Secure I Reliable I Flexible
DC-6
COPT DC-6
9651 Hornbaker Road, Manassas, Virginia
Specialized Space by a Specialized Team
2
COPT DATA CENTER SOLUTIONS
Corporate Office Properties Trust (COPT)
·· Publicly traded (NYSE: OFC) $4.5 Billion real estate investment trust (REIT)
·· Owns and developed and/or operates 2 million SF of data centers including COPT DC-6
in Manassas, VA
·· Award-winning facility and mission control operations
·· Experience and expertise in providing U.S. Government (USG) specialized data centers
·· Experience in SCIF and communications room fitout
COPT DC-6
Immediate Availability of Space
·· 39,000 usable square feet (USF) and 5 megawatts (MW) of critical power
·· Additional 9 MW and 28,000 USF in 6 months
·· Modular data container pads available
Lower Cost of Operations
·· CRAC-free design provides a 10% power savings of ------------- $144,000/MW/year
·· Owned water sources provides savings of -------------------------
$26,400/MW/year
·· Yearly Cost of Operations Savings at COPT DC-6 is ------------- $410,400/MW/year
Tenant Tax Savings
·· Equipment taxes are 70% lower at COPT DC-6, in Prince William County,
than at centers in Ashburn, Loudoun County or Fairfax County
·· Savings of $125,000 for every million dollars in equipment over a term of 10 years
www.COPTdata.com
3
COPT DC-6 Site Security
POWERLOFT SITE SECURITY PLAN
Anti-Terrorism/Force Protection (ATFP). Container Ready.
Site Security Features
·· 22 miles away from the data center concentration risk in Ashburn, VA
·· ATFP compliant with controlled site perimeter greater than 150� from the building
·· MEP separated from the IT on the data floors
·· SCIF space designs ready for construction
·· DOD and DCID compliant
·· FISMA compliant
Container Data Center Solutions
·· Site plan complete
·· Support double wide data containers
·· Make use of existing chilled water supply, UPS and generators
4
COPT DATA CENTER SOLUTIONS
Are Your Digital Assets Secure?
www.COPTdata.com
5
ASHBURN
270
95
495
Dulles International Airport
66
66
495 395
95
MANASSAS

COPT DC-6
95
The Manassas Advantage
Manassas Data Center Site Benefits
·· 22 miles from Ashburn regional concentration of data centers risk
·· Outside major flight paths of Dulles International Airport
·· 70% lower personal property tax rate in Prince William County compared to Loudoun County
·· Lower overall cost of operations over Ashburn data centers
·· Satisfies all data center location criteria
·· Not grouped together on same power generation as Ashburn
Connectivity and Latency
·· Innovation Park in Manassas, Prince William County is fiber rich
·· Multiple retail and wholesale carriers provide direct and secure connections to the Ashburn
peering point and to major government locations in VA, MD and DC
·· Latency differences between Manassas and Ashburn are non-existent
·· Latency to regional NAPs is 5x faster than NYSE SLAs
·· Dedicated dark fiber connections available to government locations
·· Certification capabilities include FISMA, ITIL and SAS 70/SAE 18
6
COPT DATA CENTER SOLUTIONS
Robust Fiber and Connectivity Infrastructure
COPT DC-6 is supported by robust fiber connectivity from AboveNet, Level 3 Communications, FiberLight, Verizon, NOVEC
and Comcast. Many providers are located nearby and service from these providers is easily obtained. The U.S. Government
secure connectivity is in the nearby area and direct connectivity is feasible through approved requirements.
COPT D C - 6 ’s l o c a t i o n i n c l u d e s direct connectivity from multiple
carrie r s t o m a j o r n e t w o r k a c c e ss points located in Ashbur n, V irginia.
Fiber providers have access to the site from two distinct underground locations and fiber entering the facility is directed into
two diverse communications Meet-Me-Rooms (MMR). Connectivity is distributed to two additional Meet-Me-Rooms, providing
a total of four MMRs. This provides one MMR for every 25,000 square feet of raised floor area, providing multiple pathways and
redundant connectivity to every space within the data center.
VERIZON
COMCAST
LOCKHEED MARTIN
FIBERLIGHT
LEVEL3
MICRON
NOVEC
ABOVENET
VACANT
COMCAST
66
PROLOGIC
234
LOGIS-TECH
PROGENY
FBI
234
MEDITECH
ZESTRON
ASSETT
COPT DC-6

