb & Gutter, Conc. required for Paving 10 10 0 26APR12 09MAY12 24MAY12 07JUN12 Curb & Gutter, Conc. required for Paving Re-Grade, Clean Up, Prep for Curb & Gutter ALL TRADES NEED TO CLEAR OUT SE PKG LOT! Start Date Finish Date Data Date Run Date 19JUN11 10AUG12 20JUN11 06JUL11 12:49 SITE Early Bar Float Bar Progress Bar Critical Activity © Primavera Systems, Inc. 1113 CM Company, Inc. Sheet 14 of 21 Date Revision 05JUL11Bid Schedule Ontario Middle School Building Addition Bid Schedule The First Thing We Build, Is Your Trust CheckedApproved JP B:2 Project Schedule Activity ID See "Bid Schedule Clarifications" after last page of the schedule Activity Description AREA Orig Rem Dur Dur % Early Start Early Finish Late Start Late Finish J J 06JUL11 12:49 A 2011 S O N D J F M 2012 A M J J A 01333 Prep & Pave Remaining Site SITE 3 3 0 10MAY12 14MAY12 08JUN12 12JUN12 Prep & Pave Remaining Site 01321 Remaining Site Concrete SITE 7 7 0 15MAY12 23MAY12 13JUN12 21JUN12 Remaining Site Concrete 01335 Remaining Light Poles SITE 4 4 0 15MAY12 18MAY12 24JUL12 27JUL12 Remaining Light Poles 01291 Striping & Signage SITE 3 3 0 15MAY12 17MAY12 25JUL12 27JUL12 Striping & Signage 01261 Topsoil & Irrigation at Remaining Site SITE 10 10 0 24MAY12 07JUN12 22JUN12 06JUL12 Topsoil & Irrigation at Remaining Site 01271 Landscaping at Remaining Site SITE 15 15 0 08JUN12 28JUN12 09JUL12 27JUL12 Landscaping at Remaining Site 01281 Site Furnishings / Bike Racks / Flag Pole SITE 5 5 0 08JUN12 14JUN12 23JUL12 27JUL12 Site Furnishings / Bike Racks / Flag Pole 01292 Site Work Complete SITE 0 0 0 28JUN12 27JUL12 Site Work Complete Submittals (submit, review & approve) 033000 Concrete Shops, Mix Des, Found Insul Submittals SBMT 2 2 0 14JUL11 15JUL11 14JUL11 15JUL11 Concrete Shops, Mix Des, Found Insul Submittals 033001 Rebar Shops for Footings, Found & Slabs Sbmtls SBMT 9 9 0 15JUL11 27JUL11 15JUL11 27JUL11 Rebar Shops for Footings, Found & Slabs Sbmtls 042000 Masonry Submittals SBMT 10 10 0 01AUG11 12AUG11 01AUG11 12AUG11 Masonry Submittals 220000 Underslab Plumbing Submittals SBMT 5 5 0 01AUG11 05AUG11 01AUG11 05AUG11 Underslab Plumbing Submittals 260000 Electrical Underground Submittals SBMT 5 5 0 01AUG11 05AUG11 01AUG11 05AUG11 Electrical Underground Submittals 051200 Structural Steel Submittals SBMT 35 35 0 01AUG11 19SEP11 08AUG11 26SEP11 Structural Steel Submittals 142400 Elevator Submittals SBMT 25 25 0 01AUG11 02SEP11 15AUG11 19SEP11 Elevator Submittals SUBMIT EARLY TO COORDINATE WITH STRUCTURE Start Date Finish Date Data Date Run Date 19JUN11 10AUG12 20JUN11 06JUL11 12:49 Early Bar Float Bar Progress Bar Critical Activity © Primavera Systems, Inc. 1113 CM Company, Inc. Sheet 15 of 21 Date Revision 05JUL11Bid Schedule Ontario Middle School Building Addition Bid Schedule The First Thing We Build, Is Your Trust CheckedApproved JP B:2 Project Schedule Activity ID See "Bid Schedule Clarifications" after last page of the schedule Activity Description AREA Orig Rem Dur Dur % Early Start Early Finish Late Start Late Finish J J 06JUL11 12:49 A 2011 S O N D J F M 071113 Foundation Waterproofing Submittals SBMT 10 10 0 01AUG11 12AUG11 16AUG11 29AUG11 Foundation Waterproofing Submittals 054000 Steel Stud / Cold Form Metal Framing Sbmtls SBMT 25 25 0 01AUG11 02SEP11 22AUG11 26SEP11 Steel Stud / Cold Form Metal Framing Sbmtls 081113 Hollow Metal Door Frame Submittals SBMT 15 15 0 01AUG11 19AUG11 22AUG11 12SEP11 Hollow Metal Door Frame Submittals 042002 Masonry Rebar Shops SBMT 10 10 0 01AUG11 12AUG11 29AUG11 12SEP11 Masonry Rebar Shops 230000 HVAC Submittals SBMT 25 25 0 01AUG11 02SEP11 29AUG11 03OCT11 HVAC Submittals 2012 A M J J A SUBMIT EARLY TO ACCOMMODATE COORDINATION DRAWINGS 210000 Fire Sprinkler Submittals SBMT 20 20 0 01AUG11 26AUG11 06SEP11 03OCT11 Fire Sprinkler Submittals SUBMIT EARLY TO ACCOMMODATE COORDINATION DRAWINGS DIV 27&28 Division 27 & 28 Submittals SBMT 50 50 0 01AUG11 10OCT11 26SEP11 06DEC11 Division 27 & 28 Submittals 084413 Alum Storefront & Curtain Wall Sbmtls SBMT 55 55 0 01AUG11 17OCT11 27SEP11 14DEC11 Alum Storefront & Curtain Wall Sbmtls 075216 Roofing, flashing, accessories submittals SBMT 50 50 0 01AUG11 10OCT11 29SEP11 09DEC11 Roofing, flashing, accessories submittals 220001 Remaining Plumbing Submittals SBMT 35 35 0 01AUG11 19SEP11 24OCT11 13DEC11 Remaining Plumbing Submittals 260500 Remaining Electrical & Special Systems Sbmtls SBMT 35 35 0 01AUG11 19SEP11 31OCT11 20DEC11 Remaining Electrical & Special Systems Sbmtls 052100 Steel Joist Submittals SBMT 30 30 0 01AUG11 12SEP11 09NOV11 22DEC11 Steel Joist Submittals 074243 Composite Wall Panel Submittals SBMT 50 50 0 01AUG11 10OCT11 15NOV11 27JAN12 Composite Wall Panel Submittals 072500 Building Wrap / Weather Barrier Submittals SBMT 30 30 0 01AUG11 12SEP11 22NOV11 06JAN12 Building Wrap / Weather Barrier Submittals 071900 Water Repellent Submittals 20 20 0 01AUG11 26AUG11 28NOV11 23DEC11 Water Repellent Submittals Start Date Finish Date Data Date Run Date 19JUN11 10AUG12 20JUN11 06JUL11 12:49 SBMT Early Bar Float Bar Progress Bar Critical Activity © Primavera Systems, Inc. 1113 CM Company, Inc. Sheet 16 of 21 Date Revision 05JUL11Bid Schedule Ontario Middle School Building Addition Bid Schedule The First Thing We Build, Is Your Trust CheckedApproved JP B:2 Project Schedule Activity ID See "Bid Schedule Clarifications" after last page of the schedule Activity Description AREA Orig Rem Dur Dur % Early Start Early Finish Late Start Late Finish J J 06JUL11 12:49 A 2011 S O N D J F M 083513 Folding Door Submittal SBMT 30 30 0 01AUG11 12SEP11 30NOV11 12JAN12 Folding Door Submittal 122413 Window Covering Submittals SBMT 50 50 0 01AUG11 10OCT11 16DEC11 27FEB12 Window Covering Submittals 055000 Metal Fabrications / Railings & Guards Submittal SBMT 25 25 0 01AUG11 02SEP11 30DEC11 03FEB12 Metal Fabrications / Railings & Guards Submittal 092900 Gypsum Board Assemblies Submittals SBMT 40 40 0 01AUG11 26SEP11 30DEC11 24FEB12 Gypsum Board Assemblies Submittals 072100 Interior Insulation & Vapor Ret. Submittals SBMT 30 30 0 01AUG11 12SEP11 16JAN12 24FEB12 Interior Insulation & Vapor Ret. Submittals 08711 Door Hardware Submittals SBMT 20 20 0 01AUG11 26AUG11 23JAN12 17FEB12 Door Hardware Submittals 2012 A M J J A ITEM NEEDED EARLY IN ORDER TO COORDINATE ACCESS CONTROL REQUIREMENTS & ROUGH IN 099100 Painting Submittals & Draw Downs SBMT 50 50 0 01AUG11 10OCT11 24JAN12 02APR12 Painting Submittals & Draw Downs 064023 Millwork Submittals SBMT 45 45 0 01AUG11 03OCT11 31JAN12 02APR12 Millwork