University of Massachusetts Lowell BID REQUEST Pre-Purchase of Emergency Generator Bid Number # CL16-HT-0037 Introduction The University of Massachusetts Lowell (UML) invites bids on the purchase of an Emergency Generator for North Quad Infrastructure. Bid Specifications 1. Please see Technical Specifications Section 263213-Engine Generators, Section 263214Installation of Engine Generators, Section 263600 Transfer Switches and North Quad Drawings. Bid Rejection The University reserves the right to reject any or all bids received in whole or in part if it is deemed such action is in the best interest of The University and the Commonwealth of Massachusetts. Preparation of Bids Bids must be signed, where instructed. Bidders are cautioned that errors, alterations, or corrections on the submitted bid must be initialed by the person signing the bid proposal or his/her authorized designee. Failure to do so may result in rejection of the bid for those items erased, altered, or corrected and not initialed. Telephone and or Fax bids will not be accepted. Selection Criteria UML shall enter into an agreement with the Bidder who submits the proposal that meets the minimum requirements, proof of quality and performance of previous work, ability to meet the time frame set by the University, is financially beneficial to UML and demonstrated ability to service the product in a timely and satisfactory manner. Prevailing Wage Law All services solicited through this RFB are subject to the Massachusetts Prevailing Wage Laws. A list is provided as part of the RFB indicating the trades for which a contractor is mandated by law to pay the prevailing wage rates. Applicable Prevailing Wage Rates are issued with this RFB and will become a part of any Contract resulting from this solicitation. It is the responsibility of the Contractor to adhere to the Prevailing Wage Laws. All Electrical Connections must be done by a Licensed Electrical Contractor. It is CL16-HT-0037 Pre-Purchase Emergency Generator Page 1 the responsibility of the Vendor to obtain a City of Lowell Electrical Permit. The Vendor is also responsible for the Cost of any and all necessary permits. Certification of Tax Status Pursuant to Massachusetts General Law, Chapter 62C, Section 49 A, the bidder certifies under penalties of perjury that to the best of the bidder's knowledge and belief, they have filed all state tax returns and paid all state taxes required by law. Certification of Non-Collusion Pursuant to Massachusetts General Law, Chapter 7, Section 22 (20), the bidder certifies under penalties of perjury that their bid is in all respects bona fide, fair, and made without collusion or fraud with any person, joint venture, partnership, corporation or other business or legal entity. Bidder's Representations Each bidder by submitting its bid represents that: a) The bid document and specifications have been read and understood by the bidder, b) The bid is based upon the items described in the bidding documents and specifications without exceptions, c) The bid has been arrived at independently and is submitted without collusion, Bid Documents Proposal may be submitted via email to Purchasing@uml.edu or hard copy sent to Purchasing at the address below. Bid Opening Bids will be opened and publicly read on, Monday, December 14, 2015 at 11:00 AM EST at the Purchasing Department: Wannalancit Business Center 600 Suffolk St. Rm 415 Lowell, MA 01854 It is vital that bids be in the Purchasing Office by the due date and time. Late bids will not be considered, and will be placed, unopened, in the bid file. We strongly encourage you to contact the Purchasing Office by telephone or e-mail prior to the bid opening to confirm that your bid has been received by the Purchasing Department. The general Purchasing Office phone number is (978) 934-3500 or email address is Purchasing@uml.edu. All communication should reference RFB No. CL16-HT-0037. CL16-HT-0037 Pre-Purchase Emergency Generator Page 2 Questions/Contact Person Prospective Bidders may submit questions to UML regarding this solicitation via email to Purchasing@uml.edu Amendments The Purchasing Department reserves the right to amend, alter, or cancel the bid at any time prior to the deadline for submissions of bids. If such action is necessary, all potential bidders who have received or requested a copy of the bid will be notified of the changes to be made in writing and whether the bid opening date will be extended. Debriefing Any Vendor may request a debriefing within one (1) week after receiving notification of award, to discuss the Selection Committee's evaluation of its bid proposal. Request for debriefing shall be made in writing to the Purchasing Manager. Debriefing shall not include discussions of any competing bids. Massachusetts Public Record Law All bids and related documents submitted in response to this RFP are subject to the Massachusetts Public Records Law, Massachusetts General Law Chapter 66, Section 10 and to M.G.L. Chapter 4, Section 7, Subsection 26, regarding public access to such documents. Statements in the bid response that are inconsistent with those statutes will be disregarded. Any additional questions regarding the Public Records Law should be directed to the Public Records Division at: (617) 727-2832 during regular business hours. You may also access various Public Records Division publications through the Internet at: www.sec.state.ma.us/pre. Transfers and Subcontracting The Vendor may not subcontract, in whole or in part, any portion of this contract without the written consent of the University. Nondiscrimination in Employment and Affirmative Action The Contractor shall not discriminate against any qualified employee or applicant for employment because of race, color, national origin, ancestry, age, sex, religion, physical or mental handicap, or sexual orientation. The Contractor agrees to comply with all applicable Federal and State statutes, rules and regulations prohibiting discrimination in employment including but not limited to: Title VII of the Civil Rights Act of 1964; the Age Discrimination in Employment Act of 1967; Section 504 of the Rehabilitation Act of 1973; the Americans with Disabilities Act of 1990; and M.G.L. c.151B. Vendor Not Employee of UML The Vendor, or his employees or agents performing under the agreement, are not to be deemed to be employees of UML nor to be agents of UML in any manner whatsoever. The Vendor will not hold himself out as, nor claim to be, an officer or employee of UML and will not make any claim, demand, or application to or for right or privilege applicable to an officer or employee of UML, including, but not limited to, workmen's compensation coverage, unemployment insurance benefits, social security benefits, or retirement membership or credit. CL16-HT-0037 Pre-Purchase Emergency Generator Page 3 Company information and signature required Company Name: Company Address: Tel. # Fax # Are you () Woman Owned Business () Minority Owned Business () Individual/Sole Proprietorship () Partnership () Government () Non-profit Organization () Corporation () Disadvantaged Business () Other (specify) Tax I.D./ FEIN # ____-___-_____ or S.S.N.# (if individual) ____-___-_____. Signature of owner or authorized officer*: Please print name: ______________________________ Title: __________________________ Date submitted: ___/___/___ CL16-HT-0037 Pre-Purchase Emergency Generator Page 4 Certification of Non Collusion The undersigned certifies under penalties of perjury that this Bid or Proposal has been made and submitted in good faith and without collusion or fraud with any other person. As used in this certification, the word "person" shall mean any natural person, business, partnership,corporation, union, committee, club, or other organization, entity, or group of individuals. ______________________________ Authorized Signature* ______________________________ Printed Name of person signing bid or proposal*) ___________________________ (Name of business) CL16-HT-0037 Pre-Purchase Emergency Generator Page 5 Business Reference Form Company Name:___________________________________________________ 1. Reference Name:______________________ Address:_____________________________ Contact Person:_______________ Tel Number:________________ Description and Dates of Services Provided: ________________________ ____________________________________________________________________________________ ____________________________________________________________________________________ __________________________________________________________________ 2. Reference Name: _____________________ Address: _____________________________ Contact Person:_______________ Tel Number:________________ Description and Dates Services Provided: ________________________ ____________________________________________________________________________________ ____________________________________________________________________________________ __________________________________________________________________ 3. Reference Name:______________________ Address:_____________________________ Contact Person:_______________ Tel Number:________________ Description and Dates of Services Provided: ________________________ ____________________________________________________________________________________ ____________________________________________________________________________________ __________________________________________________________________ Must list all jobs performed in a similar scope in the past 3 years. References will be contacted to confirm Bidder’s abilities, qualifications and performance. The University may deem the Bidder’s response unresponsive if a reference is not obtainable from listed reference after reasonable attempts. CL16-HT-0037 Pre-Purchase Emergency Generator Page 6 ATTACHMENT A BID FORM – BID # CL16-HT-0037 UNIVERSITY OF MASSACHUSETTS LOWELL Pricing: Emergency Generator System with accessories $___________ $___________ TOTAL PRICE $___________ *Total Price must include the delivery and warranty as stated in the bid* The Bid includes Addenda numbered ________________ In addition to the bid amounts stated above, we agree to abide by all the terms and conditions set out in the Bid. _______________________________________________ Vendor _______________________________________________ Address _______________________________________________ The awarding Contractor must agree to comply with all applicable Prevailing Wage Rates. By signing this form, the Contractor agrees to pay the applicable Prevailing Wage Rate. CL16-HT-0037 Pre-Purchase Emergency Generator Page 7 VENDOR BIDDER CHECK LIST AS A QUALIFIED BIDDER, HAVE YOU INCLUDED: ____ Company information and signature ____ Certificate of non-collusion and tax compliance ____ Business Reference ____ Completed Form for General Bid Attachment A ____ Bids must be delivered No later than 11:00 AM EST., Monday December 14, 2015. Bids received after this date and time will not be accepted. CL16-HT-0037 Pre-Purchase Emergency Generator Page 8 North Quad Infrastructure Renewal UMass Lowell, Lowell, MA UMBA Project No. UMBA 13-L2 ICON architecture, inc. September 17, 2015 SECTION 263213 - ENGINE GENERATORS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section. B. UMass Lowell Campus Electrical Standards; request most up to date standards at time of bid. 1.2 SUMMARY A. This Section includes packaged engine-generator sets for [emergency] power supply with the following features: 1. 2. 3. 4. 5. B. 1.3 [Diesel] engine. [Unit-mounted] cooling system. [Unit-mounted] control and monitoring. Load banks. Outdoor enclosure. Related Sections include the following: 1. Section 263214 “Installation of Engine Generators” for installation requirements of owner furnished contractor installed engine generators. 2. Section 263600 "Transfer Switches" for transfer switches including sensors and relays to initiate automatic-starting and -stopping signals for engine-generator sets. DEFINITIONS A. 1.4 Operational Bandwidth: The total variation from the lowest to highest value of a parameter over the range of conditions indicated, expressed as a percentage of the nominal value of the parameter. ACTION SUBMITTALS A. Product Data: For each type of packaged engine generator indicated. Include rated capacities, operating characteristics, and furnished specialties and accessories. In addition, include the following: 1. 2. Thermal damage curve for generator. Time-current characteristic curves for generator protective device. ENGINE GENERATORS 263213 - 1 North Quad Infrastructure Renewal UMass Lowell, Lowell, MA UMBA Project No. UMBA 13-L2 B. Shop Drawings: Detail equipment assemblies and indicate dimensions, weights, loads, required clearances, method of field assembly, components, and location and size of each field connection. 1. 2. 3. 4. 1.5 ICON architecture, inc. September 17, 2015 Dimensioned outline plan and elevation drawings of engine-generator set and other components specified. Design Calculations: Signed and sealed by a qualified professional engineer. Calculate requirements for selecting vibration isolators and for designing vibration isolation bases. Vibration Isolation Base Details: Signed and sealed by a qualified professional engineer. Detail fabrication, including anchorages and attachments to structure and to supported equipment. Include base weights. Wiring Diagrams: Power, signal, and control wiring. INFORMATIONAL SUBMITTALS A. Qualification Data: For [manufacturer] B. Source quality-control test reports. 1. Certified Summary of Performance Tests: Certify compliance with specified requirement to meet performance criteria for sensitive loads. 2. Report of factory test on units to be shipped for this Project, showing evidence of compliance with specified requirements. 3. Report of sound generation. 4. Report of exhaust emissions showing compliance with applicable regulations. C. Field quality-control test reports. D. Warranty: Special warranty specified in this Section. 1.6 CLOSEOUT SUBMITTALS A. Operation and Maintenance Data: For packaged engine generators to include in emergency, operation, and maintenance manuals. In addition to items specified in Section 011000 "Operation and Maintenance Data," include the following: 1. 1.7 List of tools and replacement items recommended to be stored at Project for ready access. Include part and drawing numbers, current unit prices, and source of supply. MAINTENANCE MATERIAL SUBMITTALS A. Furnish extra materials described below that match products installed and that are packaged with protective covering for storage and identified with labels describing contents. 1. 2. 3. Fuses: One for every 10 of each type and rating, but no fewer than one of each. Indicator Lamps: Two for every six of each type used, but no fewer than two of each. Filters: One set each of lubricating oil, fuel, and combustion-air filters. ENGINE GENERATORS 263213 - 2 North Quad Infrastructure Renewal UMass Lowell, Lowell, MA UMBA Project No. UMBA 13-L2 1.8 ICON architecture, inc. September 17, 2015 QUALITY ASSURANCE A. Installer Qualifications: Manufacturer's authorized representative who is trained and approved for installation of units required for this Project. 1. 2. Maintenance Proximity: Not more than [four] hours' normal travel time from Installer's place of business to Project site. Engineering Responsibility: Preparation of data for vibration isolators restraints of engine skid mounts, including Shop Drawings, based on testing and engineering analysis of manufacturer's standard units in assemblies similar to those indicated for this Project. B. Manufacturer Qualifications: A qualified manufacturer. Maintain, within [200 miles (321 km)] of Project site, a service center capable of providing training, parts, and emergency maintenance repairs. C. Source Limitations: Obtain packaged generator sets and auxiliary components through one source from a single manufacturer. D. Electrical Components, Devices, and Accessories: Listed and labeled as defined in NFPA 70, Article 100, by a testing agency acceptable to authorities having jurisdiction, and marked for intended use. E. Comply with ASME B15.1. F. Comply with NFPA 37. G. Comply with NFPA 70. H. Comply with NFPA 110 requirements for Level [1] emergency power supply system. I. Comply with UL 2200. J. Engine Exhaust Emissions: Comply with applicable state and local government requirements. K. Noise Emission: Comply with [applicable state and local government requirements] for maximum allowable sound level at property line due to sound emitted by generator set including engine, engine exhaust, engine cooling-air intake and discharge, and other components of installation. 1.9 PROJECT CONDITIONS A. Interruption of Existing Electrical Service: Do not interrupt electrical service to facilities occupied by Owner or others unless permitted under the following conditions and then only after arranging to provide temporary electrical service according to requirements indicated: 1. 2. Notify [Construction Manager] no fewer than [seven] days in advance of proposed interruption of electrical service. Do not proceed with interruption of electrical service without [Construction Manager's] written permission. ENGINE GENERATORS 263213 - 3 North Quad Infrastructure Renewal UMass Lowell, Lowell, MA UMBA Project No. UMBA 13-L2 B. 1.10 A. 1.11 A. Environmental Conditions: Engine-generator system shall withstand the following environmental conditions without mechanical or electrical damage or degradation of performance capability: 1. Altitude: Sea level to [1000 feet (300 m)] COORDINATION Coordinate size and location of concrete bases for package engine generators. Cast anchor-bolt inserts into bases. Concrete, reinforcement, and formwork requirements are specified with concrete. WARRANTY Special Warranty: Manufacturer's standard form in which manufacturer agrees to repair or replace components of packaged engine generators and associated auxiliary components that fail in materials or workmanship within specified warranty period. 1. 1.12 A. 1.13 A. ICON architecture, inc. September 17, 2015 Warranty Period: two years from date of Substantial Completion. MAINTENANCE SERVICE Initial Maintenance Service: Beginning at Substantial Completion, provide [24] months' full maintenance by skilled employees of manufacturer's designated service organization. Include quarterly exercising to check for proper starting, load transfer, and running under load. Include routine preventive maintenance as recommended by manufacturer and adjusting as required for proper operation. Provide parts and supplies same as those used in the manufacture and installation of original equipment. ADDITIONAL SITE VISIT UPON GENERATOR INSTALLATION This generator unit will be purchased by the owner for installation by others. This generator will form part of an NEC article 700 listed life safety power system, and as such requires selective coordination between all life safety circuit breakers. Include cost to return to the site post install and adjust and reprogram the generator controller, and electronic trip output circuit breaker settings based on the outcome of the contractors overcurrent selective coordination study. In additional to a return visit, the generator vendor shall provide the electrical contractor who will be installing the generator, all information required to include the generator system in a power flow study to determine selective coordination settings. ENGINE GENERATORS 263213 - 4 North Quad Infrastructure Renewal UMass Lowell, Lowell, MA UMBA Project No. UMBA 13-L2 ICON architecture, inc. September 17, 2015 PART 2 - PRODUCTS 2.1 MANUFACTURERS A. Manufacturers: Subject to compliance with requirements, provide products by one of the following: 1. 2. 3. 2.2 Caterpillar; Engine Div. Generac Power Systems, Inc. Kohler Co. ENGINE-GENERATOR SET A. Factory-assembled and -tested, engine-generator set. B. Mounting Frame: Maintain alignment of mounted components without depending on concrete foundation; and have lifting attachments. 1. C. Capacities and Characteristics: 1. 2. 3. D. Rigging Diagram: Inscribed on metal plate permanently attached to mounting frame to indicate location and lifting capacity of each lifting attachment and generator-set center of gravity. Power Output Ratings: Nominal ratings as indicated – 200kW. Output Connections: Three-phase, [four] wire. Nameplates: For each major system component to identify manufacturer's name and address, and model and serial number of component. Generator-Set Performance: 1. 2. 3. 4. 5. 6. Steady-State Voltage Operational Bandwidth: 3 percent of rated output voltage from no load to full load. Transient Voltage Performance: Not more than 20 percent variation for 50 percent stepload increase or decrease. Voltage shall recover and remain within the steady-state operating band within three seconds. Steady-State Frequency Operational Bandwidth: 0.5 percent of rated frequency from no load to full load. Steady-State Frequency Stability: When system is operating at any constant load within the rated load, there shall be no random speed variations outside the steady-state operational band and no hunting or surging of speed. Transient Frequency Performance: Less than 5 percent variation for 50 percent step-load increase or decrease. Frequency shall recover and remain within the steady-state operating band within five seconds. Output Waveform: At no load, harmonic content measured line to line or line to neutral shall not exceed 5 percent total and 3 percent for single harmonics. Telephone influence factor, determined according to NEMA MG 1, shall not exceed 50 percent. ENGINE GENERATORS 263213 - 5 North Quad Infrastructure Renewal UMass Lowell, Lowell, MA UMBA Project No. UMBA 13-L2 7. 8. Sustained Short-Circuit Current: For a 3-phase, bolted short circuit at system output terminals, system shall supply a minimum of 250 percent of rated full-load current for not less than 10 seconds and then clear the fault automatically, without damage to generator system components. Start Time: Comply with NFPA 110, Type 10, system requirements. a. 9. 2.3 ICON architecture, inc. September 17, 2015 Provide permanent magnet excitation for power source to voltage regulator. Start Time: Comply with NFPA 110, Type 10, system requirements. ENGINE A. Fuel: [Fuel oil, Grade DF-2, Ultra Low Sulfer 15PPM] B. Rated Engine Speed: 1800 rpm. C. Maximum Piston Speed for Four-Cycle Engines: 2250 fpm (11.4 m/s). D. Lubrication System: The following items are mounted on engine or skid: 1. 2. 3. E. Filter and Strainer: Rated to remove 90 percent of particles 5 micrometers and smaller while passing full flow. Thermostatic Control Valve: Control flow in system to maintain optimum oil temperature. Unit shall be capable of full flow and is designed to be fail-safe. Crankcase Drain: Arranged for complete gravity drainage to an easily removable container with no disassembly and without use of pumps, siphons, special tools, or appliances. Engine Fuel System: 1. 2. Main Fuel Pump: Mounted on engine. Pump ensures adequate primary fuel flow under starting and load conditions. Relief-Bypass Valve: Automatically regulates pressure in fuel line and returns excess fuel to source. F. Coolant Jacket Heater: Electric-immersion type, factory installed in coolant jacket system. Comply with NFPA 110 requirements for Level 1 equipment for heater capacity. G. Governor: [Electronic]. H. Cooling System: Closed loop, liquid cooled, with radiator factory mounted on enginegenerator-set mounting frame and integral engine-driven coolant pump. 1. 2. 3. Coolant: Solution of 50 percent ethylene-glycol-based antifreeze and 50 percent water, with anticorrosion additives as recommended by engine manufacturer. Size of Radiator: Adequate to contain expansion of total system coolant from cold start to 110 percent load condition. Expansion Tank: Constructed of welded steel plate and rated to withstand maximum closed-loop coolant system pressure for engine used. Equip with gage glass and petcock. ENGINE GENERATORS 263213 - 6 North Quad Infrastructure Renewal UMass Lowell, Lowell, MA UMBA Project No. UMBA 13-L2 4. 