Why Partner with COPT
COPT Delivers client-focused data center solutions to meet the strategic and operational requirements of our customers, especially for mission critical secure environments.
»
Publicly traded (NYSE:OFC) $4.6 Billion Real Estate Investment Trust (REIT)
»
Own and operate 3.4 million SF of data centers in 4 states
»
Over 1.3 million SF of company data centers support USG and other government agencies
»
Office and data center assets in Maryland, Virginia, Texas, Alabama
»
Committed to long term ownership and tenant satisfaction
Data Center Projects
Northrop Grumman Corporation IT/VITA
Data Centers (2)
COPT DC-6 Data Center
Other Federal Government & Defense
Contractor Clients (ATFP & DCID compliant)
Multiple facilities
Data Center Projects
Total
Total
296,000 SF
243,000 SF
1,300,000 SF
1,582,000 SF
3,421,000 SF
Northrop Grumman IT/VITA data center
Lebanon, VA | 103,000 SF
COPT DC-6 | Manassas, VA | 233,000 SF
Northrop Grumman IT/VITA data center
Chester, VA | 193,000 SF
»
»
COPT DC-6
9651 Hornbaker Road
Manassas, Virginia
Constructed in 2010
243,000 SF
EXPANSION LAND
.
»
Current Connectivity Providers
»
»
»
»
»
»
»
»
»
Comcast
Verizon
AT&T
Orange
Sprint
Fiberlight
Lightower
LINX
Level 3
Zayo
»
»
»
»
»
»
»
»
»
»
»
Cogent
Hibernia Networks
Summit IG
FiberRing
IXreach
Novec
Tata Communications
TeliaSonera Int. Carrier
TW Cable
COX – at perimeter
NOVEC– at perimeter
With a deep history of developing secure DoD-rated government office and data center facilities, COPT is uniquely qualified to secure your digital assets.
DC-6 has the necessary physical security to meet the most stringent Federal
Government requirements.
Anti-Terrorism/Force Protection (ATFP) compliance with a controlled perimeter greater than 150’ from the building
FISMA/DoD/ICD-705 support
Biometric access controls, man traps & video surveillance zones
K-12 fences and guarded security entrances
24x7x365 onsite security
SCIF space designs ready for construction
»
Segregation of MEP from IT
»
»
»
»
Scales easily
Minimizes disruption
Preserves raised floor rack space
Hard security separation
»
»
AHU vs. CRAC
»
»
»
»
160 ton AHU v. 20 ton CRAC
VFD Drives
Unique Return Air plenum
Supports 300 w/sf (@N+1 MIN)
Chilled Water Loop
»
»
»
Concurrently maintainable
No water over raised floor
Taps for in-rack cooling
Exhaust Louvers Above
Intake Louvers Below
Under Floor Plenum
AHU
Warmed Water
Chilled Water
AHU AHU AHU
»
»
»
Location
Not on same power generation as Ashburn
Outside major flight paths to Dulles
International Airport, 15 miles away
30 miles west of Washington, DC
Operational
Energy Efficient
»
Designed PUE of 1.4
Lower Cost of Operations
»
CRAC-free design provides 10% power savings
»
Owned water sources provide savings
»
»
Tax Savings
Prince William County equipment taxes are 7% lower than in Loudoun and Fairfax Counties
Savings of $125,000 for every million dollars in equipment over 10 years
Technical
»
CRAC-free design allows highly
dense deployments
»
Support for racks up to 58u for
“super dense” vertical growth
»
»
Support for up to 270w/sf with traditional air cooling
Designed to a N+1 minimum level of reliability
»
Classified as Tier III+ when measured against the Uptime Institute’s reliability criteria
Raised Floor
• 100,000 SF raised floor area
• 16 bays each supported by 1.875 MW
• 300 lbs/SF floor loads
• Ability to scale from 150 to 300 w/SF with no disruption or loss to secure raised floor zone
Fuel Storage
• Up to 500,000 gal. of ultra-low sulfur diesel fuel storage
• Fuel polishing system, w/ redundant fuel piping systems
Power System
• 17 x 2.25 MW Diesel Gensets
• Block redundant catcher system
• Rotary or Static UPS available
• No electrical paralleling
• No Emergency Power Off system
• 2 MW diesel generators provide N+2 power to
mechanical plant
• Power topology with backbone designed to
accommodate AC or DC power loads
• Modular design that provides ability to expand power in place with minimal disruption and lead time
Thank you and Questions
»