Submittals 095113 Acoustic Panel Ceiling Submittals SBMT 40 40 0 01AUG11 26SEP11 07FEB12 02APR12 Acoustic Panel Ceiling Submittals 105113 Metal Locker Submittals SBMT 50 50 0 01AUG11 10OCT11 13FEB12 20APR12 Metal Locker Submittals 096813 Floor Covering Submittals SBMT 50 50 0 01AUG11 10OCT11 14FEB12 23APR12 Floor Covering Submittals 10000 Division 10 Specialty Submittals (see log note) SBMT 70 70 0 01AUG11 07NOV11 22FEB12 30MAY12 Division 10 Specialty Submittals (see log note) 033600 Special Conc. Floor Finish Submittals SBMT 20 20 0 01AUG11 26AUG11 27FEB12 107113 Exterior Sun Control Submittals SBMT 25 25 0 01AUG11 02SEP11 13MAR12 16APR12 Exterior Sun Control Submittals 093000 Ceramic Tile Submittals SBMT 40 40 0 01AUG11 26SEP11 19MAR12 11MAY12 Ceramic Tile Submittals Start Date Finish Date Data Date Run Date 19JUN11 10AUG12 20JUN11 06JUL11 12:49 INCLUDES VISUAL DISPLAY BDS, SIGNAGE, TOILET COMPARTMENTS, WALL PROTECTION, TOILET, BATH & LAUNDRY, FIRE PROTECTION Early Bar Float Bar Progress Bar Critical Activity © Primavera Systems, Inc. 1113 CM Company, Inc. 23MAR12 Special Conc. Floor Finish Submittals Sheet 17 of 21 Date Revision 05JUL11Bid Schedule Ontario Middle School Building Addition Bid Schedule The First Thing We Build, Is Your Trust CheckedApproved JP B:2 Project Schedule See "Bid Schedule Clarifications" after last page of the schedule Activity ID Activity Description AREA Orig Rem Dur Dur % Early Start Early Finish Late Start Late Finish J J 06JUL11 12:49 A 2011 S O N 113100 Appliance Submittals SBMT 40 40 0 01AUG11 26SEP11 28MAR12 22MAY12 Appliance Submittals 081416 Wood Door & Submittals SBMT 25 25 0 01AUG11 02SEP11 19APR12 23MAY12 Wood Door & Submittals 00391 Coord Dwgs for Roof Penetrations, Supports SBMT 5 5 0 08AUG11 12AUG11 12JAN12 18JAN12 Access Control Coordination SBMT 01191 D J F M 2012 A M J J A Coord Dwgs for Roof Penetrations, Supports Inculdes all penetrations, supports for RTU's, Solar Panels, etc. 5 5 0 29AUG11 02SEP11 20FEB12 24FEB12 Access Control Coordination Fabricate & Deliver 033000 F&D Fab & Deliver Concrete & Found. Insulation FAB&DELIV 1 1 0 18JUL11 18JUL11 18JUL11 18JUL11 033001 F&D Fab & Del Rebar for Footings, Found & Slabs FAB&DELIV 5 5 0 28JUL11 03AUG11 28JUL11 03AUG11 220000 F&D Fab & Deliver Underslab Plumbing Materials FAB&DELIV 2 2 0 08AUG11 09AUG11 08AUG11 09AUG11 Fab & Deliver Underslab Plumbing Materials 260000 F&D Fab & Deliver Underslab Electrical Matls FAB&DELIV 2 2 0 08AUG11 09AUG11 08AUG11 09AUG11 Fab & Deliver Underslab Electrical Matls 042000 F&D Fabricate & Deliver Structural CMU FAB&DELIV 25 25 0 15AUG11 19SEP11 15AUG11 19SEP11 Fabricate & Deliver Structural CMU 071113 F&D Fab & Deliver Waterproofing FAB&DELIV 5 5 0 15AUG11 19AUG11 30AUG11 06SEP11 Fab & Deliver Waterproofing 042002 F&D Fab & Deliver Masonry Rebar FAB&DELIV 5 5 0 15AUG11 19AUG11 13SEP11 19SEP11 Fab & Deliver Masonry Rebar 042001 F&D Fab & Deliver Masonry Veneer FAB&DELIV 25 25 0 15AUG11 19SEP11 30DEC11 03FEB12 Fab & Deliver Masonry Veneer 081113 F&D Fab & Deliver 1st Floor HM Frames FAB&DELIV 10 10 0 22AUG11 02SEP11 13SEP11 26SEP11 081114 F&D Fab & Deliver 2nd Floor HM Frames FAB&DELIV 10 10 0 22AUG11 02SEP11 17NOV11 02DEC11 Fab & Deliver 2nd Floor HM Frames 081115 F&D Fab & Deliver Remaining HM Door Frames FAB&DELIV 10 1st Floor 10 0 22AUG11 02SEP11 13FEB12 Fab & Deliver Remaining HM Door Frames 1st Floor Start Date Finish Date Data Date Run Date 19JUN11 10AUG12 20JUN11 06JUL11 12:49 Early Bar Float Bar Progress Bar Critical Activity © Primavera Systems, Inc. 1113 CM Company, Inc. 24FEB12 Fab & Deliver Concrete & Found. Insulation Fab & Del Rebar for Footings, Found & Slabs Fab & Deliver 1st Floor HM Frames Sheet 18 of 21 Date Revision 05JUL11Bid Schedule Ontario Middle School Building Addition Bid Schedule The First Thing We Build, Is Your Trust CheckedApproved JP B:2 Project Schedule Activity ID See "Bid Schedule Clarifications" after last page of the schedule Activity Description AREA Orig Rem Dur Dur 081116 F&D Fab & Deliver Remaining HM Door Frames FAB&DELIV 10 2nd Floor 071900 F&D Fab & Deliver Water Repellent FAB&DELIV 210000 F&D % Early Start Early Finish Late Start Late Finish J J 06JUL11 12:49 A 2011 S O N D J F M 10 0 22AUG11 02SEP11 26MAR12 06APR12 5 5 0 29AUG11 02SEP11 27DEC11 03JAN12 Fab & Deliver Water Repellent Fab & Delivery Fire Sprinkler Materials FAB&DELIV 20 20 0 29AUG11 26SEP11 29DEC11 26JAN12 Fab & Delivery Fire Sprinkler Materials 033600 F&D Fab & Delivery Special Conc. Floor Finish Materi FAB&DELIV 10 10 0 29AUG11 12SEP11 26MAR12 06APR12 054000 F&D Fab & Deliver Exterior Steel Studs FAB&DELIV 20 20 0 06SEP11 03OCT11 27SEP11 24OCT11 Fab & Deliver Exterior Steel Studs 054001 F&D Fab & Deliver Interior Steel Studs FAB&DELIV 15 15 0 06SEP11 26SEP11 21DEC11 12JAN12 Fab & Deliver Interior Steel Studs 230000 F&D Fab & Deliver HVAC Materials (see log) FAB&DELIV 25 25 0 06SEP11 10OCT11 06JAN12 09FEB12 Fab & Deliver HVAC Materials (see log) 2012 A M J J A Fab & Deliver Remaining HM Door Frames 2nd Floor Fab & Delivery Special Conc. Floor Finish Materi DEL DATE SHOWN IS FOR ROUGH IN - COORDINATE ALL EQUIPMENT DELIVERIES WITH UPDATED SCHEDULE 055000 F&D Fab & Deliver Railings & Misc. Metals FAB&DELIV 15 15 0 06SEP11 26SEP11 06FEB12 24FEB12 Fab & Deliver Railings & Misc. Metals COORDINATE DELIVERY OF ALL ITEMS WITH SCHEDULE & CM SUPER 142400 F&D Fab & Deliver Elevator FAB&DELIV 60 60 0 06SEP11 30NOV11 09APR12 02JUL12 Fab & Deliver Elevator 107113 F&D Fab & Deliver Exterior Sun Control FAB&DELIV 45 45 0 06SEP11 07NOV11 17APR12 19JUN12 Fab & Deliver Exterior Sun Control SUBMIT IN TIME TO COORDINATE WITH SUPPORT REQUIREMENTS 081416 F&D Fab & Deliver Interior Doors & Hardware FAB&DELIV 25 25 0 06SEP11 10OCT11 24MAY12 28JUN12 052100 F&D Fab & Deliver Steel Joists FAB&DELIV 15 15 0 13SEP11 03OCT11 23DEC11 16JAN12 Fab & Deliver Steel Joists 072500 F&D Fab & Deliver Bldg Wrap FAB&DELIV 15 15 0 13SEP11 03OCT11 09JAN12 27JAN12 Fab & Deliver Bldg Wrap 083513 F&D Fab & Deliver Folding Door FAB&DELIV 25 25 0 13SEP11 17OCT11 13FEB12 16MAR12 Fab & Deliver Folding Door Fab & Deliver Interior Doors & Hardware VERIFY ROUGH IN REQUIREMENTS WITH OTHER AFFECTED TRADES Start Date Finish Date Data Date Run Date 19JUN11 10AUG12 20JUN11 06JUL11 12:49 Early Bar Float Bar Progress Bar Critical Activity © Primavera Systems, Inc. 1113 CM Company, Inc. Sheet 19 of 21 Date Revision 05JUL11Bid Schedule Ontario Middle School Building Addition Bid Schedule The First Thing We Build, Is Your Trust CheckedApproved