5. Temperature Control: Self-contained, thermostatic-control valve modulates coolant flow automatically to maintain optimum constant coolant temperature as recommended by engine manufacturer. Coolant Hose: Flexible assembly with inside surface of nonporous rubber and outer covering of aging-, ultraviolet-, and abrasion-resistant fabric. a. b. I. ICON architecture, inc. September 17, 2015 Rating: 50-psig (345-kPa) maximum working pressure with coolant at 180 deg F (82 deg C), and noncollapsible under vacuum. End Fittings: Flanges or steel pipe nipples with clamps to suit piping and equipment connections. Muffler/Silencer: Critical type, sized as recommended by engine manufacturer and selected with exhaust piping system to not exceed engine manufacturer's engine backpressure requirements. 1. 2. 3. Minimum sound attenuation of 25 dB at 500 Hz. Sound level measured at a distance of 23 feet (7 m) from exhaust discharge after installation is complete shall be [71] dBA or less. Provide flanged connector for connection of exhaust piping by another project. Intent is for exhaust to discharge 10’ above roofline. Provide details on how to connect additional exhaust piping with generator submittal. J. Air-Intake Filter: [Heavy]-duty, engine-mounted air cleaner with replaceable dry-filter element and "blocked filter" indicator. K. Starting System: [24]-V electric, with negative ground. 1. 2. 3. 4. 5. 6. 7. 8. Components: Sized so they will not be damaged during a full engine-cranking cycle with ambient temperature at maximum specified in Part 1 "Project Conditions" Article. Cranking Motor: Heavy-duty unit that automatically engages and releases from engine flywheel without binding. Cranking Cycle: [As required by NFPA 110 for system level specified]. Battery: Adequate capacity within ambient temperature range specified in Part 1 "Project Conditions" Article to provide specified cranking cycle at least [three times] without recharging. Battery Cable: Size as recommended by engine manufacturer for cable length indicated. Include required interconnecting conductors and connection accessories. Battery Compartment: Factory fabricated of metal with acid-resistant finish and thermal insulation. Thermostatically controlled heater shall be arranged to maintain battery above 10 deg C regardless of external ambient temperature within range specified in Part 1 "Project Conditions" Article. Include accessories required to support and fasten batteries in place. Battery-Charging Alternator: Factory mounted on engine with solid-state voltage regulation and 35-A minimum continuous rating. Battery Charger: Current-limiting, automatic-equalizing and float-charging type. Unit shall comply with UL 1236 and include the following features: a. Operation: Equalizing-charging rate of 10 A shall be initiated automatically after battery has lost charge until an adjustable equalizing voltage is achieved at battery ENGINE GENERATORS 263213 - 7 North Quad Infrastructure Renewal UMass Lowell, Lowell, MA UMBA Project No. UMBA 13-L2 b. c. d. e. f. 2.4 ICON architecture, inc. September 17, 2015 terminals. Unit shall then be automatically switched to a lower float-charging mode and shall continue to operate in that mode until battery is discharged again. Automatic Temperature Compensation: Adjust float and equalize voltages for variations in ambient temperature from minus 40 deg C to plus 60 deg C to prevent overcharging at high temperatures and undercharging at low temperatures. Automatic Voltage Regulation: Maintain constant output voltage regardless of input voltage variations up to plus or minus 10 percent. Ammeter and Voltmeter: Flush mounted in door. Meters shall indicate charging rates. Safety Functions: Sense abnormally low battery voltage and close contacts providing low battery voltage indication on control and monitoring panel. Sense high battery voltage and loss of ac input or dc output of battery charger. Either condition shall close contacts that provide a battery-charger malfunction indication at system control and monitoring panel. Enclosure and Mounting: NEMA 250, Type 1, wall-mounted cabinet. FUEL OIL STORAGE A. Comply with NFPA 30. B. Base-Mounted Fuel Oil Tank: Factory installed and piped, complying with UL 142 fuel oil tank. Features include the following: 1. 2. 3. 4. 5. 6. 2.5 Tank level indicator. Capacity: Fuel for [24] hours' continuous operation at 100 percent rated power output. Vandal-resistant fill cap. Containment Provisions: Comply with requirements of authorities having jurisdiction. The fuel tank shall be a double-walled, steel construction, and include leak detection provisions, wired to the generator set controller for local and remote alarm indication. The fuel tank shall be constructed of high strength carbon steel. CONTROL AND MONITORING A. Automatic Starting System Sequence of Operation: When mode-selector switch on the control and monitoring panel is in the automatic position, remote-control contacts in one or more separate automatic transfer switches initiate starting and stopping of generator set. When modeselector switch is switched to the on position, generator set starts. The off position of same switch initiates generator-set shutdown. When generator set is running, specified system or equipment failures or derangements automatically shut down generator set and initiate alarms. Operation of a remote emergency-stop switch also shuts down generator set. B. Configuration: Operating and safety indications, protective devices, basic system controls, and engine gages shall be grouped in a common wall-mounted control and monitoring panel located in the main Pod 2 electrical room. C. Indicating and Protective Devices and Controls: system, and the following: ENGINE GENERATORS As required by NFPA 110 for Level [1] 263213 - 8 North Quad Infrastructure Renewal UMass Lowell, Lowell, MA UMBA Project No. UMBA 13-L2 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. ICON architecture, inc. September 17, 2015 AC voltmeter. AC ammeter. AC frequency meter. DC voltmeter (alternator battery charging). Engine-coolant temperature gage. Engine lubricating-oil pressure gage. Running-time meter. Ammeter-voltmeter, phase-selector switch(es). Generator-voltage adjusting rheostat. Fuel tank high-level shutdown of fuel supply alarm. Generator overload. D. Supporting Items: Include sensors, transducers, terminals, relays, and other devices and include wiring required to support specified items. Locate sensors and other supporting items on engine or generator, unless otherwise indicated. E. Connection to Data Link: A separate terminal block, factory wired to Form C dry contacts, for each alarm and status indication is reserved for connections for data-link transmission of indications to remote data terminals. F. Common Remote Audible Alarm: Comply with NFPA 110 requirements for Level 1 systems. Include necessary contacts and terminals in control and monitoring panel. 1. 2. 3. 4. 5. G. 2.6 Overcrank shutdown. Coolant low-temperature alarm. Control switch not in auto position. Battery-charger malfunction alarm. Battery low-voltage alarm. Remote Emergency-Stop Switch: Flush; wall mounted, unless otherwise indicated; and labeled. Push button shall be protected from accidental operation. GENERATOR OVERCURRENT AND FAULT PROTECTION A. Generator Circuit Breaker: Molded-case, electronic-trip type; 100 percent rated; complying with UL 489. 1. 2. 3. 4. B. Tripping Characteristics: Adjustable long-time, short-time delay and instantaneous. Trip Settings: Selected to coordinate with generator thermal damage curve. Shunt Trip: Connected to trip breaker when generator set is shut down by other protective devices. Mounting: Adjacent to or integrated with control and monitoring panel. Generator Disconnect Switch: Molded-case type, 100 percent rated. 1. 2. Rating: Matched to generator output rating. Shunt Trip: Connected to trip switch when signaled by generator protector or by other protective devices. ENGINE GENERATORS 263213 - 9 North Quad Infrastructure Renewal UMass Lowell, Lowell, MA UMBA Project No. UMBA 13-L2 C. Generator Protector: Microprocessor-based unit shall continuously monitor current level in each phase of generator output, integrate generator heating effect over time, and predict when thermal damage of alternator will occur. When signaled by generator protector or other generator-set protective devices, a shunt-trip device in the generator disconnect switch shall open the switch to disconnect the generator from load circuits. Protector shall perform the following functions: 1. 2. 3. 4. 2.7 ICON architecture, inc. September 17, 2015 Initiates a generator overload alarm when generator has operated at an overload equivalent to 110 percent of full-rated load for 60 seconds. Indication for this alarm is integrated with other generator-set malfunction alarms. Under single or three-phase fault conditions, regulates generator to 300 percent of rated full-load current for up to 10 seconds. As overcurrent heating effect on the generator approaches the thermal damage point of the unit, protector switches the excitation system off, opens the generator disconnect device, and shuts down the generator set. Senses clearing of a fault by other overcurrent devices and controls recovery of rated voltage to avoid overshoot. GENERATOR, EXCITER, AND VOLTAGE REGULATOR A. Comply with NEMA MG 1. B. Drive: Generator shaft shall be directly connected to engine shaft. Exciter shall be rotated integrally with generator rotor. C. Electrical Insulation: Class H or Class F. D. Stator-Winding Leads: Brought out to terminal box to permit future reconnection for other voltages if required. E. Construction shall prevent mechanical, electrical, and thermal damage due to vibration, overspeed up to 125 percent of rating, and heat during operation at 110 percent of rated capacity. F. Enclosure: Dripproof. G. Instrument Transformers: Mounted within generator enclosure. H. Voltage Regulator: Solid-state type, separate from exciter, providing performance as specified. 1. I. Adjusting rheostat on control and monitoring panel shall provide plus or minus 5 percent adjustment of output-voltage operating band. Strip Heater: Thermostatically controlled unit arranged to maintain stator windings above dew point. ENGINE GENERATORS 263213 - 10 North Quad Infrastructure Renewal UMass Lowell, Lowell, MA UMBA Project No. UMBA 13-L2 2.8 ICON architecture, inc. September 17, 2015 LOAD BANK A. Description: Permanent, outdoor, weatherproof, remote-controlled, forced-air-cooled, [resistive and reactive] unit capable of providing a balanced 3-phase, delta-connected load to generator set at [50] percent rated-system capacity, at [80] percent power factor, lagging. Unit may be composed of separate resistive and reactive load banks controlled by a common control panel. Unit shall be capable of selective control of load in 25 percent steps and with minimum step changes of approximately 5 and 10 percent available. B. Resistive Load Elements: Corrosion-resistant chromium alloy with ceramic and steel supports. Elements shall be double insulated and designed for repetitive on-off cycling. Elements shall be mounted in removable aluminized-steel heater cases. C. Reactive Load Elements: Epoxy-encapsulated reactor coils. D. Load-Bank Heat Dissipation: Integral fan with totally enclosed motor shall provide uniform cooling airflow through load elements. Airflow and coil operating current shall be such that, at maximum load, with ambient temperature at the upper end of specified range, load-bank elements operate at not more than 50 percent of maximum continuous temperature rating of resistance elements. E. Load Element Switching: Remote-controlled contactors switch groups of load elements. Contactor coils are rated 120 V. Contactors shall be located in a separate NEMA 250, Type 3R enclosure within load-bank enclosure, accessible from exterior through hinged doors with tumbler locks. F. Contactor Enclosures: condensation. G. Load-Bank Enclosures: NEMA 250, Type 3R, complying with NEMA ICS 6. Louvers at cooling-air intake and discharge openings shall prevent entry of rain and snow. Openings for airflow shall be screened with 1/2-inch- (13-mm-) square, galvanized-steel mesh. Reactive load bank shall include automatic shutters at air intake and discharge. H. Protective Devices: Power input circuits to load banks shall be fused, and fuses shall be selected to coordinate with generator circuit breaker. Fuse blocks shall be located in contactor enclosure. Cooling airflow and overtemperature sensors shall automatically shut down and lock out load bank until manually reset. Safety interlocks on access panels and doors shall disconnect load power, control, and heater circuits. Fan motor shall be separately protected by overload and short-circuit devices. Short-circuit devices shall be noninterchangeable fuses with 200,000-A interrupting capacity. I. Remote-Control Panel: Separate from load bank in NEMA 250, Type 1 enclosure with a control power switch and pilot light, and switches controlling groups of load elements. J. Control Sequence: Control panel may be preset for adjustable single-step loading of generator during automatic exercising. ENGINE GENERATORS Heated by thermostatically controlled strip heaters to prevent 263213 - 11 North Quad Infrastructure Renewal UMass Lowell, Lowell, MA UMBA Project No. UMBA 13-L2 2.9 ICON architecture, inc. September 17, 2015 OUTDOOR GENERATOR-SET ENCLOSURE A. Description: Vandal-resistant, weatherproof steel housing, wind resistant up to 100 mph (160 km/h). Multiple panels shall be lockable and provide adequate access to components requiring maintenance. Panels shall be removable by one person without tools. Instruments and control shall be mounted within enclosure. B. Description: Prefabricated or preengineered enclosure with the following features: 1. 2. 3. 4. 5. 6. 7. 8. C. Engine Cooling Airflow through Enclosure: Maintain temperature rise of system components within required limits when unit operates at 110 percent of rated load for 2 hours with ambient temperature at top of range specified in system service conditions. 1. 2. D. 2.10 A. Construction: Galvanized-steel, metal-clad, integral structural-steel-framed building erected on concrete foundation. Structural Design and Anchorage: Comply with ASCE 7 for wind loads. Space Heater: Thermostatically controlled and sized to prevent condensation. Louvers: Equipped with bird screen and filter arranged to permit air circulation when engine is not running while excluding exterior dust, birds, and rodents. Hinged Doors: With padlocking provisions. Ventilation: Louvers equipped with bird screen and filter arranged to permit air circulation while excluding exterior dust, birds, and rodents. Thermal Insulation: Manufacturer's standard materials and thickness selected in coordination with space heater to maintain winter interior temperature within operating limits required by engine-generator-set components. Muffler Location: [External to] enclosure. Louvers: Fixed-engine, cooling-air inlet and discharge. Storm-proof and drainable louvers prevent entry of rain and snow. Automatic Dampers: At engine cooling-air inlet and discharge. Dampers shall be closed to reduce enclosure heat loss in cold weather when unit is not operating. Convenience Outlets: Factory wired[, GFCI]. Arrange for external electrical connection. VIBRATION ISOLATION DEVICES Elastomeric Isolation Pads: 1. Manufacturers: Subject to compliance with requirements, [available manufacturers offering products that may be incorporated into the Work include, but are not limited to, the following]: a. b. c. d. e. f. g. Ace Mountings Co., Inc. California Dynamics Corporation. Isolation Technology, Inc. Kinetics Noise Control, Inc. Mason Industries, Inc. Vibration Eliminator Co., Inc. Vibration Isolation. ENGINE GENERATORS 263213 - 12 North Quad Infrastructure Renewal UMass Lowell, Lowell, MA UMBA Project No. UMBA 13-L2 h. 2. 3. 4. 5. 6. 7. 8. Vibration Mountings & Controls, Inc. Fabrication: Single or multiple layers of sufficient durometer stiffness for uniform loading over pad area. Size: Factory or field cut to match requirements of supported equipment. Pad Material: Oil and water resistant with elastomeric properties. Surface Pattern: [Smooth] [Ribbed] [Waffle] pattern. Infused nonwoven cotton or synthetic fibers. Load-bearing metal plates adhered to pads. Sandwich-Core Material: [Resilient] [and] [elastomeric] a. b. B. ICON architecture, inc. September 17, 2015 Surface Pattern: [Smooth] [Ribbed] [Waffle] pattern. Infused nonwoven cotton or synthetic fibers. Restrained Spring Isolators: Freestanding, Steel, Open-Spring Isolators with Vertical-Limit Stop Restraint in Two-Part Telescoping Housing: 1. Manufacturers: Subject to compliance with requirements, [available manufacturers offering products that may be incorporated into the Work include, but are not limited to, the following]: a. b. c. d. e. f. g. h. 2. Two-Part Telescoping Housing: A steel top and bottom frame separated by an elastomeric material and enclosing the spring isolators. Housings are equipped with [adjustable] snubbers to limit vertical movement. a. b. 3. 4. 5. 6. Ace Mountings Co., Inc. California Dynamics Corporation. Isolation Technology, Inc. Kinetics Noise Control, Inc. Mason Industries, Inc. Vibration Eliminator Co., Inc. Vibration Isolation. Vibration Mountings & Controls, Inc. Drilled base housing for bolting to structure with an elastomeric isolator pad attached to the underside. Bases shall limit floor load to 500 psig (3447 kPa). Threaded top housing with adjustment bolt and cap screw to fasten and level equipment. Outside Spring Diameter: Not less than 80 percent of the compressed height of the spring at rated load. Minimum Additional Travel: 50 percent of the required deflection at rated load. Lateral Stiffness: More than 80 percent of rated vertical stiffness. Overload Capacity: Support 200 percent of rated load, fully compressed, without deformation or failure. ENGINE GENERATORS 263213 - 13 North Quad Infrastructure Renewal UMass Lowell, Lowell, MA UMBA Project No. UMBA 13-L2 2.11 A. 2.12 A. FINISHES Indoor and Outdoor Enclosures and Components: Manufacturer's standard finish over corrosion-resistant pretreatment and compatible primer. SOURCE QUALITY CONTROL Prototype Testing: Factory test engine-generator set using same engine model, constructed of identical or equivalent components and equipped with identical or equivalent accessories. 1. B. ICON architecture, inc. September 17, 2015 Tests: Comply with NFPA 110, Level 1 Energy Converters and with IEEE 115. Project-Specific Equipment Tests: Before shipment, factory test engine-generator set and other system components and accessories manufactured specifically for this Project. Perform tests at rated load and power factor. Include the following tests: 1. 2. 3. 4. 5. 6. 7. 8. 9. Test components and accessories furnished with installed unit that are not identical to those on tested prototype to demonstrate compatibility and reliability. Full load run. Maximum power. Voltage regulation. Transient and steady-state governing. Single-step load pickup. Safety shutdown. Provide 14 days' advance notice of tests and opportunity for observation of tests by Owner's representative. Report factory test results within 10 days of completion of test. PART 3 - EXECUTION 3.1 EXAMINATION A. Examine areas, equipment bases, and conditions, with Installer present, for compliance with requirements for installation and other conditions affecting packaged engine-generator performance. B. Examine roughing-in of piping systems and electrical connections. Verify actual locations of connections before packaged engine-generator installation. C. Proceed with installation only after unsatisfactory conditions have been corrected. 3.2 DEMONSTRATION A. Engage a factory-authorized service representative to train Owner's maintenance personnel to adjust, operate, and maintain packaged engine generators. Refer to Section 017900 "Demonstration and Training." ENGINE GENERATORS 263213 - 14 North Quad Infrastructure Renewal UMass Lowell, Lowell, MA UMBA Project No. UMBA 13-L2 3.3 ICON architecture, inc. September 17, 2015 FUEL A. Provide all fuel required for testing. B. Hand over generator system to owner after all acceptance testing is complete with all generator fuel tanks fully filled. 3.4 RETURN VISIT POST INSTALL A. Generator vendor shall return to site post installation by the electrical contractor. The vendor shall adjust the generator controller and output circuit breakers to selectively coordinate the generator circuit breaker with the rest of the life safety system, as per NEC article 700 requirements. Where the provided circuit breaker cannot be coordinated with the emergency power system, the generator vendor shall work with the electrical contractor to find a suitable circuit breaker, and shall replace the breaker on the unit with no additional labor cost. The circuit breaker, where required, shall be furnished by the project electrical contractor. END OF SECTION 263213 ENGINE GENERATORS 263213 - 15 UMass Lowell North Quad Infrastructure Renewal Lowell, MA (UMBA 13-L2) 100% CONSTRUCTION DOCUMENT SET JULY 17, 2015 CLIENT University of Massachusetts Building Authority (UMBA) 225 Franklin Street, 12th Floor Boston, MA 02110 CIVIL ENGINEER/SURVEYOR Nitsch Engineering 2 Center Plaza, Suite 430 Boston, MA 02108 University of Massachusetts Lowell (UML) 600 Suffolk Street, Suite 450 Lowell, MA 01854 GEOTECHNICAL ENGINEER Haley & Aldrich 465 Medford Street, Suite 2200 Charlestown, MA 02129 OWNER'S PROJECT MANAGER Hill International 330 Congress Street, 6th Floor Boston, MA 02210 OPM'S CODE CONSULTANT Hughes Associates, Inc. 5 Mount Royal Avenue, Suite 240 Marlborough, MA 01752 BUILDING CODE CONSULTANT Cosentini Associates, Inc. Building 200, 2nd Floor One Kendall Square Cambridge, MA 02139 COST ESTIMATING CONSULTANT V.J. Associates of New England, Inc. 60 Dedham Avenue Needham, MA 02492 STRUCTURAL ENGINEER Lim Consultants, Inc. 6 Pleasant Street, Suite 520 Malden, MA 02148 HARDWARE CONSULTANT ASSA ABLOY 110 Sargent Drive New Haven, CT 06511 MEP/FP ENGINEER ARUP USA, Inc. 955 Massachusetts Avenue Cambridge, MA 02139 SPECIFICATIONS WRITER Kalin Associates, Inc. 1121 Washington Street Newton, MA 02465 ARCHITECT ICON architecture, inc. 101 Summer Street Boston, MA 02110 E RSID RIVE UNIVERSITY VFW HIGHWAY N CAMPUS PLAN N SHEET TITLE COVER SHEET G-001 7/20/2015 2:57:49 PM LOCUS PLAN CIVIL DEMOLITION CD-100 SITE DEMOLITION PLAN CIVIL C-101 C-102 C-103 C-201 C-202 C-203 C-204 SITE UTILITY PLAN SITE GRADING PLAN SITE LAYOUT & MATERIALS PLAN SITE DETAILS & GENERAL NOTES UTILITY DETAILS I UTILITY DETAILS II UTILITY DETAILS III DEMOLITION D-101 POD 1 DEMOLITION PART PLANS - LEVEL 1 & LEVEL 1.5 D-102 POD 1 DEMOLITION PART PLANS - LEVEL 2 & LEVEL 3 D-103 POD 1 DEMOLITION PART PLANS - LEVEL 4 & ROOF D-104 POD 2 DEMOLITION PART PLANS - LEVEL 1 & MEZZ D-105 POD 2 DEMOLITION PART PLANS - LEVEL 2 & LEVEL 3 D-201 POD 1 DEMOLITION ELEVATIONS D-202 POD 2 DEMOLITION ELEVATIONS ARCHITECTURAL A-101 BASEMENT KEY PLAN A-102 LEVEL 1 KEY PLAN A-103 LEVEL 1.5 KEY PLAN A-104 LEVEL 2 KEY PLAN A-105 LEVEL 3 KEY PLAN A-106 LEVEL 4 KEY PLAN A-107 ROOF KEY PLAN A-201 POD 1 BUILDING ELEVATIONS A-202 POD 1 BUILDING ELEVATIONS A-203 POD 2 BUILDING ELEVATIONS A-204 NEW CONSTRUCTION W/ EXISTING BUILDING SECTIONS - POD 1 A-205 NEW CONSTRUCTION W/ EXISTING BUILDING SECTIONS - POD 2 A-301 POD 1 BUILDING SECTIONS A-302 POD 1 BUILDING SECTIONS A-303 POD 2 BUILDING SECTIONS A-304 POD 2 BUILDING SECTIONS A-305 KITSON MEZZ BUILDING SECTIONS A-401 TYPICAL WALL SECTIONS - POD 1 A-402 TYPICAL WALL SECTIONS - POD 1 A-403 TYPICAL WALL SECTIONS - POD 1 A-404 TYPICAL WALL SECTIONS - POD 2 A-405 TYPICAL WALL SECTIONS - POD 2 A-501 POD 1 ENLARGED FLOOR PLANS - LEVEL 1 A-502 POD 1 ENLARGED FLOOR PLANS - LEVEL 1.5 A-503 POD 1 ENLARGED FLOOR PLANS - LEVEL 2 A-504 POD 1 ENLARGED FLOOR PLANS - LEVEL 3 A-505 POD 1 ENLARGED FLOOR