www.25canadasquare.com James Young james.young@eur.cushwake.com 020 7152 5113 Bronnie Edwards bronnie.edwards@eur.cushwake.com 020 7152 5510 Jonathan Huckstep jonathan.huckstep@dtz.com 020 3296 2006 Nick Russell-Smith nick.russell-smith@dtz.com 020 3296 2106 Cornelia de Boinville cornelia.deboinville@dtz.com 020 3296 2013 This brochure is printed on Revive 100 White Silk which is an FSC® certified 100% recycled fibre. Vegetable-based inks were used throughout and 99% of the dry waste and 95% of the cleaning solvents associated with this production were recycled. This brochure was printed by a CarbonNeutral® company, holding ISO 14001 and are registered to EMAS the Eco Management and Audit Scheme, in addition to the Queen’s Award for Enterprise: Sustainable Development. Certified 100% Recycled Fibre Product group from well-managed forests, controlled sources and recycled wood or fibre. www.fsc.org Cert no. SA-COC-001683 ©1996 Forest Stewardship Council No description or information given whether or not in these particulars and whether written or verbal (“information”) about the property or its condition or its value may be relied upon as a statement or representation of fact. Neither DTZ nor Cushman & Wakefield LLP have any authority to make any representations and accordingly any information given is entirely without responsibility on the part of the agents or the seller. The photographs show only certain parts of the property at the time they were taken. Any areas measurements or distances given are approximate only. Any reference to alterations to, or use of any part of the property is not a statement that any necessary planning, building regulations or other consent has been obtained. These matters must be verified by any intending buyer. Any buyer must satisfy himself by inspection or otherwise as to the correctness of any information given. Designed & produced by Sectorlight 020 7264 7700 February 2015 (1504468). 25 CANADA SQUARE CLEAR ADVANTAGE 25 Canada Square offers some of the highest quality office space in London. At the very centre of Canary Wharf, 25 Canada Square is one of the tallest buildings in Europe and provides unique views across London and the south east. Flexible Units Are available TO SUIT OCCUPIERS OF ALL SIZES, FROM SMALLER START-UP COMPANIES TO Multinational ORGANISATIONS. 25 CANADA SQUARE CLEAR ADVANTAGE 25 CANADA SQUARE CLEAR ADVANTAGE Getting here CROSSRAIL Canary Wharf Remains One of Europe’s most successful business destinations, With over 105,000 people working on the estate daily. Built in the water of North Dock and due for completion in 2018, Canary Wharf will be one of Crossrail’s largest stations. Over 25 million passengers travel through Canary Wharf tube station each year, with a further 8.65 million travelling on 780 DLR trains. There IS AN extensive cycle network around the estate and underground car parking on site. Crossrail will add 10% MORE capacity to the London underground and rail network and will bring an extra 1.5 million people to London’s key business and shopping districts. Up to 24 Crossrail trains per hour will run through Central London at peak times. The NEW crossrail hub will be connected to the existing underground station and will include a landscaped park, restaurant and community facility on the top floor with 100,000 sq ft of retail space ON four of its six storeys. DLR, Tube & Rail travel times to Canary Wharf London Bridge 6 mins Waterloo 9 mins Bank 10 mins City Airport 11 mins Oxford Circus 19 mins King’s Cross St. Pancras 22 mins Gatwick Airport 42 mins Crossrail travel times to Canary Wharf Liverpool Street 6 mins Bond Street 13 mins Heathrow Airport 40 mins 25 CANADA SQUARE CLEAR ADVANTAGE Being here 87 restaurants, bars and eateries deliver a wide range of culinary experiences, from Teppanyaki to tapas. Canary Wharf is one of London’s most popular shopping destinations With over 850,000 people per week enjoying the 845,000 SQ FT of retail space on offer. 01 The estate currently provides: 136 shops 7 banks 5 crÈches 5 medical centres 4 health clubs 4 hotels 3 supermarkets 03 01 02 03 04 05 06 02 04 Jubilee Park The Pearson Room, Reebok Sports Club Canary Wharf Summer Screen Rocket, Canary Wharf Ibérica, Canary Wharf Boisdale, Canary Wharf 05 06 25 CANADA SQUARE CLEAR ADVANTAGE At the centre of it all 25 Canada Square is positioned directly in the centre of the Canary Wharf district overlooking Canada Square. To the City 21 Residential stfe We rry ad Plateau, Canada Square 4. Royal China, Canary Riverside 5. Boisdale of Canary Wharf, Cabot Place Le Relais de Venise L’Entrecôte, Mackenzie Walk 9. Tom’s Kitchen, Westferry Circus 5 North Colonnade 5 Canada Square 25 North Colonnade West India Avenue 15 Westferry Circus 2 Restaurants 8 Canada Square 30 North Colonnade One Churchill Place 5 Churchill Place 14 Westferry Circus 4 15 Canada Square 11 9 Residential rry Jamie’s Italian, Churchill Place 8. 