JP B:2 Project Schedule Activity ID See "Bid Schedule Clarifications" after last page of the schedule Activity Description AREA Orig Rem Dur Dur % Early Start Early Finish Late Start Late Finish J J 06JUL11 12:49 A 2011 S O N D J F 072100 F&D Fab & Deliver Interior Insul. and Vapr Rtdr FAB&DELIV 10 10 0 13SEP11 26SEP11 27FEB12 09MAR12 051200 F&D Fab & Deliver Structural Steel FAB&DELIV 15 15 0 20SEP11 10OCT11 27SEP11 17OCT11 Fab & Deliver Structural Steel 220001 F&D Fab & Deliver Plumbing Materials FAB&DELIV 40 40 0 20SEP11 14NOV11 14DEC11 09FEB12 Fab & Deliver Plumbing Materials M 2012 A M J J A Fab & Deliver Interior Insul. and Vapr Rtdr COORINDATE STAGGARED DELEIVERY OF MATERIALS PER UPDATED SCHEDULE 260500 F&D Fab & Deliver Electrical & Spec. System Matl's FAB&DELIV 40 40 0 20SEP11 14NOV11 21DEC11 16FEB12 092900 F&D Fab & Deliver Sheetrock & Framing Matl's FAB&DELIV 15 15 0 27SEP11 17OCT11 27FEB12 16MAR12 Fab & Deliver Sheetrock & Framing Matl's 095113 F&D Fab & Deliver Acoustic Panel Ceiling Matls FAB&DELIV 20 20 0 27SEP11 24OCT11 03APR12 30APR12 Fab & Deliver Acoustic Panel Ceiling Matls 093000 F&D Fab & Deliver Ceramic Tile FAB&DELIV 25 25 0 27SEP11 31OCT11 14MAY12 18JUN12 Fab & Deliver Ceramic Tile 113100 F&D Fab & Deliver Appliances FAB&DELIV 40 40 0 27SEP11 21NOV11 23MAY12 19JUL12 Fab & Deliver Appliances 064023 F&D Fab & Deliver 1st Floor Millwork FAB&DELIV 30 30 0 04OCT11 14NOV11 03APR12 14MAY12 Fab & Deliver 1st Floor Millwork 064025 F&D Fab & Deliver Epoxy Tops FAB&DELIV 50 50 0 04OCT11 14DEC11 05APR12 14JUN12 Fab & Deliver Epoxy Tops 064024 F&D Fab & Deliver 2nd Floor Millwork FAB&DELIV 30 30 0 04OCT11 14NOV11 24APR12 05JUN12 Fab & Deliver 2nd Floor Millwork 27&28 F&D Fab & Deliver Division 27 & 28 FAB&DELIV 50 50 0 11OCT11 21DEC11 07DEC11 16FEB12 Fab & Deliver Division 27 & 28 075216 F&D Fab & Deliver Roofing Systems, trim & accessorie FAB&DELIV 40 40 0 11OCT11 07DEC11 12DEC11 07FEB12 074243 F&D Fab & Deliver Composite Wall Panels FAB&DELIV 40 40 0 11OCT11 07DEC11 30JAN12 23MAR12 Fab & Deliver Composite Wall Panels 122413 F&D Fab & Deliver Window Coverings FAB&DELIV 45 45 0 11OCT11 14DEC11 28FEB12 30APR12 Fab & Deliver Window Coverings Fab & Deliver Electrical & Spec. System Matl's COORDINATE STAGGARED DELIVERY OF MATERIALS AS REQUIRED PER UPDATED SCHEDULE COORDINATE DELIVERY AS REQUIRED BY SCHEDULE Fab & Deliver Roofing Systems, trim & accessorie NOTE: ROOF ACCESSORIES MAY BE REQUIRED SOONER TO COORDINATE INSTALLATION WITH DECKING COORDINATE WITH GRID FOR ROUGH IN Start Date Finish Date Data Date Run Date 19JUN11 10AUG12 20JUN11 06JUL11 12:49 Early Bar Float Bar Progress Bar Critical Activity © Primavera Systems, Inc. 1113 CM Company, Inc. Sheet 20 of 21 Date Revision 05JUL11Bid Schedule Ontario Middle School Building Addition Bid Schedule The First Thing We Build, Is Your Trust CheckedApproved JP B:2 Project Schedule Activity ID See "Bid Schedule Clarifications" after last page of the schedule Activity Description AREA Orig Rem Dur Dur % Early Start Early Finish Late Start Late Finish J J 06JUL11 12:49 A 2011 S O N D J F M 2012 A M 099100 F&D Fab & Deliver Painting Matls FAB&DELIV 15 15 0 11OCT11 31OCT11 03APR12 23APR12 Fab & Deliver Painting Matls 105113 F&D Fab & Deliver Lockers 1st Floor FAB&DELIV 45 45 0 11OCT11 14DEC11 23APR12 25JUN12 Fab & Deliver Lockers 1st Floor 096813 F&D Fab & Deliver Floor Covering Materials FAB&DELIV 40 40 0 11OCT11 07DEC11 24APR12 19JUN12 Fab & Deliver Floor Covering Materials 105114 F&D Fab & Deliver Lockers 2nd Floor FAB&DELIV 45 45 0 11OCT11 14DEC11 30APR12 02JUL12 Fab & Deliver Lockers 2nd Floor 084413 ORD Order Aluminum Materials for Local Fabrication FAB&DELIV 25 25 0 18OCT11 21NOV11 15DEC11 20JAN12 10000 F&D Fab & Deliver Division 10 Specialties FAB&DELIV 30 30 0 08NOV11 21DEC11 31MAY12 12JUL12 084413 F&D Field Measure & Fabricate Alum Sf & Curtain Wall FAB&DELIV 25 25 0 22NOV11 29DEC11 23JAN12 Start Date Finish Date Data Date Run Date 19JUN11 10AUG12 20JUN11 06JUL11 12:49 Early Bar Float Bar Progress Bar Critical Activity © Primavera Systems, Inc. 1113 CM Company, Inc. 24FEB12 J J A Order Aluminum Materials for Local Fabrication Fab & Deliver Division 10 Specialties Field Measure & Fabricate Alum Sf & Curtain Wall Sheet 21 of 21 Date Revision 05JUL11Bid Schedule Ontario Middle School Building Addition Bid Schedule The First Thing We Build, Is Your Trust CheckedApproved JP ADDENDUM Date: June 30, 2011 Addendum #: Two Project: Ontario Middle School Classroom/Administration Addition Project #: 10038.01 Address: 573 Southwest 2nd Avenue, Ontario, OR File Code: 2-b BIDS DUE Time: 3 pm (MST) Date: July 12, 2011 Place: Ontario School District Office Board Room Address: 195 Southwest 3rd Avenue City, State: Ontario, OR To All Planholders: Please notify everyone concerned as your sub-contractors and suppliers of the issuance and contents of this addendum prior to date of bid opening. SPECIFICATIONS Architectural: Section 071900 – Water Repellents • 2.1.A.1: Revise to read: — "1. All exterior brick masonry and accents shall receive Prosoco Blok-Guard and Graffiti Control.” Section 084113 • 2.1.A: Replace '651T, center glaze,' with '651T, offset system,'. Section 105113 • Clarification: All lockers are half-high per drawing details. No additional interior shelves are to be provided in each locker. ADA requirements will be met by these lockers and/or existing lockers to remain. Section 107113 • 2.1.A.1.: Revise phone number from '208-489-0016' to '509-893-0750'. Mechanical: Section 210000: • Clarification: 'Main first floor corridor' referenced for locations where flush mounted sprinkler heads shall be installed includes the following Corridors: 102, 103, 135, and 151. Electrical: Section 260923 - Lighting Control Devices: • Clarification: Section 2.3 LIGHTING CONTROL SYSTEM applies to the lighting Control Panel for the hallways, building exterior and site and other spaces where the lighting is routed via the Lighting Control Panel. This section does not apply to the classroom and lab controls indicated in the plans and referencing details E1 and E4 on sheet E8.0. RE: E8.0-E1 and E4 for lighting control requirements in the classrooms and labs. 10038-01 AD02 063011 CHdt.doc LCA Architects 1221 Shoreline Ln. Boise, ID 83702 ph: 208.345.6677 PAGE 1 OF 7 fx: 208.344-9002 Ontario Middle School/10038.01 ADDENDUM #Two SPECIFICATIONS (CONT’D) Electrical: (Cont’d) Section 260923 - Lighting Control Devices: (cont’d) • Clarification: Section 2.5 OCCUPANCY SENSORS applies to