PLANS - LEVEL 4 A-506 POD 1 ENLARGED FLOOR PLANS - ROOF A-507 POD 2 ENLARGED FLOOR PLANS - LEVEL 1 (KITSON HALL) A-508 POD 2 ENLARGED FLOOR PLANS - LEVEL 1 A-509 KITSON MEZZ ENLARGED PLAN A-510 POD 2 ENLARGED FLOOR PLANS - LEVEL 2 A-511 POD 2 ENLARGED FLOOR PLANS - LEVEL 3 A-512 POD 2 ENLARGED FLOOR PLANS - ROOF A-520 POD 1 REFLECTED CEILING PLANS - LEVEL 1 A-521 POD 1 REFLECTED CEILING PLANS - LEVEL 1.5 A-522 POD 1 REFLECTED CEILING PLANS - LEVEL 2 A-523 POD 1 REFLECTED CEILING PLANS - LEVEL 3 A-524 POD 1 REFLECTED CEILING PLANS - LEVEL 4 A-525 POD 2 REFLECTED CEILING PLANS - LEVEL 1 A-526 POD 2 REFLECTED CEILING PLANS - LEVELS 2 & 3 A-530 RESTROOM TYPES A-531 RESTROOM TYPES A-532 RESTROOM TYPES A-534 POD 1 & 2 INTERIOR ELEVATIONS A-535 POD 1 & 2 INTERIOR ELEVATIONS A-536 KITSON INTERIOR ELEVATIONS A-601 EXISTING SOUTHWICK STAIR 1 MODIFICATIONS A-602 EXISTING PASTEUR STAIR 1 MODIFICATIONS A-603 EXISTING KITSON STAIR 2 MODIFICATIONS A-604 POD 1 ELEVATOR A-605 KITSON EXISTING ELEVATOR A-606 INTERIOR RAMP PLANS & SECTIONS A-607 INTERIOR STAIR PLANS & SECTIONS A-701 TYPICAL DETAILS A-702 POD 1 TYPICAL DETAILS A-703 POD 1 - TYPICAL EXTERIOR WALL DETAILS A-704 POD 1 TYPICAL ENLARGED EXTERIOR DETAILS A-705 POD 2 TYPICAL DETAILS A-706 TYPICAL INTERIOR DETAILS A-707 ENTRY DETAILS A-708 TYPICAL RAILING DETAILS A-709 POD 1 LEVEL 1 PLAN DETAILS A-710 POD 1 LEVEL 1.5 PLAN DETAILS A-711 POD 1 LEVELS 2-4 PLAN DETAILS A-712 A-713 A-714 A-715 A-716 A-717 A-718 A-719 A-720 A-721 A-722 A-723 A-724 A-801 A-802 A-803 A-804 A-805 A-806 POD 1 LEVELS 2-4 PLAN DETAILS POD 1 LEVELS 2-4 PLAN DETAILS POD 2 PLAN DETAILS POD 2 PLAN DETAILS TYPICAL COMPOSITE METAL PANEL SYSTEM DETAILS TYPICAL COMPOSITE METAL PANEL SYSTEM DETAILS COMPOSITE METAL PANEL INFILL DETAILS TYPICAL CURTAIN WALL DETAILS TYPICAL CURTAIN HEAD AND SILL DETAILS TYPICAL CURTAIN JAMB DETAILS @ LEVEL 1.5 TYPICAL EXPANSION JOINT DETAILS TYPICAL ROOF DETAILS DOOR DETAILS AT CMP INFILL WALL DOOR TYPES, SCHEDULE & DETAILS DOOR TYPES, SCHEDULE & DETAILS CURTAIN WALL TYPES & SCHEDULE TYPICAL PARTITION TYPES TYPICAL PARTITION TYPES ROOM FINISH SCHEDULE STRUCTURAL S-001 GENERAL NOTES S-002 GENERAL NOTES S-003 TYPICAL CONCRETE DETAILS S-004 TYPICAL CONCRETE DETAILS S-005 TYPICAL CONCRETE DETAILS S-006 TYPICAL CONCRETE DETAILS S-007 TYPICAL CMU DETAILS S-008 TYPICAL CMU DETAILS S-009 TYPICAL STEEL DETAILS S-010 TYPICAL STEEL DETAILS S-011 TYPICAL STEEL DETAILS S-012 TYPICAL STEEL DETAILS S-013 TYPICAL STEEL DETAILS S-101 LEVEL 1 KEY PLAN S-102 LEVEL 1.5 KEY PLAN S-103 LEVEL 2 KEY PLAN S-104 LEVEL 3 KEY PLAN S-105 LEVEL 4 KEY PLAN S-106 ROOF KEY PLAN S-201 COLUMN SCHEDULE POD 1 S-202 COLUMN SCHEDULE POD 2 S-203 BASE PLATE DETAILS S-204 LATERAL RESISTING FRAME ELEVATIONS POD 1 S-205 LATERAL RESISTING FRAME ELEVATIONS POD 2 S-206 BRACED FRAME DETAILS S-301 PILASTER DETAILS POD 1 S-302 FOUNDATION SECTIONS & DETAILS POD 1 S-303 FOUNDATION SECTIONS & DETAILS POD 1 S-304 FOUNDATION SECTIONS & DETAILS POD 1 S-310 FOUNDATION SECTIONS & DETAILS POD 2 S-311 FOUNDATION SECTIONS & DETAILS POD 2 S-312 FOUNDATION SECTIONS & DETAILS POD 2 S-401 SECTIONS & DETAILS S-402 SECTIONS & DETAILS S-501 POD 1 ENLARGED FRAMING PLAN - LEVEL 1/FOUNDATION S-502 POD 1 ENLARGED FRAMING PLAN - LEVEL 1.5 S-503 POD 1 ENLARGED FRAMING PLAN - LEVEL 2 S-504 POD 1 ENLARGED FRAMING PLAN - LEVEL 3 S-505 POD 1 ENLARGED FRAMING PLAN - LEVEL 4 S-506 POD 1 ENLARGED FRAMING PLAN - ROOF S-507 POD 2 ENLARGED FRAMING PLAN - LEVEL 1/FOUNDATION S-508 POD 2 ENLARGED FRAMING PLAN - LEVEL 2 S-509 POD 2 ENLARGED FRAMING PLAN - LEVEL 3 S-510 POD 2 ENLARGED FRAMING PLAN - ROOF MECHANICAL M-000 MECHANICAL SYMBOLS & ABBREVIATIONS M-001 MECHANICAL SCHEDULES SHEET 1 M-002 MECHANICAL SCHEDULES SHEET 2 M-201 MECHANICAL POD 1 DEMOLITION PART PLANS - LEVEL 1 & 1.5 M-202 MECHANICAL POD 1 DEMOLITION PART PLANS - LEVEL 2 & 3 M-203 MECHANICAL POD 1 DEMOLITION PART PLANS - LEVEL 4 & ROOF M-204 MECHANICAL POD 2 DEMOLITION PART PLANS - LEVEL 1 & MEZZ M-205 MECHANICAL POD 2 DEMOLITION PART PLANS - LEVEL 2 & 3 M-300 MECHANICAL SUPPLY AND EXHAUST AIR LINE DIAGRAM M-301 MECHANICAL SUPPLY AIR AND REFRIGERANT LINE DIAGRAM M-302 MECHANICAL REFRIGERANT LINE DIAGRAM M-402 MECHANICAL LEVEL 1 - KEY PLAN M-403 MECHANICAL LEVEL 1.5 - KEY PLAN M-404 MECHANICAL LEVEL 2 - KEY PLAN M-405 MECHANICAL LEVEL 3 - KEY PLAN M-406 MECHANICAL LEVEL 4 - KEY PLAN M-407 MECHANICAL LEVEL ROOF - KEY PLAN M-701 MECHANICAL POD 1 ENLARGED FLOOR PLANS - LEVEL 1 M-702 MECHANICAL POD 1 ENLARGED FLOOR PLANS - LEVEL 1.5 M-703 MECHANICAL POD 1 ENLARGED FLOOR PLANS - LEVEL 2 M-704 MECHANICAL POD 1 ENLARGED FLOOR PLANS - LEVEL 3 M-705 MECHANICAL POD 1 ENLARGED FLOOR PLANS - LEVEL 4 M-706 MECHANICAL POD 1 ENLARGED FLOOR PLANS - ROOF M-708 MECHANICAL POD 2 ENLARGED FLOOR PLANS - LEVEL 1 M-710 MECHANICAL POD 2 ENLARGED FLOOR PLANS - LEVEL 2 M-711 M-712 M-801 M-802 M-803 M-901 M-902 M-903 MECHANICAL POD 2 ENLARGED FLOOR PLANS - LEVEL 3 MECHANICAL POD 2 ENLARGED FLOOR PLANS - ROOF MECHANICAL DETAILS SHEET 1 MECHANICAL DETAILS SHEET 2 MECHANICAL DETAILS SHEET 3 MECHANICAL CONTROLS SHEET 1 MECHANICAL CONTROLS SHEET 2 MECHANICAL CONTROLS SHEET3 ELECTRICAL E-000 ELECTRICAL SYMBOLS & ABBREVIATIONS E-001 ELECTRICAL SCHEDULE OF PANELBOARDS E-002 ELECTRICAL SCHEDULE PLAN SHEET 1 E-003 ELECTRICAL SCHEDULE PLAN SHEET 2 E-004 ELECTRICAL SCHEDULE PLAN SHEET 3 E-005 ELECTRICAL SCHEDULE PLAN SHEET 4 E-006 ELECTRICAL SCHEDULE PLAN SHEET 5 E-007 ELECTRICAL SCHEDULE PLAN SHEET 6 E-008 ELECTRICAL SCHEDULE PLAN SHEET 7 E-201 ELECTRICAL POD 1 DEMOLITION PART PLANS - LEVEL 1 & 1.5 E-202 ELECTRICAL POD 1 DEMOLITION PART PLANS - LEVEL 2 & 3 E-203 ELECTRICAL POD 1 DEMOLITION PART PLANS - LEVEL 4 & ROOF E-204 ELECTRICAL POD 2 DEMOLITION PART PLANS - LEVEL 1 & MEZZ E-205 ELECTRICAL POD 2 DEMOLITION PART PLANS - LEVEL 2 & 3 E-300 ELECTRICAL RISER ONE LINE DIAGRAM E-301 ELECTRICAL RISER TWO LINE DIAGRAM E-402 ELECTRICAL LEVEL 1 - KEY PLAN E-403 ELECTRICAL LEVEL 1.5 - KEY PLAN E-404 ELECTRICAL LEVEL 2 - KEY PLAN E-405 ELECTRICAL LEVEL 3 - KEY PLAN E-406 ELECTRICAL LEVEL 4 - KEY PLAN E-407 ELECTRICAL ROOF - KEY PLAN E-701 ELECTRICAL POD 1 ENLARGED FLOOR PLANS - LEVEL 1 E-702 ELECTRICAL POD 1 ENLARGED FLOOR PLANS - LEVEL 1.5 E-703 ELECTRICAL POD 1 ENLARGED FLOOR PLANS - LEVEL 2 E-704 ELECTRICAL POD 1 ENLARGED FLOOR PLANS - LEVEL 3 E-705 ELECTRICAL POD 1 ENLARGED FLOOR PLANS - LEVEL 4 E-706 ELECTRICAL POD 1 ENLARGED FLOOR PLANS - ROOF E-707 ELECTRICAL POD 2 ENLARGED FLOOR PLANS - LEVEL 1 (KITSON HALL) E-710 ELECTRICAL POD 2 ENLARGED FLOOR PLANS - LEVEL 2 E-711 ELECTRICAL POD 2 ENLARGED FLOOR PLANS - LEVEL 3 E-712 ELECTRICAL POD 2 ENLARGED FLOOR PLANS - ROOF E-720 ELECTRICAL POD 1 ENLARGED LIGHTING PLANS - LEVEL 1 E-721 ELECTRICAL POD 1 ENLARGED LIGHTING PLANS - LEVEL 1.5 E-722 ELECTRICAL POD 1 ENLARGED LIGHTING PLANS - LEVEL 2 E-723 ELECTRICAL POD 1 ENLARGED LIGHTING PLANS - LEVEL 3 E-724 ELECTRICAL POD 1 ENLARGED LIGHTING PLANS - LEVEL 4 E-725 ELECTRICAL POD 2 ENLARGED LIGHTING PLANS - LEVEL 1 E-726 ELECTRICAL POD 2 ENLARGED LIGHTING PLANS - LEVELS 2 & 3 E-800 ELECTRICAL DETAILS PLAN SHEET 1 E-801 ELECTRICAL DETAILS PLAN SHEET 2 E-802 ELECTRICAL DETAILS PLAN SHEET 3 E-803 ELECTRICAL DETAILS PLAN SHEET 4 PLUMBING P-000 PLUMBING LEGEND & GENERAL NOTES P-001 PLUMBING SCHEDULES P-201 PLUMBING LEVEL 1 DEMOLITION KEY PLAN P-202 PLUMBING POD 1 DEMOLITION PART PLANS - LEVEL 1 & 5 P-300 PLUMBING DOMESTIC WATER RISER DIAGRAM - PASTEUR P-301 PLUMBING DOMESTIC WTAER RISER DIAGRAM - KITSON P-302 PLUMBING SANTARY RISER DIAGRAM PASTEUR P-303 PLUMBING SANTARY RISER DIAGRAM KITSON P-401 PLUMBING BASEMENT - KEY PLAN P-402 PLUMBING LEVEL 1 - KEY PLAN P-403 PLUMBING LEVEL 1.5 - KEY PLAN P-404 PLUMBING LEVEL 2 - KEY PLAN P-405 PLUMBING LEVEL 3 - KEY PLAN P-406 PLUMBING LEVEL 4 - KEY PLAN P-407 PLUMBING ROOF - KEY PLAN P-700 PLUMBING POD 1 ENLARGED FLOOR PLANS - BASEMENT P-701 PLUMBING POD 1 ENLARGED FLOOR PLANS - LEVEL 1 P-702 PLUMBING POD 1 ENLARGED FLOOR PLANS - LEVEL 1.5 P-703 PLUMBING POD 1 ENLARGED FLOOR PLANS - LEVEL 2 P-704 PLUMBING POD 1 ENLARGED FLOOR PLANS - LEVEL 3 P-705 PLUMBING POD 1 ENLARGED FLOOR PLANS - LEVEL 4 P-706 PLUMBING POD 1 ENLARGED FLOOR PLANS - ROOF P-708 PLUMBING, POD 2 UNDERSLAB P-709 PLUMBING POD 2 ENLARGED FLOOR PLANS - LEVEL 1 P-711 PLUMBING POD 2 ENLARGED FLOOR PLANS - LEVEL 2 P-712 PLUMBING POD 2 ENLARGED FLOOR PLANS - LEVEL 3 P-713 PLUMBING POD 2 ENLARGED FLOOR PLANS - ROOF P-800 PLUMBING DETAILS P-801 PLUMBING DETAILS FIRE PROTECTION FA-000 FIRE ALARM SYMBOLS & ABBREVIATIONS FA-201 FIRE ALARM POD 1 DEMOLITION PARTS PLANS - LEVEL 1 & 1.5 FA-204 FIRE ALARM POD 2 DEMOLITION PART PLANS - LEVEL 1 & MEZZ FA-300 FIRE ALARM RISER DIAGRAM FA-301 FIRE ALARM SEQUENCE OF OPERATIONS FA-402 FA-403 FA-404 FA-405 FA-406 FA-701 FA-702 FA-703 FA-704 FA-705 FA-707 FA-710 FA-711 FA-800 FA-801 FP-000 FP-201 FP-300 FP-400 FP-403 FP-404 FP-405 FP-406 FP-407 FP-701 FP-702 FP-703 FP-704 FP-705 FP-707 FP-709 FP-710 FP-711 FP-800 FP-801 FIRE ALARM LEVEL 1 - KEY PLAN FIRE ALARM LEVEL 1.5 - KEY PLAN FIRE ALARM LEVEL 2 - KEY PLAN FIRE ALARM LEVEL 3 - KEY PLAN FIRE ALARM LEVEL 4 - KEY PLAN FIRE ALARM POD 1 ENLARGED FLOOR PLANS - LEVEL 1 FIRE ALARM POD 1 ENLARGED FLOOR PLANS - LEVEL 1.5 FIRE ALARM POD 1 ENLARGED FLOOR PLANS - LEVEL 2 FIRE ALARM POD 1 ENLARGED FLOOR PLANS - LEVEL 3 FIRE ALARM POD 1 ENLARGED FLOOR PLANS - LEVEL 4 FIRE ALARM POD 2 ENLARGED FLOOR PLANS - LEVEL 1 (KITSON HALL) FIRE ALARM POD 2 ENLARGED FLOOR PLANS - LEVEL 2 FIRE ALARM POD 2 ENLARGED FLOOR PLANS - LEVEL 3 FIRE ALARM DETAILS SHEET 1 FIRE ALARM DETAILS SHEET 2 FIRE PROTECTION SYMBOLS & ABBREVIATIONS FIRE PROTECTION LEVEL 1 DEMOLITION PLAN FIRE PROTECTION RISER DIAGRAM FIRE PROTECTION LEVEL 1 - KEY PLAN FIRE PROTECTION LEVEL 1.5 - KEY PLAN FIRE PROTECTION LEVEL 2 - KEY PLAN FIRE PROTECTION LEVEL 3 - KEY PLAN FIRE PROTECTION LEVEL 4 - KEY PLAN FIRE PROTECTION ROOF - KEY PLAN FIRE PROTECTION POD 1 ENLARGED FLOOR PLANS - LEVEL 1 FIRE PROTECTION POD 1 ENLARGED FLOOR PLANS - LEVEL 1.5 FIRE PROTECTION POD 1 ENLARGED FLOOR PLANS - LEVEL 2 FIRE PROTECTION POD 1 ENLARGED FLOOR PLANS - LEVEL 3 FIRE PROTECTION POD 1 ENLARGED FLOOR PLANS - LEVEL 4 FIRE PROTECTION POD 2 ENLARGED FLOOR PLANS - LEVEL 1 (KITSON HALL) FIRE PROTECTION KITSON MEZZ ENLARGED PLAN FIRE PROTECTION POD 2 ENLARGED FLOOR PLANS - LEVEL 2 FIRE PROTECTION POD 2 ENLARGED FLOOR PLANS - LEVEL 3 FIRE PROTECTION DETAILS SHEET 1 FIRE PROTECTION DETAILS SHEET 2 TELECOMMUNICATIONS T-000 TELECOMS SYMBOLS & ABBREVIATIONS T-300 TELECOMS RISER ONE LINE DIAGRAM T-402 TELECOMMS LEVEL 1 - KEY PLAN T-403 TELECOMMS LEVEL 1.5 - KEY PLAN T-404 TELECOMMS LEVEL 2 - KEY PLAN T-405 TELECOMMS LEVEL 3 - KEY PLAN T-406 TELECOMMS LEVEL 4 - KEY PLAN T-701 L TELECOMMS POD 1 ENLARGED FLOOR PLANS - LOW LEVEL 1 T-702 H TELECOMMS POD 1 ENLARGED FLOOR PLANS - HIGH LEVEL 1.5 T-702 L TELECOMMS POD 1 ENLARGED FLOOR PLANS - LOW LEVEL 1.5 T-703 H TELECOMMS POD 1 ENLARGED FLOOR PLANS - HIGH LEVEL 2 T-703 L TELECOMMS POD 1 ENLARGED FLOOR PLANS - LOW LEVEL 2 T-704 H TELECOMMS POD 1 ENLARGED FLOOR PLANS - HIGH LEVEL 3 T-704 L TELECOMMS POD 1 ENLARGED FLOOR PLANS - LOW LEVEL 3 T-705 H TELECOMMS POD 1 ENLARGED FLOOR PLANS - HIGH LEVEL 4 T-705 L TELECOMMS POD 1 ENLARGED FLOOR PLANS - LOW LEVEL 4 T-707 H TELECOMMS POD 2 ENLARGED FLOOR PLANS - HIGH LEVEL 1 (KITSON HALL) T-707 L TELECOMMS POD 2 ENLARGED FLOOR PLANS - LOW LEVEL 1 (KITSON HALL) T-710 H TELECOMMS POD 2 ENLARGED FLOOR PLANS - HIGH LEVEL 2 T-710 L TELECOMMS POD 2 ENLARGED FLOOR PLANS - LOW LEVEL 2 T-711 H TELECOMMS POD 2 ENLARGED FLOOR PLANS - HIGH LEVEL 3 T-711 L TELECOMMS POD 2 ENLARGED FLOOR PLANS - LOW LEVEL 3 T-800 TELECOMMS DETAILS SHEET 1 T-801 TELECOMMS DETAILS SHEET 2 T-802 TELECOMMS DETAILS SHEET 3 UMass Lowell North Quad Infrastructure Renewal (UMBA 13-L2) Lowell, MA University of Massachusetts Building Authority University of Massachusetts Lowell ARCHITECT CONSULTANT 100% CONSTRUCTION DOCUMENTS SET STAMP 7/17/15 100% CONSTRUCT. DOC. SET 2 06/30/15 TIER 1 PHASE 1 PERMIT SET 1 05/07/15 90% CONSTRUCT. DOC. SET 04/22/15 TIER 1 PHASE 1 (EARLY PACKAGE) PERMIT SET 04/06/15 60% CONSTRUCTION PERMIT SET 01/15/15 100% DESIGN DEVELOPMENT SET 12/18/14 50% DESIGN DEVELOPMENT SET 08/29/14 SCHEMATIC DESIGN SET 06/10/14 FEASIBILITY STUDY SET MARK DATE DESCRIPTION PROJECT NUMBER: 21332 RD DRAWN BY: CHECKED BY: JM SHEET TITLE DRAWING LIST Highlighted Drawings are excerpt from 100% Construction Documents Dated 7/17/2015. Highlighted drawings included in this package pertain to Pre - Purchase Generator; G-002 7/20/2015 2:57:50 PM GENERAL G-001 COVER SHEET G-002 DRAWING LIST G-003 SITE PLAN ACCESSIBLE ROUTE PROJECT ABREVIATIONS: 38 6. 11 PE GC DE.77 5S 11OV TR I A E RH N B EA RI D DG E FALMOUTH STREET 15 5. 11 76 4. 11 70 4. 11 02 5. 11 79 4. 11 45 4. 11 62 4. 11 S 54 4. 11 STEAM CONC 5 7 4. 11 S 34 4. 11 70 4. 11 73 4. 11 72 4. S 11 78 3. 11 T BI 41 4. 11 07 4. 11 21 4. 11 61 2. 11 37 3. 11 NC CO 27 4. 11 LT T 6" S S T 6" S T 4" "T 16 90 3. 11 04 4. 11 STEAM8 8 3. 11 69 3. 11 S GC NC CO 34 3. 11 STEAM T BI 73 3. 11 STEAM 2 .4 H 3 M =11 7.9 R 10 I= 55 3. 11 67 3. 11 28 3. 11 41 3. 11 PARKING STRIPE (typical) 40 3. 11 60 3. 11 S S S S S "T 12 S S T 8" S S T 8" S D 07 3. 11 20 3. 11 D 54 3. 11 64 3. 11 73 3. 11 S 93 3. 11 GC 9 .4 12 C B =1 R 82 2. 11 10 3. 11 77 2. 11 PARKING STRIPE (typical) 52 2. 11 56 2. 11 59 2. 11 D M GC GRAVEL 29 2. 11 61 1. 11 03 2. 11 GC 46 2. 11 S S V C S S P GR 79 2. 11 M GR V P HY W 6" SEWER POSS AC G 1 D-202 NC CO 90 2. 11 78 2. 11 ST EA 32 2. 11 18 2. 11 69 1. 11 GC D T BI STEAM 92 2. 11 CLF 68 1. 11 .58 48 1. 1 11 11 GC GRAVEL D 11 3 21 3. 11 30 3. 11 38 3. STEAM 11 64 2. 11 33 2. 11 GR 27 1. 11 G R 2 D-202 96 0. 11 16 2. 11 12 2. 11 01 2. 11 ST EA M WB-50 B O 14 2. 11 T U 69 1. 11 LT AASHTO 2004 (US) T BI NC CO 112 INSIDE DIMENSION OUTSIDE DIMENSION CONCRETE TYPICAL STEEL DIAMETER MAXIMUM MINIMUM ABOVE FINISH FLOOR CENTER LINE SIMILAR REFLECTED CEILING PLAN FIRE ALARM CONTROL PANEL CERAMIC TILE GYPSUM WALL BOARD GYPSUM FLOOR DRAIN PAINTED EQUAL APPROXIMATELY ELEVATOR STUDENT STAFF WOMENS WATER CLOSET MENS WATER CLOSET PLUMBING EXISTING ELECTRIC JANITOR INTERMEDIATE DISTRIBUTION FRAME / INFORMATION TECHNOLOGY EXPANSION MACHINE ROOM (ELEVATOR) FIRE RATED EMERGENCY ELECTRIC STAIR MECHANICAL, ELECTRICAL, PLUMBING CORRIDOR VENT THROUGH ROOF ROOF DRAIN DRINKING FOUNTAIN LOCATION TO BE DETERMINED GROSS SQUARE FEET NET SQUARE FEET HOUR ON CENTER REGULAR ROOF TOP UNIT EMERGENCY ENTRANCE PRIMARY MEZZANINE STRUCTURE STAINLESS STEEL FEET PER MINUTE CLEAR FIRE EXTINGUISHER CABINET FIRE RESISTANCE RATING OPEN TO ABOVE OPEN TO BELOW MANUFACTURER WITH AIR VAPOR BARRIER UMass Lowell North Quad Infrastructure Renewal (UMBA 13-L2) Lowell, MA University of Massachusetts Building Authority University of Massachusetts Lowell ARCHITECT CONSULTANT 100% CONSTRUCTION DOCUMENTS SET STAMP 21 2. 11 STEAM ELEC 88 2. 11 CONC CONC 48 2. 11 46 2. 11 40 2. 11 30 2. 11 93 2. 11 CONC RAMP 16 2. 11 96 1. 11 03 2. 11 85 1. 11 DRAIN NOT OBS. 90 0. 11 POD 2 ADDITION C RK " A "X M 0 H T 9 C AN 3. EN R 11 B YD V= H LE E 68 1. 11 54 1. 11 8"WATER 05 1. ELEC 11 111 A NC 70 ) . 0. ±(A S CO CB =11 8.9 OB R 10 OT I= N B B EXP. MR FR EE STR. MEP CORR. VTR RD DF LOC'N TBD GSF NSF HR O.C. REG RTU EMER. ENT PRIM. MEZZ STRUCT. SS F.P.M CLR FEC FRR OTA OTB MANUF. W/ AVB D 52 3. 11 63 3. 11 74 3. 11 81 3. 11 89 3. 11 97 3. 11 GC LIMIT OF WORK T BI 81 0. 11 HAND RAIL 92 92 94 0. 0. 0. 11 11 11 SOUTHWICK 11 5 "T 18 LP 82 4. 11 S GC 58 4. 11 69 3. 11 41 3. 11 45 3. 11 61 2. ± CB =11 9.6 R 10 I= 30 2. 11 WB-50 G G 90 0. 11 92 0. 11 DN VC 10 5. 11 V 34 5. 11 74 3. 11 79 3. 11 GR 91 3. 11 B A GR GAS2004 (US) AASHTO 55 1. 11 35 1. 11 P RI P RA .09 1 11 2 0 1. 11 P GM WALL MOUNTED LED FIXTURES 4"P GAS WALL MOUNTED LED FIXTURES WATER 4" D( R) 46 5. 11 C 114 92 3. 11 02 4. 11 4 H 2.8 (A) ) 1 SM =1 6.9 4(B ) S. R 0 . (C B 1 9 I= 10 6.6 T O I= 10 O I = =N D C 4"ME T STAIR PLANT REFER TO DEMO PLANS D-104 THROUGH D-105 FOR DEMO AREA (ALL LEVELS) 32 5. 11 12 4. 11 17 4. 11 8"WATER SLIDING GATE D 61 3. A CONC BLOCK RET WALL 11 75 8. CO 11 W NC AL L GAS 17 5. 11 S 41 4. 11 56 4. 11 A 12"SEWER GR C B RIP RAP ELEC "T 18 V 56 4. 11 S 87 3. 11 88GC 3. 11 ) 0 C H 3.9 (AB G W SM =11 6.3 R 10 I= C B 80 3. 11 NC 8 WB-50 " P CO V C AASHTO T 2004 (US) BI 67 2. 11 87 3. 11 11 4 8" PV C6 5 9. 11 (R) GC P P 12"SEWER ELEC 14 5. 11 86 7. 11 6"SEWER GRAVEL GRAVEL GRAVEL PB PCC DL SLIDING GATE GR 73 53 4. 4. 11 11 18 5. 11 79 9. 11 .01 RIP RAP TW=120 91 9. 11 111 ELEC M GC GC 33 4. 11 P GAS 71 4. 11 77 4. 11 15 5. 11 9 .7 .48 CONC 21 19 =1 1 C 38 A .67 5. HV 1 9 11 1 16 8. 11 TW ST EA GAS 44 4. 11 G 57 5. 11 BERM AC 2 11 GC W P P 38 9. 11 HV R) GC 37 4. 11 72 60 4. 4. 11 11 P CC S P NC CO 115 04 5. 11 02 9. 11 03 0. 12 113 W( SE M O B STEAM T U C RK " A "X M H T 52 C AN 7. 29 EN R 11 4. B YD V= CB =11 7.8 H LE R 10 E I= 58 4. 11 77 4. 11 T BI 76 8. 11 AC V 5"SEW(R) NC CO 23 5. 11 33 5. 11 69 4. 95 4. 11 52 9. 119 11 HV CONC WALL M BALL HALL CROSSWALK AND THE PROPOSED EAST ENTRANCE (SERVICE YARD) TO KITSON HALL THE GRADE DROPS VERTICALLY 4.93’ OVER A HORIZONTAL DISTANCE OF 257’, OR 1:52.13, WELL BELOW THE MAXIMUM 1:20 SLOPE. UNLESS THERE ARE LOCAL CONDITIONS ALONG THAT PATH THAT EXCEED A 1:20 SLOPE, THE EXISTING DRIVEWAY CAN PROVIDE AN ACCESSIBLE PATH BETWEEN THE CROSSWALK AND THE NEW KITSON ENTRANCE. IF THE EXISTING DRIVEWAY WIDTH ALLOWS, CONSIDER PAINTING A PEDESTRIAN ZONE ALONG THE PERRY HALL BERM/RETAINING WALL & INSTALLING A GUARDRAIL TO SEPARATE THIS ZONE FROM THE VEHICULAR LANES. ELEC DL SWING GATE DL COMP. 45 5. 11 T BI 42 5. 11 11 G ELEC 117 BERM 118 45 RET WALL 36 0. 0. AC 12 12 HV GATE EA ST D HY 9 0 07 5. 5. 11 11 W 35 9. 11 9 .7 21 =1 7 TW 0.6 12 GAS INTERCOM EL EC S GA C STEAM NC 8"RCP DUMPSTER AREA SEE ENLARGED PLANS 100S1 GC 8"WATER 63 5. 11 54 8. 11 36 0. 12 V 1 STORY "KITSON" POD 2 55 4. 11 34 5. 11 ELEC CONC 67 0. 12 6 H 3.2 ± C) SM =11 0.3 4(B R 11 6. I= 10 I= LIMIT OF SITE WORK 212.68sf CO 8"SEWER(R) SEWER(R) 8"PVC PERRY REMOVE EXISTING ASPHALT PAVEMENT; EXCAVATE & PROVIDE BACKFILL FOR NEW SUBGRADE, TOP SOIL/LOAM & SEED, WALKWAYS AND PADS, SITE LIGHTING, SPRINKLER IRRIGATION 16 5. 11 15"SEWER 90 5. 11 24 6. 11 21 8. 11 90 0. 12 V AT 7.86 NC 1 O =1 C OR DO 4 STORY "ENGINEERING BUILDING" RESTORE PAVEMENT WITHIN LIMIT OF WORK KITSON ELE 115 61 7. 63 11 7. 0 11 .6 21 =1 AC TW HV 73 0. 12 76 7. 11 3 STORY 16'-0" X 22'-0" PAD EL EC WALK SWING GATE 120 116 67 5. 11 24 6. 11 4 .7 AT 17 1 NC R= CO OO D ACCESSIBLE ROUTE FROM BALL HALL FOR REFERENCE ONLY (NOT IN SCOPE) 5'-0" WIDE WALKWAY ACCESSIBLE ROUTE NOT TO EXCEED 5% SLOPE 06 6. 11 GAS 97 5. STEAM 11 74 5. 11 39 5. 11 8"WATER GAS STEAM ELEC GAS 1 STORY "BALL BUILDING" 4 STORY C ELE EC EL CRO SS ID OD CONC. TYP. STL. DIA. MAX. MIN. A.F.F. CL SIM RCP FACP CT GWB GYP FD PTD EQ. APPROX. ELEV. STD STF WWC MWC PLUMB EXIST. ELEC. JAN. IDF/IT 6" D POSS AC D 8" S AC S PO MAINTENANCE BUILDING DRY LAB LESS THAN 5% SLOPE POD 1 13'-0" X 20'-0" PAD 44 1. 11 ACCESSIBLE ROUTE FROM UNIVERSITY AVE WALL MOUNTED EMERG. PHONE O.F.O.I. RELOCATED DUMPSTER & TRASH COMPACTOR SEE ENLARGED PLANS 10'-0" WIDE WALKWAY NEW GENERATOR 1 D-201 2 D-201 WALL MOUNTED LED FIXTURES WALL MOUNTED LED FIXTURES REFER TO DEMO PLANS D-101 THROUGH D-103 FOR DEMO AREA (ALL LEVELS) FALMOUTH POD 1 ADDITION FALMOUTH PROJECT LIMIT LINE MARK 100% CONSTRUCT. DOC. SET 06/30/15 TIER 1 PHASE 1 PERMIT SET 05/07/15 90% CONSTRUCT. DOC. SET 04/22/15 TIER 1 PHASE 1 (EARLY PACKAGE) PERMIT SET 04/06/15 60% CONSTRUCTION PERMIT SET 01/15/15 100% DESIGN DEVELOPMENT SET 12/18/14 50% DESIGN DEVELOPMENT SET 08/29/14 SCHEMATIC DESIGN SET 06/10/14 FEASIBILITY STUDY SET DATE DESCRIPTION PROJECT NUMBER: 21332 RD DRAWN BY: CHECKED BY: JM GENERAL NOTES: 1. 7/17/15 REFER TO ENLARGED PLANS (A-501 THROUGH A-512) FOR INTERIOR SCOPE OF WORK SHEET TITLE 2. REFER TO DEMOLITION PLANS & ELEVATIONS (D-101 THROUGH D-202) FOR DEMO SCOPE AT SITE 3. REFER TO CIVIL DWGS (C-101 THROUGH C-204) & SPECS FOR FULL EXTERIOR IMPROVEMENTS SITE PLAN ACCESSIBLE ROUTE PASTEUR 1 SITE PLAN 1" = 30'-0" N GRAPHIC SCALE 0 30 60 90 120 G-003 7/20/2015 2:57:52 PM EXISTING GENERATOR 2,a DESCRIPTION CEILING MOUNTED LIGHTING FIXTURE AND OUTLET BOX. - 'F' DENOTES FIXTURE TYPE - '2' DENOTES BRANCH CIRCUIT NUMBER - 'a' DENOTES SWITCHED CIRCUIT - SHADED AREA FIXTURE ON EMERGENCY CIRCUIT F 2,a F F 2 a F 2 a WALL MOUNTED LIGHTING FIXTURE AND OUTLET BOX. - 'F' DENOTES FIXTURE TYPE - '2' DENOTES BRANCH CIRCUIT NUMBER - 'a' DENOTES SWITCHED CIRCUIT - SHADED AREA FIXTURE ON EMERGENCY CIRCUIT CEILING/WALL EXIT LIGHT AND OUTLET BOX, LED TYPE, SELF CONTAINED, WITH BATTERY PACK: - SHADED AREA INDICATES ILLUMINATED FACE(S) - ARROW INDICATES DIRECTION EMERGENCY UNIT EQUIPMENT, 90 MINUTE BATTERY PACK, CHARGER AND TEST SWITCH. NOTE: SEE LIGHT FIXTURE SCHEDULE AND SPECIFICATIONS FOR COMPLETE FIXTURE DESCRIPTION. WIRING DEVICES SYMBOL a S3 b SK4 20A SPST TOGGLE SWITCH U.O.N.: -LOWER CASE LETTER DENOTES LIGHTING FIXTURE SWITCHING ARRANGEMENT - '3' DENOTES THREE-WAY - '4' DENOTES FOUR-WAY - 'K' KEY OPERATED SPDT MOMENTARY CONTACT SWITCH SDM WALL DIMMER SWITCH SWP WEATHERPROOF SWITCH SXP EXPLOSION PROOF SWITCH a O PIR b O DT 4X 4X F 4X CB 200 FUSED DISCONNECT SWITCH - NUMERICAL DENOTES FUSE SIZE - '4x' DENOTES NEMA ENCLOSURE IF INDICATED 225 ENCLOSED CIRCUIT BREAKER - NUMERICAL DENOTES TRIP SIZE - '4x' DENOTES NEMA ENCLOSURE IF INDICATED 4X MOTOR LOAD. SEE E008 FOR REQUIREMENTS. 