3.4 MILES
28
GEORGE MASON UNIVERSITY
EXPANSION LAND
EXPANSION LAND
www.COPTdata.com
7
8
COPT DATA CENTER SOLUTIONS
www.COPTdata.com
9
COPT DC-6 I Space and Rack Plan
WEST WING I Suites 201-208
10
COPT DATA CENTER SOLUTIONS
EAST WING I Suites 209-216
www.COPTdata.com
11
Design Benefits and Specifications
Data Space and Rack Efficiencies
·· 254 Racks within a 5,600 square foot bay
·· CRAC-free Space - tenant installs 50% more racks within the premises
·· Flexible Power - 100 W to over 300 W per usable square foot
Systems Design Advantages
·· Tier III+ Design
·· Flexible Design - Rotary or Static UPS
·· LEED-NC Gold rating and top energy efficiency
·· Isolation from the power grid providing MEP protection
·· Electrical generation is block redundant - no single point of failure
·· Most advanced NOC and integrated management reporting systems
·· Water and air side economizer reduces energy and operating costs
12
COPT DATA CENTER SOLUTIONS
Innovative Design
Segregates Mechanical/Electrical Infrastructures from the IT space
Exhaust 
Louvers
Above
 Exhaust
Louvers
Above
Intake 
Louvers
Below
 Intake
Louvers
Below
Segregation of MEP from IT
·· Scales easily
·· Minimizes disruption
·· Preserves raised floor rack space
·· Hard security separation
AHU vs. CRAC
·· 160 ton AHU vs. 20 ton CRAC
·· VFD Drives
·· Unique return air plenum
·· Supports 300 W/SF (@ N+1MIN.)
Chilled Water Loop
·· Concurrently maintainable
·· No water over raised floor
·· Taps for In-Rack cooling
www.COPTdata.com
13
Design Benefits and Specifications
Federal Compliance:
·· COPT DC-6 meets stringent Federal security standards that include: a minimum 150� secured vehicle standoff, vehicle arrest
barriers, K-12 fencing, guarded entrances, man traps, biometric access controls and multiple video surveillance zones.
·· The facility hosts SAS 70 II and SSAE 16 certified installations and can support a FISMA (High) level of network
certification.
·· COPT DC-6 is one of the 10 sites selected to host the GSA Cloud.
Operating Efficiency:
·· COPT DC-6 uses 70% less essential power than traditional designs in the Northern Virginia market.
Scalable High Density:
·· The COPT DC-6 design allows users to increase critical power and cooling for higher rack densities with minimal
disruption or loss of raised floor area, with either air or close coupled cooling.
·· The building was designed to handle up to 300 watts per square foot using air, and densities well beyond that using
water to the rack.
·· The chilled water plant utilizes water-side economization while the building allows for air-side economization.
Reliability:
·· COPT DC-6 is designed to a N+1 minimum level of reliability and would be classified as a Tier III+ when measured
against the Uptime Institute’s reliability criteria.
·· 2N UPS topography can be added to bring this system to Tier IV level of reliability.
·· COPT DC-6 is managed by COPT staff and COPT is fully responsible for insuring that the facility and campus meet
an exacting array of SLA metrics that track all operations 24/7, from the closed circuit cameras prowling the perimeter
down to a single circuit monitoring device, all of which are monitored from a dedicated 24/7 Network Operation Center
located within the facility.
Green Design:
·· COPT DC-6 is a LEED NC Gold facility.
·· Our mechanical plant uses both air and water side economization.
·· The roof ballast is comprised of reflective white stone.
·· Automated illumination fixtures and surfaces throughout.
Location:
Innovation Park
·· COPT DC-6 is in Prince William County’s Innovation Park campus,
a 1,000 acre master planned business park designated as a high
technology incubator and managed by the Prince William County
Economic Development Authority (www.pwcecondev.org).
Distance from Washington, D.C.
·· Innovation Park is located 30 miles west of Washington, D.C., within
an easy 45 minute reverse commute from downtown Washington, D.C.
·· The site is accessible via Route 234 either from I-95 to the south or
I-66 to the north. The Manassas VRE rail station is 1.5 miles to the
south and Dulles International Airport is 15 miles to the north.
14
COPT DATA CENTER SOLUTIONS
Utilities:
Water
·· Water is provisioned from dual ground water wells, which are capable of sustaining the facility’s mechanical plant requirements
during the hottest days of the Virginia summer. As a result, our operating expenses do not include a monthly fee for water.
Electric
·· NOVEC committed to providing 50 MW power via a dedicated 34.5 KV connection. In addition to insulating COPT DC-6
from variations in power quality resulting from a shared distribution loop, NOVEC oversized the concrete conduits serving
COPT DC-6’s site to accommodate another 50 MW of expansion capacity.
Bull Run
Transmission Network
115/230 kV