all occupancy sensors within the project. The sensor, system, and commissioning information for the classroom and lab lighting control systems indicated in details E1 and E4 on sheet E8.0 provide additional system requirements in regards to the controls in classrooms and labs. These requirements are in addition to and supersede the requirements of section 2.5 where there is a conflict. The manufactures indicated in 2.5-C do not apply to the classroom and lab control system or its components. See details E1 and E4 on sheet E8.0 for approved manufactures of classroom and lab lighting controls. Section 271500 - Telecommunications Cabling: • • • • • • • • • • • Paragraph 1.3-D-11 shall refer to the Current adopted version of the Oregon Electrical Specialty Code. Paragraph 1.4 Installer Qualifications, add section D as follows: D. Installing contractor shall be fully certified by TE Connectivity at the time of bid so that a full performance warranty can be provided. Revise portions of Paragraph 1.5 as noted below: A. 4-pair UTP Cable: Amp Category 6 Cable (Plenum/Non-Plenum/Limited Combustible). Outer cable shield shall be White in color. No substitutions. B. Optical Fiber Cable manufacture: Corning. No substitutions. C. UTP connector product manufacture: AMP/Tyco Electronics. No substitutions D. Fiber Optic cabinet product manufacture: Corning. No substitutions E. Fiber Optic connectors/splices/couplers: Corning. No substitutions F. Rack and Cabinet manufacture: Chatsworth or approved equal. H. UTP Patch Cord Manufacture: Amp Category 6 Cable. No substitutions. Add Paragraph 1.6-A-B-10 10. Installation of Aruba Wireless Access Points, related hardware and cabling. The hardware shall be installed with warrantee by the contractor. The Licensing and configuration shall be by the owner. Revise Paragraph 2.5-3-a a. AMP/Tyco Electronics. No substitutions Revise Paragraph 2.6-A-3-a a. Corning cable 62.5/125 micron fiber (12-strand). No substitutions. Revise Paragraph 2.7-B B. Fiber optic connection type. ALL fiber optic connectors shall be SC type. Delete Paragraphs 2.7-C ST Fiber Optic Connectors and 2.7-B LC Fiber Optic Connectors Maintain Paragraph 2.7-C SC Fiber Optic Connectors. Modify 2.7-C-2-a to be “Corning SC Fiber Optic Connectors”. No substitutions. Revise portions of Paragraph 2.9-A-1 as noted below: 1. White in color. 2. be AMP category 6 patch cord with boots. No substitutions Add Paragraph 2.12 2.12 WIRELESS ACCESS POINTS A. Provide the following hardware and install in available space indicated as “Owner Supplied Equipment” on the Rack detail. Refer to the plans. 1. Provide (1) Aruba 3200 Controller, 8 AP SUPPORT, part #3200-8-US. No substitutions 2. Provide (1) AC Power Cord, North America Version, part # PC-AC-NA. No substitutions. 3. Provide (1) HP ProCurve 3500yl PoE 24 Port Switch, part #J8692A#ABA. No substitutions. 10038-01 AD02 063011 CHdt.doc LCA Architects 1221 Shoreline Ln. Boise, ID 83702 ph: 208.345.6677 PAGE 2 OF 7 fx: 208.344-9002 Ontario Middle School/10038.01 ADDENDUM #Two SPECIFICATIONS (CONT’D) Electrical: (Cont’d) Section 271500 - Telecommunications Cabling: (Cont’d) B. Provide the following equipment at locations indicated on the plans as wireless access points. The wireless access points shall be connected to the Aruba Controller via the HP POE switch. 1. (1) Aruba 105 Wireless Access Point (Dual Radio), part #AP-105. No substitutions 2. (1) Aruba 105 Wireless Access Point Mounting Kit, part #AP-105-MNT. No substitutions. 3. Cabling to Equipment. Section 282300 - Video Surveillance: • Section 2.4 – Exterior cameras shall be IP based, fixed position, color, day/night auto-iris. Cameras shall be installed in a weather proof, vandal resistant, housing and shall include a heater and blower system. Provide 120-Volt connection for the heater, including all conduit, boxes and conductors required. DRAWINGS Architectural: A2.7FA and A2.7FB: • Finish Legend: Add ‘RF3 = Rubber Floor (096519). See attached sketch AD2-A2.7FB-1. A3.0: • • • First Floor Door and Frame Schedule. Revise schedule information for each door as noted: — Door 101A: Revise Hardware Group from '35' to '34'. — Door 103: Revise Glass from '--' to '1'. — Door 113: Revise Frame Type from 'U' to 'L1'. — Door 131: Revise Frame Type from 'AP' to 'AQ'. Second Floor Door and Frame Schedule. Revise schedule information for each door as noted: — Door 206B: Revise Frame Type from 'AP' to 'AN'. Existing Gymnasium Door and Frame Schedule. Revise schedule information for each door as noted: — Door 308A: Revise Frame Type from 'AP' to '(E)'. — Door 308B: Revise Frame Type from 'AP' to '(E)'. — Door 308C: Revise Frame Type from 'AP' to '(E)'. — Door 320A: Revise Remarks from ‘9’ to ‘—‘. — Door 321A: Revise Remarks from ‘9’ to ‘—‘. — Door 331: Revise Facing Finish from 'P' to '(E)'. Sheet A3.2: • Second Floor Door & Frame Schedule: — Revise Frame Type and Door Mark 206B to read “AN”. Sheet A3.4: • Detail B4: — Add note to read: 'Provide structural reinforcing by 084413 at 4" gap between horizontal mullions as required to transfer loads of glazing and vertical mullions above. All reinforcing/framing and connections/fasteners shall be concealed behind closures noted with Keynote 3.' — Provide tube steel structural support at the door openings at Frame Type ‘AC.’ See attached sketch AD2A3.4-1. Structural: Sheets S1.03A and S1.03B • Detail 1/S8.03 shall apply to framing above all windows along gridline A that are wider than 12’-0”. 10038-01 AD02 063011 CHdt.doc LCA Architects 1221 Shoreline Ln. Boise, ID 83702 ph: 208.345.6677 PAGE 3 OF 7 fx: 208.344-9002 Ontario Middle School/10038.01 ADDENDUM #Two DRAWINGS (CONT’D) Mechanical: Sheet M5.1: • • Packaged Air Conditioning Schedule, REMARK 8, remove “Micrometl welded isolation rails.” For MS-RTU-204, 209, 215, and 218 (all 2 ton units), change SUPPLY FAN DRIVE callout to “DIRECT” and the EER listed for these units shall be changed to SEER. Sheet P6.1: • Plumbing Fixture Schedule. Delete chrome plated tailpiece and stainless steel grid strainer. Please provide polypropylene acid waste tailpiece at the following sinks: S-3 and S-4 where an epoxy strainer is integral to the sink. Sheet P6.1: • Plumbing Fixture Schedule. Please provide vandal resistant screw driver stop valves for sink S-4. Sheet P2.1B: • Plumbing First Floor Plan – Area B. Provide a 24”X24”X30”deep sump in elevator hoistway. See sheet A9.6 for construction of sump.