4X VFD VARIABLE FREQUENCY DRIVE CONTROLLER - '4x' DENOTES NEMA ENCLOSURE IF INDICATED 4X COMBINATION DISCONNECT SWITCH/CONTROLER - NUMERICAL DENOTES FUSE/TRIP SIZE - '4x' DENOTES NEMA ENCLOSURE IF INDICATED 400 4X VFD STP M PB ATS R 6 WALL MOUNTED OCCUPANCY SENSOR. - 'PIR' DENOTES PASSIVE INFRARED - 'DT' DENOTES DUAL TECHNOLOGY - 'a' DENOTES SWITCHING ARRANGEMENT GFP NEW CONDUIT OR EQUIPMENT CONDUIT UNDER SLAB TIME CLOCK RC REMOTE CONTROL SWITCH IS CONDUIT IN SLAB PUSH BUTTON UG CONDUIT UNDERGROUND EXISTING CONDUIT AND WIRING TO BE REMOVED EXISTING CONDUIT AND WIRING TO REMAIN SIMPLEX RECEPTACLE WALL MOUNTED 20A, 125V, 2P, 3W GROUNDING MISCELLANEOUS SYMBOL P380D LOW VOLTAGE FUSE/SWITCH UNIT - 'TEXT' DENOTES FUSE ACCESSORIES ST, GFR, EO, LO, LOCK OUT PROVISIONS - NUMERICAL DENOTES FUSE SIZE MEDIUM VOLTAGE DRAWOUT FUSE/SWITCH UNIT - 'TEXT' DENOTES FUSE ACCESSORIES - NUMERICAL DENOTES FUSE SIZE SIMPLEX RECEPTACLE FLUSH FLOOR MOUNTED 20A, 125V, 2P, 3W GROUNDING DUPLEX RECEPTACLE FLUSH FLOOR MOUNTED 20A, 125V, 2P, 3W GROUNDING QUAD RECEPTACLE FLUSH FLOOR MOUNTED 20A, 125V, 2P, 3W GROUNDING SPECIAL RECEPTACLE FLUSH FLOOR MOUNTED NEMA CONFIGURATION AS INDICATED ON PLANS JUNCTION BOX RECESSED WALL MOUNTED: - 'SG' DENOTES JUNCTION BOX FOR ELECTRICALLY ILLUMINATED SIGNAGE J RECESSED CEILING MOUNTED JUNCTION BOX J FLUSH FLOOR MOUNTED JUNCTION BOX AUTOMATIC TEMPERATURE CONTROL ATS AUTOMATIC TRANSFER SWITCH BAS BUILDING AUTOMATION SYSTEM BMS BUILDING MANAGEMENT SYSTEM BFG BELOW FINISHED GRADE C, CDT CONDUIT # A E-3 EF 1 CB CIRCUIT BREAKER CKT CIRCUIT C.O., CO CONDUIT ONLY CONFIG. CONFIGURATION CL CONV ENCLOSED CIRCUIT BREAKER - 'TEXT' DENOTES CB ACCESSORIES - NUMERICAL DENOTES TRIP SIZE ST 225 ENCLOSED SAFETY DISCONNECT SWITCH - 'TEXT' DENOTES FUSE ACCESSORIES - NUMERICAL DENOTES SWITCH SIZE ST 400 N E ATS-1 4 POLE 600A L DDC DIGITAL DATA CONTROL DWG DRAWING E.C. ELECTRICAL CONTRACTOR ELEC ELECTRICAL EM EMERGENCY EMT ELECTRICAL METALLIC TUBING E.O. ELECTRICALLY OPERATED 'ON-OFF' EQ EQUAL EWC FIRE ALARM FAI FURNISH AND INSTALL FBO FURNISHED BY OTHERS FLA FULL LOAD AMPS FSD FIRE SMOKE DAMPER G, GND GROUND GEN GENERATOR GFCI GROUND FAULT CIRCUIT INTERRUPTER HP DESCRIPTION FEEDER SIZE, SEE FEEDER SCHEDULE INSTALLED BY ELECTRICAL CONTRACTOR JB,J JUNCTION BOX KVA KILO VOLT- AMPERE KW KILO WATT LCP LIGHTING CONTROL PANEL LTG LIGHTING LV LOW VOLTAGE LVR MFRR M MOTOR KI KEY INTERLOCK 51 RELAY NUMERICAL INDICATES TYPE M UTILITY METER EQUIPMENT REFERENCE. COORDINATE EQUIPMENT WITH MECHANICAL/PLUMBING TRADES. SEE MECHANICAL/PLUMBING DRAWINGS FOR LOCATIONS. SEE E-008 FOR SCHEDULE OF REQUIREMENTS. M V A 200/5 (1) MINIMUM MLO MAIN LUGS ONLY MSB MAIN SWITCHBOARD MTD MOUNTED N NEUTRAL NOT APPLICABLE NEMA NATIONAL ELECTRICAL MANUFACTURERS ASSOCIATION N.C. NORMALLY CLOSED NIC NOT IN CONTRACT # NORMALLY OPEN NTS NOT TO SCALE OC ON CENTER OFCI POLES PB PULL BOX PFC POWER FACTOR CORRECTION PH, PHASE PNL PANEL PWR POWER RECPT RECEPTACLE RM ROOM SG SIGNAGE SHT SHEET EMERGENCY LIGHTING INVERTER BATTERY XMFR-1 75KVA 480V208/120 TRANSFORMER WITH PRIMARY AND SECONDARY CONNECTIONS AS INDICATED ON RISER DIAGRAM. OWNER FURNISHED, CONTRACTOR INSTALLED P GROUND ROD. SEE E8XX SERIES DETAILS FOR MORE INFORMATION. INV NUMBER N.O. CURRENT TRANSFORMER: - '200/5' DENOTES CT RATIO IF INDICATED DELTA CONNECTION EQUIPMENT GROUNDING CONNECTION. MANUFACTURER NA,N/A DIGITAL MULTIFUNCTION METER WITH CURRENT/POTENTIAL TRANSFORMER AS REQUIRED POTENTIAL TRANSFORMER: - NUMERICAL DENOTES QUANTITY OF FUSES LOW VOLTAGE RELAY MIN REFERENCE NOTE DIGITAL REFERENCE: - DETAIL DESIGNATION - SHEET NUMBER REFERENCE HORSE POWER IBEC AUTOMATIC TRANSFER SWITCH GENERATOR ELECTRIC WATER COOLER FA ENCLOSED FUSED DISCONNECT SWITCH - 'TEXT' DENOTES FUSE ACCESSORIES - NUMERICAL DENOTES SWITCH SIZE G CONVENIENCE CONSTRUCTION MANAGER SPACE IN DISTRIBUTION EQUIPMENT ST 225 CENTERLINE CM SPARE SWITCH IN DISTRIBUTION EQUIPMENT WYE CONNECTION SPECIAL RECEPTACLE CEILING MOUNTED NEMA CONFIGURATION AS INDICATED ON PLANS ATC CONDUIT IN DUCTBANK ANNOTATION FOR RECEPTACLE WIRING DEVICES: - SOLID CENTER HATCH DENOTES GFI TYPE - CT - DENOTES COUNTER TOP - EM EMERGENCY TYPE J 12KV HOMERUN TO PANELBOARD "LP-3A": - NUMERALS DENOTE CIRCUIT NUMBERS - DESIGNATION DENOTES CIRCUIT NUMBERS, 3#12 + 1#10N-3/4" EMT, U.O.N. TC SG LOW VOLTAGE DRAW OUT CIRCUIT BREAKER: - 'TEXT' DENOTES CB ACCESSORIES - NUMERICAL DENOTES TRIP SIZE INTERMEDIATE CLASS MOV SURGE ARRESTER - NUMERICAL DENOTES ARRESTER RATING FLOOR MOUNTED DISTRIBUTION/SWITCHBOARD US L6-20R SA SURFACE MOUNTED POWER PANELBOARD CONDUIT CAPPED QUAD RECEPTACLE CEILING MOUNTED 20A, 125V, 2P, 3W GROUNDING SPACE 255 FLUSH MOUNTED LTG/APPLIANCE PANELBOARD LIGHTING CONTACTOR DUPLEX RECEPTACLE CEILING MOUNTED 20A, 125V, 2P, 3W GROUNDING ABOVE FINISHED FLOOR MEDIUM VOLTAGE DRAW OUT CIRCUIT BREAKER WITH INTEGRAL TRIP UNIT SPARE 200 RELAY - NUMERAL DENOTES NUMBER OF POLES LC SIMPLEX RECEPTACLE CEILING MOUNTED 20A, 125V, 2P, 3W GROUNDING TRIP AUTOMATIC TRANSFER SWITCH, SEE RISER DIAGRAM FOR RATING CONDUIT TURNING DOWN SPECIAL RECEPTACLE WALL MOUNTED NEMA CONFIGURATION AS INDICATED ON PLANS AFF TRANSFORMER, SEE SCHEDULE FOR RATING WALL MOUNTED PHOTOCELL CONTROLLER L6-20R ALTERNATING CURRENT PULLBOX PC QUAD RECEPTACLE WALL MOUNTED 20A, 125V, 2P, 3W GROUNDING GFP MANUAL MOTOR STARTER WITH THERMAL OVERLOAD AND PILOT LIGHT CONDUIT TURNING UP DUPLEX RECEPTACLE WALL MOUNTED 20A, 125V, 2P, 3W GROUNDING GFP TRIP TRIP CEILING MOUNTED PHOTOCELL CONTROLLER GFI LSI TRIP COMBINATION DISCONNECT SWITCH/CONTROLLER VARIABLE FREQUENCY DRIVE - '4x' DENOTES NEMA ENCLOSURE IF INDICATED PC EM AC BUSWAY MOLDED CASE CIRCUIT BREAKER: - 'TEXT' DENOTES CB ACCESSORIES ST, ET. GFP, EO, LSI TRIP FUNCTIONS - NUMERICAL DENOTES TRIP SIZE AMPERE AMPS INTERRUPTING CAPACITY FEEDER BW DESCRIPTION AIC PANELBOARD, SEE PANEL SCHEDULE FOR RATING SURFACE MOUNTED LTG/APPLIANCE PANELBOARD LP-3A/ 1,3,5 SYMBOL PANEL 52 T4 DESCRIPTION A,AMP FLEXIBLE CONNECTION WALL SWITCH OCCUPANCY SENSOR CEILING MOUNTED OCCUPANCY SENSOR. - 'PIR' DENOTES PASSIVE INFRARED - 'US' DENOTES ULTRASONIC - 'DT' DENOTES DUAL TECHNOLOGY - 'a' DENOTES SWITCHING ARRANGEMENT SYMBOL DESCRIPTION UNFUSED DISCONNECT SWITCH WITH RATING => UPSTEAM PROTECTIVE DEVICE - '4x' DENOTES NEMA ENCLOSURE IF INDICATED DESCRIPTION SMC a SOS SYMBOL ABBREVIATIONS SPEC SPECIFICATIONS SPDT SINGLE POLE DOUBLE THROW SPST SINGLE POLE SINGLE THROW SW SWITCH SWBD SWITCHBOARD SWGR SWITCHGEAR TC TIME CLOCK TYP TYPICAL UG UNDERGROUND UON, U.O.N. UNF UNLESS OTHERWISE NOTED UNFUSED V VOLT VA VOLT-AMPERES PLUG MOLD W WATT SURFACE RACEWAY WP WEATHERPROOF TRACK BUSWAY XFMR TRANSFORMER GENERAL NOTES: 1. ALL MATERIAL AND WORKMANSHIP SHALL CONFORM TO THE NATIONAL ELECTRICAL CODE AND APPLICABLE LOCAL CODES AND REGULATIONS. 2. ALL PANELS, SWITCHES, AND WIRING TROUGHS SHALL HAVE SUFFICIENT GUTTER SPACE AND LUGS TO ACCOMMODATE CONDUCTORS SHOWN. 3. WHERE WIRE SIZES ARE INDICATED ON PLANS, FOR INDIVIDUAL CIRCUITS, THE WIRE SIZE INDICATED SHALL APPLY TO THE COMPLETE CIRCUIT, UNLESS OTHERWISE NOTED. 4. ALL JUNCTION BOXES AND PULL BOXES SHALL BE CODE GAUGE AND SIZE TO ACCOMMODATE NUMBER OF CONDUITS/CONDUCTORS SHOWN. 5. ALL PULL BOXES IN FINISHED AREAS SHALL HAVE FACTORY APPLIED PRIMER COAT OF PAINT. ELECTRICAL CONTRACTOR SHALL VERIFY THE EXACT LOCATION OF ALL MECHANICAL, PLUMBING AND OTHER EQUIPMENT REQUIRING ELECTRICAL POWER, PRIOR TO PERFORMANCE OF ANY WORK. 6. ELECTRICAL CONTRACTOR SHALL VERIFY THE EXACT LOCATION OF ALL MECHANICAL, PLUMBING AND OTHER EQUIPMENT REQUIRING ELECTRICAL POWER, PRIOR TO PERFORMANCE OF ANY WORK. 7. ALL PANELBOARDS SHALL HAVE LOCKING DOORS AND BE KEYED ALIKE UNLESS OTHERWISE NOTED. 8. ALL MOUNTING HEIGHTS FOR DEVICES SHALL BE AS PER ELECTRICAL DETAILS (E8.XX SERIES). 9. DRAWINGS ARE DIAGRAMMATIC AND INDICATE GENERAL ARRANGEMENT OF SYSTEMS AND WORK INCLUDED. FOLLOW DRAWINGS IN LAYING OUT WORK AND CHECK DRAWINGS OF OTHER TRADES TO VERIFY SPACE IN WHICH WORK WILL BE INSTALLED. MAINTAIN HEADROOM AND SPACE CONDITIONS AT ALL TIMES. 10. ELECTRICAL CONTRACTOR SHALL COORDINATE THE LOCATION OF ALL WALL OUTLET BOXES FOR CLOCKS, SWITCHES, FIRE ALARM DEVICES, RECEPTACLES ETC. WITH MILLWORK AND FURNITURE. 11. ELECTRICAL CONTRACTOR SHALL COORDINATE THE LOCATION OF ALL WALL OUTLET BOXES FOR CLOCKS, SWITCHES, FIRE ALARM DEVICES, RECEPTACLES ETC. WITH MILLWORK AND FURNITURE. 12. WHERE ELECTRIC MOTORS OR HEATERS ARE INSTALLED IN HUNG CEILINGS, PROVIDE DISCONNECT SWITCH IN HUNG CEILING WITHIN REACH FROM ACCESS POINT. 13. EXPOSED RACEWAYS (WHEN INDICATED ON DRAWINGS) SHALL BE RUN PARALLEL WITH OR AT RIGHT ANGLES TO WALLS. 14. FURNISH APPROVED EXPANSION FITTINGS WHERE RACEWAY CROSSES BUILDING EXPANSION JOINTS. 15. FURNISH FISH WIRE IN EACH RACEWAY RUN OVER 10' IN LENGTH, IN WHICH PERMANENT WIRING IS NOT INSTALLED. 16. NOT MORE THAN THREE LIGHTING OR CONVENIENCE OUTLET CIRCUITS ARE PERMITTED IN ONE CONDUIT, UNLESS OTHERWISE INDICATED. ALL CIRCUITS SHALL HAVE A DEDICATED NEUTRAL UON. 17. PROVIDE PULL BOXES WHEREVER NECESSARY TO FACILITATE PULLING OF CONDUCTORS. COORDINATE LOCATIONS OF BOXES WITH OTHER TRADES TO AVOID CONFLICT. 18. OUTLET BOXES FOR LIGHT FIXTURES RECESSED IN HUNG CEILING SHALL BE ACCESSIBLE THROUGH OPENING CREATED BY REMOVAL OF SUCH FIXTURES. 19. ELECTRICAL CONTRACTOR SHALL VERIFY POWER REQUIREMENTS AND LOCATIONS FOR HVAC, PLUMBING AND FIRE PROTECTION EQUIPMENT WITH RELEVANT CONTRACTOR PRIOR TO PERFORMANCE OF ANY WORK. 20. ALL EXTERIOR ELECTRICAL DEVICES AND EQUIPMENT SHALL BE WEATHERPROOF TYPE, NEMA 4X. 21. CONDUIT RUNS ARE NOT PERMITTED IN OR BELOW CONCRETE SLAB. ALL CONDUITS WILL BE PLACED IN THE HUNG CEILING UNLESS SPECIFICALLY INDICATED OTHERWISE. 22. LIGHTING, POWER, VOICE/DATA OUTLETS SHALL NOT BE INSTALLED BACK TO BACK. 23. WHERE MORE THAN ONE LIGHT SWITCH OCCURS AT SAME LOCATION, SWITCHES SHALL BE MOUNTED IN A MULTIPLE GANG BOX WITH A SINGLE COVER PLATE. 24. ALL HOMERUNS SHALL BE (2)#12+#12G THHW/THWN COPPER UON. MC CABLE IS ALLOWED BUT SHALL NOT BE CONNECTED DIRECTLY TO PANELBOARDS. ALL PANELBOARD CONNECTIONS SHALL BE IN CONDUIT. 25. ALL EQUIPMENT SCHEDULED THROUGHOUT THESE DRAWINGS AND SPECIFICATIONS IS ON AN "OR APPROVED EQUAL" BASIS. 26. PERFORM MEGGER OHM TESTING ON ALL EXISTING TO BE REUSED FEEDERS (EXISTING 4160V LOOP FEEDERS IN CAMPUS NETWORK). FOLLOW ANSI/NETA ATS, “Standard for Acceptance Testing Specifications” ON ALL FEEDERS AFFECTED BY THIS WORK. PERFORM CONTINUTITY TESTS ON ALL EXTENDED BRANCH AND FEEDER CIRCUITS. 27. DEMOLITION SHALL INCLUDE BUT NOT BE LIMITED TO ALL CONDUIT, WIRE, LIGHT FIXTURES, RECEPTACLES, JUNCTION BOXES, BATTERIES, DISCONNECT SWITCHES, CIRCUIT BREAKERS, WIREWAYS, FITTINGS, HANGERS ETC. CONTRACTOR SHALL REMOVE ALL ASSOCIATED CONDUT, WIRE AND ASSOCIATED COMPONENTS BACK TO THE PANEL SERVING THE EQUIPMENT. NO CONDUIT OR WIRE SHALL BE LEFT ABANDONED. 28. AN IMPAIRMENT PLAN FOR THE FIRE ALARM SYSTEM AND ELECTRICAL DISTRIBUTION SYSTEMS SHALL BE DEVELOPED AND APPROVED BY THE OWNER PRIOR TO IMPAIRING ANY SYSTEMS. THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING A CONTINUOUS FIRE WATCH WHEN THE FIRE PROTECTION OR FIRE ALARM SYSTEM IS IMPAIRED. ALL OUTAGES SHALL BE APPROVED BY THE OWNERS CONSTRUCTION MANAGER. OUTAGES SHALL BE SCHEDULED AT THE DISCRETION OF THE OWNERS CONSTRUCTION MANAGER, AND SHALL BE LIMTED TO "OFF HOURS", AS DEFINED BY UMASS LOWELL OR THEIR REPRESENTATIVE. POD 2 NEW SERVICE REQUIRES CHANGING 4160V LOOP OPEN POINT. SCHEDULE MODIFICATIONS TO LOOP NO LESS THAN 30 DAYS IN ADVANCE WITH THE SCHOOLS CONSTRUCTION MANAGER. DO NOT OPERATE LOOP WITHOUT AN OPEN POINT, SYSTEM FAULT LEVEL WITH EXCEED SYSTEM CAPACITY. 29. DEMOLITION AND REMOVAL WORK SHALL BE PERFORMED TO THE EXTENT INDICATED PLUS SUCH ADDITIONAL DEMOLITION AND REMOVAL AS NECESSARY FOR THE INSTALLATION OF NEW WORK AND REMODELING OF EXISTING WORK. THE CONTRACTOR MAY DEMOLISH AND REMOVE MORE THAN THAT IS INDICATED WHERE SUCH VARIATION WILL EXPEDITE THE WORK AND RESTORE ALL AREAS TO THE ORIGINAL CONDITION, SUBJECT TO THE OWNER'S REPRESENTATIVE'S APPROVAL, AND WITHOUT ADDITIONAL COST TO THE OWNER. 30. THE INFORMATION ON THESE DRAWINGS WAS OBTAINED FROM THE BEST SOURCES AVAILABLE BUT IT IS NOT ASSUMED TO REFLECT ACTUAL "AS-BUILT" CONDITIONS. THE CONTRACTOR IS RESPONSIBLE FOR CONFIRMING ALL AS BUILT CONDITIONS. 31. THE CONTRACTOR SHALL VERIFY IN THE FIELD ALL EXISTING CONDITIONS. NOTIFY THE ARCHITECT AND ENGINEER OF ANY DISCREPANCIES OR CONFLICTS PRIOR TO COMMENCING WORK. DO NOT PROCEED WITHOUT APPROVAL BY THE ARCHITECT OR ENGINEER, FOR ANY CHANGES, IF REQUIRED. 32. REFER TO MECHANICAL, PLUMBING, FIRE PROTECTION AND ARCHITECTURAL DEMOLITION DRAWINGS FOR ADDITIONAL INFORMATION AND LOCATIONS. 33. THE INTENT OF THE DEMOLITION IS FOR THE CONTRACTOR TO DEMOLISH AND REMOVE FROM THE SITE ALL EXISTING ELEMENTS NECESSARY TO CONSTRUCT NEW WORK IN THE CONSTRUCTION DOCUMENTS. 34. ALL FINAL EQUIPMENT CONNECTIONS FROM ALL JUNCTIONBOXES AND DISCONNECTION DEVICES BY ELECTRICAL CONTRACTOR UNLESS NOTED OTHERWISE. UMass Lowell North Quad Infrastructure Renewal (UMBA 13-L2) Lowell, MA University of Massachusetts Building Authority University of Massachusetts Lowell ARCHITECT CONSULTANT Arup USA Inc 955 Massachusetts Avenue 4th Floor Cambridge, MA 02139 T 617 864 2987 F 617 864 6178 www.arup.com 100% CONSTRUCTION DOCUMENT SET ELECTRICAL DRAWING LIST Sheet Number E-000 E-001 E-002 E-003 E-004 E-005 E-006 E-007 E-008 E-201 E-202 E-203 E-204 E-205 E-300 E-301 E-402 E-403 E-404 E-405 E-406 E-407 E-701 E-702 E-703 E-704 E-705 E-706 E-707 E-710 E-711 E-712 E-720 E-721 E-722 E-723 E-724 E-725 E-726 E-800 E-801 E-802 E-803 STAMP Sheet Name ELECTRICAL SYMBOLS & ABBREVIATIONS ELECTRICAL SCHEDULE OF PANELBOARDS ELECTRICAL SCHEDULE PLAN SHEET 1 ELECTRICAL SCHEDULE PLAN SHEET 2 ELECTRICAL SCHEDULE PLAN SHEET 3 ELECTRICAL SCHEDULE PLAN SHEET 4 ELECTRICAL SCHEDULE PLAN SHEET 5 ELECTRICAL SCHEDULE PLAN SHEET 6 ELECTRICAL SCHEDULE PLAN SHEET 7 ELECTRICAL POD 1 DEMOLITIONLITION PART PLANS - LEVEL 1 & 1.5 ELECTRICAL POD 1 DEMOLITION PART PLANS - LEVEL 2 & 3 ELECTRICAL POD 1 DEMOLITION PART PLANS - LEVEL 4 & ROOF ELECTRICAL POD 2 DEMOLITION PART PLANS - LEVEL 1 & MEZZ ELECTRICAL POD 2 DEMOLITION PART PLANS - LEVEL 2 & 3 ELECTRICAL RISER ONE LINE DIAGRAM A ELECTRICAL RISER ONE LINE DIAGRAM B ELECTRICAL LEVEL 1 - KEY PLAN ELECTRICAL LEVEL 1.5 - KEY PLAN ELECTRICAL LEVEL 2 - KEY PLAN ELECTRICAL LEVEL 3 - KEY PLAN ELECTRICAL LEVEL 4 - KEY PLAN ELECTRICAL ROOF - KEY PLAN ELECTRICAL POD 1 ENLARGED FLOOR PLANS - LEVEL 1 ELECTRICAL POD 1 ENLARGED FLOOR PLANS - LEVEL 1.5 ELECTRICAL POD 1 ENLARGED FLOOR PLANS - LEVEL 2 ELECTRICAL POD 1 ENLARGED FLOOR PLANS - LEVEL 3 ELECTRICAL POD 1 ENLARGED FLOOR PLANS - LEVEL 4 ELECTRICAL POD 1 ELARGED FLOOR PLANS - ROOF ELECTRICAL POD 2 ENLARGED FLOOR PLANS - LEVEL 1 (KITSON HALL) ELECTRICAL POD 2 ENLARGED FLOOR PLANS - LEVEL 2 ELECTRICAL POD 2 ENLARGED FLOOR PLANS - LEVEL 3 ELECTRICAL POD 2 ENLARGED FLOOR PLANS - ROOF ELECTRICAL POD 1 ENLARGED LIGHTING PLANS - LEVEL 1 ELECTRICAL POD 1 ENLARGED LIGHTING PLANS - LEVEL 1.5 ELECTRICAL POD 1 ENLARGED LIGHTING PLANS - LEVEL 2 ELECTRICAL POD 1 ENLARGED LIGHTING PLANS - LEVEL 3 ELECTRICAL POD 1 ENLARGED LIGHTING PLANS - LEVEL 4 ELECTRICAL POD 2 ENLARGED LIGHTING PLANS - LEVEL 1 ELECTRICAL POD 2 ENLARGED LIGHTING PLANS - LEVELS 2&3 ELECTRICAL DETAILS PLAN SHEET 1 ELECTRICAL DETAILS PLAN SHEET 2 ELECTRICAL DETAILS PLAN SHEET 3 ELECTRICAL DETAILS PLAN SHEET 4 Scale 8 7 6 5 4 3 2 1 07/17/15 06/30/15 05/07/15 04/06/15 01/15/15 12/18/14 08/29/14 06/10/14 MARK DATE 100% CONSTRUCT. DOC. SET TIER 1 PHASE 1 PERMIT SET 90% CONSTRUCT. DOC. SET 60% CONSTRUCTION PERMIT SET 100% DESIGN DEVELOPMENT SET 50% DESIGN DEVELOPMENT SET SCHEMATIC DESIGN SET FEASIBILITY STUDY SET DESCRIPTION PROJECT NUMBER: 21332 DRAWN BY: IT CHECKED BY: JA SHEET TITLE ELECTRICAL SYMBOLS & ABBREVIATIONS E-000 7/17/2015 1:57:58 PM SYMBOL SINGLE LINE DIAGRAM POWER LIGHTING UMass Lowell North Quad Infrastructure Renewal SCHEDULE OF PANELBOARD SCHEDULES EP-FK-1A EP-FK-1B EP-FK-2 EP-FK-3 LP-FK-1 LP-FK-2 LP-FK-3 MP-FK-1 MP-FK-3 MP-SP-1 OEP-FK-1A OEP-FK-1B OEP-FK-2 OEP-FK-3 OP-SP-1 OP-SP-3 RP-F-1 RP-F-2 RP-F-3 RP-K-1 RP-K-2 RP-K-3 SP-P1 SP-P1(TUB 2) 1. REFER TO THE FOLLOWING E00X SHEETSSP-P3 FOR PANELBOARD SCHEDULES. On Sheet (UMBA 13-L2) E-002 E-002 E-004 E-006 E-002 E-004 E-005 E-002 E-006 E-007 E-003 E-003 E-005 E-006 E-004 E-007 E-003 E-005 E-007 E-003 E-005 E-006 E-004 E-004 E-007 Lowell, MA University of Massachusetts Building Authority University of Massachusetts Lowell ARCHITECT CONSULTANT Arup USA Inc 955 Massachusetts Avenue 4th Floor Cambridge, MA 02139 T 617 864 2987 F 617 864 6178 www.arup.com 100% CONSTRUCTION DOCUMENT SET STAMP 8 7 6 5 4 3 2 1 07/17/15 06/30/15 05/07/15 04/06/15 01/15/15 12/18/14 08/29/14 06/10/14 MARK DATE 100% CONSTRUCT. DOC. SET TIER 1 PHASE 1 PERMIT SET 90% CONSTRUCT. DOC. SET 60% CONSTRUCTION PERMIT SET 100% DESIGN DEVELOPMENT SET 50% DESIGN DEVELOPMENT SET SCHEMATIC DESIGN SET FEASIBILITY STUDY SET DESCRIPTION PROJECT NUMBER: 21332 DRAWN BY: IT CHECKED BY: JA SHEET TITLE ELECTRICAL SCHEDULE OF PANELBOARDS E-001 7/17/2015 1:58:00 PM Panel Name FED FROM: USS-FK MOUNTING: Surface PANEL NAME: CIRCUIT DESCRIPTION 1 LIGHTING 1 3 SPACE -- -- 5 SPACE -- -- 7 SPACE -- -- 9 SPACE -- -- 11 SPACE -- -- 13 SPACE -- -- 15 SPACE -- -- 17 SPACE -- -- 19 SPACE -- -- 21 SPACE -- -- 23 SPACE -- -- 25 SPACE -- -- 27 SPACE -- -- 29 SPACE -- -- 31 SPACE -- -- 33 SPACE -- -- 35 SPACE -- -- 37 SPACE -- -- 39 SPACE -- -- -- -- 41 SPACE A 180 VA C PO... TRIP 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA TOTAL CONNECTED LOAD: TOTAL CONNECTED AMPS: LOAD CLASSIFICATION *LIGHTING 0 VA 180 VA 1A 0 VA 0A 0 VA 0A CONNECTED... 180 VA DEMAND FACTOR 125.00% CALC. NEC LOAD 225 VA CIRCUIT DESCRIPTION CKT CIRCUIT DESCRIPTION 1 20 A SPARE 2 1 SPACE -- -- 1 20 A SPARE 4 3 SPACE -- -- 1 20 A SPARE 6 5 MOTOR - DWH-1 50 A 1 1 20 A SPARE 8 7 MOTOR - CUH-2 25 A 3 1 20 A SPARE 10 9 -- -- -- 1 20 A SPARE 12 11 -- -- -- 1 20 A SPARE 14 13 SPARE 20 A 1 1 20 A SPARE 16 15 SPARE 20 A 1 1 20 A SPARE 18 17 SPARE 20 A 1 1 20 A SPARE 20 19 SPARE 20 A 1 1 20 A SPARE 22 21 SPARE 20 A 1 1 20 A SPARE 24 23 SPARE 20 A 1 1 20 A SPARE 26 25 SPARE 20 A 1 1 20 A SPARE 28 27 SPARE 20 A 1 1 20 A SPARE 30 29 SPARE 20 A 1 1 20 A SPARE 32 31 SPACE -- -- 1 20 A SPARE 34 33 SPACE -- -- 1 20 A SPARE 36 35 SPACE -- -- 1 20 A SPARE 38 37 SPACE -- -- 1 20 A SPARE 40 39 SPACE -- -- 1 20 A SPARE 42 41 SPACE -- -- A 0 VA MCB RATING: 225 A BUS RATING: 225 A B C 0 VA 6925 VA 2464 VA 0 VA 0 VA 2464 VA 0 VA 2464 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA LOAD CLASSIFICATION *MOTOR LOAD PO... TRIP 0 VA 0 VA TOTAL CONNECTED LOAD: TOTAL CONNECTED AMPS: PANEL TOTALS MAINS TYPE: MCB WIRES: 4 TRIP PO... 0 VA 2464 VA 9A 2464 VA 9A 9389 VA 34 A CONNECTED... 14317 VA DEMAND FACTOR 112.91% CALC. NEC LOAD 16165 VA CIRCUIT DESCRIPTION -- SPACE 2 -- -- SPACE 4 3 20 A MOTOR - PLATFORM LIFT (UMBA 13-L2) CKT -- Lowell, MA 6 -- -- -- 8 -- -- -- 10 -- -- SPACE 12 -- -- SPACE 14 -- -- SPACE 16 -- -- SPACE 18 -- -- SPACE 20 -- -- SPACE 22 -- -- SPACE 24 -- -- SPACE 26 -- -- SPACE 28 -- -- SPACE 30 -- -- SPACE 32 -- -- SPACE 34 -- -- SPACE 36 -- -- SPACE 38 -- -- SPACE 40 -- -- SPACE 42 University of Massachusetts Building Authority University of Massachusetts Lowell ARCHITECT CONSULTANT PANEL TOTALS TOTAL CONNECTED LOAD: 0.2 kVA TOTAL CONNECTED LOAD: 14.3 kVA TOTAL NEC LOAD: 225 VA TOTAL CONNECTED AMPS: 0 A TOTAL NEC AMPS: 0 A TOTAL NEC LOAD: 16165 VA TOTAL CONNECTED AMPS: 17 A TOTAL NEC AMPS: 19 A NOTES: UMass Lowell North Quad Infrastructure Renewal A.I.C. RATING: 22kA PHASES: 3 ENCLOSURE: Type 1 MP-FK-1 CKT VOLTS: 480/277 Wye MOUNTING: Surface PANEL NAME: MCB RATING: 100 A BUS RATING: 100 A B 0 VA FED FROM: USS-FK MAINS TYPE: MCB WIRES: 4 TRIP PO... 20 A A.I.C. RATING: 22k PHASES: 3 ENCLOSURE: Type 1 LP-FK-1 CKT VOLTS: 480/277 Wye Arup USA Inc 955 Massachusetts Avenue 4th Floor Cambridge, MA 02139 T 617 864 2987 F 617 864 6178 www.arup.com NOTES: 100% CONSTRUCTION DOCUMENT SET ENCLOSURE: Type 1 EP-FK-1A CKT VOLTS: 480/277 Wye CIRCUIT DESCRIPTION POD 2 LEVEL 1 EM LIGHTING - UTILITY 20 A 1 3 LIGHTING 20 A 1 5 EP-FK-2 125 A 3 7 -- -- -- 9 -- -- -- 11 EP-FK-3 125 A 3 13 -- -- -- 15 -- -- -- 17 TX3 30 A 3 19 -- -- -- 21 -- -- -- 23 SPACE -- -- 25 SPACE -- -- 27 SPACE -- -- 29 SPACE -- -- 31 SPACE -- -- 33 SPACE -- -- 35 SPACE -- -- 37 SPACE -- -- 39 SPACE -- -- 41 SPACE -- -- TOTAL CONNECTED LOAD: TOTAL CONNECTED AMPS: LOAD CLASSIFICATION *LIGHTING *RECEPTACLE WIRES: 4 TRIP PO... 1 A 268 VA B C 0 VA 18 VA 0 VA 277 VA 12 VA 0 VA 0 VA 0 VA 277 VA 0 VA 0 VA 1600 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 1100 VA 0 VA 0 VA 0 VA 0 VA 1300 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 1580 VA 6A CONNECTED... 852 VA 1000 VA 1118 VA 4A 0 VA FED FROM: TX3 MAINS TYPE: MCB PANEL NAME: MCB RATING: 225 A BUS RATING: 225 A EP-FK-1B PO... TRIP CIRCUIT DESCRIPTION CKT CKT DEMAND FACTOR CALC. NEC LOAD 125.00% 1065 VA 100.00% 1000 VA CIRCUIT DESCRIPTION 2 1 NON-CONTINUOUS 20 A 1 1 20 A SPARE 4 3 CONTINUOUS - FA BOOSTER 20 A 1 1 20 A SPARE 6 5 EE 371A - F/A BOOSTER POWER SUPPLY 20 A 1 1 20 A SPARE 8 7 NON-CONTINUOUS - FSDs 20 A 1 1 20 A SPARE 10 9 EMER. ELEC. 172A - POWER FOR FIRE ALARM 20 A 1 1 20 A SPARE 12 11 EMER. ELEC. 172A - POWER FOR FIRE ALARM 20 A 1 1 20 A SPARE 14 13 NON-CONTINUOUS - FSDs 20 A 1 1 20 A SPARE 16 15 MOTOR - FSDs 20 A 1 1 20 A SPARE 18 17 SPACE -- -- 1 20 A SPARE 20 19 SPACE -- -- 1 20 A SPARE 22 21 SPACE -- -- 1 20 A SPARE 24 23 SPACE -- -- 1 20 A SPARE 26 25 SPACE -- -- 1 20 A SPARE 28 27 SPACE -- -- 1 20 A SPARE 30 29 SPACE -- -- 1 20 A SPARE 32 31 SPACE -- -- 1 20 A SPARE 34 33 SPACE -- -- 1 20 A SPARE 36 35 SPACE -- -- 1 20 A SPARE 38 37 SPACE -- -- 1 20 A SPARE 40 39 SPACE -- -- 1 20 A SPARE 42 41 SPACE -- -- TOTAL CONNECTED LOAD: TOTAL CONNECTED AMPS: 1700 VA 100.00% 1700 VA *MOTOR LOAD *CONTINUOUS 200 VA 1100 VA 112.50% 125.00% 225 VA 1375 VA TOTAL CONNECTED LOAD: 4.9 kVA TOTAL NEC LOAD: 5365 VA TOTAL CONNECTED AMPS: 6 A TOTAL NEC AMPS: 6 A INTEGRAL SPD. PROVIDE WITH MAIN DISCONNECT SWITCH. SEE E3.01 FOR ADDITIONAL BREAKER COORDINATION REQUIREMENTS AND BASIS OF DESIGN CIRCUIT BREAKERS. 20A BREAKERS AS PER SQUARE D ED FRAME. 125A BREAKERS AS PER E3.01 SINGLE LINE. MAINS TYPE: MCB WIRES: 4 TRIP PO... 20 A SPARE A.I.C. RATING: 10 kA PHASES: 3 ENCLOSURE: Type 1 1 PANEL TOTALS VOLTS: 120/208 Wye MOUNTING: Surface 2154 VA 8A *NON-CONTINUOUS NOTES: A.I.C. RATING: 22kA PHASES: 3 A 500 VA MCB RATING: 50 A BUS RATING: 100 A B C 0 VA 100 VA 0 VA 100 VA 100 VA 0 VA 1000 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 200 VA 0 VA 0 VA 0 VA 1000 VA 1000 VA PO... TRIP 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 1600 VA 14 A 1300 VA 11 A 1100 VA 9A CONNECTED... 1000 VA 1700 VA DEMAND FACTOR 100.00% 100.00% CALC. NEC LOAD 1000 VA 1700 VA *MOTOR LOAD 200 VA 112.50% 225 VA *CONTINUOUS 1100 VA 125.00% 1375 VA LOAD CLASSIFICATION *RECEPTACLE *NON-CONTINUOUS NOTES: CIRCUIT DESCRIPTION STAMP CKT 1 20 A SPARE 2 1 20 A SPARE 4 1 20 A SPARE 6 1 20 A SPARE 8 1 20 A SPARE 10 1 20 A SPARE 12 1 20 A SPARE 14 1 20 A SPARE 16 1 20 A SPARE 18 1 20 A SPARE 20 1 20 A SPARE 22 1 20 A SPARE 24 1 20 A SPARE 26 1 20 A SPARE 28 1 20 A SPARE 30 1 20 A SPARE 32 1 20 A SPARE 34 1 20 A SPARE 36 1 20 A SPARE 38 1 20 A SPARE 40 1 20 A SPARE 42 PANEL TOTALS 8 7 6 5 4 3 2 1 07/17/15 06/30/15 05/07/15 04/06/15 01/15/15 12/18/14 08/29/14 06/10/14 MARK DATE 100% CONSTRUCT. DOC. SET TIER 1 PHASE 1 PERMIT SET 90% CONSTRUCT. DOC. SET 60% CONSTRUCTION PERMIT SET 100% DESIGN DEVELOPMENT SET 50% DESIGN DEVELOPMENT SET SCHEMATIC DESIGN SET FEASIBILITY STUDY SET DESCRIPTION PROJECT NUMBER: 21332 DRAWN BY: IT CHECKED BY: JA SHEET TITLE TOTAL CONNECTED LOAD: 4 kVA TOTAL NEC LOAD: 4300 VA TOTAL CONNECTED AMPS: 11 A TOTAL NEC AMPS: 12 A INTEGRAL SPD. SEE E3.01 FOR ADDITIONAL BREAKER COORDINATION REQUIREMENTS AND BASIS OF DESIGN CIRCUIT BREAKERS. 20A BREAKERS AS PER SQUARE D ED FRAME. ELECTRICAL SCHEDULE PLAN SHEET 1 E-002 7/17/2015 1:58:02 PM FED FROM: ATS3 MOUNTING: Surface PANEL NAME: FED FROM: ATS1 MOUNTING: Surface PANEL NAME: CIRCUIT DESCRIPTION 1 TX2 3 3 -- -- -- 5 -- -- -- 7 SPARE 20 A 1 9 SPARE 20 A 1 11 SPARE 20 A 1 13 SPARE 20 A 1 15 SPARE 20 A 1 17 SPARE 20 A 1 19 SPARE 20 A 1 21 SPACE -- -- 23 SPACE -- -- 25 SPACE -- -- 27 SPACE -- -- 29 SPACE -- -- 31 SPACE -- -- 33 SPACE -- -- 35 SPACE -- -- 37 SPACE -- -- 39 SPACE -- -- 41 SPACE -- -- A 12418... C 0 VA 0 VA 11018 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA TOTAL CONNECTED LOAD: TOTAL CONNECTED AMPS: PO... TRIP 0 VA 12418 VA 45 A 12118 VA 44 A 11018 VA 40 A CONNECTED... 720 VA 500 VA DEMAND FACTOR 100.00% 100.00% CALC. NEC LOAD 720 VA 500 VA *MOTOR LOAD 33035 VA 109.81% 36278 VA *CONTINUOUS 1300 VA 125.00% 1625 VA LOAD CLASSIFICATION *RECEPTACLE *NON-CONTINUOUS CIRCUIT DESCRIPTION CKT CIRCUIT DESCRIPTION 1 20 A SPARE 2 1 OEP-FK-2 100 A 3 1 20 A SPARE 4 3 -- -- -- 1 20 A SPARE 6 5 -- -- -- 1 20 A SPARE 8 7 OEP-FK-3 150 A 3 1 20 A SPARE 10 9 -- -- -- 1 20 A SPARE 12 11 -- -- -- 1 20 A SPARE 14 13 CONTINUOUS - SECURITY SYSTEM 20 A 1 1 20 A SPARE 16 15 CONTINUOUS - DDC PANEL 20 A 1 1 20 A SPARE 18 17 MOTOR - EF 2-2 20 A 1 1 20 A SPARE 20 19 MOTOR - EF 2-1 20 A 1 1 20 A SPARE 22 21 RECEPTACLE - L6-30 20 A 2 1 20 A SPARE 24 23 -- -- -- 1 20 A SPARE 26 25 MOTOR - AC 3-1/3-2 20 A 2 1 20 A SPARE 28 27 -- -- -- 1 20 A SPARE 30 29 RECEPTACLE - L6-30 20 A 2 1 20 A SPARE 32 31 -- -- -- 1 20 A SPARE 34 33 MOTOR - AC 2-1 15 A 2 1 20 A SPARE 36 35 -- -- -- 1 20 A SPARE 38 37 CONTINUOUS - HEAT TRACE 20 A 1 1 20 A SPARE 40 39 CONTINUOUS - HEAT TRACE 20 A 1 1 20 A SPARE 42 41 NON-CONTINUOUS - DRY VALUE 20 A 1 A 580 VA TOTAL NEC LOAD: 39123 VA TOTAL CONNECTED AMPS: 43 A TOTAL NEC AMPS: 47 A NOTES: C PO... TRIP 0 VA 0 VA 52 VA 9358 VA 0 VA 0 VA 9306 VA 0 VA 9706 VA 100 VA 0 VA 0 VA 100 VA 0 VA 528 VA 528 VA 0 VA 0 VA 180 VA 0 VA 0 VA 1352 VA 0 VA 0 VA 1352 VA 0 VA 180 VA 0 VA 0 VA 0 VA 52 VA 0 VA 52 VA 500 VA 0 VA 0 VA 500 VA 0 VA 500 VA 0 VA 12418 VA 105 A 12118 VA 102 A 11018 VA 92 A CONNECTED... 