12 20 20 Columbus Courtyard Cabot Square Cabot Place 5 3 1 15 One Canada Square Canary Wharf 6 Canada Square 10 Canada Square Park 7 Churchill Place 19 Park Place 20 Churchill Place tfe 7. 11 Westferry Circus One Cabot Square 17 es Wahaca, The Park Pavilion 10 Cabot Square Columbus Courtyard 7 Westferry Circus 22 13 W 6. 17 Columbus Courtyard 1 Westferry Circus Ro Gaucho, Canary Riverside 3. West India Quay North Dock Residential Restaurants 2. North Quay Residential Restaurant Roka, The Park Pavilion Hotel Docklands Museum Four Seasons Hotel 1. Poplar Cinema The Jubilee Line, DLR and Jubilee Place Shopping mall ARE ALL within three minutes’ walk of the reception. Westferry a Ro d 10. The Pearson Room, Canada Square 25 Cabot Square 11. Ibérica, Cabot Square 20 South Colonnade 10 South Colonnade 30 South Colonnade Square 8 Bars 12. Corney & Barrow, Cabot Square Riverside South 13. The Fine Line, Fisherman’s Walk 20 Canada Square 16 33 Canada Jubilee Line Middle Dock Jubilee Line Montgomery Square Jubilee Park 14. The Parlour, The Park Pavilion River Thames 15.One Canada Square Restaurant and Bar, Canada Square 10 Upper Bank Street 16. Smollensky’s, Reuters Plaza 1-10 Bank Street 17. Davy’s Bar, Fisherman’s Walk 18. Obikà Mozzarella Bar, West Wintergarden 20 Bank Street Gyms 19. Reebok Sports Club, Canada Square South Dock 20. Canary Wharf Health Club, Cabot Square 21. LA Fitness, West India Quay 22. Virgin Active Health Club, Canary Riverside Existing Buildings Proposed Buildings Bus London Underground Docklands Light Railway Crossrail Station Heron Quays 25 Bank Street 18 West Winter Garden 40 Bank Street East Winter Garden 50 Bank Street 25 Churchill Place 25 CANADA SQUARE CLEAR ADVANTAGE Seamless Access 25 Canada Square benefits from direct access to the transport network, retail and leisure amenities via the covered pedestrian walkway from reception. MANAGING YOUR ARRIVAL AT 8,000 sq ft, the double height dedicated reception makes a striking first impression. 25 CANADA SQUARE CLEAR ADVANTAGE Typical Floors provide approximately 28,000 sq ft of column-free space, flooded by natural light and with panoramic views of London. ALL accommodation is available pre-wired, offering some of the highest specification tower space in central London. 25 CANADA SQUARE CLEAR ADVANTAGE Simply miles ahead 25 Canada square offers spectacular views across London and the South east. 01 01 View west towards the City 02 View east over The O2 03View north towards the Queen Elizabeth Olympic Park 02 03 25 CANADA SQUARE CLEAR ADVANTAGE Canada Square 14.2m OUR TENANTS Lift Bank 1 low rise floor Plan indicative (L13) 01 25 Canada square attracts tenants across a number of sectors, testament to the flexibility and quality of space, the services provided AND the competitive financial terms on offer. Occupiers of 25 Canada Square benefit from amenities including: Café 36 180 seat Auditorium Gymnasium 12.9m Conference 33,361 sq ft / 3,099.3 sq m Upper Bank Street Current tenants include: GDF De Suez Truphone gfk NOP Skrill CrossRaiL SunGard Europe General Pharmaceutical Council 23.3m Kitchen 02 03 Jubilee Park Canada Square 14.2m 04 Lift Bank 2 Level 20-24 FLOOR Plan indicative (L23) 15.9m 12.6m 30,581 sq ft / 2,841.1 sq m Upper Bank Street North Electrical Riser 01 02 03 04 05 View from a tenant’s break-out area Café 36 A tenant’s cafeteria Interoute’s reception Skrill’s reception 05 R = Riser room Floor plans not to scale Jubilee Park 25 CANADA SQUARE CLEAR ADVANTAGE Canada Square Canada Square 14m Lift Bank 3 mid rise FLOOR Plan indicative (L27) 13m Lift Bank 4 Tower FLOOR Level 41 Floor Plan 13m 28,361 sq ft / 2,634.8 sq m 28.7m 22m 19,666 sq ft / 1,827.0 sq m Upper Bank Street Kitchenette Upper Bank Street Kitchenette Comms Rooms Electrical Riser R R Electrical Riser R 8m R R R 8m 9m Jubilee Park Jubilee Park Canada Square Square Canada Canada Square Square 14m Lift Bank 4 high rise FLOOR Plan indicative (L37) 13m Level 27 space planning Financial 13m 28,361 sq ft / 2,634.8 sq m 27,889 sq ft / 2,591.0 sq m Fan Room Density information Comms Rooms Single offices Trading desks Open-plan support 16 268 31 Total 315 Kitchenette Reception Breakout Space Comms Room Floor area per person 90 sq ft / 8.4 sq m per person North Number of meeting rooms R R Electrical Riser R 18 person rooms 16 person rooms 8 person rooms 2 1 4 R R Electrical Riser R R = Riser room Floor plans