(See attached MSK-1) Sheets P2.2A and P2.2B: • Provide ACID waste and ACID vent piping for all sinks (S-3). Provide ACID waste and ACID vent piping for Storage/Prep. sinks (S-4). Provide ACID waste and ACID vent piping for Storage/Prep. floor sink (FS-1). Provide ACID waste and ACID vent piping for Emergency Eye Wash (EYE-1). Provide ACID waste and ACID vent piping for floor drain (FD-1) at emergency shower (ES-1). Sheet P5.1: • Floor Cleanout (FCO) Detail. All floor cleanouts exposed shall be flush with the top of floor slab. Electrical: Sheet E4.1A: • The following Classrooms shall have two occupancy sensors in each room. The occupancy sensors shall be located for maximum coverage per the manufactures recommendations: 107 and 108. Sheet E4.1B: • The following Classrooms shall have two occupancy sensors in each room. The occupancy sensors shall be located for maximum coverage per the manufactures recommendations: 139, 140, 141, 145, 148, 149, and 150. Sheet E4.2A: • The following Classrooms shall have two occupancy sensors in each room. The occupancy sensors shall be located for maximum coverage per the manufactures recommendations: 201, 204, 205, 207, 208, and 212. Sheet E4.2B: • The following Classrooms shall have two occupancy sensors in each room. The occupancy sensors shall be located for maximum coverage per the manufactures recommendations: 221, 222, 223, 224, 225, 226, and 227. Sheet E6.1A: • Modify Keyed Note #19 to read: “19. CEILING MOUNTED WIRELESS ACCESS POINT. QUANTITY OF CAT 6 CABLES INDICATED TO DATA RACK(S). CABLE TO BE ROUTED VIA THE POE SWITCH AND CONNECTED TO THE ARUBA CONTROLLER PER THE MANUFACTURES INSTALLATION REQUIREMENTS. COORDINATE THE MOUNTING OF THE ACCESS POINT WITH THE CEILING/STRUCTURE.” 10038-01 AD02 063011 CHdt.doc LCA Architects 1221 Shoreline Ln. Boise, ID 83702 ph: 208.345.6677 PAGE 4 OF 7 fx: 208.344-9002 Ontario Middle School/10038.01 ADDENDUM #Two DRAWINGS (CONT’D) Electrical: (Cont’d) Sheet E6.1B: • Modify Keyed Note #8 to read: “8. CEILING MOUNTED WIRELESS ACCESS POINT. QUANTITY OF CAT 6 CABLES INDICATED TO DATA RACK(S). CABLE TO BE ROUTED VIA THE POE SWITCH AND CONNECTED TO THE ARUBA CONTROLLER PER THE MANUFACTURES INSTALLATION REQUIREMENTS. COORDINATE THE MOUNTING OF THE ACCESS POINT WITH THE CEILING/STRUCTURE.” Sheet E6.1B: (Cont’d) • • Previously issued ESK-5 (part of Addendum #1) is to refer to sheet E6.1B in lieu of E4.1B. The exterior cameras indicated by keyed notes 2 & 8 shall be indicated by keyed notes 2 & 9, typical of eight locations. Sheet E6.2A: • Modify Keyed Note #11 to read: “11. CEILING MOUNTED WIRELESS ACCESS POINT. QUANTITY OF CAT 6 CABLES INDICATED TO DATA RACK(S). CABLE TO BE ROUTED VIA THE POE SWITCH AND CONNECTED TO THE ARUBA CONTROLLER PER THE MANUFACTURES INSTALLATION REQUIREMENTS. COORDINATE THE MOUNTING OF THE ACCESS POINT WITH THE CEILING/STRUCTURE.” Sheet E6.2B: • Modify Keyed Note #7 to read: “7. CEILING MOUNTED WIRELESS ACCESS POINT. QUANTITY OF CAT 6 CABLES INDICATED TO DATA RACK(S). CABLE TO BE ROUTED VIA THE POE SWITCH AND CONNECTED TO THE ARUBA CONTROLLER PER THE MANUFACTURES INSTALLATION REQUIREMENTS. COORDINATE THE MOUNTING OF THE ACCESS POINT WITH THE CEILING/STRUCTURE.” Sheet E7.0: • • Modify location of transformer for this building. RE: ESK-7 Conduit stub ups provided under the site package are installed per sheet E7.0S of the site package; stubbed to within the building. Sheet E8.0 Details E1 & E4: • • • • • Each Classroom or lab shall have two occupancy sensors LMDC-100. The location of the sensors indicated on the floor plans are for reference. The contractor shall locate the occupancy sensors per the manufactures recommendations such that the occupancy sensors activate the lighting when an occupant is less than two feet into the room. The sensitivity settings and operation shall be part of the factory commissioning of the system. The dual technology sensors shall require both technologies to active the lighting but require PIR only to maintain the lighting ON, the Ultra-sonic technology shall then be deactivated to eliminate conflicts with the classroom projector systems. The time out function of the PIR shall be set at 20 minutes with a warn-off at 19 minutes. In the event the lighting is manually turned off, it shall require manual ON until the PIR timeout period, at which time system is returned to unoccupied mode. Clarification - Detail General Note 1: The lighting control system for each classroom or lab shall operate as a stand-alone system and all of the classroom and lab systems shall be networked together and connected to a central control location allowing the owner to adjust individual device settings of each device throughout the project from one location. Provide all cabling, components, and software required. Operation of the networked system is to be included in the owner training. Detail General Note 5 is added as follows: The photocell shall be installed and adjusted per the manufactures recommendations. The photocell(s) shall be adjusted to maintain a minimum lighting level equal to the lighting levels when the lights are at 100% brightness with no supplemental contribution. Photocell commissioning shall include adjustments to the setting during both daytime and nighttime hours to ensure proper lighting levels are maintained. 10038-01 AD02 063011 CHdt.doc LCA Architects 1221 Shoreline Ln. Boise, ID 83702 ph: 208.345.6677 PAGE 5 OF 7 fx: 208.344-9002 Ontario Middle School/10038.01 ADDENDUM #Two APPROVALS: Approvals are based on manufacturers only. Contractors are responsible for bidding on approved equipment equivalent in size and performance to that specified. Contractor is also responsible for all special electrical, mechanical, or other field adaptations required for equipment or items used other than that shown in the original project design. All mechanical and electrical equipment shall bear the UL label. Architectural: Exterior Sun Control Devices (Must match indicated profiles or profiles approved by Architect.): • • Doralco ASCM, Inc. Rubber Tile Flooring: • Terranova by Mondo Flooring Visual Display Surfaces: • • Marker & Tack Boards: DTS Series by Platinum Visual Marker & Tack Boards: Newline Products, Inc. Wall and Door Protection (Must meet special warranty requirements): • Corner Guards: Alpar Flush Wood Doors: • Vancouver Door solid core doors Aluminum-Framed Entrances and Storefronts: • • Pacific Aluminum T700 Pacific Aluminum 500HW Glazed Aluminum Curtain Walls: • Pacific Aluminum 8590 Curtainwall Mechanical: Vitreous Plumbing Fixtures: • Sloan Linear Slot