720 VA 500 VA DEMAND FACTOR 100.00% 100.00% CALC. NEC LOAD 720 VA 500 VA *MOTOR LOAD 33035 VA 109.81% 36278 VA *CONTINUOUS 1300 VA 125.00% 1625 VA LOAD CLASSIFICATION *RECEPTACLE *NON-CONTINUOUS TOTAL CONNECTED LOAD: 35.6 kVA MCB RATING: 225 A BUS RATING: 225 A B 628 VA TOTAL CONNECTED LOAD: TOTAL CONNECTED AMPS: PANEL TOTALS MAINS TYPE: MCB WIRES: 4 TRIP PO... UMass Lowell North Quad Infrastructure Renewal A.I.C. RATING: 10kA PHASES: 3 ENCLOSURE: Type 1 OEP-FK-1B CKT VOLTS: 120/208 Wye MOUNTING: Surface PANEL NAME: MCB RATING: 225 A BUS RATING: 225 A B 12118 VA FED FROM: TX2 MAINS TYPE: MCB WIRES: 4 TRIP PO... 100 A A.I.C. RATING: 22kA PHASES: 3 ENCLOSURE: Type 1 OEP-FK-1A CKT VOLTS: 480/277 Wye CIRCUIT DESCRIPTION (UMBA 13-L2) CKT 1 20 A SPARE 2 1 20 A SPARE 4 1 20 A SPARE 6 1 20 A SPARE 8 1 20 A SPARE 10 1 20 A SPARE 12 1 20 A SPARE 14 1 20 A SPARE 16 1 20 A SPARE 18 1 20 A SPARE 20 1 20 A SPARE 22 1 20 A SPARE 24 1 20 A SPARE 26 1 20 A SPARE 28 1 20 A SPARE 30 1 20 A SPARE 32 1 20 A SPARE 34 1 20 A SPARE 36 1 20 A SPARE 38 1 20 A SPARE 40 1 20 A SPARE 42 Lowell, MA University of Massachusetts Building Authority University of Massachusetts Lowell ARCHITECT CONSULTANT PANEL TOTALS Arup USA Inc 955 Massachusetts Avenue 4th Floor Cambridge, MA 02139 T 617 864 2987 F 617 864 6178 www.arup.com TOTAL CONNECTED LOAD: 35.6 kVA TOTAL NEC LOAD: 39123 VA TOTAL CONNECTED AMPS: 99 A TOTAL NEC AMPS: 109 A NOTES: 100% CONSTRUCTION DOCUMENT SET PANEL NAME: ENCLOSURE: Type 1 RP-K-1 CKT VOLTS: 120/208 Wye PHASES: 3 CIRCUIT DESCRIPTION TRIP PO... 1 RECEPTACLE - L5-30 20 A 1 3 RECEPTACLE 20 A 1 5 MOTOR - COOLER 20 A 1 7 RECEPTACLE 20 A 1 9 RECEPTACLE 20 A 1 11 RECEPTACLE 20 A 1 13 CONTINUOUS - GEN CHARGER 20 A 1 15 MOTOR - HAIR DRYER 20 A 1 17 RECEPTACLE 20 A 1 19 *GEN HEATER 60 A 2 -- -- 23 MOTOR - HAIR DRYER 20 A 1 25 CORR. 100C6 - POWER FOR VAV/HVAC... 20 A 1 27 SPARE 20 A 1 29 SPARE 20 A 1 31 SPACE -- -- 33 SPACE -- -- 35 SPACE -- -- 37 SPACE -- -- 39 SPACE -- -- 41 SPACE -- -- 21 -- WIRES: 4 TOTAL CONNECTED LOAD: TOTAL CONNECTED AMPS: A 180 VA B C 0 VA 500 VA 720 VA 0 VA 540 VA 1000 VA 0 VA 540 VA 0 VA 800 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 500 VA 100 VA 0 VA 0 VA 800 VA 500 VA 0 VA 0 VA 720 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 2500 VA 21 A 2380 VA 20 A 2380 VA 20 A CONNECTED... 3060 VA 1000 VA DEMAND FACTOR 100.00% 100.00% CALC. NEC LOAD 3060 VA 1000 VA *MOTOR LOAD 2200 VA 109.09% 2400 VA *CONTINUOUS 1000 VA 125.00% 1250 VA LOAD CLASSIFICATION *RECEPTACLE *NON-CONTINUOUS NOTES: FED FROM: DP-FK1 MAINS TYPE: MCB PANEL NAME: MOUNTING: Surface MCB RATING: 225 A BUS RATING: 225 A RP-F-1 PO... TRIP 0 VA 360 VA A.I.C. RATING: 10kA CIRCUIT DESCRIPTION CKT CKT ENCLOSURE: Type 1 CIRCUIT DESCRIPTION 20 A SPARE 2 1 RECEPTACLE 20 A 1 1 20 A SPARE 4 3 GENERATOR BATTERY CHARGER 20 A 1 1 20 A SPARE 6 5 GENERATOR AUX POWER CONNECTION 60 A 2 1 20 A SPARE 8 7 -- -- -- 1 20 A SPARE 10 9 SPARE 20 A 1 1 20 A SPARE 12 11 SPARE 20 A 1 1 20 A SPARE 14 13 SPARE 20 A 1 1 20 A SPARE 16 15 SPARE 20 A 1 1 20 A SPARE 18 17 SPARE 20 A 1 1 20 A SPARE 20 19 SPARE 20 A 1 1 20 A SPARE 22 21 SPACE -- -- 1 20 A SPARE 24 23 SPACE -- -- 1 20 A SPARE 26 25 SPACE -- -- 1 20 A SPARE 28 27 SPACE -- -- 1 20 A SPARE 30 29 SPACE -- -- 1 20 A SPARE 32 31 SPACE -- -- 1 20 A SPARE 34 33 SPACE -- -- 1 20 A SPARE 36 35 SPACE -- -- 1 20 A SPARE 38 37 SPACE -- -- 1 20 A SPARE 40 39 SPACE -- -- 1 20 A SPARE 42 41 SPACE -- -- TOTAL CONNECTED LOAD: TOTAL CONNECTED AMPS: TOTAL CONNECTED LOAD: 7.3 kVA LOAD CLASSIFICATION *RECEPTACLE *NON-CONTINUOUS TOTAL NEC LOAD: 7710 VA A.I.C. RATING: 10kA MAINS TYPE: MCB WIRES: 4 TRIP PO... 1 PANEL TOTALS VOLTS: 120/208 Wye PHASES: 3 A 360 VA MCB RATING: 225 A BUS RATING: 225 A B C 0 VA 500 VA 0 VA 3000 VA 3000 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA PO... TRIP 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 3360 VA 31 A 500 VA 4A 3000 VA 28 A CONNECTED... 360 VA 6500 VA DEMAND FACTOR 100.00% 100.00% CALC. NEC LOAD 360 VA 6500 VA CIRCUIT DESCRIPTION 1 20 A SPARE 2 1 20 A SPARE 4 1 20 A SPARE 6 1 20 A SPARE 8 1 20 A SPARE 10 1 20 A SPARE 12 1 20 A SPARE 14 1 20 A SPARE 16 1 20 A SPARE 18 1 20 A SPARE 20 1 20 A SPARE 22 1 20 A SPARE 24 1 20 A SPARE 26 1 20 A SPARE 28 1 20 A SPARE 30 1 20 A SPARE 32 1 20 A SPARE 34 1 20 A SPARE 36 1 20 A SPARE 38 1 20 A SPARE 40 1 20 A SPARE 42 PANEL TOTALS STAMP CKT 8 7 6 5 4 3 2 1 07/17/15 06/30/15 05/07/15 04/06/15 01/15/15 12/18/14 08/29/14 06/10/14 MARK DATE 100% CONSTRUCT. DOC. SET TIER 1 PHASE 1 PERMIT SET 90% CONSTRUCT. DOC. SET 60% CONSTRUCTION PERMIT SET 100% DESIGN DEVELOPMENT SET 50% DESIGN DEVELOPMENT SET SCHEMATIC DESIGN SET FEASIBILITY STUDY SET DESCRIPTION PROJECT NUMBER: 21332 DRAWN BY: IT CHECKED BY: JA SHEET TITLE TOTAL CONNECTED LOAD: 6.9 kVA TOTAL NEC LOAD: 6860 VA TOTAL CONNECTED AMPS: 20 A TOTAL NEC AMPS: 21 A TOTAL CONNECTED AMPS: 19 A TOTAL NEC AMPS: 19 A NOTES: ELECTRICAL SCHEDULE PLAN SHEET 2 E-003 7/17/2015 1:58:04 PM FED FROM: DP-FK1 MOUNTING: Surface VOLTS: 120/208 Wye MOUNTING: Surface PANEL NAME: CKT SP-P3 3 MAINS TYPE: MCB WIRES: 4 MCB RATING: 150 A BUS RATING: 225 A DP-S CIRCUIT DESCRIPTION 1 PHASES: 3 ENCLOSURE: Type 1 SP-P1 A.I.C. RATING: 22kA TRIP PO... 100 A 3 -- -- -- 5 -- -- -- 7 LIGHTING 20 A 1 9 MOTOR - EF 1-2 20 A 1 11 LIGHTING 20 A 1 13 NON-CONTINUOUS - HAND DRYER 20 A 1 15 CONTINUOUS - CONTROL PANEL 20 A 1 17 LIGHTING 20 A 1 19 RECEPTACLE 20 A 1 21 RECEPTACLE 20 A 1 23 MOTOR - HAND DRYER 20 A 1 25 RECEPTACLE 20 A 1 27 RECEPTACLE - L5-30 30 A 1 29 RECEPTACLE 20 A 1 31 NON-CONTINUOUS - COOLER 20 A 1 33 RECEPTACLE 20 A 1 35 NON-CONTINUOUS - HAND DRYER 20 A 1 37 RECEPTACLE 20 A 1 39 SPARE 20 A 1 41 SPARE 20 A 1 43 SPARE 20 A 1 45 SPARE 20 A 1 47 SPARE 20 A 1 49 SPARE 20 A 1 51 SPARE 20 A 1 53 SPARE 20 A 1 55 SPARE 20 A 1 57 SPARE 20 A 1 59 SPARE 20 A 1 61 SPACE -- -- 63 SPACE -- -- 65 SPACE -- -- 67 SPACE -- -- 69 SPACE -- -- 71 SPACE -- -- 73 SPACE -- -- 75 SPACE -- -- 77 SPACE -- -- 79 SPACE -- -- 81 SPACE -- -- 83 SPACE -- -- A 7518 VA B C 126 VA 9176 VA 135 VA 8225 VA 336 VA 528 VA 500 VA 528 VA 900 VA 170 VA 800 VA 180 VA 100 VA 100 VA 100 VA 305 VA 360 VA 360 VA 360 VA 360 VA 360 VA 500 VA 360 VA 500 VA 500 VA 500 VA 500 VA 540 VA 500 VA 540 VA 720 VA 720 VA 540 VA 800 VA 720 VA 800 VA 800 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA TOTAL CONNECTED LOAD: TOTAL CONNECTED AMPS: 13700 VA 114 A LOAD CLASSIFICATION *LIGHTING CONNECTED... 2035 VA Receptacle PO... TRIP 13919 VA 116 A 0 VA 360 VA *RECEPTACLE 14180 VA 85.26% 12090 VA *NON-CONTINUOUS *MOTOR LOAD 50 VA 23941 VA 100.00% 107.52% 50 VA 25742 VA 500 VA 125.00% 625 VA PANEL NAME: CKT CIRCUIT DESCRIPTION SPARE 20 A 1 3 SPARE 20 A 1 5 SPARE 20 A 1 7 SPARE 20 A 1 9 SPARE 20 A 1 11 SPARE 20 A 1 13 SPARE 20 A 1 15 SPARE 20 A 1 17 SPACE -- -- 19 SPACE -- -- 21 SPACE -- -- 23 SPACE -- -- 25 SPACE -- -- 27 SPACE -- -- 29 SPACE -- -- 31 SPACE -- -- 33 SPACE -- -- 35 SPACE -- -- 37 SPACE -- -- 39 SPACE -- -- 41 SPACE -- -- TOTAL CONNECTED LOAD: TOTAL CONNECTED AMPS: LOAD CLASSIFICATION 20 A LIGHTING 4 1 20 A MOTOR - EF 1-1 6 1 20 A MOTOR -COOLER 8 1 20 A RECEPTACLE 10 1 20 A RECEPTACLE - L5-30 12 1 20 A CONTINUOUS - DDC PANEL 14 1 20 A CONTINUOUS - DDC PANEL 16 1 20 A RECEPTACLE 18 1 20 A RECEPTACLE 20 1 20 A RECEPTACLE 22 1 20 A NON-CONTINUOUS - COOLER 24 1 20 A MOTOR - HAND DRYER 26 1 20 A MOTOR - COOLER 28 1 20 A RECEPTACLE 30 1 20 A RECEPTACLE 32 1 20 A RECEPTACLE 34 1 20 A MOTOR - HAND DRYER 36 1 20 A MOTOR - HAND DRYER 38 1 20 A SPARE 40 1 20 A SPARE 42 1 20 A SPARE 44 1 20 A SPARE 46 1 20 A SPARE 48 1 20 A SPARE 50 1 20 A SPARE 52 1 20 A SPARE 54 1 20 A SPARE 56 1 20 A SPARE 58 *NON-CONTINUOUS 60 *MOTOR LOAD *CONTINUOUS 1 20 A SPARE -- -- SPACE 62 -- -- SPACE 64 -- -- SPACE 66 -- -- SPACE 68 -- -- SPACE 70 -- -- SPACE 72 -- -- SPACE 74 -- -- SPACE 76 -- -- SPACE 78 -- -- SPACE 80 -- -- SPACE 82 -- -- SPACE 84 0 VA MCB RATING: 100 A BUS RATING: 100 A C 0 VA PO... TRIP 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 3 TRIP PO... 100 A 3 -- -- -- 5 -- -- -- 7 RECEPTACLE 20 A 1 9 CONTINUOUS - SECURITY SYSTEM 20 A 1 15 A 2 -- -- 15 NON-CONTINUOUS - FSDs 20 A 1 17 NON CONTINUOUS - FSDs 20 A 1 19 NON-CONTINUOUS - FSDs 20 A 1 21 LIGHTING (VIA INV1) 20 A 1 23 LIGHTING 20 A 1 25 LIGHTING 20 A 1 27 POWER PROVISION FOR FIRE ALARM 20 A 1 29 POWER PROVISION FOR FIRE ALARM 20 A 1 31 SPARE 20 A 1 33 SPARE 20 A 1 35 SPARE 20 A 1 37 INV 20 A 3 39 -- -- -- 41 -- -- -- 11 MOTOR - AC 1-3 13 -- A MCB RATING: 200 A BUS RATING: 225 A B C PO... TRIP CIRCUIT DESCRIPTION 5717 VA 500 VA 2 4738 VA 180 VA 0 VA 100 VA 100 VA 0 VA 52 VA 52 VA 0 VA 0 VA 200 VA 0 VA 200 VA 100 VA 255 VA 0 VA 70 VA 0 VA 18 VA 30 VA 209 VA 52 VA 100 VA 52 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 100 VA 0 VA 52 VA 0 VA LOAD CLASSIFICATION *LIGHTING *RECEPTACLE -- 52 VA 6331 VA 53 A 5933 VA 50 A 5624 VA 47 A CONNECTED... 962 VA 1040 VA DEMAND FACTOR 125.00% 100.00% CALC. NEC LOAD 1203 VA 1040 VA 900 VA 100.00% 900 VA 14289 VA 700 VA 122.69% 125.00% 17532 VA 875 VA 30 A RECEPTACLE - L6-30 -- -- 6 20 A CONTINUOUS - FACU 8 1 20 A MOTOR - ELEVATOR CABIN FAN 10 -- -- SPACE 12 -- -- SPACE 14 -- -- SPACE 16 1 20 A LIGHTING (VIA INV2) -- SPACE 20 -- -- SPACE 22 1 20 A LIGHTING (VIA INV3) 24 2 15 A MOTOR - AC 1-1 26 -- 28 1 20 A SPARE 30 1 20 A SPARE 32 1 20 A SPARE 34 -- -- SPACE 20 A CONTINUOUS - FA BOOSTER 38 2 15 A MOTOR - AC 1-2 40 -- ARCHITECT 36 1 -- University of Massachusetts Building Authority University of Massachusetts Lowell 18 -- -- Lowell, MA 4 1 -100 VA 0 VA (UMBA 13-L2) CKT 2 4859 VA TOTAL CONNECTED LOAD: TOTAL CONNECTED AMPS: -- CONSULTANT 42 PANEL TOTALS Arup USA Inc 955 Massachusetts Avenue 4th Floor Cambridge, MA 02139 T 617 864 2987 F 617 864 6178 www.arup.com TOTAL CONNECTED LOAD: 17.9 kVA TOTAL NEC LOAD: 21549 VA TOTAL CONNECTED AMPS: 50 A TOTAL NEC AMPS: 60 A NOTES: 100% CONSTRUCTION DOCUMENT SET 0 VA 0 VA 0 VA 0 VA 0A 0 VA 0A 0 VA 0A CONNECTED... DEMAND FACTOR CALC. NEC LOAD CIRCUIT DESCRIPTION CKT VOLTS: 480/277 Wye MOUNTING: Surface CIRCUIT DESCRIPTION 1 LIGHTING 20 A 1 3 LIGHTING 20 A 1 5 SPARE 20 A 1 7 SPARE 20 A 1 9 SPARE 20 A 1 11 SPARE 20 A 1 13 SPARE 20 A 1 15 SPARE 20 A 1 17 SPACE -- -- 19 SPACE -- -- 21 SPACE -- -- 23 SPACE -- -- 25 SPACE -- -- 27 SPACE -- -- 29 SPACE -- -- 31 SPACE -- -- 33 SPACE -- -- 35 SPACE -- -- 37 SPACE -- -- 39 SPACE -- -- 41 SPACE -- -- MAINS TYPE: MLO WIRES: 4 TRIP PO... A 277 VA MCB RATING: N/A BUS RATING: 125 A B C 0 VA 0 VA 0 VA PO... TRIP 0 VA 12 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA CIRCUIT DESCRIPTION 20 A SPARE 2 1 20 A SPARE 4 1 20 A SPARE 6 1 20 A SPARE 8 1 20 A SPARE 10 1 20 A SPARE 12 1 20 A SPARE 14 1 20 A SPARE 16 1 20 A SPARE 18 1 20 A SPARE 20 1 20 A SPARE 22 1 20 A SPARE 24 1 20 A SPARE 26 1 20 A SPARE 28 1 20 A SPARE 30 1 20 A SPARE 32 1 20 A SPARE 34 1 20 A SPARE 36 1 20 A SPARE 38 1 20 A SPARE 40 1 20 A SPARE 42 20 A SPARE 2 1 20 A SPARE 4 1 20 A SPARE 6 1 20 A SPARE 8 1 20 A SPARE 10 1 20 A SPARE 12 1 20 A SPARE 14 1 20 A SPARE 16 1 20 A SPARE 18 1 20 A SPARE 20 1 20 A SPARE 22 1 20 A SPARE 24 1 20 A SPARE 26 1 20 A SPARE 28 1 20 A SPARE 30 1 20 A SPARE 32 1 20 A SPARE 34 1 20 A SPARE 36 1 20 A SPARE 38 1 20 A SPARE 40 TOTAL CONNECTED LOAD: 0.3 kVA 1 20 A SPARE 42 TOTAL NEC LOAD: 361 VA TOTAL CONNECTED AMPS: 0 A TOTAL NEC AMPS: 0 A TOTAL CONNECTED LOAD: TOTAL CONNECTED AMPS: LOAD CLASSIFICATION *LIGHTING 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 277 VA 1A CONNECTED... 289 VA 12 VA 0A 0 VA CKT 1 1 0 VA STAMP A.I.C. RATING: 22kA PHASES: 3 ENCLOSURE: Type 1 EP-FK-2 A.I.C. RATING: 22kA 0 VA 0 VA OP-SP-3 CKT 0 VA 0 VA 1 PANEL NAME: MAINS TYPE: MCB B 0 VA CIRCUIT DESCRIPTION WIRES: 4 FED FROM: EP-FK-1A TOTAL NEC LOAD: 41411 VA TOTAL CONNECTED AMPS: 114 A TOTAL NEC AMPS: 115 A WIRES: 4 A CKT MAINS TYPE: MCB PANEL TOTALS VOLTS: 480/277 Wye TRIP PO... 1 1 PHASES: 3 ENCLOSURE: Type 1 LP-FK-2 2 UMass Lowell North Quad Infrastructure Renewal A.I.C. RATING: 22kA PHASES: 3 ENCLOSURE: Type 1 OP-SP-1 20 A LIGHTING TOTAL CONNECTED LOAD: 41 kVA 100.00% FED FROM: USS-FK MOUNTING: Surface PANEL NAME: 1 DEMAND FACTOR CALC. NEC LOAD 125.00% 2544 VA MOUNTING: Surface CKT VOLTS: 120/208 Wye 13448 VA 112 A 360 VA *CONTINUOUS CIRCUIT DESCRIPTION FED FROM: DP-P 0 VA 0A DEMAND FACTOR CALC. NEC LOAD 125.00% 361 VA PANEL TOTALS 8 7 6 5 4 3 2 1 07/17/15 06/30/15 05/07/15 04/06/15 01/15/15 12/18/14 08/29/14 06/10/14 MARK DATE 100% CONSTRUCT. DOC. SET TIER 1 PHASE 1 PERMIT SET 90% CONSTRUCT. DOC. SET 60% CONSTRUCTION PERMIT SET 100% DESIGN DEVELOPMENT SET 50% DESIGN DEVELOPMENT SET SCHEMATIC DESIGN SET FEASIBILITY STUDY SET DESCRIPTION PROJECT NUMBER: 21332 DRAWN BY: IT CHECKED BY: JA SHEET TITLE ELECTRICAL SCHEDULE PLAN SHEET 3 PANEL TOTALS NOTES: TOTAL CONNECTED LOAD: 0 kVA TOTAL NEC LOAD: 0 VA TOTAL CONNECTED AMPS: 0 A TOTAL NEC AMPS: 0 A INTEGRAL SPD. PROVIDE WITH MAIN DISCONNECT SWITCH. SEE E3.01 FOR ADDITIONAL BREAKER COORDINATION REQUIREMENTS AND BASIS OF DESIGN CIRCUIT BREAKERS. 20A BREAKERS AS PER SQUARE D ED FRAME. E-004 7/17/2015 1:58:06 PM FED FROM: FED FROM: OEP-FK-1B MOUNTING: Surface PANEL NAME: CIRCUIT DESCRIPTION MOTOR - SF-1 15 A 1 3 MOTOR - EF 2-3 15 A 1 5 MOTOR - AC 2-3 15 A 2 7 -- -- -- 9 CONTINUOUS - DDC PANEL 20 A 1 11 SPARE 20 A 1 13 SPARE 20 A 1 15 SPARE 20 A 1 17 SPARE 20 A 1 19 SPARE 20 A 1 21 SPARE 20 A 1 23 SPARE 20 A 1 25 SPARE 20 A 1 27 SPARE 20 A 1 29 SPARE 20 A 1 31 SPACE -- -- 33 SPACE -- -- 35 SPACE -- -- 37 SPACE -- -- 39 SPACE -- -- 41 SPACE -- -- A 528 VA C 0 VA 0 VA 52 VA 52 VA 0 VA 0 VA 100 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA TOTAL CONNECTED LOAD: TOTAL CONNECTED AMPS: LOAD CLASSIFICATION *MOTOR LOAD *CONTINUOUS PO... TRIP 0 VA CIRCUIT DESCRIPTION CKT CIRCUIT DESCRIPTION 1 20 A SPARE 2 1 RECEPTACLE 20 A 1 1 20 A SPARE 4 3 RECEPTACLE - L5-30 20 A 1 1 20 A SPARE 6 5 SPARE 20 A 1 1 20 A SPARE 8 7 SPARE 20 A 1 1 20 A SPARE 10 9 SPARE 20 A 1 1 20 A SPARE 12 11 SPARE 20 A 1 1 20 A SPARE 14 13 SPARE 20 A 1 1 20 A SPARE 16 15 SPARE 20 A 1 1 20 A SPARE 18 17 SPARE 20 A 1 1 20 A SPARE 20 19 SPARE 20 A 1 1 20 A SPARE 22 21 SPACE -- -- 1 20 A SPARE 24 23 SPACE -- -- 1 20 A SPARE 26 25 SPACE -- -- 1 20 A SPARE 28 27 SPACE -- -- 1 20 A SPARE 30 29 SPACE -- -- 1 20 A SPARE 32 31 SPACE -- -- 1 20 A SPARE 34 33 SPACE -- -- 1 20 A SPARE 36 35 SPACE -- -- 1 20 A SPARE 38 37 SPACE -- -- 1 20 A SPARE 40 39 SPACE -- -- 1 20 A SPARE 42 41 SPACE -- -- A 180 VA 628 VA 6A 52 VA 0A CONNECTED... 1160 VA 100 VA DEMAND FACTOR 111.38% 125.00% CALC. NEC LOAD 1292 VA 125 VA PANEL TOTALS MCB RATING: 225 A BUS RATING: 225 A B C 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA LOAD CLASSIFICATION *RECEPTACLE PO... TRIP 0 VA 180 VA TOTAL CONNECTED LOAD: TOTAL CONNECTED AMPS: 580 VA 6A MAINS TYPE: MCB WIRES: 4 TRIP PO... 0 VA 180 VA 2A 180 VA 2A 0 VA 0A CONNECTED... 360 VA DEMAND FACTOR 100.00% CALC. NEC LOAD 360 VA CIRCUIT DESCRIPTION (UMBA 13-L2) CKT 1 20 A SPARE 2 1 20 A SPARE 4 1 20 A SPARE 6 1 20 A SPARE 8 1 20 A SPARE 10 1 20 A SPARE 12 1 20 A SPARE 14 1 20 A SPARE 16 1 20 A SPARE 18 1 20 A SPARE 20 1 20 A SPARE 22 1 20 A SPARE 24 1 20 A SPARE 26 1 20 A SPARE 28 1 20 A SPARE 30 1 20 A SPARE 32 1 20 A SPARE 34 1 20 A SPARE 36 1 20 A SPARE 38 1 20 A SPARE 40 1 20 A SPARE 42 Lowell, MA University of Massachusetts Building Authority University of Massachusetts Lowell ARCHITECT CONSULTANT PANEL TOTALS TOTAL CONNECTED LOAD: 1.3 kVA TOTAL CONNECTED LOAD: 0.4 kVA TOTAL NEC LOAD: 1417 VA TOTAL CONNECTED AMPS: 3 A TOTAL NEC AMPS: 4 A TOTAL NEC LOAD: 360 VA TOTAL CONNECTED AMPS: 1 A TOTAL NEC AMPS: 1 A NOTES: UMass Lowell North Quad Infrastructure Renewal A.I.C. RATING: 10kA PHASES: 3 ENCLOSURE: Type 1 RP-K-2 CKT VOLTS: 120/208 Wye MOUNTING: Surface PANEL NAME: MCB RATING: 100 A BUS RATING: 100 A B 528 VA FED FROM: DP-FK1 MAINS TYPE: MCB WIRES: 4 TRIP PO... 1 A.I.C. RATING: 10kA PHASES: 3 ENCLOSURE: Type 1 OEP-FK-2 CKT VOLTS: 120/208 Wye Arup USA Inc 955 Massachusetts Avenue 4th Floor Cambridge, MA 02139 T 617 864 2987 F 617 864 6178 www.arup.com NOTES: 100% CONSTRUCTION DOCUMENT SET MOUNTING: Surface PANEL NAME: CIRCUIT DESCRIPTION RECEPTACLE 20 A 1 3 RECEPTACLE 20 A 1 5 MOTOR - HAIR DRYER 20 A 1 7 MOTOR - HAIR DRYER 20 A 1 9 RECEPTACLE 20 A 1 11 RECEPTACLE 20 A 1 13 MOTOR - HAIR DRYER 20 A 1 15 MOTOR - COOLER 20 A 1 17 MOTOR - HAIR DRYER 20 A 1 19 SPARE 20 A 1 21 SPARE 20 A 1 23 SPARE 20 A 1 25 SPARE 20 A 1 27 SPARE 20 A 1 29 SPARE 20 A 1 31 SPARE 20 A 1 33 SPARE 20 A 1 35 SPARE 20 A 1 37 SPARE 20 A 1 39 SPARE 20 A 1 20 A 1 41 SPARE TOTAL CONNECTED LOAD: TOTAL CONNECTED AMPS: LOAD CLASSIFICATION *RECEPTACLE *MOTOR LOAD NOTES: A 360 VA C 0 VA 0 VA 800 VA 800 VA 0 VA 540 VA 0 VA 800 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 500 VA 0 VA 0 VA 0 VA 900 VA 800 VA PO... TRIP 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 1960 VA 16 A 1940 VA 16 A 2140 VA 18 A CONNECTED... 2340 VA 3700 VA DEMAND FACTOR 100.00% 105.41% CALC. NEC LOAD 2340 VA 3900 VA CIRCUIT DESCRIPTION CKT CIRCUIT DESCRIPTION 20 A SPARE 2 1 LIGHTING 20 A 1 1 20 A SPARE 4 3 LIGHTING 20 A 1 1 20 A SPARE 6 5 SPARE 20 A 1 1 20 A SPARE 8 7 SPARE 20 A 1 1 20 A SPARE 10 9 SPARE 20 A 1 1 20 A SPARE 12 11 SPARE 20 A 1 1 20 A SPARE 14 13 SPARE 20 A 1 1 20 A SPARE 16 15 SPARE 20 A 1 1 20 A SPARE 18 17 SPARE 20 A 1 1 20 A SPARE 20 19 SPARE 20 A 1 1 20 A SPARE 22 21 SPACE -- -- 1 20 A SPARE 24 23 SPACE -- -- 1 20 A SPARE 26 25 SPACE -- -- 1 20 A SPARE 28 27 SPACE -- -- 1 20 A SPARE 30 29 SPACE -- -- 1 20 A SPARE 32 31 SPACE -- -- 1 20 A SPARE 34 33 SPACE -- -- 1 20 A SPARE 36 35 SPACE -- -- 1 20 A SPARE 38 37 SPACE -- -- 1 20 A SPARE 40 39 SPACE -- -- 1 20 A SPARE 42 41 SPACE -- -- TOTAL CONNECTED LOAD: TOTAL CONNECTED AMPS: PANEL TOTALS LOAD CLASSIFICATION *LIGHTING MAINS TYPE: MCB WIRES: 4 TRIP PO... 1 A.I.C. RATING: 22kA PHASES: 3 ENCLOSURE: Type 1 LP-FK-3 CKT VOLTS: 480/277 Wye MOUNTING: Surface PANEL NAME: MCB RATING: 225 A BUS RATING: 225 A B 540 VA FED FROM: USS-FK MAINS TYPE: MCB WIRES: 4 TRIP PO... 1 A.I.C. RATING: 10kA PHASES: 3 ENCLOSURE: Type 1 RP-F-2 CKT VOLTS: 120/208 Wye A 360 VA MCB RATING: 100 A BUS RATING: 100 A B C 0 VA 12 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA PO... TRIP 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 360 VA 1A 12 VA 0A 0 VA 0A CONNECTED... 372 VA DEMAND FACTOR 125.00% CALC. NEC LOAD 465 VA CIRCUIT DESCRIPTION 1 20 A SPARE 2 1 20 A SPARE 4 1 20 A SPARE 6 1 20 A SPARE 8 1 20 A SPARE 10 1 20 A SPARE 12 1 20 A SPARE 14 1 20 A SPARE 16 1 20 A SPARE 18 1 20 A SPARE 20 1 20 A SPARE 22 1 20 A SPARE 24 1 20 A SPARE 26 1 20 A SPARE 28 1 20 A SPARE 30 1 20 A SPARE 32 1 20 A SPARE 34 1 20 A SPARE 36 1 20 A SPARE 38 1 20 A SPARE 40 1 20 A SPARE 42 PANEL TOTALS TOTAL CONNECTED LOAD: 6 kVA TOTAL CONNECTED LOAD: 0.4 kVA TOTAL NEC LOAD: 6240 VA TOTAL CONNECTED AMPS: 17 A TOTAL NEC AMPS: 17 A TOTAL NEC LOAD: 465 VA TOTAL CONNECTED AMPS: 0 A TOTAL NEC AMPS: 1 A NOTES: STAMP CKT 8 7 6 5 4 3 2 1 07/17/15 06/30/15 05/07/15 04/06/15 01/15/15 12/18/14 08/29/14 06/10/14 MARK DATE 100% CONSTRUCT. DOC. SET TIER 1 PHASE 1 PERMIT SET 90% CONSTRUCT. DOC. SET 60% CONSTRUCTION PERMIT SET 100% DESIGN DEVELOPMENT SET 50% DESIGN DEVELOPMENT SET SCHEMATIC DESIGN SET FEASIBILITY STUDY SET DESCRIPTION PROJECT NUMBER: 21332 DRAWN BY: IT CHECKED BY: JA SHEET TITLE ELECTRICAL SCHEDULE PLAN SHEET 4 E-005 7/17/2015 1:58:08 PM FED FROM: DP-FK1 FED FROM: USS-FK MOUNTING: Surface PANEL NAME: CIRCUIT DESCRIPTION 1 MOTOR - POD 1 ROOF RTU 2 3 WIRES: 4 TRIP PO... 25 A 3 -- -- -- 5 -- -- -- 7 SPARE 20 A 1 9 SPARE 20 A 1 11 SPARE 20 A 1 13 SPARE 20 A 1 15 SPARE 20 A 1 17 SPARE 20 A 1 19 SPACE -- -- 21 SPACE -- -- 23 SPACE -- -- 25 SPACE -- -- 27 SPACE -- -- 29 SPACE -- -- 31 SPACE -- -- 33 SPACE -- -- 35 SPACE -- -- 37 SPACE -- -- 39 SPACE -- -- 41 SPACE -- -- A.I.C. RATING: 35kA PHASES: 3 ENCLOSURE: Type 1 MP-FK-3 CKT VOLTS: 480/277 Wye A 5542 VA B C -5542 VA 6925 VA 1 5542 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA TOTAL CONNECTED LOAD: TOTAL CONNECTED AMPS: LOAD CLASSIFICATION *MOTOR LOAD 0 VA 0 VA 0 VA MAINS TYPE: MCB PANEL NAME: MCB RATING: 600 A BUS RATING: 600 A EP-FK-3 PO... TRIP 0 VA 0 VA 5542 VA 20 A 12467 VA 45 A 5542 VA 20 A CONNECTED... 23552 VA DEMAND FACTOR 117.65% CALC. NEC LOAD 27709 VA -- FED FROM: EP-FK-1A CIRCUIT DESCRIPTION SPACE 50 A MOTOR - POD 2 L3 DWH-1 VOLTS: 480/277 Wye MOUNTING: Surface PHASES: 3 ENCLOSURE: Type 1 CKT CKT CIRCUIT DESCRIPTION 2 1 LIGHTING 20 A 1 4 3 SPARE 20 A 1 -- -- SPACE 6 5 SPARE 20 A 1 -- -- SPACE 8 7 SPARE 20 A 1 -- -- SPACE 10 9 SPARE 20 A 1 -- -- SPACE 12 11 SPARE 20 A 1 -- -- SPACE 14 13 SPARE 20 A 1 -- -- SPACE 16 15 SPARE 20 A 1 -- -- SPACE 18 17 SPARE 20 A 1 -- -- SPACE 20 19 SPARE 20 A 1 -- -- SPACE 22 21 SPARE 20 A 1 -- -- SPACE 24 23 SPARE 20 A 1 -- -- SPACE 26 25 SPARE 20 A 1 -- -- SPACE 28 27 SPARE 20 A 1 -- -- SPACE 30 29 SPARE 20 A 1 -- -- SPACE 32 31 SPACE -- -- -- -- SPACE 34 33 SPACE -- -- -- -- SPACE 36 35 SPACE -- -- -- -- SPACE 38 37 SPACE -- -- -- -- SPACE 40 39 SPACE -- -- -- -- SPACE 42 41 SPACE -- -- A MCB RATING: N/A BUS RATING: 125 A B 277 VA C 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 277 VA 1A LOAD CLASSIFICATION *LIGHTING PO... TRIP 0 VA 0 VA TOTAL CONNECTED LOAD: TOTAL CONNECTED AMPS: PANEL TOTALS MAINS TYPE: MLO WIRES: 4 TRIP PO... CONNECTED... 277 VA 0 VA 0A UMass Lowell North Quad Infrastructure Renewal A.I.C. RATING: 22kA 0 VA CIRCUIT DESCRIPTION (UMBA 13-L2) CKT 1 20 A SPARE 2 1 20 A SPARE 4 1 20 A SPARE 6 1 20 A SPARE 8 1 20 A SPARE 10 1 20 A SPARE 12 1 20 A SPARE 14 1 20 A SPARE 16 1 20 A SPARE 18 1 20 A SPARE 20 1 20 A SPARE 22 1 20 A SPARE 24 1 20 A SPARE 26 1 20 A SPARE 28 1 20 A SPARE 30 1 20 A SPARE 32 1 20 A SPARE 34 1 20 A SPARE 36 1 20 A SPARE 38 1 20 A SPARE 40 1 20 A SPARE 42 Lowell, MA University of Massachusetts Building Authority University of Massachusetts Lowell ARCHITECT CONSULTANT 0 VA 0A DEMAND FACTOR CALC. NEC LOAD 125.00% 346 VA PANEL TOTALS TOTAL CONNECTED LOAD: 23.6 kVA Arup USA Inc 955 Massachusetts Avenue 4th Floor Cambridge, MA 02139 T 617 864 2987 F 617 864 6178 www.arup.com TOTAL CONNECTED LOAD: 0.3 kVA TOTAL NEC LOAD: 27709 VA TOTAL NEC LOAD: 346 VA TOTAL CONNECTED AMPS: 28 A TOTAL NEC AMPS: 33 A TOTAL CONNECTED AMPS: 0 A TOTAL NEC AMPS: 0 A NOTES: PROVIDE MAIN BREAKER AS LSI ELECTRONIC TRIP. NOTES: INTEGRAL SPD. PROVIDE WITH MAIN DISCONNECT SWITCH. SEE E3.01 FOR ADDITIONAL BREAKER COORDINATION REQUIREMENTS AND BASIS OF DESIGN CIRCUIT BREAKERS. 20A BREAKERS AS PER SQUARE D ED FRAME. 100% CONSTRUCTION DOCUMENT SET FED FROM: OEP-FK-1B VOLTS: 120/208 Wye MOUNTING: Surface ENCLOSURE: Type 1 PANEL NAME: OEP-FK-3 PHASES: 3 WIRES: 4 A.I.C. RATING: 10kA FED FROM: DP-FK1 MAINS TYPE: MCB MCB RATING: 150 A BUS RATING: 225 A MOUNTING: Surface ENCLOSURE: Type 1 PANEL NAME: RP-K-3 VOLTS: 120/208 Wye A.I.C. RATING: 10kA PHASES: 3 WIRES: 4 MAINS TYPE: MCB MCB RATING: 225 A BUS RATING: 225 A STAMP CIRCUIT DESCRIPTION 1 RECEPTACLE - L6-30 3 -- 5 MOTOR - ACCU-3 CONNECTION 1 7 9 TRIP PO... 20 A 2 -- -- 50 A 3 -- -- -- -- -- -- 20 A 2 -- -- 30 A 3 17 -- -- -- 19 -- -- -- 21 RECEPTACLE 20 A 1 23 MOTOR - SF-2 20 A 1 25 MOTOR - ACCU-3 CONNECTION 2 30 A 3 27 -- -- -- 29 -- -- -- 31 SPARE 20 A 1 33 SPARE 20 A 1 35 SPARE 20 A 1 37 SPARE 20 A 1 39 SPARE 20 A 1 41 SPARE 20 A 1 11 MOTOR - AC 2-6 13 -15 MOTOR - ACCU-2 TOTAL CONNECTED LOAD: TOTAL CONNECTED AMPS: LOAD CLASSIFICATION *RECEPTACLE *MOTOR LOAD A 180 VA B C 0 VA 0 VA 0 VA 4323 VA 4323 VA 0 VA 52 VA 0 VA 2402 VA 0 VA 528 VA 0 VA 2402 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 2402 VA 0 VA 0 VA 0 VA 180 VA 2402 VA 0 VA 0 VA 2402 VA 2402 VA 0 VA 0 VA 4323 VA 52 VA PO... TRIP 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 9358 VA 78 A 9306 VA 78 A 9706 VA 81 A CONNECTED... 360 VA 28011 VA DEMAND FACTOR 100.00% 111.57% CALC. NEC LOAD 360 VA 31254 VA CIRCUIT DESCRIPTION CKT CKT CIRCUIT DESCRIPTION 1 20 A SPARE 2 1 RECEPTACLE 20 A 1 1 20 A SPARE 4 3 MOTOR - HAIR DRYER 20 A 1 1 20 A SPARE 6 5 RECEPTACLE 20 A 1 1 20 A SPARE 8 7 RECEPTACLE - L5-30 20 A 1 1 20 A SPARE 10 9 SPARE 20 A 1 1 20 A SPARE 12 11 SPARE 20 A 1 1 20 A SPARE 14 13 SPARE 20 A 1 1 20 A SPARE 16 15 SPARE 20 A 1 1 20 A SPARE 18 17 SPARE 20 A 1 1 20 A SPARE 20 19 SPARE 20 A 1 1 20 A SPARE 22 21 SPARE 20 A 1 1 20 A SPARE 24 23 SPARE 20 A 1 1 20 A SPARE 26 25 SPARE 20 A 1 1 20 A SPARE 28 27 SPARE 20 A 1 1 20 A SPARE 30 29 SPARE 20 A 1 1 20 A SPARE 32 31 SPACE -- -- 1 20 A SPARE 34 33 SPACE -- -- 1 20 A SPARE 36 35 SPACE -- -- 1 20 A SPARE 38 37 SPACE -- -- 1 20 A SPARE 40 39 SPACE -- -- 1 20 A SPARE 42 41 SPACE -- -- TOTAL CONNECTED LOAD: TOTAL CONNECTED AMPS: PANEL TOTALS TOTAL CONNECTED LOAD: 28.4 kVA LOAD CLASSIFICATION *RECEPTACLE *MOTOR LOAD TOTAL NEC LOAD: 31614 VA TOTAL CONNECTED AMPS: 79 A TOTAL NEC AMPS: 88 A NOTES: TRIP PO... A 360 VA B C 0 VA 800 VA 0 VA 360 VA 180 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA PO... TRIP 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 540 VA 5A 800 VA 7A 360 VA 3A CONNECTED... 