Loudoun
Transmission Network
500/230 kV
Gainesville Sub
230/115 kV
COPT DC-6
Ox
Transmission Network
500/230 kV

Vulcan Sub
115/34 kV
Innovation Sub
115/34 kV
Power feed from multiple transmission sources
·· Loudoun/Gainesville/Vulcan Substations
·· New radial 34.5 kV circuit with 50 MW of capacity
·· Dedicated feeds = higher quality power
Summary Specifications
RAISED FLOOR
·· 100,000 square feet of raised floor area
·· 16 bays each supported by 1.875 MW
·· 250 pound per square foot floor loads
·· Ability to scale from 150 to 300 watts per square foot
with no disruption or loss to secure raised floor zone
POWER SYSTEM
·· 5 x 2.25 MW Diesel Gensets (1.25 MW Critical)
·· Configured in 6 MW block - 4 primary, 1 backup
·· Rotary or Static UPS available
·· No electrical paralleling
·· No Emergency Power Off system
·· 2 MW Diesel Generators provide N+2 power to
mechanical plant
·· Power topology with backbone designed to
accommodate AC or DC power loads
·· Modular design that provides ability to expand
power in place with minimal disruption and lead time

Cannon Branch Sub
230/115 kV
Optional redundant 34.5 kV circuit
·· From the Ox/Cannon Branch Substations
FUEL STORAGE
·· Up to 500,000 gal. of ultra-low sulfur diesel fuel storage
·· Fuel polishing system, w/ redundant fuel piping systems
HVAC
·· Up to 11,400 tons of refrigeration
·· Up to 60 x 60,000 CFM air handlers
·· High efficiency chilled water plant
·· Air and water side economization
·· 20 minutes of chilled water storage
·· On site make-up water supply wells
·· Concurrently maintainable chilled water piping loops
·· N+2 redundant
·· No water over raised floor
FIRE SUPPRESSION
·· Multi-zone pre-action dry pipe sprinkler system
·· iVESDA detection installed per HPCS requirements
MONITORING SYSTEMS
·· Four Siemens modules:
EPMS, BMS, Security and Life/Fire/Safety
www.COPTdata.com
15
Time To Upgrade Your Digital Infrastructure?
CONTACT US:
Mark Gilbert
Director, Business Development - COPT Data Center Solutions
443.285.5684 I mark.gilbert@copt.com
Frank W. Ziegler
Senior Vice President New Business & Development
COPT Government Services
443.285.5680 I frank.ziegler@copt.com
Charles J. Fiala, Jr.
Senior Vice President - COPT Government Services
443.285.5675 I charles.fiala@copt.com
w w w. C O P T d a t a . c o m
James F. Coakley
President & CEO - Hornbaker Group
703.342.0001 I jcoakley@hornbakergroup.com
Robert Walters
Principal - Avison Young
703.760.9064 I rob.walters@avisonyoung.com
Corporate Office Properties Trust
6711 Columbia Gateway Drive, Suite 300, Columbia, Maryland 21046 I www.copt.com I 443.285.5400 I NYSE: OFC
Download