Diffuser: • Anemostat, Carnes, J&J Register, Tuttle & Bailey, Nailor, Metal-aire, Krueger and Price Packaged Air Conditioning Units: • York Electrical: Lighting Controls for classrooms, RE: E8.0-E1 and E4: • • nLight by Acuity Brands Lightolier Controls Light Fixtures, RE:E9.1 • • • • • • • • • • • Type B1A – H.E. Williams 76 Series Type B2A - H.E. Williams 76 Series Types DI4B – Ledalite Sona Series, Finelite 12-ID Series, Alera Lighting CVL Series, Corelite I2 Series Type DI4D - Ledalite Sona Series, Finelite 12-ID Series, Alera Lighting CVL Series, Corelite I2 Series Type DI8D - Ledalite Sona Series, Finelite 12-ID Series, Alera Lighting CVL Series, Corelite I2 Series Type DI12B - Ledalite Sona Series, Finelite 12-ID Series, Alera Lighting CVL Series, Corelite I2 Series Type DI16B - Ledalite Sona Series, Finelite 12-ID Series, Alera Lighting CVL Series, Corelite I2 Series Type DI20D – Ledalite Sona Series, Finelite 12-ID Series, Alera Lighting CVL Series, Corelite I2 Series Type DI24B – Ledalite Sona Series, Finelite 12-ID Series, Alera Lighting CVL Series, Corelite I2 Series Type FF1A – H.E. Williams 50 Series Type FF2A – H.E. Williams 50 Series 10038-01 AD02 063011 CHdt.doc LCA Architects 1221 Shoreline Ln. Boise, ID 83702 ph: 208.345.6677 PAGE 6 OF 7 fx: 208.344-9002 Ontario Middle School/10038.01 ADDENDUM #Two APPROVALS (CONT’D) Electrical: (Cont’d) Light Fixtures, RE:E9.1 (cont’d): • • • • • • • • • • Type GF1 – H.E. Williams 50 Series Type GF2B – H.E. Williams 50 Series Type LED – Jesco DL Series, Tokistar Lighting TLP-50 Series Type RC1 – Lightolier 2001 Series, Indy FD14 Series, Atlantic Lighting A45113E1 Type RC3 – Lightolier 330X Series, Contrast Lighting 3000 Series Type VF1 – H.E. Williams HET Series, Columbia Lighting, EPC Series Type VF2 – H.E. Williams HET Series, Columbia Lighting, EPC Series Type WB1B – H.E. Williams 29 Series Type WB2B – H.E. Williams 29 Series Type WPA – Trace-Lite TL110A Series, AccuLite DT Series, Hubbell Lighting TRP Series Lighting Control System – Specification Section 260923-2.3-D • Hubbell Building Automation Occupancy Sensors – Specification Section 260923-2.5-C • Hubbell Building Automation Video Surveillance – Specification Section 282300 • • Interior Cameras (282300-2.3-A) — Bosch, Samsung Exterior Cameras (282300-2.4-A) — Bosch, Samsung ATTACHMENT LIST Sketch sheets AD2-A2.7FB-1, AD2-A3.4-1, MSK-1, and ESK-7 10038-01 AD02 063011 CHdt.doc LCA Architects 1221 Shoreline Ln. Boise, ID 83702 ph: 208.345.6677 PAGE 7 OF 7 fx: 208.344-9002 ARCHITECTURE ~ PLANNING ~ INTERIOR DESIGN 1221 Shoreline Lane Boise, Idaho 83702 PHONE: (208) 345-6677 FAX: (208) 344-9002 COPYRIGHT 2011 All rights reserved. Reproduction or use in any form or by any means -graphic, electronic, mechanical, etc. -- without written permission of LCA ARCHITECTS is unlawful and subject to criminal prosecution. ARCHITECTURE ~ PLANNING ~ INTERIOR DESIGN 1221 Shoreline Lane Boise, Idaho 83702 PHONE: (208) 345-6677 FAX: (208) 344-9002 COPYRIGHT 2011 All rights reserved. Reproduction or use in any form or by any means -graphic, electronic, mechanical, etc. -- without written permission of LCA ARCHITECTS is unlawful and subject to criminal prosecution. 1114 Ontario High School, 1113 Ontario Middle School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onstruction Managers General Contractors PWC-C-10654 Unlimited 1, 2, 3 RCE 1245 Oregon #62774, LBPR 6227 Washington #600 626 741 431 W. McGregor Drive Boise, Idaho 83705 208 384-0800 RFI To: Casey Huse LCA Architects 1221 Shoreline Ln Boise, ID 83702 PH: 208-345-6677 RFI No.: 04 - Prebid Date: 6/21/2011 Fax: 208-344-9002 Job: Ontario Middle School Addition Job Phone: Subject: Structural for Curtain Wall Entries Drawing: Spec Section: If this RFI creates a cost / schedule impact on your firm / scope of work, you must notify CM Company, Inc., in writing, within 5 business days of receipt of this RFI. Any additional costs received after this date will be rejected. Request: Date Required: 6/29/2011 See the attached RFI from Architectural Glass & Glazing: There are some problems with the Curtainwall entries in regards to the structural problems the AA and AC openings. There is a horizontal steel beam to aid with the wind loading but there is nothing there to aid with the dead loading especially with vertical door frames not extending past the door header and the verticals above the door openings landing in the middle of the door openings; please advise. Tom Reeder, Architectural Glass & Glazing Submitted by: Jackie Phelps Response: Per conversation with Paul Cannon with Kawneer and Frame Type AA is fine as is. Type AC will require an additional 4x4 tube steel beam at the door head to be supported by the tube columns on either side of the vestibule. The beam will need to be 15'-10”. Answered by: Posted Answered date: Page 1 of 1 Rev 06/14/11 Construction Managers General Contractors PWC-C-10654 Unlimited 1, 2, 3 RCE 1245 Oregon #62774, LBPR 6227 Washington #600 626 741 431 W. McGregor Drive Boise, Idaho 83705 208 384-0800 RFI To: Casey Huse LCA Architects 1221 Shoreline Ln Boise, ID 83702 PH: 208-345-6677 RFI No.: 05 - Prebid Date: 6/21/2011 Fax: 208-344-9002 Job: Ontario Middle School Addition Job Phone: Subject: AR Slope Glazing System Drawing: Spec Section: If this RFI creates a cost / schedule impact on your firm / scope of work, you must notify CM Company, Inc., in writing, within 5 business days of receipt of this RFI. Any additional costs received after this date will be rejected. Request: Date Required: 6/29/2011 See attached RFI from Architectural Glass & Glazing: If I'm seeing this correctly opening AR slope glazing system once glazed will have no access above the system thus no way of applying the pressure plate and beauty caps. Please advise. Submitted by: Jackie Phelps Response: There will be access to the top of the sloped glazing from the Lobby 101 side. Answered by: A.Townsend Posted Answered date: 06/28/11 Page 1 of 1 Rev 06/14/11 Construction Managers General Contractors PWC-C-10654 Unlimited 1, 2, 3 RCE 1245 Oregon #62774, LBPR 6227 Washington #600 626 741 431 W. McGregor Drive Boise, Idaho 83705 208 384-0800 RFI To: Alexis Townsend LCA Architects 1221 Shoreline Ln Boise, ID 83702 PH: 208-345-6677 RFI No.: 06 - Pre Bid Date: 6/21/2011 Fax: 208-344-9002 Job: Ontario Middle School Addition Job Phone: Subject: AN Type HM Frame rated for 3 hours Drawing: Spec Section: If this RFI creates a cost / schedule impact on your firm / scope of work, you must