900 VA 800 VA DEMAND FACTOR 100.00% 125.00% CALC. NEC LOAD 900 VA 1000 VA CIRCUIT DESCRIPTION 1 20 A SPARE 2 1 20 A SPARE 4 1 20 A SPARE 6 1 20 A SPARE 8 1 20 A SPARE 10 1 20 A SPARE 12 1 20 A SPARE 14 1 20 A SPARE 16 1 20 A SPARE 18 1 20 A SPARE 20 1 20 A SPARE 22 1 20 A SPARE 24 1 20 A SPARE 26 1 20 A SPARE 28 1 20 A SPARE 30 1 20 A SPARE 32 1 20 A SPARE 34 1 20 A SPARE 36 1 20 A SPARE 38 1 20 A SPARE 40 1 20 A SPARE 42 PANEL TOTALS 8 7 6 5 4 3 2 1 07/17/15 06/30/15 05/07/15 04/06/15 01/15/15 12/18/14 08/29/14 06/10/14 MARK DATE 100% CONSTRUCT. DOC. SET TIER 1 PHASE 1 PERMIT SET 90% CONSTRUCT. DOC. SET 60% CONSTRUCTION PERMIT SET 100% DESIGN DEVELOPMENT SET 50% DESIGN DEVELOPMENT SET SCHEMATIC DESIGN SET FEASIBILITY STUDY SET DESCRIPTION PROJECT NUMBER: 21332 DRAWN BY: IT CHECKED BY: JA SHEET TITLE TOTAL CONNECTED LOAD: 1.7 kVA TOTAL NEC LOAD: 1900 VA TOTAL CONNECTED AMPS: 5 A TOTAL NEC AMPS: 5 A NOTES: CKT ELECTRICAL SCHEDULE PLAN SHEET 5 E-006 7/17/2015 1:58:11 PM CKT MOUNTING: Surface PANEL NAME: CIRCUIT DESCRIPTION CONTINUOUS - DDC PANEL 20 A 1 3 MOTOR - POD 2 L3 EF 2-4 20 A 1 5 RECEPTACLE 20 A 1 7 ROOF - RTU CONTROL POWER 20 A 1 9 RECEPTACLE 20 A 1 11 MOTOR - HAIR DRYER 20 A 1 13 RECEPTACLE 20 A 1 15 RECEPTACLE 20 A 1 17 MOTOR - HAIR DRYER 20 A 1 19 MOTOR - COOLER 20 A 1 21 MOTOR - HAIR DRYER 20 A 1 23 SPARE 20 A 1 25 SPARE 20 A 1 27 SPARE 20 A 1 29 SPARE 20 A 1 31 SPARE 20 A 1 33 SPARE 20 A 1 35 SPARE 20 A 1 37 SPARE 20 A 1 39 SPARE 20 A 1 41 SPARE 20 A 1 A 100 VA C 0 VA 0 VA 360 VA 800 VA 0 VA 0 VA 360 VA 0 VA 800 VA 900 VA 0 VA 0 VA 540 VA 0 VA 500 VA 500 VA 0 VA 0 VA 500 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA TOTAL CONNECTED LOAD: TOTAL CONNECTED AMPS: LOAD CLASSIFICATION *RECEPTACLE *MOTOR LOAD PO... TRIP 0 VA 2300 VA 20 A 1928 VA 16 A 1660 VA 14 A CONNECTED... 2160 VA 3628 VA DEMAND FACTOR 100.00% 105.51% CALC. NEC LOAD 2160 VA 3828 VA 100 VA 125.00% 125 VA *CONTINUOUS CIRCUIT DESCRIPTION CKT CIRCUIT DESCRIPTION 1 20 A SPARE 2 1 RECEPTACLE 20 A 1 1 20 A SPARE 4 3 RECEPTACLE 20 A 1 1 20 A SPARE 6 5 MOTOR - EF 1-3 15 A 1 1 20 A SPARE 8 7 CONTINUOUS - DDC PANEL 20 A 1 1 20 A SPARE 10 9 RECEPTACLE 20 A 1 1 20 A SPARE 12 11 MOTOR - HAIR DRYER 20 A 1 1 20 A SPARE 14 13 RECEPTACLE 20 A 1 1 20 A SPARE 16 15 MOTOR - HAIR DRYER 20 A 1 1 20 A SPARE 18 17 MOTOR - HAIR DRYER 20 A 1 1 20 A SPARE 20 19 MOTOR - COOLER 20 A 1 1 20 A SPARE 22 21 RECEPTACLE 20 A 1 1 20 A SPARE 24 23 LIGHTING 20 A 1 1 20 A SPARE 26 25 RECEPTACLE 20 A 1 1 20 A SPARE 28 27 RECEPTACLE 20 A 1 1 20 A SPARE 30 29 RECEPTACLE 20 A 1 1 20 A SPARE 32 31 RECEPTACLE 20 A 1 1 20 A SPARE 34 33 RECEPTACLE 20 A 1 1 20 A SPARE 36 35 MOTOR - HAIR DRYER 20 A 1 1 20 A SPARE 38 37 MOTOR - HAIR DRYER 20 A 1 1 20 A SPARE 40 39 RECEPTACLE - L5-30 20 A 1 1 20 A SPARE 42 41 RECEPTACLE 20 A 1 43 NON-CONTINUOUS - ELEV DAMPER 20 A 1 45 MOTOR - AC 5-4/5-5/5-6 15 A 2 47 -- -- -- 49 MOTOR - COOLER 20 A 1 51 RECEPTACLE 20 A 1 53 RECEPTACLE 20 A 1 55 RECEPTACLE 20 A 1 57 SPARE 20 A 1 59 SPARE 20 A 1 PANEL TOTALS TOTAL CONNECTED LOAD: 5.9 kVA TOTAL NEC LOAD: 6113 VA TOTAL CONNECTED AMPS: 16 A TOTAL NEC AMPS: 17 A NOTES: A 180 VA MOUNTING: Surface OP-SP-3 CKT CIRCUIT DESCRIPTION 1 RECEPTACLE - L6-30 20 A 2 3 -- -- -- 5 MOTOR - AC 1-5 15 A 2 7 -- -- -- 9 LIGHTING (VIA INV5) 20 A 1 11 CONTINUOUS - FA BOOSTER 20 A 1 13 RECEPTACLE 20 A 1 15 CONTINUOUS - FA BOOSTER 20 A 1 17 LIGHTING 20 A 1 19 LIGHTING 20 A 1 21 MOTOR - AC 1-4 15 A 2 -- -- 25 LIGHTING (VIA INV4) 20 A 1 27 MOTOR - ACCU-1 50 A 3 29 -- -- -- 31 -- -- -- 20 A 1 23 -- 33 NON-CONTINUOUS - FSDs 35 NON-CONTINUOUS - FSDs 20 A 1 37 ROOF - ELEVATOR SHAFT DAMPER 20 A 1 39 SPARE 20 A 1 41 SPARE 20 A 1 TOTAL CONNECTED LOAD: TOTAL CONNECTED AMPS: LOAD CLASSIFICATION *LIGHTING *RECEPTACLE *NON-CONTINUOUS *MOTOR LOAD *CONTINUOUS A 180 VA C 0 VA 0 VA 100 VA 0 VA 12 VA 0 VA 52 VA 0 VA 4323 VA 0 VA 0 VA 200 VA 0 VA 200 VA 800 VA 0 VA 0 VA 4323 VA 4323 VA 0 VA 0 VA 52 VA 171 VA 0 VA 0 VA 100 VA 12 VA 0 VA 0 VA 184 VA 180 VA PO... TRIP 0 VA 52 VA 52 VA 0 VA 0 VA 0 VA 100 VA 720 VA 500 VA 500 VA 360 VA 528 VA 500 VA 800 VA 180 VA 800 VA 800 VA 2402 VA 2402 VA 900 VA 2402 VA 170 VA 180 VA 156 VA 156 VA 318 VA 360 VA 360 VA 305 VA 170 VA 900 VA 180 VA 800 VA 800 VA 0 VA 0 VA 180 VA 0 VA 360 VA 50 VA 0 VA 0 VA 156 VA 0 VA 156 VA 500 VA 0 VA 0 VA 360 VA 0 VA 360 VA 360 VA 0 VA 0 VA 0 VA 0 VA 0 VA 7518 VA 63 A 1 20 A MOTOR - HAIR DRYER 2 1 20 A MOTOR - HAIR DRYER 4 1 20 A ROOF - POWER FOR RTU CONTROLS 6 1 20 A CONTINUOUS - DDC PANEL 8 1 20 A MOTOR - COOLER 10 1 15 A MOTOR - EF 1-4 12 1 20 A MOTOR - COOLER 14 1 20 A RECEPTACLE 16 3 30 A MOTOR - ACCU-5 18 -- -- -- 20 -- -- -- 22 2 -- 720 VA CONNECTED... 963 VA 180 VA 9176 VA 77 A 0 VA 15 A MOTOR - AC 5-1/5-2 -- -- Lowell, MA University of Massachusetts Building Authority University of Massachusetts Lowell ARCHITECT 24 26 1 20 A LIGHTING 28 1 20 A LIGHTING 30 1 20 A LIGHTING 32 1 20 A RECEPTACLE - L6-30 34 1 20 A SPARE 36 1 20 A SPARE 38 1 20 A SPARE 40 1 20 A SPARE 42 1 20 A SPARE 44 1 20 A SPARE 46 1 20 A SPARE 48 1 20 A SPARE 50 1 20 A SPARE 52 1 20 A SPARE 54 1 20 A SPARE 56 1 20 A SPARE 58 1 20 A SPARE 60 CONSULTANT Arup USA Inc 955 Massachusetts Avenue 4th Floor Cambridge, MA 02139 T 617 864 2987 F 617 864 6178 www.arup.com 8225 VA 69 A DEMAND FACTOR CALC. NEC LOAD 125.00% 1204 VA 100.00% 180 VA *RECEPTACLE 6840 VA 100.00% 6840 VA *NON-CONTINUOUS *MOTOR LOAD 50 VA 16685 VA 100.00% 110.80% 50 VA 18486 VA 200 VA 125.00% 250 VA MCB RATING: 100 A BUS RATING: 100 A B 0 VA 800 VA (UMBA 13-L2) CKT PANEL TOTALS TOTAL CONNECTED LOAD: 25 kVA 100% CONSTRUCTION DOCUMENT SET TOTAL NEC LOAD: 27010 VA TOTAL CONNECTED AMPS: 69 A TOTAL NEC AMPS: 75 A MAINS TYPE: MCB WIRES: 4 TRIP PO... 500 VA CIRCUIT DESCRIPTION NOTES: A.I.C. RATING: 22kA PHASES: 3 ENCLOSURE: Type 1 PO... TRIP 500 VA 100 VA *CONTINUOUS PANEL NAME: C 528 VA LOAD CLASSIFICATION *LIGHTING Receptacle VOLTS: 120/208 Wye MCB RATING: 100 A BUS RATING: 100 A B 360 VA TOTAL CONNECTED LOAD: TOTAL CONNECTED AMPS: FED FROM: OP-SP-1 MAINS TYPE: MCB WIRES: 4 TRIP PO... UMass Lowell North Quad Infrastructure Renewal A.I.C. RATING: PHASES: 3 ENCLOSURE: Type 1 SP-P3 CKT VOLTS: 120/208 Wye MOUNTING: Surface PANEL NAME: MCB RATING: 225 A BUS RATING: 225 A B 528 VA FED FROM: SP-P1 MAINS TYPE: MCB WIRES: 4 TRIP PO... 1 A.I.C. RATING: 10kA PHASES: 3 ENCLOSURE: Type 1 RP-F-3 CKT VOLTS: 120/208 Wye 0 VA 0 VA 0 VA 5718 VA 48 A 4859 VA 41 A 4739 VA 39 A CONNECTED... 379 VA 360 VA DEMAND FACTOR 125.00% 100.00% CALC. NEC LOAD 474 VA 360 VA 400 VA 100.00% 400 VA 13977 VA 200 VA 123.20% 125.00% 17220 VA 250 VA CIRCUIT DESCRIPTION CKT PANEL NAME: 20 A SPARE 2 1 20 A SPARE 4 1 20 A SPARE 6 CKT 1 20 A SPARE 8 1 MOTOR - POD 1 L1.5 FTR 1 & FTR 2 15 A 1 1 20 A SPARE 10 3 MOTOR - POD 1 L3 DWH-1 50 A 1 1 20 A SPARE 12 5 MOTOR - POD 1 L2 DWH-1 50 A 1 1 20 A SPARE 14 7 MOTOR - POD 1 L1.5 DWH 1 50 A 1 1 20 A SPARE 16 9 MOTOR - POD 1 ROOF RTU 1 60 A 3 1 20 A SPARE 18 11 -- -- -- 1 20 A SPARE 20 13 -- -- -- 1 20 A SPARE 22 15 CONTINUOUS - POD 1 L4 DWH 1 30 A 1 1 20 A SPARE 24 17 MOTOR - POD 1 L 2 FTR 1 & FTR 2 & FTR 3 25 A 1 1 20 A SPARE 26 19 MOTOR - CUH-1 20 A 3 1 20 A SPARE 28 21 -- -- -- 1 20 A SPARE 30 23 -- -- -- 1 20 A SPARE 32 25 MOTOR - POD 1 L3 FTR 1 & FTR 2 & FTR 3 25 A 1 1 20 A SPARE 34 27 MOTOR - POD 1 L4 FTR 1 & FTR 2 & FTR 3 20 A 1 20 A 1 CIRCUIT DESCRIPTION 1 20 A SPARE 36 1 20 A SPARE 38 31 MOTOR - POD 1 L4 FTR 2 & FTR 3 20 A 1 20 A 1 1 20 A SPARE 40 33 SPARE 1 20 A SPARE 42 35 SPARE 20 A 1 37 SPARE 20 A 1 39 SPARE 20 A 1 41 SPARE 20 A 1 TOTAL CONNECTED LOAD: TOTAL CONNECTED AMPS: TOTAL CONNECTED LOAD: 15.3 kVA TOTAL NEC LOAD: 18703 VA TOTAL CONNECTED AMPS: 43 A TOTAL NEC AMPS: 52 A LOAD CLASSIFICATION *MOTOR LOAD *CONTINUOUS A 1745 VA MCB RATING: 100 A BUS RATING: 100 A B C 0 VA 6925 VA 6925 VA 0 VA 9699 VA 0 VA 3490 VA 0 VA 2464 VA 0 VA 1994 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 3490 VA 2742 VA 0 VA 0 VA 2464 VA 3490 VA 0 VA 0 VA 6925 VA 2464 VA 0 VA 0 VA 9699 VA 9699 VA PO... TRIP 0 VA 6925 VA 0 VA 0 VA 0 VA 0 VA 0 VA 0 VA 27066 VA 99 A 29503 VA 108 A 24573 VA 89 A CONNECTED... 74217 VA DEMAND FACTOR 109.80% CALC. NEC LOAD 81491 VA 6925 VA 125.00% 8656 VA CIRCUIT DESCRIPTION CKT 1 20 A SPARE 2 1 20 A SPARE 4 1 20 A SPARE 6 1 20 A SPARE 8 1 20 A SPARE 10 1 20 A SPARE 12 1 20 A SPARE 14 1 20 A SPARE 16 1 20 A SPARE 18 1 20 A SPARE 20 1 20 A SPARE 22 1 20 A SPARE 24 1 20 A SPARE 26 1 20 A SPARE 28 1 20 A SPARE 30 1 20 A SPARE 32 1 20 A SPARE 34 1 20 A SPARE 36 1 20 A SPARE 38 1 20 A SPARE 40 1 20 A SPARE 42 PANEL TOTALS TOTAL CONNECTED LOAD: 81.1 kVA TOTAL NEC LOAD: 90148 VA TOTAL CONNECTED AMPS: 98 A TOTAL NEC AMPS: 108 A NOTES: STAMP MAINS TYPE: MCB WIRES: 4 TRIP PO... 29 MOTOR - POD 1 L4 FTR 2 & FTR 2 A.I.C. RATING: 35kA PHASES: 3 ENCLOSURE: Type 1 MP-SP-1 1 PANEL TOTALS VOLTS: 480/277 Wye FED FROM: USS-S MOUNTING: Surface 8 7 6 5 4 3 2 1 07/17/15 06/30/15 05/07/15 04/06/15 01/15/15 12/18/14 08/29/14 06/10/14 MARK DATE 100% CONSTRUCT. DOC. SET TIER 1 PHASE 1 PERMIT SET 90% CONSTRUCT. DOC. SET 60% CONSTRUCTION PERMIT SET 100% DESIGN DEVELOPMENT SET 50% DESIGN DEVELOPMENT SET SCHEMATIC DESIGN SET FEASIBILITY STUDY SET DESCRIPTION PROJECT NUMBER: 21332 DRAWN BY: IT CHECKED BY: JA SHEET TITLE ELECTRICAL SCHEDULE PLAN SHEET 6 NOTES: E-007 7/17/2015 1:58:13 PM FED FROM: DP-FK1 UMass Lowell North Quad Infrastructure Renewal MOTOR EQUIPMENT SCHEDULE EQUIPMENT TAG AC AC AC AC AC AC AC AC AC AC AC AC AC AC AC AC ACCU ACCU ACCU ACCU ACCU CUH CUH DWH DWH DWH DWH DWH DWH EF EF EF EF EF EF EF EF FTR FTR FTR FTR FTR FTR FTR FTR FTR FTR FTR FTR FTR FTR FTR RTU RTU SF SF MOTOR VOLT S NO. PH 1-1 1-2 1-3 1-4 1-5 2-1 2-2 2-3 3-1 3-2 5-1 5-2 5-3 5-4 5-5 5-6 1 2 3-1 3-2 5 1 2 1 1 1 1 1 1 1-1 1-2 1-3 1-4 2-1 2-2 2-3 2-4 1 1 1 1 2 2 2 2 2 2 2 3 3 3 3 1 2 1 2 208 208 208 208 208 208 208 208 208 208 208 208 208 208 208 208 208 208 208 208 208 480 480 277 277 277 277 277 277 120 120 120 120 120 120 120 120 277 277 277 277 277 277 277 277 277 277 277 277 277 277 277 480 480 120 120 HP KVA FLA 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 1.4 1.4 0.1 0.1 0.1 0.1 0.1 0.1 13.0 7.2 13.0 7.2 7.2 7.4 7.4 6.9 6.9 6.9 6.9 6.9 6.9 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.7 0.7 0.7 0.7 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.7 1.7 1.7 1.7 29.1 16.6 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 6.5 6.5 0.5 0.5 0.5 0.5 0.5 0.5 36.0 20.0 36.0 20.0 20.0 15.4 15.4 25.0 25.0 25.0 25.0 25.0 25.0 4.4 4.4 4.4 4.4 4.4 4.4 4.4 4.4 2.7 2.7 2.7 2.7 3.6 3.6 3.6 3.6 3.6 3.6 3.6 6.3 6.3 6.3 6.3 35.0 20.0 4.4 4.4 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 3 3 3 3 3 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 3 3 1 1 BRANCH BRANCH WIRING (COPPER CIRCUIT THHN/THWN) CIRCU IT GROU NUMB SET CONDUC ND CONDU ER S TOR SIZE SIZE IT SIZE PANEL OP-SP-1 OP-SP-1 OP-SP-1 OP-SP-3 OP-SP-3 OEP-FK-1B OEP-FK-2 OEP-FK-3 OEP-FK-1B OEP-FK-1B SP-P3 SP-P3 SP-P3 SP-P3 SP-P3 SP-P3 OP-SP-3 OEP-FK-3 OEP-FK-3 OEP-FK-3 SP-P3 MP-SP-1 MP-FK-1 MP-SP-1 MP-FK-1 MP-SP-1 MP-FK-3 MP-SP-1 MP-SP-1 SP-P1 SP-P1 SP-P3 SP-P3 OEP-FK-1B OEP-FK-1B OEP-FK-2 RP-F-3 MP-SP-1 MP-SP-1 MP-SP-1 MP-SP-1 MP-SP-1 MP-SP-1 MP-SP-1 MP-SP-1 MP-SP-1 MP-SP-1 MP-SP-1 MP-SP-1 MP-SP-1 MP-SP-1 MP-SP-1 MP-SP-1 MP-FK-3 OEP-FK-2 OEP-FK-3 26,28 40,42 11,13 21,23 5,7 33,35 5,7 11,13 25,27 25,27 24,26 24,26 24,26 45,47 45,47 45,47 27,29,31 15,17,19 5,7,9 25,27,29 18,20,22 19,21,23 7,9,11 7 5 3 4 15 5 6 9 5 12 19 17 3 3 1 17 25 27 1 17 25 27 29 31 29 17 25 27 31 9,11,13 1,3,5 1 23 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 #12 #12 #12 #12 #12 #12 #12 #12 #12 #12 #12 #12 #12 #12 #12 #12 #6 #10 #6 #10 #10 #12 #12 #10 #10 #10 #10 #10 #10 #12 #12 #12 #12 #12 #12 #12 #12 #12 #12 #12 #12 #12 #12 #12 #12 #12 #12 #12 #12 #12 #12 #12 #6 #10 #12 #12 #12 #12 #12 #12 #12 #12 #12 #12 #12 #12 #12 #12 #12 #12 #12 #12 #10 #10 #10 #10 #10 #12 #12 #10 #10 #10 #10 #10 #10 #12 #12 #12 #12 #12 #12 #12 #12 #12 #12 #12 #12 #12 #12 #12 #12 #12 #12 #12 #12 #12 #12 #12 #10 #10 #12 #12 3/4" 3/4" 3/4" 3/4" 3/4" 3/4" 3/4" 3/4" 3/4" 3/4" 3/4" 3/4" 3/4" 3/4" 3/4" 3/4" 1 1/4" 1" 1 1/4" 1" 1" 3/4" 3/4" 3/4" 3/4" 3/4" 3/4" 3/4" 3/4" 3/4" 3/4" 3/4" 3/4" 3/4" 3/4" 3/4" 3/4" 3/4" 3/4" 3/4" 3/4" 3/4" 3/4" 3/4" 3/4" 3/4" 3/4" 3/4" 3/4" 3/4" 3/4" 3/4" 1 1/4" 1" 3/4" 3/4" STARTER/DISCONNECT TYPE (UMBA 13-L2) TYPE NEMA TYPE RATING FURNISH ED BY DISCONNECT DISCONNECT DISCONNECT DISCONNECT DISCONNECT DISCONNECT DISCONNECT DISCONNECT DISCONNECT DISCONNECT DISCONNECT DISCONNECT DISCONNECT DISCONNECT DISCONNECT DISCONNECT DISCONNECT DISCONNECT DISCONNECT DISCONNECT DISCONNECT DISCONNECT DISCONNECT DISCONNECT DISCONNECT DISCONNECT DISCONNECT DISCONNECT DISCONNECT DISCONNECT/STARTER DISCONNECT/STARTER DISCONNECT/STARTER DISCONNECT/STARTER DISCONNECT/STARTER DISCONNECT/STARTER DISCONNECT/STARTER DISCONNECT/STARTER MOTOR RATED SWITCH MOTOR RATED SWITCH MOTOR RATED SWITCH MOTOR RATED SWITCH MOTOR RATED SWITCH MOTOR RATED SWITCH MOTOR RATED SWITCH MOTOR RATED SWITCH MOTOR RATED SWITCH MOTOR RATED SWITCH MOTOR RATED SWITCH MOTOR RATED SWITCH MOTOR RATED SWITCH MOTOR RATED SWITCH MOTOR RATED SWITCH DISCONNECT/VFD DISCONNECT/VFD DISCONNECT/STARTER DISCONNECT/STARTER 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 4X 4X 1 1 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 50 30 50 30 30 20 20 50 50 50 50 50 50 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 60 25 20 20 EC EC EC EC EC EC EC EC EC EC EC EC EC EC EC EC EC EC EC EC EC EC EC EC EC EC EC EC EC MC MC MC MC MC MC MC MC EC EC EC EC EC EC EC EC EC EC EC EC EC EC EC MC MC MC MC Lowell, MA NOTES University of Massachusetts Building Authority University of Massachusetts Lowell PROVIDE 3/4 INCH CONDUIT BETWEEN INDOOR UNIT AND OUTDOOR UNIT FOR CONTROLS. PROVIDE #12 PULL WIRE PROVIDE 3/4 INCH CONDUIT BETWEEN INDOOR UNIT AND OUTDOOR UNIT FOR CONTROLS. PROVIDE #12 PULL WIRE PROVIDE 3/4 INCH CONDUIT BETWEEN INDOOR UNIT AND OUTDOOR UNIT FOR CONTROLS. PROVIDE #12 PULL WIRE PROVIDE 3/4 INCH CONDUIT BETWEEN INDOOR UNIT AND OUTDOOR UNIT FOR CONTROLS. PROVIDE #12 PULL WIRE PROVIDE 3/4 INCH CONDUIT BETWEEN INDOOR UNIT AND OUTDOOR UNIT FOR CONTROLS. PROVIDE #12 PULL WIRE PROVIDE 3/4 INCH CONDUIT BETWEEN INDOOR UNIT AND OUTDOOR UNIT FOR CONTROLS. PROVIDE #12 PULL WIRE PROVIDE 3/4 INCH CONDUIT BETWEEN INDOOR UNIT AND OUTDOOR UNIT FOR CONTROLS. PROVIDE #12 PULL WIRE PROVIDE 3/4 INCH CONDUIT BETWEEN INDOOR UNIT AND OUTDOOR UNIT FOR CONTROLS. PROVIDE #12 PULL WIRE PROVIDE 3/4 INCH CONDUIT BETWEEN INDOOR UNIT AND OUTDOOR UNIT FOR CONTROLS. PROVIDE #12 PULL WIRE PROVIDE 3/4 INCH CONDUIT BETWEEN INDOOR UNIT AND OUTDOOR UNIT FOR CONTROLS. PROVIDE #12 PULL WIRE PROVIDE 3/4 INCH CONDUIT BETWEEN INDOOR UNIT AND OUTDOOR UNIT FOR CONTROLS. PROVIDE #12 PULL WIRE PROVIDE 3/4 INCH CONDUIT BETWEEN INDOOR UNIT AND OUTDOOR UNIT FOR CONTROLS. PROVIDE #12 PULL WIRE PROVIDE 3/4 INCH CONDUIT BETWEEN INDOOR UNIT AND OUTDOOR UNIT FOR CONTROLS. PROVIDE #12 PULL WIRE PROVIDE 3/4 INCH CONDUIT BETWEEN INDOOR UNIT AND OUTDOOR UNIT FOR CONTROLS. PROVIDE #12 PULL WIRE PROVIDE 3/4 INCH CONDUIT BETWEEN INDOOR UNIT AND OUTDOOR UNIT FOR CONTROLS. PROVIDE #12 PULL WIRE PROVIDE 3/4 INCH CONDUIT BETWEEN INDOOR UNIT AND OUTDOOR UNIT FOR CONTROLS. PROVIDE #12 PULL WIRE ARCHITECT ACCU 3 RQUIRES TWO CONNECTION POINTS - ACCU 3-1 AND ACCU 3-2 ACCU 3 RQUIRES TWO CONNECTION POINTS - ACCU 3-1 AND ACCU 3-2 CONSULTANT POD 1 LEVEL 1.5 POD 2 LEVEL 1 POD 1 LEVEL 3 POD 2 LEVEL 3 POD 1 LEVEL 4 POD 1 LEVEL 2 STARTER FURNISHED BY MC (ECM MOTOR). STARTER FURNISHED BY MC (ECM MOTOR). STARTER FURNISHED BY MC (ECM MOTOR). STARTER FURNISHED BY MC (ECM MOTOR). STARTER FURNISHED BY MC (ECM MOTOR). STARTER FURNISHED BY MC (ECM MOTOR). STARTER FURNISHED BY MC (ECM MOTOR). STARTER FURNISHED BY MC (ECM MOTOR). Arup USA Inc 955 Massachusetts Avenue 4th Floor Cambridge, MA 02139 T 617 864 2987 F 617 864 6178 www.arup.com 100% CONSTRUCTION DOCUMENT SET STAMP SINGLE CONNECTION PT SINGLE CONNECTION PT STARTER FURNISHED BY MC (ECM MOTOR). STARTER FURNISHED BY MC (ECM MOTOR). 1. REFER TO ELECTRICAL PLANS FOR APPROXIMATE EQUIPMENT LOCATION. REFER TO HVAC DRAWINGS FOR SPECIFIC LOCATIONS OF AC, ACCU, CUH, EF, FTR AND RTUS. REFER TO PLUMBING DRAWINGS FOR EXACT LOCATIONS OF DWHS. 2. U.O.N. FINAL CONNECTIONS TO EQUIPMENT SHALL BE BY THE EC. 8 7 6 5 4 3 2 1 07/17/15 06/30/15 05/07/15 04/06/15 01/15/15 12/18/14 08/29/14 06/10/14 MARK 1 MANUFACTURER MODEL NUMBER DESCRIPTION WATTAGE VOLTAGE COMMENTS R1 PHILIPS L5RAE1-L5R10835-L5RDW 5" LED DOWNLIGHT 13 277V R2 PHILIPS HLS22GLR33L35ULAG LED RECESSED 2X2 31 277V R3 PHILIPS PDK (4)523-000004-32 12" COLOR LED LINEAR COVE 6 277V LENGTH AS PER ARCHITECTS PLANS. R4 LITHONIA OLVTWM VAPOR TIGHT LED JAR LIGHT 15 120V (OR APPROVED EQUAL) REFER TO SHEETS E-706 & E-712 FOR QUANTITIES AND LOCATIONS S1 PHILIPS OWL440L840-UNV-DIM LED 1X4 STRIPLIGHT 38 277V S2 PHILIPS SLTLED434KDRBSSL PIT LIGHT 39 120/277V W1 PHILIPS LP7 LED DOWNWARD WALL SCONCE 13 120V EX1 PHILIPS VCXL-26-HFL-EB-4 EXTERIOR CFL MAINTENANCE LIGHT 26 120V PROVIDE ONE SPARE LAMP PER FIXTURE EXIT PHILIPS CA6RCA1IC CHLORIDE EXIT 5 277V FACE QTY, ARROWS AND MOUNTING HARDWARE TO SUIT FIELD CONDITIONS DESCRIPTION PROJECT NUMBER: 21332 DRAWN BY: IT CHECKED BY: JA SHEET TITLE ELECTRICAL SCHEDULE PLAN SHEET 7 LIGHTING FIXTURE SCHEDULE NTS 1. ALL LIGHTING SPECIFIED ABOVE IS ON AN "OR APPROVED EQUAL BY LITHONIA, COOPER OR COLUMBIA LIGHTING. 2. PROVIDE ALL MOUNTING HARDWARE AND COMPONENTS TO MATCH INSTALLATION REQUIREMENTS. 3. POD 1 LIGHTS ARE 120V, POD 2 LIGHTS ARE 277V. 4. POD 1 EMERGENCY LIGHTING VIA BODINE ELI-S-250 MICRO INVERTERS, OR APPROVED EQUAL. POD 2 EMERGENCY LIGHTING VIA EMERGENCY GENERATOR. E-008 7/17/2015 1:58:16 PM TYPE DATE 100% CONSTRUCT. DOC. SET TIER 1 PHASE 1 PERMIT SET 90% CONSTRUCT. DOC. SET 60% CONSTRUCTION PERMIT SET 100% DESIGN DEVELOPMENT SET 50% DESIGN DEVELOPMENT SET SCHEMATIC DESIGN SET FEASIBILITY STUDY SET FUTURE SPACE ONLY: EQUIPMENT SHOWN ON PLANS FOR SPACE PLANNING GENERAL NOTES 1. REFER TO DRAWING E0.00 FOR ELECTRICAL LEGEND, ABBREVIATIONS AND NOTES. 2. THIS DRAWING SHALL BE READ IN CONJUNCTION WITH THE MEP/ ARCHITECTURAL DRAWINGS AND SPECIFICATIONS 3. PROVIDE POWER MONITORING ELECTRONIC TRIP BREAKER FOR USS-FK MAIN BREAKER. 4. UNLESS OTHERWISE NOTED PROVIDE 25% SPARE CB'S AND 25% SPACE IN ALL PANELBOARDS. PROVIDE SPARE CB'S AND SPACE ONLY IN SWITCHBOARDS AS SHOWN ON THE RISER DIAGRAMS. 5. AS A MINIMUM, DISCONNECT SWITCHES SHALL BE RATED AT FRAME SIZE OF THE DOWN STREAM PROTECTION DEVICE. 6. MATERIAL AND EQUIPMENT SHALL BE UL, NEMA, ANSI, IEEE, ADA AND CBM APPROVED FOR INTENDED SERVICE. MATERIAL AND INSTALLATION SHALL MEET REQUIREMENTS OF MASS STATE ELECTRIC CODE. 7. ALL WIRING SHALL BE TYPE THWN RATED 75°C MIN.,600 VOLT, WET OR DRY LOCATIONS. . 8. ALL MAIN CIRCUIT BREAKERS SHALL HAVE ADJUSTABLE THERMAL AND MAGNETIC TRIPS. 9. BREAKERS SHALL BE 3P UNLESS INDICATED OTHERWISE. 10. CONNECTIONS SHOWN DO NOT IDENTIFY ENTRY/EXIT OR LUG LOCATIONS. CONNECTIONS SHOWN ARE DIAGRAMMATIC SHOWING SYSTEM TOPOLOGY ONLY. 11. CONTRACTOR TO ADJUST TRANSFORMER TAP SETTINGS AS REQUIRED. 12. ALL TRANSFER SWITCHES SHALL BE 4 POLE. GENERATOR TO BE SEPARATELY DERIVED SOURCE. 13. ALL LIFE SAFETY PANELBOARDS TO BE PROVIDED WITH INTEGRAL 150kA SPD'S. 14. GENERATOR TO BE OWNER FURNISHED, CONTRACTOR INSTALLED. 15. LIFE SAFETY SYSTEM TO COORDINATE DOWN TO 0.01 SECONDS. CONTRACTOR TO PROVIDE COORDINATED CIRCUIT BREAKERS, WITH SETTINGS AS PER CONTRACTORS SHORT COORDINATION STUDY RECOMMENDATIONS. LP-FK-3 EP-FK-3 SPD MP-FK-3 (UMBA 13-L2) P110D P175D (2)P310D LEVEL 3 University of Massachusetts Building Authority University of Massachusetts Lowell ARCHITECT EP-FK-2 SPD LP-FK-2 P110D P150D FR P110D LEVEL 2 EP-FK-1B SPD 12 ELECTRONIC ADJUSTABLE LSI CIRCUIT BREAKER. SYSTEM TO SELECTIVELY COORDINATE TO 0.01S. GENERATOR CIRCUIT BREAKER TO COORDINATE WITH THE REST OF THE EMERGENCY POWER SYSTEM. ELECTRICAL CONTRACTOR AND GENERATOR MANUFACTURER TO COORDINATE CORRECT SELECTION AND SETTING OF UNIT MOUNTED CIRCUIT BREAKER BASED ON COORDINATION WITH THE REST OF THE DISTRIBUTION SYSTEM. INCLUDE GENERATOR CIRCUIT BREAKER IN "CONTRACTORS COORDINATION STUDY" TO ENSURE CORRECT BREAKER SETTING ARE PROVIDED. ADJUST SETTINGS AS PER CONTRACTORS SHORT CIRCUIT COORDINATION STUDY. P110D BASIS OF DESIGN BREAKER: SQUARE D POWERPACT PG 5.0. LSI FUNCTION. LIFE SAFETY SYSTEM TO COORDINATE TO 0.01S. BASIS OF DESIGN: SUBFEED BREAKERS AS PER SQUARE D POWERPACT LD LSI 3.3S, 125A. LIFE SAFETY SYSTEM TO COORDINATE TO 0.01S. LEP-FK-1 P230D OEPFK-1B P230D 4 400AF 400AT KITSON REFER TO DP-K DRAWING E-402 600A FOR LOCATION RP-F-1 RP-K-1 225A TX2 480/208-120V 75kVA 115c Rise ATS1 480/277V 260A LIFE SAFETY P255D FR P230D P230D ATS3 480/277V 260A OPTIONAL ATS2 480/277V 260A Arup USA Inc 955 Massachusetts Avenue 4th Floor Cambridge, MA 02139 T 617 864 2987 F 617 864 6178 www.arup.com (2)P335D P110B (2)P200D FR 12 CONSULTANT EXISTING OEPFK-1A P230D 12 SPARE 100% CONSTRUCTION DOCUMENT SET SPARE P255D FR 1500kVA 11 1 3 5 2400AF 2200AT GFP 125AF 100AT 3P 125AF 100AT 3P 600AF 600AT 3P 125AF 100AT 3P 1 10 600AF 450AT G TX1 480/208-120V 300kVA 115c Rise 12 PROVIDE SLEEVES IN BETWEEN FLOORS TO ACCOMMODATE 3" CONDUITS. 7 1200AF 250AT 3P 7 1200AF 250AF 3P (2)SPARE 225A (2)SPARE 100A 250AF 225AT 3P 1 1200AF 250AT 3P 3P 7 1200AF 250AF 3P 1 250AF 225AT 3P 7 1200AF 400AT 3P 1 1200AF 1000AT 3P 250AF 225AT 3P SPACE ONLY SPACE ONLY 250AF 225AT 3P 250AF 225AT 3P 250AF 225AT 3P 250AF 225AT 3P 250AF 225AT 3P SPD 150kA 2 EDP-FK 250AF 225AT 3P 600AF 600AT 3P STAMP DP-FK1 208/120V, 1000A, 3-PH. 4W, 35kAIC POD 2 MAIN ELECTRICAL ROOM 480/277V, 400A, 3-PH. 4W, 35kAIC SEPARATE SECTIONS PER BREAKER. POD 2 EMERGENCY ELECTRICAL ROOM 4160V/480-277V, 1500KVA,2000A, 3-PH. 4W, 35kAIC UNIT SUB STATION - POD 2 MAIN ELECTRICAL ROOM 250AF 225AT 3P 10 USS-FK SPD 250kA (2)P230B CLOSE COUPLED CONNECTION. 1 250AF 225AT 3P 1 N PROVIDE PANEL WITH MAIN DISCONNECT SWITCH. NEW 15kV TO MANHOLE #2/0 FEEDERS 8 9 P255D FR 10 BREAKER SIZED PER MANUFACTURERS REQUIREMENTS. 