not to scale Jubilee Park Park Jubilee Park Jubilee Park UpperBank BankStreet Street Upper Upper Bank Street Kitchenette 25 CANADA SQUARE CLEAR ADVANTAGE Canada Canada Square Square Level 27 space planning LEGAL SPECIFICATION 1. Summary specification 28,361 sq ft / 2,634.8 sq m Fan assisted VAV air conditioning Fan Room Metal tiled suspended ceilings integral lighting Density information 5 126 35 Total 166 200mm raised floors with Electrak bus bar power provision Kitchenette Reception Breakout Space Floor area per person Upper Bank Bank Street Upper Single offices Double offices Open-plan 171 sq ft / 15.9 sq m per person Category 5e data and voice flood wiring 2.7m floor to ceiling heights 1.5m planning grid Occupational density 1 person per 8.6 sq m Secure bicycle and car parking in the basement Number of meeting rooms 14 person rooms 8 person rooms Dual power back-up 1 4 R R R The 42 storeys above ground floor area are generally framed with a 70mm lightweight concrete slab on a 60mm composite metal deck (total depth 130mm) supported by steel beams, columns and reinforced concrete walls within the core areas. At ground floor level and below, a reinforced concrete structure is used with only the principal tower columns continuing to basement level one in steel. These columns are encased in concrete. Jubilee Park Jubilee Park R = Riser room Floor plans not to scale Raised floor void Floor to ceiling heights Slab to slab heights 200mm overall 2.7m 4.1m 2.2 Loading allowances Canada Square Square Live loads Office Stairs, corridors and lobbies Plant rooms 1.5m Fan Room 3.1 Design criteria Density information The building services have been designed using the following criteria: 23 257 Total 280 Kitchenette Reception Breakout Space Floor area per person 101 sq ft / 9.4 sq m per person Number of meeting rooms 1 4 4 R R Electrical Riser R UpperBank Bank Street Street Upper Single offices Open-plan External conditions Temperature and humidity Summer 28°C Dry bulb 20°C Wet bulb exceeded for less than 2.5% of the year Winter -4°C Dry bulb 100% Relative humidity exceeded for more than 99% of the year Internal conditions Internal climate control is based upon a maximum occupancy of 1 person per 10 sq m and 16 litres per sec per person fresh air. Office areas Temperature Summer 22°C +/- 1°C Winter 22°C +/- 1°C Fresh air Three and three quarter air changes per hour of fresh air are available. This equates to an average of 16 litres per sec per person based upon an occupational density of 1 person per 10 sq m. Jubilee Jubilee Park Park 3.2 Provision for tenant services The following facilities are available for installation and completion by the tenants: Roughed in kitchen exhaust risers to use with tenant supplied fans and ecology units. Provision is made for 2000 l/s of exhaust for each five floors. General exhaust system (capped) with an allowance of 1,500 l/s per floor in the south east corner of the core. Toilet exhaust system (capped) with an allowance of 500 l/s per floor. Two spigot connections are provided – one outside each of the two WCs. Access to the building chilled water risers for supplementary cooling (capped and valved) inside the compartment unit room. 35 kW of cooling is available per floor. 3.3 Vertical transportation design criteria Average Waiting Interval Five Minute Ratio Capacity Factor 20.8 seconds or less 15% 13.7% or less Based upon the above performance criteria, the installed main passenger lift installations serve a uniform occupancy of 1 person / 14 sq m. 3. Mechanical services installation 28,361 sq ft / 2,634.8 sq m 18 person rooms 8 person rooms 4 person rooms 4.0 kN / sq m 4.0 kN / sq m 7.5 kN / sq m 2.3 Planning grid Level 27 space planning CORPORATE The boxes are zoned to provide a separate zone for each corner, each 9m length of the perimeter and interior zones of approximately 80 sq m. Heat recovery Heat recovery systems are incorporated to reduce running costs. 2.1 Structure North Medium pressure ductwork distributes air from compartment units to fan powered VAV control boxes and from the boxes to ceiling diffusers in the interior and slot diffusers at the perimeter. The perimeter fan powered VAV boxes have electrical resistance heating coils sequenced with the cold air supply to heat only at minimum supply air quantity. Return air migrates through the ceiling plenum to the compartment units. 