notify CM Company, Inc., in writing, within 5 business days of receipt of this RFI. Any additional costs received after this date will be rejected. Request: Date Required: See attached RFI from Architectural Glass & Glazing "The AN type hollow metal frame rated at 3 hours; where is this located? Submitted by: Jackie Phelps Response: This will be clarified as part of Add. #2. Frame Type "AN" occurs at opening 206B. Answered by: A.Townsend Posted Answered date: 06/27/11 Page 1 of 1 Rev 06/14/11 Construction Managers General Contractors PWC-C-10654 Unlimited 1, 2, 3 RCE 1245 Oregon #62774, LBPR 6227 Washington #600 626 741 431 W. McGregor Drive Boise, Idaho 83705 208 384-0800 RFI To: Casey Huse LCA Architects 1221 Shoreline Ln Boise, ID 83702 PH: 208-345-6677 RFI No.: 07 - Pre Bid Date: 6/21/2011 Fax: 208-344-9002 Job: Ontario Middle School Addition Job Phone: Subject: Curtain Wall - Sunshades Drawing: Spec Section: If this RFI creates a cost / schedule impact on your firm / scope of work, you must notify CM Company, Inc., in writing, within 5 business days of receipt of this RFI. Any additional costs received after this date will be rejected. Request: Date Required: See attached RFI from Architectural Glass & Glazing: The sunshades located above the doors in the AC opening have a 48" deep sunshade that ties around the corner in to the AD opening; Kawneer has a sunshade system that anchors into the Curtainwall system. The maximum depth they can do is a 36" deep; see attached details from Kawneer for this application. Submitted by: Jackie Phelps Response: The sunshade is specified under 107113. the curtainwall manufacturer. Answered by: A.Townsend Posted It is not required to be by Answered date: 06/27/11 Page 1 of 1 Rev 06/14/11 Construction Managers General Contractors PWC-C-10654 Unlimited 1, 2, 3 RCE 1245 Oregon #62774, LBPR 6227 Washington #600 626 741 431 W. McGregor Drive Boise, Idaho 83705 208 384-0800 RFI To: Casey Huse LCA Architects 1221 Shoreline Ln Boise, ID 83702 RFI No.: 08 - Pre Bid Date: 6/23/2011 Job: Ontario Middle School Addition PH: 208-345-6677 Fax: 208-344-9002 CC: David Moe; Jim Stubbs; Anna Ellis; Jackie Phelps; Nicole Job Phone: 541-889-4843 (job trailer) 208-941-4543 (Jim Stubbs) Calzacorta; Casey Huse, Alexis Subject: Kawneer 651 T Center Glazed System Needs Changed to Offset Drawing: Addendum 1 - 084113 Spec Section: If this RFI creates a cost / schedule impact on your firm / scope of work, you must notify CM Company, Inc., in writing, within 5 business days of receipt of this RFI. Any additional costs received after this date will be rejected. Request: Date Required: Please refer to attached RFI from D&A Glass: "Per Addendum #1 Section 084113 revised as Kawneer 651T Center Glazed system does not exist as per Paul Cannon (801-201-1080) from Kawneer. 651 T has an offset system; please advise." Note: corresponding ".dwg" files will be forwarded under a separate email. Submitted by: Jackie Phelps CM Company, Inc. Response: Per Addendum 2: Section 084113 • 2.1.A: Replace '651T, center glaze,' with '651T, offset system,'. Answered by: Posted Answered date: Page 1 of 1 Rev 06/14/11 Construction Managers General Contractors PWC-C-10654 Unlimited 1, 2, 3 RCE 1245 Oregon #62774, LBPR 6227 Washington #600 626 741 431 W. McGregor Drive Boise, Idaho 83705 208 384-0800 RFI To: Casey Huse LCA Architects 1221 Shoreline Ln Boise, ID 83702 PH: 208-345-6677 Fax: 208-344-9002 CC: Alexis Townsend, Thad Mason, Anna Ellis, Jim Stubbs, James Lovejoy Subject: clarification on the outdoor cameras Drawing: RFI No.: 09 - Prebid Date: 6/24/2011 Job: Ontario Middle School Addition Job Phone: 541-889-4843 (job trailer) 208-941-4543 (Jim Stubbs) Spec Section: 1337399, 1337419 If this RFI creates a cost / schedule impact on your firm / scope of work, you must notify CM Company, Inc., in writing, within 5 business days of receipt of this RFI. Any additional costs received after this date will be rejected. Request: Date Required: 6/29/2011 See attached RFI from Allied General dated 6/24/11: I would like clarification on the outdoor cameras at both of the Ontario School projects. (1337399, 1337419). Looking at the prints, the symbol for the outdoor ameras are shown as fixed. While reading the specifications (282300-3) they are stating Spectra IV series (or equal) cameras which are a PTZ controllable camera. The price difference is around $1200.00ea between the two. Please let me know which is applicable so we can proceed with our bids Submitted by: Jackie Phelps CM Company, Inc. Response: Exterior cameras shall be IP based, fixed position, color, day/night auto-iris. Cameras shall be installed in a weather proof, vandal resistant, housing and shall include a heater and blower system. Provide 120-Volt connection for the heater, including all conduit, boxes and conductors required. Answered by: Kurt Lechtenberg, Musgrove Engineering Posted Answered date: 7/1/11 Page 1 of 1 Rev 06/14/11 Construction Managers General Contractors PWC-C-10654 Unlimited 1, 2, 3 RCE 1245 Oregon #62774, LBPR 6227 Washington #600 626 741 431 W. McGregor Drive Boise, Idaho 83705 208 384-0800 RFI To: Casey Huse LCA Architects 1221 Shoreline Ln Boise, ID 83702 PH: 208-345-6677 Fax: 208-344-9002 CC: Alexis Townsend, Marty Qwinowski, Anna Ellis, Jim Stubbs, James Lovejoy RFI No.: 10 - Pre Bid Date: 6/29/2011 Job: 1113 Ontario Middle School Addition Job Phone: 541-889-4843 (job trailer) 208-941-4543 (Jim Stubbs) Subject: Fire Sprinkler Heads at Main Entry and Main First Floor Corridor Drawing: Spec Section: 210000 Part 2.2A-12 If this RFI creates a cost / schedule impact on your firm / scope of work, you must notify CM Company, Inc., in writing, within 5 business days of receipt of this RFI. Any additional costs received after this date will be rejected. Request: Date Required: 6/29/2011 Submitted by Viking Sprinkler - Brett Lawatch (brett.lawatch@vikingsprinkler.net ) In section 210000 – Fire Sprinkler Systems, part 2.2-A-12 states, “Sprinkler heads in the main entry and main first floor corridor shall be concealed flush mounted style with white paintable covers.” My question: What qualifies as “main first floor corridor?” I would assume it is Corridor 151. However it merges together with Corridors 135 and 102 right next to the main entry of the school. Could you please clarify this for me? Submitted by: Jackie Phelps CM Company, Inc. Response: Per addendum 2" Section 210000: • Clarification: 'Main first floor corridor' referenced for locations where