200A (3)P335D PS-FK 200A, 4160V #250 IN 1"C GROUNDING DIAGRAM CONDUIT AND CONDUCTOR SIZES ARE BASED ON EMT CONDUIT WITH COPPER XHHW. 600V RATED CONDUCTORS. CONTRACTOR IS RESPONSIBLE FOR CONFIRMING CONDUIT AND CONDUCTOR SIZES IF OTHER MATERIALS ARE USED. EGC FOR MULTIPLE SETS EGC FOR MULTIPLE SETS EGC FOR MULTIPLE SETS TAG CONDUIT & WIRE TAG CONDUIT & WIRE X2 X3 X4 X5 TAG CONDUIT & WIRE X2 X3 X4 X5 TAG CONDUIT & WIRE X2 X3 X4 X5 X6 X8 X10 X12 1#3G 1#1G 1#1/0G 1#2/0G 1#3G 1#1G 1#1/0G 1#2/0G 1#3G 1#1G 1#1/0G 1#2/0G 1#3G 1#1G 1#1/0G 1#2/0G 1#3G 1#1G 1#1/0G 1#2/0G 1#3G 1#1G 1#1/0G 1#2/0G 1#2G 1#1/0G 1#2/0G 1#3/0G 1#2G 1#1/0G 1#2/0G 1#3/0G 1#2G 1#1/0G 1#2/0G 1#3/0G 1#1G 1#1/0G 1#3/0G 1#4/0G 1#1G 1#1/0G 1#3/0G 1#4/0G 1#1G 1#1/0G 1#3/0G 1#4/0G P285A P285B P285C P285D P285E P285F P310A P310B P310C P310D P310E P310F P335A P335B P335C P335D P335E P335F P380A P380B P380C P380D P380E P380F (3)300kcmil - 3"C (3)300kcmil + #2G - 3"C (4)300kcmil - 3"C (4)300kcmil + #2G - 3-1/2"C (3)300kcmil + (2)300kcmil N- 3-1/2"C (3)300kcmil + (2)300kcmil N+#2G- 4"C (3)350kcmil - 3"C (3)350kcmil + #2G - 3"C (4)350kcmil - 3"C (4)350kcmil + #2G - 3-1/2"C (3)350kcmil + (2)350kcmil N - 3-1/2"C (3)350kcmil + (2)350kcmil N+#2G - 3-1/2"C (3)400kcmil - 3-1/2"C (3)400kcmil + #1/0G - 3-1/2"C (4)400kcmil - 3-1/2"C (4)400kcmil + #1/0G - 4"C (3)400kcmil + (2)400kcmil N- 4"C (3)400kcmil + (2)400kcmil N+#1/0G- 4"C (3)500kcmil - 3-1/2"C (3)500kcmil + #1/0G - 3-1/2"C (4)500kcmil - 3-1/2"C (4)500kcmil + #1/0G - 4"C (3)500kcmil + (2)500kcmil N- 4"C (3)500kcmil + (2)500kcmil N+#1/0G- 4"C 1#1G 1#2/0G 1#3/0G 1#4/0G 1#250G 1#250G 1#250G 1#250G 1#1G 1#2/0G 1#3/0G 1#4/0G 1#250G 1#250G 1#250G 1#250G 1#1G 1#2/0G 1#3/0G 1#4/0G 1#250G 1#250G 1#250G 1#250G 1#1/0G 1#2/0G 1#4/0G 1#4/0G 1#250G 1#350G 1#350G 1#350G 1#1/0G 1#2/0G 1#4/0G 1#4/0G 1#250G 1#350G 1#350G 1#350G 1#1/0G 1#2/0G 1#4/0G 1#4/0G 1#250G 1#350G 1#350G 1#350G 1#1/0G 1#3/0G 1#4/0G 1#250G 1#350G 1#400G 1#400G 1#400G 1#1/0G 1#3/0G 1#4/0G 1#250G 1#350G 1#400G 1#400G 1#400G 1#1/0G 1#3/0G 1#4/0G 1#250G 1#350G 1#400G 1#400G 1#400G 1#1/0G 1#3/0G 1#4/0G 1#250G 1#350G 1#500G 1#500G 1#500G 1#1/0G 1#3/0G 1#4/0G 1#250G 1#350G 1#500G 1#500G 1#500G 1#1/0G 1#3/0G 1#4/0G 1#250G 1#350G 1#500G 1#500G 1#500G LV GROUND CONNECTION CONT #3/0 IN 1"C 8 7 6 5 4 3 2 1 07/17/15 06/30/15 05/07/15 04/06/15 01/15/15 12/18/14 08/29/14 06/10/14 MARK DATE 100% CONSTRUCT. DOC. SET TIER 1 PHASE 1 PERMIT SET 90% CONSTRUCT. DOC. SET 60% CONSTRUCTION PERMIT SET 100% DESIGN DEVELOPMENT SET 50% DESIGN DEVELOPMENT SET SCHEMATIC DESIGN SET FEASIBILITY STUDY SET DESCRIPTION #3 IN 1"C PROJECT NUMBER: 21332 DRAWN BY: IT CHECKED BY: JA SHEET TITLE ELECTRICAL RISER ONE LINE DIAGRAM B CONT #3/0 IN 1"C #2 IN 1"C 200% SPARE WAYS E-301 7/17/2015 1:58:34 PM FEEDER SCHEDULE P30A 3#10 - 3/4"C P85A 3#3 - 1-1/4"C P175A 3#2/0 - 2"C P30B 3#10 + #10G - 3/4"C P85B 3#3 + #8G - 1-1/2"C P175B 3#2/0 + #4G - 2"C P30C 4#10 - 3/4"C P85C 4#3 - 1-1/2"C P175C 4#2/0 - 2"C P30D 4#10 + #10G - 3/4"C P85D 4#3 + #8G - 1-1/2"C P175D 4#2/0 + #4G - 2"C P30E 3#10 + #6N - 3/4"C P85E 3#3 + #3/0N - 1-1/2"C P175E 3#2/0 + 2#2/0N - 2"C P30F 3#10 + #6N+10G - 3/4"C P85F 3#3 + #3/0N+#8G - 1-1/2"C P175F 3#2/0 + 2#2/0N+#4G- 2-1/2"C P40A 3#8 - 1"C P95A 3#2 - 1-1/2"C P200A 3#3/0 - 2"C P40B 3#8 + #10G - 1"C P95B 3#2 + #6G - 1-1/4"C P200B 3#3/0 + #2G - 2"C P40C 4#8 - 1"C P95C 4#2 - 1-1/2"C P200C 4#3/0 - 2"C P40D 4#8 + #10G - 1"C P95D 4#2 + #6G - 1-1/2"C P200D 4#3/0 + #2G - 2-1/2"C P40E 3#8 + #3N - 1"C P95E 3#2 + 2#2N - 1-1/2"C P200E 3#3/0 + 2#3/0N - 2-1/2"C P40F 3#8 + #3N+#10G - 1"C P95F 3#2 + 2#2N+#6G - 1-1/2"C P200F 3#3/0 + 2#3/0N+#2G- 2-1/2"C P55A 3#6 - 1-1/4"C P110A 3#1 - 1-1/2"C P230A 3#4/0 - 2-1/2"C P55B 3#6 + #8G - 1-1/4"C P110B 3#1 + #6G - 1-1/2"C P230B 3#4/0 + #2G - 2-1/2"C P55C 4#6 - 1-1/4"C P110C 4#1 - 1-1/2"C P230C 4#4/0 - 2-1/2"C P55D 4#6 + #8G - 1-1/4"C P110D 4#1 + #6G - 2"C P230D 4#4/0 + #2G - 2-1/2"C P55E 3#6 + #1/0N - 1-1/4"C P110E 3#1 + 2#1N - 2"C P230E 3#4/0 + 2#4/0N - 2-1/2"C P55F 3#6 + #1/0N+#8G - 1-1/4"C P110F 3#1 + 2#1N+#6G - 2"C P230F 3#4/0 + 2#4/0N+#2G - 2-1/2"C P70A 3#4 - 1-1/4"C P150A 3#1/0 - 2"C P255A (3)250kcmil - 2-1/2"C P70B 3#4 + #8G - 1-1/4"C P150B 3#1/0 + #6G - 2"C 1#4G 1#2G 1#1G 1#1/0G P255B (3)250kcmil + #2G - 2-1/2"C P70C 4#4 - 1-1/4"C P150C 4#1/0 - 2"C P255C (4)250kcmil - 3"C P70D 4#4 + #8G - 1-1/4"C P150D 4#1/0 + #6G - 2"C 1#4G 1#2G 1#1G 1#1/0G P255D (4)250kcmil + #2G - 3-1/2"C P70E 3#4 + #2/0N - 1-1/4"C P150E 3#1/0 + 2#1/0N - 2"C P255E (3)250kcmil + (2)250kcmil N - 3-1/2"C P70F 3#4 + #2/0N+#8G - 1-1/2"C P150F 3#1/0 + 2#1/0N+#6G - 2"C 1#4G 1#2G 1#1G 1#1/0G P255F (3)250kcmil + (2)250kcmil N+#2G - 3-1/2"C "FR" ADJACENT TO FEEDER TAG INDICATES 2 HOUR FIRE RATED FEEDER TYP RHH AND UL LISTED AS FHIT. REFER TO RHH CONDUIT FILL TABLE IN NEC AND UPSIZE AS REQUIRED. "UG" ADJACENT TO FEEDER TAG INDICATES CONDUIT RUN UNDERGROUND TO ENTER EQUIPMENT FROM BELOW. "MV" ADJACENT TO FEEDER TAG INDICATES 15kV RATED MEDIUM VOLTAGE CABLE. LEVEL 1 CONNECTION TO IDF RM GROUND BARS (TYP OF 3) P200A MV UG P200A MV CONNECTION TO MDF RM GROUND BAR G GEN-1 (SEE FEEDER TAG) NEW 15kV TO MANHOLE #2/0 FEEDERS PS-FK GROUND BAR 11 EP-FK-1A SPD MLO GEN1 480/277V 200kW/250kVA STANDBY/EM SEP DERIVED OFCI FURNISHED BY OWNER. INSTALLED BY EC. P30B FR CIRCUIT BREAKER TO HAVE POWER MONITORING FUNCTION WITH CURRENT PER PHASE DISPLAYED ON BREAKER LCD SCREEN. 7 9 MP-FK-1 LP-FK-1 BASIS OF DESIGN BREAKER: SQUARE D MASTERPACT NW LF 5.0, LSIG FUNCTION. LIFE SAFETY SYSTEM TO COORDINATE AS PER NEC 700.28 AS PER SQUARE D "MINI BREAK" OR APPROVED EQUAL. REFER TO SPECIFICATION SECTION 261300. 8 P55D FR TX3 480/208-120V 15kVA 115c Rise SWITCHBOARD GRADE BOARD WITH PHYSICAL SEPARATION BETWEEN BREAKERS. 6 RP-F-2 RP-K-2 TO BUIDING STEEL (SEE E4.02) 5 OEP-FK-2 LEP-FK-2 DUCTBANK GROUND LAY IN 20' OF GROUND WIRE AND TIE TO REBAR 4 Lowell, MA TO MAIN INCOMING SERVICE WATER PIPE (SEE E4.02) 3 RP-F-3 RP-K-3 CONNECTION TO GROUND RODS 2 OEP-FK-3 LEP-FK-3 KEYED NOTES: 1 UMass Lowell North Quad Infrastructure Renewal ROOF 141sf 104 OFF CHEM E EXISTING PERRY ELECTRICAL RMS (UMBA 13-L2) E-725 426sf 101 U/M PLANT 1 1 EXISTING TO REMAIN PERRY PRIMARY LOAD BREAK SWITCH E-707 243sf U/M PLANT 163sf U/M PLANT 111A Lowell, MA 101B EX 101A 156.13sf U/M PLANT UMass Lowell North Quad Infrastructure Renewal 568sf 103 CL LAB CHEM E 232sf 102 OFF CHEM E GENERAL NOTES 1. THIS DRAWING SHOWS THE NEW CAMPUS ELECTRICAL DISTRIBUTION SYSTEMS ONLY. SEE ENLARGED ELECTRICAL SHEETS FOR MORE POD DISTRIBUTION EQUIPMENT AND POWER DEVICES. 2. DO NOT SCALE FROM THIS DRAWING, REFER TO ARCHITECTURAL DRAWINGS FOR MORE INFORMATION. 3. REFER TO ARCHITECTURAL AND CIVIL DRAWINGS AND SCHEDULES FOR MORE INFORMATION AND EXACT EQUIPMENT LOCATIONS. 4. COORDINATE ALL DOWNTIME FOR MAIN 4160V FEEDERS WITH UMASS LOWELL NO LESS THAN FOUR WEEKS BEFORE SHUTDOWN. CAMPUS LOOP FEEDS ADJACENT BUILDINGS. SHUTDOWN SHALL BE RESTRICTED TO "OFF HOURS" AND A DAY OF THE WEEK AS DEFINED BY UMASS LOWELL OR THEIR REPRESENTATIVE. 5. COORDINATE WITH CIVIL DRAWINGS FOR SPECIFIC DUCT BANK ROUTES AND MANHOLE LOCATIONS. THIS DRAWING IS DIAGRAMATIC ONLY. SEE E800 DETAIL 1 FOR ADDITIONAL DUCTBANK REQUIREMENTS. University of Massachusetts Building Authority University of Massachusetts Lowell 335.88sf 111B CLASS REG 121 NEW GENERATOR FEEDERS. 107.41sf SEE 100E1 E301 FOR FEEDER INFORMATION. ELEV ELEC IDF/IT PLANT SEE CIVIL DRAWINGS FOR MORE TYP OF 3 10 ELEV LOBBY INFORMATION ON ROUTE. STAIR PLANT 459.2sf 316.07sf 742.68sf 531.66sf 101 103 RS LAB MECH RS LAB MECH 101A RS LAB MECH 550.8sf 865.63sf 105 107 RS LAB MECH 115 RS LAB MECH 111 RS LAB MECH 414.78sf 113 886.77sf RS LAB MECH OFF MECH CL LAB CIVIL 216sf CORR PLANT 276sf 100C4 70sf 125 CLB SV CIVIL 100C3 100C2 613.71sf 822.08sf EX 100C4 CORR PLANT CORR PLANT CORR PLANT U/M PLANT 761.34sf 305.17sf 100C6 STD WWC STD MWC CORR PLANT CORR PLANT 50.76sf 261sf 130A RS LAB MECH OFF CIVIL 129 465.73sf 100S2 CORR PLANT RS LAB MECH RS LAB MECH 190.76sf 100C5 106 104 CL LAB MECH CL LAB MECH 254.97sf 824.76sf 644.92sf 102 102A CORR PLANT 407sf 100C3 305sf 123 1552.32sf 112 STAIR PLANT 104A A' CONSULTANT NEW PRIM. ELEC. RLB SV MECH PS-FK USS-FK RS LAB MECH 130 CL LAB CIVIL 818sf 100 DOCK PLANT 73sf CORR PLANT 100C2 723sf 3' 5 9 U/M PLANT 154.69sf 106B 127 2' NEW EMER. ELEC. RLB SV MECH 552.35sf 4 1' GEN-1 EDP-FK 106A 101.25sf 1027sf 1 2.36sf 100C1 CL LAB CIVIL EXISTING DUCTBANK AND FEEDER TO REMAIN. 105A 243.05sf RLB SV CIVIL 192sf 266sf 126 CLB SV CIVIL 120 DP-K 3 ARCHITECT 7 6 E B' STAIR PLANT WOMEN PLANT 223sf 133 273sf 100S2 JC PLANT 133A 31sf 88sf 132A CMP/TEL IT MEN PLANT 56sf 132D U/M PLANT 86sf U/M PLANT 437sf 132C 61sf 1005sf 102A C SERV PURCH 242sf Arup USA Inc 955 Massachusetts Avenue 4th Floor Cambridge, MA 02139 T 617 864 2987 F 617 864 6178 www.arup.com 100A U/M PLANT 36sf ELEV PLANT 100E1 100C1 CORR PLANT 741sf 101 MR SV BKSTR 132B C' 1 100% CONSTRUCTION DOCUMENT SET 1 CORR PLANT 817sf 100C1 E-701 E-720 EXISTING SOUTHWICK ELECTRICAL RM ATS-S 1 A 2 KEYNOTES A.5 FD SV DINING 101sf 143 STAIR PLANT 263sf DN 100S1 U/M PLANT 141A 53sf U/M PLANT 140D 53sf EX CORR PLANT 305sf EX 100C2 U/M PLANT 140C 249sf CORR. FD SV DINING B DINING & STD MWC 2 CORR. UNISEX PLANT DINING & STD WWC 3 414sf 152A C.5 102B 57sf 52sf 5 C FD SV DINING 140A 4 MR SV BKSTR 152 3 5878sf 214sf 2 102 U/M PLANT 1.5 1 EX 34sf 1 MERCH BKSTR DP-S 1 140B 0.5 USS-S 2 4 339sf 622sf RLB SV GSE RS LAB DN ENGR 40sf FOOD DINING 145 U/M PLANT 106G 37sf 168sf 106 145sf 106A 106D OFF GSE OFF GSE DN 61sf 150 FD SV DINING 1960sf FOOD DINING 106C OFF GSE OFF GSE EX 469sf 100C3 100C2 CORR PLANT CORR PLANT CORR PLANT 146 FD SV DINING 39sf 152sf OFF CIVIL 107B 169sf 148 66sf OFF CIVIL 107C FD SV DINING 202sf 7 107 OF SV CIVIL 46sf MEN PLANT 62sf 112sf 107B OF SV CIVIL JC PLANT 107D 35sf 107C CORR PLANT OFF CIVIL OFF CIVIL OFF CIVIL 113 196sf 105D CORR PLANT 241sf 105B 214sf OFF CIVIL 111 OFF CIVIL RS LAB CIVIL 133sf 100C4 251sf OFF CIVIL 109 108A 105C 117sf 253sf 100C5 OFF CIVIL 481sf OFF CIVIL 388sf 107 OFF CIVIL 287sf 178sf 105A OFF CIVIL OF SV CIVIL OF SV CIVIL U/M PLANT 108 101 CONF CIVIL 103A 292sf 115sf 107A CL LAB CIVIL 269sf 103 OF SV CIVIL 219sf 43sf 115 CMP/TEL IT 107A 330sf 108B 105 OF SV CIVIL 500sf 223sf 109A 125sf CORR PLANT 105E 6 100C4 181sf RS LAB CIVIL 5 109sf 106B 457sf 100C1 114 105 100 RS LAB CIVIL 1004sf 96sf 1958sf 259sf OFF CIVIL 112 CL LAB CIVIL STAIR PLANT 279sf OFF CIVIL 110 450sf UP 227sf 100S1 348sf CORR PLANT OFF DINING CIVIL 2 659sf 100A 273sf DP-P108 1 OFF 104 U/M PLANT RS LAB CIVIL 106E ELEV PLANT 100C3 235sf 100E1 127sf 21sf U/M PLANT OFF P&T 106 106F 75sf JC PLANT 3293sf 15sf 100B 249sf 538sf 103 MR SV BKSTR 259sf 100S1 E STAIR PLANT 145A D 8 9 10 1 ELECTRICAL - KEY PLAN - LEVEL 1 1/16" = 1'-0" METER EXISTING EQUIPMENT FOR A MINIMUM OF 30 DAYS. SUBMIT METERING REPORT TO OWNERS CONSTRUCTION MANAGER FOR REVIEW PRIOR TO CARRYING OUT ANY WORK. COMPLY WITH NEC 220.87 METERING REQUIREMENTS. INTENT OF METERING IS TO CONFIRM AVAILABLE CAPACITY IN SYSTEM TO ACCEPT NEW LOADS AS INDICATED. EXISTING PANEL TO BE PROVIDED WITH ADDITIONAL CIRCUIT BREAKERS. SEE E300 FOR MORE INFORMATION. FIELD VERIFY EXISTING EQUIPMENT REQUIREMENTS AND PROVIDE NEW BREAKERS COMPATIBLE WITH EXISTING EQUIPMENT. EXISTING PANEL TO BE CONNECTED TO NEW POD 2 DISTRIBUTION SYSTEM. COORDINATE EXACT GENERATOR LOCATION WITH CIVIL DRAWINGS. GENERATOR IS OWNER FURNISHED, CONTRACTOR INSTALLED. PROVIDE 60A/2P/208V AUX CIRCUIT CONNECTION (3#4,#10G) FROM PANEL RP-F-1 IN 1-1/4" CONDUIT FOR JACKET HEATER. PROVIDE 20A/1P (2#12) CIRCUIT IN 1"C FOR BATTERY CHARGER FROM PANEL RP-F-1. PROVIDE SEPARATE 1" GENERATOR CONTROL WIRING CONDUIT FROM GENERATOR INDICATOR PANEL CONNECTION AND ATS CONTROL WIRES. PROVIDE DEDICATED 1" CONTROL CONDUIT FOR LIFE SAFETY ATS CONTROL WIRING. RELOCATED SECURITY CAMERA. PROVIDE NEW 1" CONDUIT FROM INTERCEPT LOCATION TO POD 2 EXTERIOR. COORDINATE EXACT LOCATION OF CAMERA IN FIELD WITH UML FACILITIES. PROVIDE #12 PULL WIRE FOR CAMERA REINSTALLTION BY OTHERS. SEE E2.01 FOR MORE INFORMATION. NEW DUCTBANK FOR PRIMARY LOOP IN/LOOP OUT FEEDERS. REFER TO CIVIL DRAWINGS FOR MORE INFORMATION. NEW 5kV LOOPED FEEDERS WORK: BREAK INTO EXISTING MANHOLE AND EXTEND FEEDERS INTO POD 2 ELECTRICAL ROOM (RM116A). INTERCEPT EXISTING PERRY PRIMARY FEEDERS (3#2/0), CUT, SPLICE AND EXTEND LOOPED CONNECTION TO NEW POD 2 PRIMARY SWITCH. TEST FEEDERS AND SPICE AS PER GENERAL NOTES ON E000. PROVIDE ADDITIONAL CABLE RACKS AS REQUIRED BY FIELD INSTALLATION. POD2 GROUNDING CONNECTION TO INCOMING WATER PIPE. GROUNDING CLAMP. SEE E3.01 FOR MORE INFORMATION. POD2 GROUNDING CONNECTION TO BUILDING STEEL. EXOTHERMIC WELD. CONSEAL INSIDE NEW POD STRUCTURE, CONNECTION SHOULD NOT BE VISIBLE FROM BELOW. SEE E3.01 FOR MORE INFORMATION. COORDINATE IN FIELD. 10'x3/4" COPPER CLAD STEEL GROUNDING ELECTRODES. REFER TO E8XX SERIES DETAILS AND E301 FOR MORE INFORMATION. COORDINATE LOCATION WITH CIVIL CONTRACTOR. STAMP 8 7 6 5 4 3 2 1 07/17/15 06/30/15 05/07/15 04/06/15 01/15/15 12/18/14 08/29/14 06/10/14 MARK DATE 100% CONSTRUCT. DOC. SET TIER 1 PHASE 1 PERMIT SET 90% CONSTRUCT. DOC. SET 60% CONSTRUCTION PERMIT SET 100% DESIGN DEVELOPMENT SET 50% DESIGN DEVELOPMENT SET SCHEMATIC DESIGN SET FEASIBILITY STUDY SET DESCRIPTION PROJECT NUMBER: 21332 DRAWN BY: IT CHECKED BY: JA SHEET TITLE ELECTRICAL LEVEL 1 KEY PLAN E-402 7/17/2015 1:58:39 PM 122 538sf 100S1 CL LAB DN ENGR 1646sf MEN PLANT 212.68sf 8 GENERAL NOTES 1. SEE E4.02 FOR MORE INFORMATION ON SITE ELECTRICAL DISTRIBUTION. 2. AC SYSTEM INDOOR UNITS POWERED SEPARATELY FROM OUTDOOR UNITS. 3. EXHAUST FANS ARE ELECTRICALLY COMMUTATED MOTORS WITH INTEGRAL TOGGLE SWITCHES. PROVIDED BY MC, WIRED BY EC. 4. 120V POWER PROVIDED FOR DDC PANELS (PANEL WIRED AND CONNECTED TO DOWNSTREAM EQUIPMENT BY DDC CONTRACTOR). 5. SEE E0.00 FOR ADDITIONAL GENERAL NOTES. UMass Lowell North Quad Infrastructure Renewal 1 J OEP-FK-1B/13 100E1 7 8 9 10 11 12 13 14 15 16 17 18 19 AC 2-1 OEP-FK-1B RP-F-1/1 L5-30 ELEV LOBBY 115 RS LAB MECH University of Massachusetts Building Authority University of Massachusetts Lowell 5 RP-K-1 1L1 ELEC OFF MECH IDF/IT 173 LP-FK-1 MP-FK-1 OEP-FK-1B/29,31 3/4"C,(2)#10,(1)#10G L6-30 174 EF 2-1 RP-K-1/7 RP-K-1/7 ARCHITECT RP-K-1/1 3/4"C,(2)#10,(1)#10G 6 RP-F-1/1 EP-FK-1B/13 EP-FK-1B/13 J J RP-K-1/7 16 16 CORR. 100C6 RP-K-1/25 J 18 CONSULTANT +63" RP-K-1/7 15 J RP-K-1/5 RP-K-1/9 RP-K-1/9 822.08sf 100C6 CORR PLANT STD MWC STD WWC 171 170 2 17 Arup USA Inc 955 Massachusetts Avenue 4th Floor Cambridge, MA 02139 T 617 864 2987 F 617 864 6178 www.arup.com OEP-FK-1B/41 J 3/4"C,2#10,#10G 3 2 RP-K-1/15 RP-K-1/9 RP-K-1/23 RP-K-1/9 EDP-FK ATS1 100% CONSTRUCTION DOCUMENT SET 7 RP-K-1/11 NEW EMER. ELEC. 172A EF 2-2 TX3 19 EP-FK-1A EP-FK-1B 19 EP-FK-1B/9 J J FACU J EP-FK-1B/1 EP-FK-1B/11 254.97sf 190.76sf 100C5 100S2 CORR PLANT STAIR PLANT F 465.73sf 112 OEP-FK-1A ATS2 RP-K-1/11 ACCESS TO KITSON MEZZ 2 OEP-FK-1B/15 7 TX2 10 13 STAMP J A' RP-K-1/17 7 4 DP-FK1 RP-K-1/11 100S3 U/M PLANT 225A TX1 ATS3 NEW PRIM. ELEC. AC 3-1 AC 3-2 172 CUH 2 SWITCHBOARD SECTION RP-K-1/17 8 J USS-FK 7 11 12 TRANSFORMER SECTION 8 7 6 5 4 3 2 1 8 PS-FK OEP-FK-1B/37 7 OEP-FK-1B/39 9 MARK MP-FK-1/6,8,10 F 4X 818sf 100 DOCK PLANT 73sf CORR PLANT 100C2 B' DESCRIPTION PROJECT NUMBER: 21332 DRAWN BY: IT CHECKED BY: JA ELECTRICAL POD 2 ENLARGED FLOOR PLANS - LEVEL 1 (KITSON HALL) 61sf 100A U/M PLANT 36sf 100E1 1/4" = 1'-0" ELEV PLANT POWER - LEVEL 1 ENLARGED/KITSON STAIR 1 PLAN (POD 2) DATE 100% CONSTRUCT. DOC. SET TIER 1 PHASE 1 PERMIT SET 90% CONSTRUCT. DOC. SET 60% CONSTRUCTION PERMIT SET 100% DESIGN DEVELOPMENT SET 50% DESIGN DEVELOPMENT SET SCHEMATIC DESIGN SET FEASIBILITY STUDY SET SHEET TITLE C' 1 07/17/15 06/30/15 05/07/15 04/06/15 01/15/15 12/18/14 08/29/14 06/10/14 E-707 7/17/2015 1:59:24 PM 6 113 RP-K-1/3 J 5 414.78sf LEP-FK-1 RP-K-1/17 J 4 459.2sf POWER FOR SECURITY SYSTEM. INSTALLED BY OTHERS, WIRED BY EC. HAND DRYER. WIRED BY EC, INSTALLED BY OTHERS. DRY VALVE. INSTALLED BY OTHERS, EC TO PROVIDE DISCONENCT SWITHC AND INSTALL ASSOCIATED WIRING. 3/4HP. POWER FOR DDC PANEL. FINAL CONNECTION OF DDC PANEL BY CONTROLS CONTRACTOR. L5-30 OUTLET MOUNTED IN OVERHEAD CABLE TRAY. LOCATE BETWEEN TWO NEW RACKS INDICATED ON TELECOMS DRAWINGS. L6-30 OUTLET MOUNTED IN OVERHEAD CABLE TRAY. LOCATE BETWEEN TWO NEW RACKS INDICATED ON TELECOMS DRAWINGS. PROVIDE 4" CONCRETE HOUSEKEEPING PAD. HEAT TRACE SYSTEM. FINAL CONNECTION TO HEAT TRACING CONTROL PANEL BY EC, CONNECTION OF HEAT TRACING CABLE TO CONTROL PANEL BY HEAT TRACING INSTALLER. NEW PLATFORM LIFT. PROVIDE FUSE SIZE AS PER MANUFACTURERS RECOMENDATION. FINAL CONNECTION TO LIFT BY EC. PRIMARY AND SECONDARY TRANSFORMER DISCONNECTS. COORDINATE EXACT UNIT SUBSTATION LOCATION WITH EXISTING STRUCTURAL BEAMS. TRANSFORMER SECTION TO BE LOCATED BETWEEN BEAMS TO ENSURE ADEQUATE CLEARANCE. MAIN 4160V FEEDERS TO ENTER UNIT SUBSTATION FROM BELOW. MAIN GROUNDBAR. SEE E3.01 FOR MORE INFORMATION. CONDUITS BELOW SLAB. TURN TO ENTER PRIMARY SWITCH FROM BELOW. COORDINATE EXACT CONDUIT STUB UP LOCATION WITH EQUIPMENT SUBMITAL PRIOR TO ROUGH IN. SEE E4.02 FOR DUCTBANK CONTINUATION. REFER TO CIVIL DRAWINGS FOR ROUTING OF DUCTBANK ON SITE, SEE STRUCTURAL DRAWINGS FOR FLOOR TRENCHING INFORMATION. POWER FOR FSD. INSTALLED BY OTHERS, WIRED BY EC. WATER COOLER. WIRED BY EC, INSTALLED BY OTHERS. POWER FOR FSD LOCATED WITHIN FLOOR SLAB. INSTALLED BY OTHERS, WIRED BY EC. NOT USED 120V POWER IN CEILING MOUNTED JUNCTION BOX FOR CONNECTION TO VAV/HVAC DEVICES. POWER PROVISION FOR FIRE ALARM. ELEV PLANT RP-F-1 J 2 3 Lowell, MA 107.41sf KEYNOTES 1 (UMBA 13-L2) RP-K-1/3 FINISH GRADE OR PAVEMENT 1/4" CAST IRON WITH LEGEND "GROUND" UMass Lowell North Quad Infrastructure Renewal CONCRETE SLAB (UMBA 13-L2) . 12" Lowell, MA 30"MIN. TO TOP OF CONDUIT DUCT BANK CONTINUOUS WARNING TAPE COLORED CONCRETE ENCASED, SEE SPECS COMPACT BACKFILL (95%) SITE WORK SPECIFICATIONS FINISH GRADE OR PAVEMENT University of Massachusetts Building Authority University of Massachusetts Lowell 3"MIN. . 24"MIN. COVER FROM TOP SURFACE OF CONDUIT TO TOP SURFACE OF FINISHED GRADE . CONDUIT (TYP.) CONTINUOUS WARNING TAPE 12" DIAMETER X 2'-0" STANDARD CONCRETE PIPE WITH HUB COMPACT BACKFILL (95%) SITE WORK SPECIFICATIONS 3"MIN. GROUND CONNECTOR (BURNDY TYPE "GAR") BARE GROUNDING CABLE (SIZE AS SHOWN ON PLANS) GROUND ROD (SIZE AS SPECIFIED) . 3"MIN. 12" ARCHITECT . . 3"MIN. CONDUIT (TYP.) 1 CONCRETE ENCASED UNDERGROUND DUCT BANK NTS 2 1. APPLIES TO NEW GENERATOR AND NEW PRIMARY FEEDERS AS SHOWN ON E-402. TO NEXT GROUND ROD BRANCH CIRCUIT DIRECT BURIAL CONDUIT 3 NTS 1. TYPICAL FOR ALL EXTERIOR BRANCH CIRCUITS. FEEDERS TO BE CONCRETE ENCASED PER DETAIL 1. CONSULTANT GROUND ROD AND WELL NTS 1. TYPICAL FOR ALL GROUND RODS SHOWN ON E402 AND E301. Arup USA Inc 955 Massachusetts Avenue 4th Floor Cambridge, MA 02139 T 617 864 2987 F 617 864 6178 www.arup.com SECURE LIGHT FIXTURE SUPPORT WIRES TO MOUNTING TABS, IF LIGHT FIXTURE NOT FURNISHED WITH MOUNTING TABS. PROVIDE 4-EYE BOLTS WITH ALL NECESSARY HARDWARE UNISTRUT P1000 HS. STEEL POST OF EQUIPMENT SCREEN FRAME #12 GA (MIN) LIGHT SUPPORT WIRE, 4-PER 4-FOOT LENGHT OF LIGHT FIXTURE. SECURE TO BUILDING STRUCTURE SIMILAR TO CEILING SUPPORT WIRES 100% CONSTRUCTION DOCUMENT SET TYPE EX1 VAPORTIGHT FIXTURE PER LUMINAIRE SCHEDULE WEATHERPROOF GFI RECEPTACLE AND LIGHT SWITCH TO HVAC CONTROLS MOUNT IN NEMA 1 ENCLOSURE TYPICAL FLEX CONDUIT WITH ALL NECESSARY FITTINGS TO JUNCTION BOX. PROVIDE #12 BRANCH CIRCUIT WIRES AND #12 GROUND WIRE BOND TO LIGHT FIXTURES "T" BAR CLIP, ALL LIGHT FIXTURES (OR ROWS) SHALL HAVE TWO CLIPS AT EACH END. PROVIDE 2#8-32 BOLTS WITH LARGE FLAT WASHERS AND NUTS BETWEEN LIGHT FIXTURES IN CONTINUOUS ROW INSTALLATION 24" ROOF TYPICAL CROSS "T" BAR M TYPICAL ACOUSTICAL TILE CEILING MOTOR UNISTRUT P2072A POST BASE 4 STAMP TO NEXT 120 RECEPTACLE OR FIXTURE CONTROL RELAY (COORDINATE COIL VOLTAGE WITH HVAC CONTROLS) C TYPICAL RECESSED LIGHT FIXTURE SECURE LIGHT FIXTURE SUPPORT WIRES TO MOUNTING TABS, IF LIGHT FIXTURE NOT FURNISHED WITH MOUNTING TABS. PROVIDE 4-EYE BOLTS WITH ALL NECESSARY HARDWARE LINE VOLTAGE MANUAL STARTER WITH THERMAL OVERLOAD TYPICAL GYPSUM CEILING 120V/277V SINGLE PHASE MOTOR CONTROL DIAGRAM NTS 1. TYPICAL DETAIL. REFER TO MECHNICAL DRAWINGS AND COORDINATE WITH MECHANICAL CONTRACTOR FOR SPECIFIC EQUIPMENT REQUIREMENTS. E008 SHOWS TABLE OF MECHANICAL EQUIPMENT. 5 ROOFTOP LIGHT AND RECEPTACLE NTS 1. PROVIDE TYPE EX1 OUTLET AT ALL ROOFTOP MAINTENENCE OUTLET LOCATIONS. PROVIDE LOCAL WEATHER PROOF SWITCH. 6 TYPICAL RECESSED LIGHT FIXTURE TYPICAL MAIN "T" RUNNER RECESSED LIGHT FIXTURE MOUNTING DETAIL NTS 1. DETAIL SHOWN IS TYPICAL FOR RECESSED LIGHT FIXTURES. FOLLOW MANUFACTURERS SPECIFIC INSTALLATION INSTRUCTIONS FOR ALL FIXTURES. 8 7 6 5 4 3 2 1 07/17/15 06/30/15 05/07/15 04/06/15 01/15/15 12/18/14 08/29/14 06/10/14 MARK DATE 100% CONSTRUCT. DOC. SET TIER 1 PHASE 1 PERMIT SET 90% CONSTRUCT. DOC. SET 60% CONSTRUCTION PERMIT SET 100% DESIGN DEVELOPMENT SET 50% DESIGN DEVELOPMENT SET SCHEMATIC DESIGN SET FEASIBILITY STUDY SET DESCRIPTION PROJECT NUMBER: 21332 DRAWN BY: IT CHECKED BY: JA SHEET TITLE ELECTRICAL DETAILS PLAN SHEET 1 E-800 7/17/2015 2:00:00 PM 36" #12 GA (MIN) LIGHT SUPPORT WIRE, 4-PER 4-FOOT LENGTH OF LIGHT FIXTURE. SECURE TO BUILDING STRUCTURE SIMILAR TO CEILING SUPPORT WIRES UMass Lowell North Quad Infrastructure Renewal POD 2 EM ELEC RM REMOTE ANNUNCIATOR PANEL BATTERY CHARGER OUTPUT CONNECT TO BATTERY 2#10 IN 3/4"C. BATTERY CHARGER 120V 20A-1P DEDICATED CIRCUIT 2#12 & 1#12 GND. INSTALL IN 2" GENERATOR BRANCH CIRCUIT CONDUIT WITH BLOCK HEATER AND VENT DAMPER BRANCH CIRCUITS SIGNAL WIRING TO REMOTE ANNUN. 2#10 & 4#14 INSTALL IN 2" GENERATOR BRANCH CIRCUIT CONDUIT SIGNAL WIRING TO REMOTE ANNUNCIATOR 2#10 & 4#14 IN 3/4"C. Lowell, MA ENGINE START CONTROL WIRING 2#14 INSTALL IN 2" GENERATOR BRANCH CIRCUIT CONDUIT University of Massachusetts Building Authority University of Massachusetts Lowell BATTERY CHARGER J SIGNAL WIRING TO ATS 4#14 IN 1/2"C. (UMBA 13-L2) ATS NORMAL POWER SOURCE, FOR REQUIREMENTS REFER TO ELECTRICAL RISER DIAGRAM INT. FA INTERFACE. DAMPER RJ45 IN/OUT JACKS PER DEVICE. RELAY IF REQUIRED EXH. PHOTO ARCHITECT OCC OWNER FURNISHED, CONTRACTOR INSTALLED CAT5e DATA CABLE TO MANUFACTURERS REQUIREMENTS. AUTOMATIC TRANSFER SWITCH ATS OUTPUT FEEDER TO EMERGENCY DISTRIBUTION PANELBOARD, FOR REQUIREMENTS REFER TO ELECTRICAL RISER DIAGRAM EMERGENCY GENERATOR SET BELLY TANK HIGH/LOW LEVEL SWITCHES WIRED BY OTHERS. VENT DAMPER CONTROL WIRING 2#12, 2#12 GND. IN 1/2"C. NEUTRAL LIGHTING BRANCH CIRCUIT AS INDICATED ON PLANS SWITCHED LIGHTING CIRCUIT PER CONTROL ZONE. SWITCHPACK AOM NOTES: MODE OPERATION : 1. TYPICAL FOR ALL CIRCULATION, BATHROOM AND OTHER SPACES SHOWN WITH CEILING OCC SENSORS. 2. FIXTURES ARE TO OPERATE AS AUTO ON/AUTO OFF (OCCUPANCY DETECTION). 1. CONTRACTOR SHALL COORDINATE ALL CONTROLS, CONTROL WIRING AND ALL OTHER REQUIREMENTS WITH THE APPROVED MANUFACTURER, ADJUST ALL WIRING ACCORDINGLY. 3. PROVIDE QUANTITY OF SWITCHING PACKS AS REQUIRED FOR CONTROL ZONES AS INDICATED ON PLANS. 2. WIRING FOR ONE ATS IS SHOWN, REFER TO RISER DIAGRAM FOR EXACT REQUIREMENTS, QUANTITIES OF ATS'S, CIRCUIT BREAKERS, ETC. 4. EM LIGHTING CIRCUITS REQUIRE UL924 BYPASS RELAY TO ACTIVATE ON LOSS OF MAINS POWER. AS PER SENSOR SWITCH "NLIGHT" SYSTEM OPERATING IN STAND ALONE ROOM CONTROLLER MODE. ALTERNATE SOLUTIONS AS PER WATT STOPPER "DLM" AND LUTRON "ECOSYSTEM". ATS EMERGENCY FEEDER (VIA MSB-GEN, NOT SHOWN) FOR REQUIREMENTS REFER TO ELECTRICAL SINGLE LINE DIAGRAM 1 RELAY 1 NOTE 5 POWER WIRING FOR ENGINE JACKET WATER HEATER, 60A-2P. HOT (POWER TO OPERATE SMOKE HATCH) TO/FROM FIRE ALARM SLC 3. ENGINE START WIRING FOR LIFE SAFETY AND LEGALLY REQUIRED SYSTEMS TO BE 2 HOUR FIRE RATED AND SEPARATE FROM OTHER WIRING. 4. ENGINE JACKET AND OTHER AUX LOAD CONNECTIONS SHOWN ARE MANUFACTURER SPECIFIC. CONTRACTOR IS RESPONSIBLE FOR COORDINATING REQUIREMENTS WITH CHOSEN MANUFACTURER. 5. CONTRACTOR TO ENGAGE GENERATOR MANUFACTURER TO REPROGRAM GENERATOR AND SET OUTPUT CIRCUIT BREAKER AS PER RESULTS OF CONTRACTORS OVERCURRENT PROTECTION STUDY. LIFE SAFETY SYSTEM TO COORDINATE DOWN TO 0.01S. Emergency Generator Detail GENERAL NOTES 1. PROVIDE A RELAY MODULES TO OPERATE FAN STARTER. 2. LOCATE ACTIVATION RELAYS WITHIN 3 FT OF DEVICE BEING CONTROLLED IN ACCORDANCE WITH NFPA 72. 3. WIRE THERMOSTAT SO BOTH THERMOSTAT AND FIRE ALARM CAN START FAN. 2 NTS Hoistway Vent Interface Arup USA Inc 955 Massachusetts Avenue 4th Floor Cambridge, MA 02139 T 617 864 2987 F 617 864 6178 www.arup.com Ceiling Occupancy Sensor Detail 3 NTS CONSULTANT NTS 100% CONSTRUCTION DOCUMENT SET FIRE RATED CONCRETE WALL STAMP 3M FIRE BARRIER FS-195 WRAP/STRIP 24" 24" INSULATED METAL PIPE 3M FIRE BARRIER CP 25 CAULK 3M FIRE BARRIER CP 25 CAULK PIPE CLAMP 3" CONDUIT (TYPICAL) NOTES HANGER ROD (TYPICAL) LOCKNUT (TYP.) DAMMING MATERIAL (MINERAL WOOL OR CERAMIC FIBER) STRUT SUPPORT FIRE RATED CONCRETE FLOOR SLAB WALL PENETRATION FIRE STOPS MUST BE INSTALLED ON BOTH SIDES OF THE WALL. 2. THE MAXIMUM ANNULAR SPACE TO BE FILLED IN THE WALL IS 3", AND THE MINIMUM ANNULAR SPACE IS 3/4". 3. FS-195 WRAP/STRIPS ARE FRICTION FIT INTO THE OPENING OR SECURED WITH 16 GAUGE STEEL TIE WIRE OR ALUMINUM FOIL TAPE AND SLID INTO THE OPENING WITH A MINIMUM 1/4" BEAD OF CP 25 CAULK. 