2. Base building structure Electrical Riser Air-conditioning Two compartment unit air handlers per floor provide conditioned supply air to the occupied spaces. Each unit is supplied complete with replaceable filters, cooling coil, rust resistant construction including a coated galvanised steel drip pan, silencers to achieve NR38, variable speed fan, trapped condensate drain, controls etc. 3.4 Chilled water system The refrigeration plant consists of multiple hermetic electric centrifugal refrigeration machines with associated condenser water pumps, chilled water pumps and closed evaporative cooling towers providing N+1 redundancy. Chilled water is circulated to the on floor handling units via two separate risers, which are divisible into separate circuits. 3.5 Plumbing systems Domestic water A complete domestic water system is provided serving all typical floor WCs. Typical floor WCs are equipped with all plumbing fittings including low water flow WCs and counter-mounted basins. Domestic hot water is provided to the WCs by local electric storage type heaters located on each floor. Provision for tenant’s services In the north west corner or south east corner of the building core, connections for water and drainage services for tenant fit-out are provided as follows: 100mm drain capped connection 50mm vent capped connection 20mm water valved and capped connection 25 CANADA SQUARE CLEAR ADVANTAGE 3.6 Telecoms BT, Cable & Wireless, Colt, Verizon, Fibernet, Above.net, Level 3, Interoute and Thus supply the building. 3.7 Cat 5e cabling Cat 5e cabling is installed throughout the building and is capable of speeds up to 100MB per second. 4. Finishes 4.1 Offices Raised floors 600 x 600mm galvanised steel encased tiles. Walls Plasterboard linings to core walls and columns are decorated with a paint finish. Internal faces of external wall panels are anodised aluminium. Ceilings Fully accessible plain and perforated metal tiles set in a 1.5m grid. Ceilings Plasterboard coffered ceilings with concealed perimeter lighting. Lifts Stainless steel lift doors with stainless steel architraves. Internally, the lift cars are finished with hardwood timber veneer panels with recessed lighting. 4.5 WCs Honed finished marble to the floors and skirting; polished finished marble to the walls and vanity tops; full height hardwood timber veneered cubicle partitions with hardwood timber veneered doors and white ceramic sanitary ware. Vanity tops are polished finish marble. 4.6 Staircases The walls are plastered with emulsion paint finish. Stairs will incorporate recessed lighting combining emergency service requirements. Balustrading and handrails are both stainless steel. 5. Environment 5.1 Design Shades Shearweave fabric blinds are installed as part of the base design with manual control. High efficiency lighting systems < 11W/m2 with integrated lighting control Carpets and floor boxes Medium grade environmentally compliant carpet tiles are installed on level 37. A capital contribution in lieu of carpets and floor boxes will be granted to the ingoing occupiers of all the other floors. Distributed direct digital control systems 4.2 Ground floor entrance hall – Low energy inverter drives on major items of plant – Control down to individual FATVAV units Integrated heat recovery systems – On fresh air plant Adiabatic humidity control Floors Verde Tinos marble with Nero Assoluto granite contrast strips. 5.2 Building systems flexibility Walls Monte Carlo marble. Extensive use of free cooling Variable static pressure management Ceilings Coffered ceiling in glass reinforced gypsum with stainless steel grid, incorporating concealed uplighters. Optimisation of fresh air supply volumes 4.3 Ground floor lift lobbies – Minimising fan power Flexibility of operational times – Split floor working Floors Verde Tinos marble with Nero Assoluto granite contrast strips. Systems selection to optimise sustainable operation Walls Noire St. Laurent marble. 5.3 Building operations Ceilings Linen finish stainless steel and metal panel ceiling with recessed downlights and concealed cove lighting. 4.4 Lift lobbies Floors Nero Assoluto granite with polished finish. Walls Spray painted MDF hung panels. – Demountable systems, modular wiring and controls system design Recycling programmes – 100% of all building waste is diverted from landfill. All waste is either recycled or sent to a waste to energy plant Two electric vehicle charge points are located in the basement of the building ISO 14001 – Certified in March 2014, setting benchmark targets for energy & waste reduction Citi were awarded the Carbon Trust Standard in May 2014 for their efforts in reducing the carbon footprint of their UK portfolio. They were also recognised for their commitment to investment in energy efficient “Green” technology as a means of reducing CO2 emissions. Citi are partnering with Global Action Plan to lessen the environmental impact of doing business in the UK.