flush mounted sprinkler heads shall be installed includes the following Corridors: 102, 103, 135, and 151. Answered by: Posted Answered date: Page 1 of 1 Rev 06/14/11 Construction Managers General Contractors PWC-C-10654 Unlimited 1, 2, 3 RCE 1245 Oregon #62774, LBPR 6227 Washington #600 626 741 431 W. McGregor Drive Boise, Idaho 83705 208 384-0800 RFI To: RFI No.: 11 - Prebid Date: 6/29/2011 PH: Fax: CC: Subject: Scope Conflict; Electrical Conduit Drawing: E7.0S, E7.0 Job: 1113 Ontario Middle School Addition Job Phone: 541-889-4843 (job trailer) 208-941-4543 (Jim Stubbs) Spec Section: If this RFI creates a cost / schedule impact on your firm / scope of work, you must notify CM Company, Inc., in writing, within 5 business days of receipt of this RFI. Any additional costs received after this date will be rejected. Request: Date Required: Submitted by Dave Bonner; NEI Sheet E7.0S (under separate contract) shows conduits being stubbed within this new Classroom Building by Site contractor. Sheet E7.0 shows those same conduits to be stubbed short of the building… to be intercepted and extended inside the building. CM has given verbal direction to us instruction on E7.0 - stubbed short of the building. Please verify this is correct. Submitted by: Jackie Phelps CM Company, Inc. Response: Conduits are stubbed into the building under the early site work currently under contract as shown on E7.0S. Answered by: Posted Answered date: Page 1 of 1 Rev 06/14/11 Construction Managers General Contractors PWC-C-10654 Unlimited 1, 2, 3 RCE 1245 Oregon #62774, LBPR 6227 Washington #600 626 741 431 W. McGregor Drive Boise, Idaho 83705 208 384-0800 RFI To: Casey Huse LCA Architects 1221 Shoreline Ln Boise, ID 83702 PH: 208-345-6677 Fax: 208-344-9002 CC: Alexis Townsend, James Lovejoy, Anna Ellis Subject: Hardware Conflicts Drawing: A1.0, A3.0 RFI No.: 12 Date: 6/29/2011 Job: 1113 Ontario Middle School Addition Job Phone: 541-889-4843 (job trailer) 208-941-4543 (Jim Stubbs) Spec Section: If this RFI creates a cost / schedule impact on your firm / scope of work, you must notify CM Company, Inc., in writing, within 5 business days of receipt of this RFI. Any additional costs received after this date will be rejected. Request: Date Required: Please see the attached RFI from Architectural Building Supply requesting hardware clarifications. Thank you. Submitted by: Jackie Phelps CM Company, Inc. Response: See Addendum 2 page 3. Answered by: Posted Answered date: Page 1 of 1 Rev 06/14/11 Construction Managers General Contractors PWC-C-10654 Unlimited 1, 2, 3 RCE 1245 Oregon #62774, LBPR 6227 Washington #600 626 741 431 W. McGregor Drive Boise, Idaho 83705 208 384-0800 RFI To: Casey Huse LCA Architects 1221 Shoreline Ln Boise, ID 83702 RFI No.: 13 - Pre Bid Date: 6/29/2011 Job: 1113 Ontario Middle School Addition PH: 208-345-6677 Fax: 208-344-9002 CC: Alexis Townsend, Jonathan Knopp, James Lovejoy, Anna Job Phone: 541-889-4843 (job trailer) 208-941-4543 (Jim Stubbs) Ellis Subject: Steel Erection Clarifications Drawing: As stated in question Spec Section: If this RFI creates a cost / schedule impact on your firm / scope of work, you must notify CM Company, Inc., in writing, within 5 business days of receipt of this RFI. Any additional costs received after this date will be rejected. Request: Date Required: See attached RFI submitted by Engleman Steel Erection, Inc.; please address engineering items, CM will address scope items. Thank you. Submitted by: Jackie Phelps CM Company, Inc. Response: Item #1 CM Comment: Relief angle is only shown above windows, and this angle will be installed by the steel erector. See Sheet A3.3 for additional details. LCA Comment: No relieving angles in veneer. We are within recommended tolerances Item #2 & #3 CM Comment: All fall protection shall be provided Bid Package # 10. The steel erector shall receive all elements that require welding from the Bid Package 10 contractor and weld in place. LCA Comment: - Fall protection shall be installed per manufacturer requirements (welded or bolted), attached to provided steel structure. Item #4 Provide as specified. Item #5: Correct. Item #6: 12 ga closure plates at window heads are non-structural fascia pieces. They are to be provided and installed by Bid Package 16, Metal Framing, Gypsum Board, Insulation & Acoustical Systems. Answered by: Huse, LCA Architects & James Lovejoy, CM Company, Inc. Answered date: Answered by: Casey Posted Page 1 of 1 Rev 06/14/11 JLIn 29 11 02:21 p 208-333-0860 Engleman· Steel Inc. p.1 ENGLEMAN STEEL ERECTION, INC. 671 N. Morningside Way, Boise, ldaho 83712 PHONE: (208) 385-9358 FAX: (208) 333·0860 IREQUEST FOR INFORMATION RFI NO. 1 TO: .Jackie Phelps DATE: 06/29111 COMPANY: CM Co. PROJECT: Ontario Middle School I=AX NO. 345-5323 CONTRACT: I=ROM: NUMBER OF PAGES INCLUDING COVER: 1 Jeff Keller REQUEST: Item #1: There is brick veneer in SOllIe locations approximately 30 feet tall. Will there be any shelf or.relief angles required, if so please provide a plan or elevation reference and a detaiL If relief angles are.,required, 'Who vvill be installing them? Item #2: Addendum. #1 has r~vi~ed Bid Package 10 to include furnishing and installing all fall proteCtion. Does this inciude the fall protection anchors that wdd to embeds per B3/A2.4 or should these be installed by the steel erector? Item. #3: Re: 8 1.03A keynote 11 refers to roof mounted fall protection anchors and refers to 7/85.231 for the beam. connection to thejoists, hut there is no fall protection anchor to beam. connection shown. Please provide a connection detail and clarify if this roof anchor is to be installed by the roofer or the steel erector. Item. #4: All stainless steel handrail connections are specified to be 'Welded in division ------0550Q.-Thefield welding and finishing of-the-180 grit finish is expensive and difficult to achieve. Can the field splicing of the stainless steel hand railbe done m.echanically rather than by field welding? Item. #5: Bid Package #6 Masonry includes the installation of steel lintels in masonry. I assutning; this' is referring to loose lintels~ and the lintels that weld to etnbeds as sho'Wll on 4/88.02 will. bc~dnsta1ledby the steel erector. Please clarify. . ..,. 81TI ~', Item. #6: Re: 3/84.02 shows the schedule ·for loose lintels to be installed by the mason. Bid package 7. steel erection. does, not include lintels in tnasonry and has also excluded lit gauge steel less than 10 gauge. Who will be ins1fllling the 12 gauge plate per 3/84.02?