4. THE MINIMUM ANNULAR SPACE MUST ACCOMADATE THE MINIMUM NUMBER OF FS-195 WRAP/STRIPS REQUIRED PER INSULATION THICKNESS. SEE TABLE 1 BELOW. TABLE 1 3M FIRE BARRIER FS-195 WRAP/STRIP WRAP 1 WRAP 2 WRAP 3 WRAP CONDUIT 3'-2" 3'-2"3'-6" 3'-2" 1. CAULK 1" DEPTH 2" DEPTH 3" DEPTH INSULATION 1" THICK 2" THICK 3" THICK 8 7 6 5 4 3 2 1 07/17/15 06/30/15 05/07/15 04/06/15 01/15/15 12/18/14 08/29/14 06/10/14 MARK DATE 100% CONSTRUCT. DOC. SET TIER 1 PHASE 1 PERMIT SET 90% CONSTRUCT. DOC. SET 60% CONSTRUCTION PERMIT SET 100% DESIGN DEVELOPMENT SET 50% DESIGN DEVELOPMENT SET SCHEMATIC DESIGN SET FEASIBILITY STUDY SET DESCRIPTION PROJECT NUMBER: 21332 DRAWN BY: IT CHECKED BY: JA SHEET TITLE Typical Conduit Rack Detail NTS 5 Typical Conduit Through Floor Detail NTS 6 Typical Conduit Through Wall Detail NTS ELECTRICAL DETAILS PLAN SHEET 3 E-802 7/17/2015 2:00:03 PM 4 141sf 104 OFF CHEM E 568sf 103 CL LAB CHEM E 232sf 102 OFF CHEM E UMass Lowell North Quad Infrastructure Renewal (UMBA 13-L2) 426sf 101 U/M PLANT Lowell, MA 1 M-708 243sf U/M PLANT 101B 111A U/M PLANT M 163sf U/M PLANT 101A 156.13sf University of Massachusetts Building Authority University of Massachusetts Lowell 335.88sf 111B MEN PLANT 212.68sf 531.66sf 550.8sf RS LAB MECH RS LAB MECH RS LAB MECH 101 101A 120 CL LAB CIVIL 216sf 276sf 107 RS LAB MECH 111 RS LAB MECH RS LAB MECH IDF/IT OFF MECH 6" FLUE UP CORR PLANT CORR PLANT CORR PLANT 6" FLUE FROM GENERATOR 822.08sf 613.71sf 100C6 100C4 100C3 100C2 100C1 U/M PLANT 761.34sf 305.17sf STD WWC STD MWC CORR PLANT CORR PLANT 1' 50.76sf 130A 261sf OFF CIVIL RS LAB MECH CL LAB MECH CL LAB MECH 254.97sf 3' A' 465.73sf 100S2 CORR PLANT RS LAB MECH RS LAB MECH 190.76sf 100C5 106 104 2' NEW EMER. ELEC. 824.76sf 644.92sf 102 102A CORR PLANT 407sf 1552.32sf 552.35sf 100C3 129 305sf 106A RLB SV MECH 112 STAIR PLANT U/M PLANT 154.69sf 106B 104A CONSULTANT NEW PRIM. ELEC. RLB SV MECH 101.25sf 818sf 130 723sf B' 100 DOCK PLANT 73sf CORR PLANT 100C2 CL LAB CIVIL RS LAB MECH CL LAB CIVIL 127 115 ELEC ELEV LOBBY 2.36sf CORR PLANT 100C4 CLB SV CIVIL 70sf 125 105 414.78sf 113 886.77sf 105A 243.05sf RLB SV CIVIL 192sf 123 126 CLB SV CIVIL 266sf 103 865.63sf FSD 742.68sf ELEV PLANT FSD 121 CLASS REG 459.2sf 316.07sf RS LAB MECH 1027sf ARCHITECT 107.41sf 100E1 122 1646sf STAIR PLANT CL LAB DN ENGR 538sf 100S1 STAIR PLANT 273sf 100S2 MEN PLANT 2"LPS UP 1 1/2" CD UP (N) WOMEN PLANT 133 223sf JC PLANT 31sf 133A CMP/TEL IT 88sf 132A U/M PLANT 56sf 86sf 132B U/M PLANT 437sf 1005sf 132C 61sf 100A U/M PLANT 36sf ELEV PLANT 100E1 Arup USA Inc 955 Massachusetts Avenue 4th Floor Cambridge, MA 02139 T 617 864 2987 F 617 864 6178 www.arup.com 102A C SERV PURCH 242sf 100C1 CORR PLANT 741sf 101 MR SV BKSTR 132D C' 100% CONSTRUCTION DOCUMENT SET CORR PLANT 817sf 100C1 1 M-701 0.5 1 1.5 2 3 4 5 B VD CORR. VD VD VD DINING & STD MWC FSD FSD VD 143 101sf FD SV DINING STAIR PLANT 263sf STAMP A.5 DN 100S1 U/M PLANT 141A 53sf U/M PLANT CORR PLANT 305sf 100C2 53sf 140D U/M PLANT 140C 249sf FD SV DINING 52sf 140A U/M PLANT 34sf 140B 5878sf 102 CORR. MERCH BKSTR A C 57sf UNISEX PLANT 152A 152 FD SV DINING DINING & STD WWC 4"LPS 3"CD (E) 414sf 102B C.5 MR SV BKSTR 214sf VD 40sf FOOD DINING 145 3293sf U/M PLANT U/M PLANT 622sf RLB SV GSE RS LAB DN ENGR 106G 37sf 168sf 106 DN 61sf 150 FD SV DINING 1960sf RS LAB CIVIL 109sf 106B 106C OFF GSE OFF GSE 469sf 457sf 100C1 223sf 146 FD SV DINING PROJECT NUMBER: 21332 DRAWN BY: CHECKED BY: - SHEET TITLE 152sf OFF CIVIL 107B 169sf 39sf DESCRIPTION 66sf OFF CIVIL 107C 148 DATE 100% CONSTRUCT. DOC. SET TIER 1 PHASE 1 PERMIT SET 90% CONSTRUCT. DOC. SET 60% CONSTRUCTION PERMIT SET 100% DESIGN DEVELOPMENT SET 50% DESIGN DEVELOPMENT SET SCHEMATIC DESIGN SET FEASIBILITY STUDY SET 107 46sf 112sf 62sf JC PLANT OF SV CIVIL 35sf 107C 107D CORR PLANT CORR PLANT OFF CIVIL OFF CIVIL 196sf 133sf 105D 241sf 105B OFF CIVIL 113 OFF CIVIL RS LAB CIVIL 214sf OFF CIVIL 111 108A 105C 117sf 100C4 251sf OFF CIVIL 109 100C5 481sf 253sf OFF CIVIL OFF CIVIL OFF CIVIL 388sf 107 108 287sf 178sf 105A OF SV CIVIL OF SV CIVIL U/M PLANT 202sf OF SV CIVIL OFF CIVIL 115sf 107A 269sf 103 CL LAB CIVIL 107A 330sf CMP/TEL IT CONF CIVIL 101 115 OF SV CIVIL 108B 105 OF SV CIVIL 103A 292sf 43sf 109A 125sf CORR PLANT 105E 500sf 100C4 181sf 219sf MARK CORR PLANT CORR PLANT RS LAB CIVIL 07/17/15 06/30/15 05/07/15 04/06/15 01/15/15 12/18/14 08/29/14 06/10/14 100C3 100C2 CORR PLANT 114 105 FOOD DINING 259sf OFF CIVIL 112 1004sf 96sf 100 279sf OFF CIVIL 110 CL LAB CIVIL STAIR PLANT 348sf OFF CIVIL 108 450sf UP 227sf 273sf CORR PLANT U/M PLANT 100S1 1958sf 235sf 106E ELEV PLANT 659sf OFF DINING OFF GSE 104 2" LPS 127sf 100A 106D OFF GSE RS LAB CIVIL 100E1 145sf 106A 100C3 BFP 1 1/2" CD 339sf 21sf 106 JC PLANT 106F 75sf OFF P&T FD SV DINING 8 7 6 5 4 3 2 1 15sf 100B 249sf 538sf 103 MR SV BKSTR 259sf 100S1 E STAIR PLANT 145A D 107B MEN PLANT 1 MECHANICAL - KEY PLAN - LEVEL 1 1/16" = 1'-0" M-402 7/20/2015 3:01:34 PM MECHANICAL LEVEL 1 - KEY PLAN UMass Lowell North Quad Infrastructure Renewal (UMBA 13-L2) Lowell, MA 1 X-M-709 University of Massachusetts Building Authority University of Massachusetts Lowell 212.68sf 100S1 STAIR PLANT ARCHITECT 107.41sf 100E1 ELEV PLANT MEZZANINE 1 [UNASSIGNED] FD 6" FLUE UP & DN 1' 190.76sf 100S2 MEZZANINE 2 [UNASSIGNED] 2' 3' A' CONSULTANT B' C' Arup USA Inc 955 Massachusetts Avenue 4th Floor Cambridge, MA 02139 T 617 864 2987 F 617 864 6178 www.arup.com 100% CONSTRUCTION DOCUMENT SET 1 M-702 0.5 1 1.5 2 3 4 5 UP UP A STAMP A.5 FSD VD ENTRY LOBBY MR B CORR. VDVD C C.5 FD EE JC IDF/IT FD D ELEC. E LIGHTWELL 10sf 8 7 6 5 4 3 2 1 07/17/15 06/30/15 05/07/15 04/06/15 01/15/15 12/18/14 08/29/14 06/10/14 MARK DATE 100% CONSTRUCT. DOC. SET TIER 1 PHASE 1 PERMIT SET 90% CONSTRUCT. DOC. SET 60% CONSTRUCTION PERMIT SET 100% DESIGN DEVELOPMENT SET 50% DESIGN DEVELOPMENT SET SCHEMATIC DESIGN SET FEASIBILITY STUDY SET DESCRIPTION PROJECT NUMBER: 21332 DRAWN BY: CHECKED BY: - SHEET TITLE 1 MECHANICAL - KEY PLAN - LEVEL 1.5 1/16" = 1'-0" M-403 7/20/2015 3:01:38 PM MECHANICAL LEVEL 1.5 - KEY PLAN 1101.19sf 201 CL LAB CHEM E 138.93sf 204 CL LAB CHEM E 223.60sf 202 OFF CHEM E UMass Lowell North Quad Infrastructure Renewal (UMBA 13-L2) 284sf OFF U ADV 254D 102sf OFF U ADV 254C OFF U ADV 102sf 254B OFF U ADV 145sf 254A OFF U ADV 97.66sf 128.39sf 98.46sf 201B 201A OFF U ADV OFF U ADV 99.24sf 97.65sf 200J 200K OFF WRK ENV OFF WRK ENV 109.56sf 200L 118.3sf 200M OFF WRK ENV 190.84sf 140.63sf 182.26sf 200P 200Q 200R 200S 200T OFF WRK ENV OFF WRK ENV OF SV WRK ENV OFF WRK ENV OFF WRK ENV 103.64sf 200U 200O OFF WRK ENV OFF U ADV 96sf OFF U ADV 254F 96sf OFF U ADV OFF WRK ENV OFF WRK ENV RS LAB WRK ENV 133.44sf 201D 201C 201D OFF U ADV 19.83sf 200E 200D OFF WRK ENV OFF WRK ENV OFF WRK ENV 200F 111.19sf OFF U ADV 608sf 258 204 OFF U ADV 202C 194.28sf OFF WRK ENV OFF WRK ENV 69.26sf 195.18sf 204D 202B 204C OFF WRK ENV OFF WRK ENV 204B OFF WRK ENV OFF WRK ENV OFF LCSP OFF LCSP 128.86sf 212A 200S2 OFF LCSP 1' 36.21sf 225sf 210C 212 U/M PLANT STAIR PLANT 2' 973.78sf U/M PLANT 215 C SERV PURCH 533sf 134.78sf 105.58sf 206A OFF WRK ENV 117.54sf 117.76sf 109.11sf 105.64sf 210H 210G 210F 210E OFF LCSP OFF LCSP OFF LCSP OFF LCSP A' 244.47sf 210D CONSULTANT 214 U/M PLANT OFF LCSP OFF U ADV 235sf 256A 120sf 391sf STAIR PLANT 200S2 OFF U ADV 256B OFF U ADV 184sf STAIR PLANT Arup USA Inc 955 Massachusetts Avenue 4th Floor Cambridge, MA 02139 T 617 864 2987 F 617 864 6178 www.arup.com WOMEN PLANT 227sf C' 262 260 FSD 95sf JC PLANT B' 201B OF SV DN ENGR 155sf 202A OFF MGMT OFF MGMT 111sf 202C 27sf FSD 36sf 200E1 ELEV PLANT 353sf 431sf 201 OF SV DN ENGR 202 434sf CONF MGMT OFF MGMT 111sf 202D 200S4 194sf 201A 256C FD MEET U ADV 3' 170.43sf 208 CLASS REG 127.7sf 206B 210B OF SV LCSP OF SV WRK ENV 180.25sf 175.19sf 85.61sf 210A 210 109.68sf 206 OF SV WRK ENV OF SV WRK ENV OFF WRK ENV OFF WRK ENV 344.11sf OFF U ADV 250B CORR PLANT 110sf 250D 1 200C6 CORR PLANT 73.34sf 133.4sf 206C OFF WRK ENV 119.83sf 202 202D OF SV U ADV 250C 104sf 6" GENERATOR FLUE UP/DN 773.06sf 196.66sf 200C5 MEET DN ENGR 103sf CORR PLANT OFF MGMT 115sf 505.23sf 200C4 CORR PLANT 155sf U/M PLANT 200W OFF WRK ENV OFF MMIS 35sf 216 C SERV PURCH 202E 242 827.14sf 101.82sf LOUNGE WRK ENV 200C3 204A OFF WRK ENV OFF WRK ENV 111.26sf 256 OF SV U ADV 74sf OFF U ADV 250A 105sf OFF U ADV 105sf 250I 101sf 213 202F OFF U ADV 250H 200A 204.22sf 204E 202A 172.06sf OFF U ADV CL LAB WRK ENV CORR PLANT 202E 102sf OFF WRK ENV CONF WRK ENV 778.77sf OFF WRK ENV 250G 197.6sf 200C 200X 200Y 90.92sf 200C2 104.95sf 240 91.45sf 256.7sf OF SV U ADV 883sf 86.78sf 303.82sf M-710 CORR PLANT 250P 88.84sf 136.52sf 197.62sf 200V 200 CMP/TEL IT OFF U ADV 250 537.76sf 200C1 OFF U ADV 501sf 254E OFF U ADV 254 280sf CONF U ADV 316sf 252 OFF U ADV OFF U ADV 133sf 250L 250K 102sf 275sf 250J 249.68sf 183.52sf 748sf ELEV PLANT 1212.04sf 234.69sf STAIR PLANT 200E1 173.67sf 201 ARCHITECT 111.26sf OFF WRK ENV OFF WRK ENV 201 200S1 188.97sf 97.92sf 200N OFF WRK ENV 190.84sf University of Massachusetts Building Authority University of Massachusetts Lowell FD 247sf 250N OFF U ADV 304sf 250M Lowell, MA 236sf 204D RLB SV DN ENGR 194sf 202B OFF MGMT CORR PLANT 200C1 1009sf 200C1 203 1679sf RS LAB ECE 315sf 204 4 RS LAB DN ENGR 3 70sf 175sf 2 204A 1.5 204C RLB SV DN ENGR 372sf RS LAB DN ENGR M-703 1 100% CONSTRUCTION DOCUMENT SET 204B RS LAB ECE 1 0.5 2"LPS DN 1 1/2" CD DN 5 A UP UP FSD VD FD VD 202D 119sf VD 119sf CORR PLANT 200C1 639sf OFF CCE OFF CCE 434sf 200S1 CORR PLANT OFF CCE 203B 101sf OFF CCE 203C 111sf 207 OF SV MMIS 201L 54sf OF SV MMIS 89sf 201K CONF MMIS 201 553sf OFF MMIS 201I OFF MMIS OFF MMIS 201A 137sf OFF MMIS 102sf 201B OFF MMIS 201C 104sf OFF MMIS 104sf 201D OFF MMIS 201E 104sf OFF MMIS 201F 80sf MARK DATE 100% CONSTRUCT. DOC. SET TIER 1 PHASE 1 PERMIT SET 90% CONSTRUCT. DOC. SET 60% CONSTRUCTION PERMIT SET 100% DESIGN DEVELOPMENT SET 50% DESIGN DEVELOPMENT SET SCHEMATIC DESIGN SET FEASIBILITY STUDY SET DESCRIPTION 327sf CONF SOB ORG LOUNGE SOB ORG 203 126sf 207A OLB SV MGMT 133sf 211B OFF MGMT PROJECT NUMBER: 21332 DRAWN BY: CHECKED BY: - SHEET TITLE 178sf OFF MMIS 130sf 203A OFF MGMT 201G 07/17/15 06/30/15 05/07/15 04/06/15 01/15/15 12/18/14 08/29/14 06/10/14 207E 104sf CONF SOB ORG 142sf 126sf 201B OFF MGMT 201 207F LOUNGE SOB ORG OF SV MGMT 128sf 418sf CONF SOB ORG 207 OP LAB MGMT OFF MGMT 179sf 201A 211A 1201sf OFF MGMT 205 215 207G CONF MMIS CLASS REG 207H 90sf 789sf OP LAB MGMT 41sf 209 1106sf 213 1457sf 631sf CLASS REG OF SV MGMT OFF MGMT OFF MGMT 211 CLASS REG 201H 319sf OLB SV MGMT 207H 201J 209 80sf 200 CMP/TEL IT 207 383sf U/M PLANT CORR PLANT OFF MGMT 215A 338sf 200C1 CONF MGMT 112sf 8 7 6 5 4 3 2 1 34sf 109sf 120sf 99sf 200C3 CORR PLANT 330sf 100sf 202E 613sf 200C2 95sf 177sf DN UP 103sf OF SV CCE OFF MGMT UP 207D 202F ELEV PLANT 207C 130sf OFF MGMT 224 207B OFF CCE 180sf OFF MGMT 222 OFF MGMT 203A 230sf OFF MGMT 220 207A 121sf FSD VD FD OFF VDVD VD 202B 202C 119sf OFF 119sf 202A VD UP OFF CCE 202 727sf OFF CCE 203 1023sf OFF CCE 203G 203F OFF CCE OFF CCE 203E 229sf OFF MGMT 186sf 203D 162sf 218 CORR PLANT OFF CCE 105sf 105sf VD VD VD DN STAIR PLANT 381sf 200S1 STAIR PLANT 352sf OFF CCE 200S3 CONF CCE 358sf 204 OFF CCE 219sf 136sf 105sf OFF MGMT 200C4 102sf 205 216 538sf OFF MGMT CORR PLANT OFF MGMT 114sf OFF MGMT 210 OFF SOB ORG 191sf 214 JC PLANT 134sf 212 79sf 148sf 212 165sf CS PLANT 204 210 214 200E1 383sf 208 189sf 37sf 254sf WOMEN PLANT MEN PLANT OFF MGMT OFF MGMT 162sf 208A 206 200C3 JC PLANT 364sf 855sf CLASS REG 10sf 208B 269sf 213sf 203B OFF DN ENGR 284sf VD VD VD STAIR PLANT 174sf 527sf 203A OFF DN ENGR 200S1 STAIR PLANT E FD 202 134sf 203E OFF ECE 169sf RLB SV ECE 203C 190sf CORR PLANT 200C2 208A D FD VD 218sf 208 FD 325sf C.5 FD RS LAB DN ENGR C 653sf VD VD RS LAB DN ENGR VD 206 VD B RS LAB DN ENGR VD 113sf CORR. 208B 203I UP RS LAB DN ENGR 203H 125sf 203D OFF ECE 152sf 203F RLB SV ECE 115sf 206A RS LAB DN ENGR STAMP A.5 1 MECHANICAL - KEY PLAN - LEVEL 2 1/16" = 1'-0" M-404 7/20/2015 3:01:48 PM MECHANICAL LEVEL 2 - KEY PLAN 543sf 301 RS LAB CHEM E 304 193sf OFF CHEM E 22sf SHFT PLANT 148sf 301B 301A RS LAB CHEM E 302 180sf OFF CHEM E UMass Lowell North Quad Infrastructure Renewal (UMBA 13-L2) Lowell, MA 113sf 309B CL SV REG OFF CAREER CL SV REG 107sf OFF CAREER OFF CAREER CLASS REG 308 CLASS REG 287sf 310 512sf 312 CLASS REG CLASS REG OF SV DN ENGR OFF PROV 320A 121sf 302P 131.63sf OF SV PROV 302O 133.25sf DN UP LOBBY PLANT WOMEN PLANT 239sf 312 JC PLANT 314 30sf 310E OF SV CLASS 79sf 16sf OFF CLASS OFF CLASS 124sf 310A 308A 223sf OFF CLASS 448sf 310 OFF CLASS 308 264sf OF SV CLASS 310D OFF CLASS 93sf 310C OFF CLASS 310B 112sf 520sf 311 OFF CLASS 131sf CORR PLANT 300C3 310 315 OLB SV CLASS 115sf OP LAB CLASS 536sf 313 OFF CLASS 311A 308B OFF CLASS FD VD CL LAB CLASS VD 302 74sf 163sf 230sf 113sf 214sf 320 322 324 326 OFF MGMT OFF MGMT OF SV MGMT OFF MGMT CS PLANT 318 OFF MGMT 304 ELEV PLANT OF SV CCE OF SV CCE 31sf CORR PLANT 305B 303 UP 305B CONF SOB ORG DN 307 305G 342sf 305 14sf U/M PLANT 15sf 307A 48sf 307A 305C CL SV MGMT CF SV SOB ORG 44sf 49sf 309B 309A CF SV MGMT 309A U/M PLANT OFF CCE 301 253sf OF SV CCE 56sf 301A OF SV CCE 303B 40sf 305 305E 682sf 309 DATE 100% CONSTRUCT. DOC. SET TIER 1 PHASE 1 PERMIT SET 90% CONSTRUCT. DOC. SET 60% CONSTRUCTION PERMIT SET 100% DESIGN DEVELOPMENT SET 50% DESIGN DEVELOPMENT SET SCHEMATIC DESIGN SET FEASIBILITY STUDY SET DESCRIPTION PROJECT NUMBER: 21332 DRAWN BY: CHECKED BY: - CONF MGMT SHEET TITLE 303A OFF CCE 301D 127sf OFF CCE 301C 96sf OFF CCE 127sf 301B CONF CCE 303C 218sf OFF CCE 303D 305F 307 313 96sf CLASS REG CLASS REG OFF CCE CF SV SOB ORG 305D OFF SOB ORG 305H 120sf 878sf 07/17/15 06/30/15 05/07/15 04/06/15 01/15/15 12/18/14 08/29/14 06/10/14 311 301 CLASS REG 33sf 870.20sf OFF CCE 309 1096sf CLASS REG 303 303 OFF SOB ORG 1323.01sf 1186sf 463sf 1797sf 8 7 6 5 4 3 2 1 MARK 30.93sf 301E 326 300C4 CORR PLANT 300C2 324 439sf JC PLANT 33sf 322 320 300C4 300C3 CORR PLANT DN 318 300C3 308B OF SV CCE 300C2 STAIR PLANT 316 314 349sf 308 170sf 312 289sf 211.26sf 303A 301 DN 300S1 300C1 310 308 UP 223sf OF SV DN MGMT 301F CORR PLANT OF SV CCE 303S 62sf OF SV CCE 66sf 166sf 316 223.64sf 303R OFF MGMT 314 300E1 300 300C1 303E VD VD CCE CCE 83sf 83sf VD 720sf 302 CORR PLANT 576sf 300C1 OFF CCE 303P 84sf OFF CCE VD VD UP 304 206sf OF SV CCE OFF CCE 304B 80sf OFF CCE 80sf 304A OFF CCE 303N 68sf OFF CCE 68sf 330O 84sf 303Q FSD FSD VD VD DN VD 154sf 310 STAIR PLANT 399sf 300S1 LOBBY PLANT 300L1 309sf CL LAB CLASS 309 799sf OFF CCE OFF CCE OFF CCE 303M 303L 303K OFF CCE 303J 152sf OFF MGMT 312 869.60sf 151sf OFF MGMT 309 152sf 310 OFF MGMT 809.73sf 308 306 CORR PLANT WOMEN PLANT OFF MGMT OFF MGMT 244sf 306 304 302 300C3 OFF CCE 141sf 225sf 215sf 451.19sf 300 CLASS REG 180sf 308A 303I 155.56sf OFF MGMT 305G VD VD MEN PLANT OFF CCE 119.03sf OFF MGMT 285.25sf 300S1 STAIR PLANT E FD CORR PLANT 303H 115.13sf 305F OFF MMIS 305E VD 37sf OFF CCE 139.84sf OFF MGMT D 300C4 303G 152.42sf 305D OF SV MGMT 305H 270.30sf OFF MGMT 305 418.41sf OFF MGMT FD 306 C.5 VD 323sf OFF CCE 301D 148.35sf OFF MGMT CORR PLANT 357.35sf 300C2 302B 131.75sf C OFF ECON VD 141.95sf 141.78sf 305A OFF MGMT 305B 302A 122.92sf 136.16sf B OFF ECON CORR. OFF ECON 130.24sf 302C VD VD 303F 145.04sf OFF ENGLISH 301C OFF ENGLISH 74.89sf 305C OF SV MGMT STAMP A.5 OFF ECON 90sf 151.19sf 301B OFF ENGLISH OFF CLASS 257.71sf 301A OFF ENGLISH 89.67sf 100% CONSTRUCTION DOCUMENT SET 302 OFF ECON A 301E 5 OF SV ENGLISH 4 244.07sf 301 OF SV ENGLISH CORR PLANT 1312.12sf 3 302D 96sf Arup USA Inc 955 Massachusetts Avenue 4th Floor Cambridge, MA 02139 T 617 864 2987 F 617 864 6178 www.arup.com 300C1 2 302Q 1.5 OFF ECON 93sf C' 886.85sf 1 266.00sf 0.5 302E 93sf B' 702.64sf 300 CONF DN ENGR 315A FSD 132.71sf M-704 OFF ECON OFF ECON 96sf 404.45sf WOMEN PLANT 302N 128.92sf OFF ECON 302M 308.75sf OFF ECON 127.02sf 1 302F 93sf CONSULTANT VD VD FD OFF ECON 158sf OFF DN ENGR U/M PLANT OFF ECON 93sf VD 198sf 313A OF SV DN ENGR 316A 302G OFF CLASS 201sf 313 OFF ECON 93sf VD 316 137sf OFF 247sf A' VD 151sf OFF ECE FSD 306 VD OF SV CAREER 326D CLASS REG 1021sf 771sf 304 OFF PROV 320B OFF GSA 511sf 3' VD OF SV CAREER 92sf 326D 63sf 779sf 2' JC PLANT STAIR PLANT 302 1' CORR PLANT 314 OFF PROV 98sf 37sf 226sf 300S2 300 OFF DN ENGR 942sf 300C6 300A 320 311 JC PLANT CONF ECON STAIR PLANT 892sf 314A 47.83sf 525sf 24sf CORR PLANT CORR PLANT 130.89sf 300S2 300C5 300C4 128.25sf 399sf CORR PLANT 129.83sf 31sf 300C3 CORR PLANT 128.78sf 320C 300C2 283sf OFF CAREER 326C 74sf 324 CORR PLANT 335sf 513sf 506sf VD 136sf 328K CORR PLANT 300C5 258sf OFF CAREER 326 300C1 OF SV CAREER 326B 125sf 74sf OFF CAREER 72sf 326A CORR PLANT 366sf 300C4 269sf 302H 74sf M-711 6" FLUE UP & DN 204sf OFF ECON 321sf 1 302I 300L2 STAIR PLANT VD CONF CAREER 328L 210sf OFF CAREER 743sf 328 OFF CLASS 91sf 321A 300S1 302L OP LAB CLASS 20sf OF SV DN ENGR OFF ECON 311B OFF DN ENGR 311C OF SV ECON 319 CLASS REG 166.25sf 549sf 309 CLASS REG 311A CONF DN ENGR 302J 317 303 CLASS REG 300sf 311B ELEV PLANT MEN PLANT 1280sf 305 OFF ECON 831sf 301 CLASS REG 309C 1353sf 1065sf 302K CL LAB CLASS 1100sf ARCHITECT 220sf 300E1 235sf OFF CAREER 120sf 328A OFF CAREER 103sf OP LAB CLASS 799sf 321 OP LAB CLASS 321B 92sf 328B OFF CAREER 167sf 328C 120sf 328J 445sf FD 189sf 328I 114sf OFF CAREER 328H OFF CAREER 162sf 328G OFF CAREER 118sf 328F OFF CAREER 148sf 328E OFF CAREER 198sf 328D University of Massachusetts Building Authority University of Massachusetts Lowell 115sf 309A DN 160sf 303A OFF SOB ORG 205sf 305H 305F 216sf 340sf OFF SOB ORG OFF SOB ORG OFF SOB ORG 305E 1 MECHANICAL - KEY PLAN - LEVEL 3 1/16" = 1'-0" M-405 7/20/2015 3:01:58 PM MECHANICAL LEVEL 3 - KEY PLAN UMass Lowell North Quad Infrastructure Renewal (UMBA 13-L2) Lowell, MA University of Massachusetts Building Authority University of Massachusetts Lowell ARCHITECT ROOF 6" GENERATOR FLUE TERMINATE MIN. 10'-0" ABOVE ROOF LEVEL 1' 2' 1 M-712 3' A' CONSULTANT VD VD FSD FSD C' Arup USA Inc 955 Massachusetts Avenue 4th Floor Cambridge, MA 02139 T 617 864 2987 F 617 864 6178 www.arup.com 642sf 402 405 CLASS REG 804sf CLASS REG 395sf STAIR PLANT CL SV REG 402B JC PLANT 14sf 6sf 402C 407 CLASS REG 1094sf 400S2 DN FSD B' 100% CONSTRUCTION DOCUMENT SET CLASS REG 651sf 404 CORR PLANT 643sf 403 CLASS REG 816sf 400C1 1 M-705 0.5 1 1.5 2 3 4 5 A STAMP VD FSD FSD FSD VD C C.5 FD VD VD VD VD CORR. B VD VD VD DN STAIR PLANT 400S1 393sf JC PLANT 408 17sf CLASS REG 401 1012sf A.5 FD D E FD DN 769sf 531sf 406 37sf 404 400E1 CLASS REG CLASS REG ROOF ELEV PLANT 758sf 408 CLASS REG 181sf 660sf 499sf OFF MGMT CLASS REG CLASS REG 410 417 412 DN 233sf DN 400S1 STAIR PLANT 154sf JC PLANT 278sf 400C2 400C3 CORR PLANT CORR PLANT CORR PLANT CORR PLANT 414 OFF ENGLISH 439sf 411 CLASS MGMT 454sf 520sf CLASS REG 401 278sf 973sf 1100sf OFF MGMT CLASS REG CLASS REG 403 405 407 415sf 413 CLASS REG OFF MGMT PROJECT NUMBER: 21332 DRAWN BY: CHECKED BY: - 102sf 415 OFF ENGLISH SHEET TITLE 225sf 409 DESCRIPTION 400C4 110sf 400 DATE 100% CONSTRUCT. DOC. SET TIER 1 PHASE 1 PERMIT SET 90% CONSTRUCT. DOC. SET 60% CONSTRUCTION PERMIT SET 100% DESIGN DEVELOPMENT SET 50% DESIGN DEVELOPMENT SET SCHEMATIC DESIGN SET FEASIBILITY STUDY SET 619sf 649sf 400C1 CLASS REG 07/17/15 06/30/15 05/07/15 04/06/15 01/15/15 12/18/14 08/29/14 06/10/14 MARK 14sf 406A UP 8 7 6 5 4 3 2 1 135sf 416 OFF ENGLISH 1 MECHANICAL - KEY PLAN - LEVEL 4 1/16" = 1'-0" M-406 7/20/2015 3:02:04 PM MECHANICAL LEVEL 4 - KEY PLAN UMass Lowell North Quad Infrastructure Renewal (UMBA 13-L2) 107.41sf 100E1 ELEV LOBBY TG-1 1L1 EF 2-1 FD UC ELEV PLANT Lowell, MA AC 2-1 ELEC 10"x10" EA W/WMS (150) IDF/IT 173 FD T ARCHITECT RL UP (TYP 2) RHG UP (TYP 2) 12"x8" SA UP 12"x8" EA UP 174 10"x10" EA W/WMS University of Massachusetts Building Authority University of Massachusetts Lowell T CORR. CD-2 (200) FSD 12"x8" EA 8"ø SA VAV 6 FSD UC 100C6 8"x6" SA CONSULTANT T 12"x8" SA 822.08sf STD MWC 8"x4" SA 8"x6" SA 100C6 CORR PLANT STD WWC 8x4 SA 171 EG-1 (150) 170 EG-1 (150) Arup USA Inc 955 Massachusetts Avenue 4th Floor Cambridge, MA 02139 T 617 864 2987 F 617 864 6178 www.arup.com CD-1 (100) CD-1 (100) 8"ø EA 8"x6" EA 6" FLUE UP 100% CONSTRUCTION DOCUMENT SET 6" FLUE FROM GENERATOR 10"x10" EA W/WMS (150) NEW EMER. ELEC. 2" CD 172A EF 2-2 2" CD DN FD W/WMS TG-1 FD CD-2 (200) STAMP A' 10"x10" EA (150) ACCESS TO KITSON MEZZ 2 3/4" CD 1 1/4" CD 100S3 NEW PRIM. ELEC. 172 T AC 3-1 AC 3-2 CUH 2 8 7 6 5 4 3 2 1 T 07/17/15 06/30/15 05/07/15 04/06/15 01/15/15 12/18/14 08/29/14 06/10/14 MARK B' DESCRIPTION PROJECT NUMBER: 21332 DRAWN BY: CHECKED BY: - MECHANICAL - LEVEL 1 ENLARGED PLAN (POD 2) 1/4" = 1'-0" SHEET TITLE MECHANICAL POD 2 ENLARGED FLOOR PLANS - LEVEL 1 M-708 7/20/2015 3:02:34 PM 1 DATE 100% CONSTRUCT. DOC. SET TIER 1 PHASE 1 PERMIT SET 90% CONSTRUCT. DOC. SET 60% CONSTRUCTION PERMIT SET 100% DESIGN DEVELOPMENT SET 50% DESIGN DEVELOPMENT SET SCHEMATIC DESIGN SET FEASIBILITY STUDY SET UMass Lowell North Quad Infrastructure Renewal (UMBA 13-L2) Lowell, MA University of Massachusetts Building Authority University of Massachusetts Lowell RL DN (TYP 2) RHG DN (TYP 2) ARCHITECT 12"x8" SA DN 12"x8" EA DN 12"x8" EA 12"x8" SA CONSULTANT Arup USA Inc 955 Massachusetts Avenue 4th Floor Cambridge, MA 02139 T 617 864 2987 F 617 864 6178 www.arup.com 6"ø FL UP&DN 1' 2' 3' 100% CONSTRUCTION DOCUMENT SET A' 6"x6" EA STF WWC STAMP 273 T 274 8"ø EA 6"ø SA 6"ø SA CD-2 (150) EG-2 (200) CD-2 (150) 8"x6" SA 10"x8" SA EG-1 (50) ELEC. 271 EE EF 2-3 IDF/IT 271A 6"ø SA 10"x8" SA VAV 7 STD WWC UC 6"ø EA T UC 14"x12" EA UP 12"x12" SA UP CD-2 (150) FD 3/4" CD 8"ø EA 275 270 T 8 7 6 5 4 3 2 1 CD-2 (150) 8"x6" SA FD 272 14"x8" SA TG-1 AC 2-2 8"x8" JC 3/4" CD DISCHARGE OVER JANITORS SINK EG-2 (200) B' 431sf 201 OF SV 200C4 EG-1 (150) 12"x8" SA MARK DATE 100% CONSTRUCT. DOC. SET TIER 1 PHASE 1 PERMIT SET 90% CONSTRUCT. DOC. SET 60% CONSTRUCTION PERMIT SET 100% DESIGN DEVELOPMENT SET 50% DESIGN DEVELOPMENT SET SCHEMATIC DESIGN SET FEASIBILITY STUDY SET DESCRIPTION FSD PROJECT NUMBER: 21332 DRAWN BY: CHECKED BY: - FSD SHEET TITLE 12"x8" EA CORR. 07/17/15 06/30/15 05/07/15 04/06/15 01/15/15 12/18/14 08/29/14 06/10/14 STF MWC 276 EG-1 (50) 1 1/2" CD UP 2" LPS UP RHG UP (TYP 2) RL UP (TYP 2) C' 36sf 200E1 MECHANICAL POD 2 ENLARGED FLOOR PLANS - LEVEL 2 1 MECHANICAL - KITSON MEZZ 1/4" = 1'-0" M-710 7/20/2015 3:02:37 PM CD-1 (100) 14"x8" EA 4"ø EA EG-2 (150) STD MWC T UMass Lowell North Quad Infrastructure Renewal (UMBA 13-L2) 107sf 220sf 300E1 300sf 311B ELEV PLANT Lowell, MA 311A CONF DN ENGR University of Massachusetts Building Authority University of Massachusetts Lowell OFF DN ENGR ARCHITECT 20sf 311C OF SV DN ENGR CONSULTANT Arup USA Inc 955 Massachusetts Avenue 4th Floor Cambridge, MA 02139 T 617 864 2987 F 617 864 6178 www.arup.com 892sf 311 OFF DN ENGR 942sf 300C6 6" FLUE UP & DN CORR PLANT 1' 2' 3' 100% CONSTRUCTION DOCUMENT SET A' T STF MWC 6"x6" EA 373 EG-2 (150) VD 4ø EA EG-1 CD-2 (50) (150) VD JC 372 FD ELEC. EE 371 371A EF 2-4 IDF/IT VD CD-2 (150) 12"x8" SA TG-1 AC 2-3 0' - 7" 6ø SA UC VD 3/4" CD FD 300A WOMEN PLANT 404.45sf T T UC RG-1 (150) 6"ø EA CD-2 (150) 370 CORR. 300C4 8 7 6 5 4 3 2 1 EG-2 (200) VD VD OFF DN ENGR 8ø EA STD WWC 375 EG-1 (50) 14"x8" SA 8ø EA B' 07/17/15 06/30/15 05/07/15 04/06/15 01/15/15 12/18/14 08/29/14 06/10/14 MARK DATE 100% CONSTRUCT. DOC. SET TIER 1 PHASE 1 PERMIT SET 90% CONSTRUCT. DOC. SET 60% CONSTRUCTION PERMIT SET 100% DESIGN DEVELOPMENT SET 50% DESIGN DEVELOPMENT SET SCHEMATIC DESIGN SET FEASIBILITY STUDY SET DESCRIPTION FSD OF SV DN ENGR 2" LPS UP 1 1/2" CD UP 8"x8" EA 313A VD CD-2 (100) 6"ø SA 8"x6" SA 313 6"ø SA VD EG-2 (200) CD-2 (150) 14"x8" EA 198sf STAMP 6x6 EA 374 T 201sf STD MWC VD VD PROJECT NUMBER: 21332 DRAWN BY: CHECKED BY: - 16"x16" EA UP 14"x12" EA DN STF WWC 8"ø SA 376 FSD 16"x16" SA UP 12"x12" SA DN 1 1/2" CD DN 2" LPS DN SHEET TITLE C' 1/4" = 1'-0" 702.64sf MECHANICAL - LEVEL 3 ENLARGED PLAN (POD 2) 300 CONF DN ENGR 1 M-711 7/20/2015 3:02:41 PM VAV 8 MECHANICAL POD 2 ENLARGED FLOOR PLANS - LEVEL 3 UMass Lowell North Quad Infrastructure Renewal (UMBA 13-L2) Lowell, MA University of Massachusetts Building Authority University of Massachusetts Lowell ARCHITECT CONSULTANT 1' 2' Arup USA Inc 955 Massachusetts Avenue 4th Floor Cambridge, MA 02139 T 617 864 2987 F 617 864 6178 www.arup.com 3' A' 100% CONSTRUCTION DOCUMENT SET 2" LPS DN 1 1/2" CD DN STAMP ACCU 3 RTU 2 ACCU 2 B' 8 7 6 5 4 3 2 1 SA-4 16"x16" EA 16"x16" SA SA-3 RHG UP (TYP 2) RL UP (TYP 2) C' 07/17/15 06/30/15 05/07/15 04/06/15 01/15/15 12/18/14 08/29/14 06/10/14 MARK DATE 100% CONSTRUCT. DOC. SET TIER 1 PHASE 1 PERMIT SET 90% CONSTRUCT. DOC. SET 60% CONSTRUCTION PERMIT SET 100% DESIGN DEVELOPMENT SET 50% DESIGN DEVELOPMENT SET SCHEMATIC DESIGN SET FEASIBILITY STUDY SET DESCRIPTION PROJECT NUMBER: 21332 DRAWN BY: CHECKED BY: - SHEET TITLE MECHANICAL - ROOF ENLARGED PLAN (POD 2) 1/4" = 1'-0" M-712 7/20/2015 3:02:43 PM 1 MECHANICAL POD 2 ENLARGED FLOOR PLANS - ROOF UMass Lowell North Quad Infrastructure Renewal (UMBA 13-L2) Lowell, MA "MINI" BELLMOUTH FITTING STANDING SEAM VOLUME DAMPER WITH LOCKING QUADRANT University of Massachusetts Building Authority University of Massachusetts Lowell MASTIC SEALANT MIN.10'-0" ABOVE ROOF 9" DRAWBAND CONNECTION (TYP) DISCHARGE FROM GENERATOR W/RAINCAP 3" MINIMUM W ARCHITECT 1 5'-8" MIN. MIN. L FULL HEIGHT ACOUSTIC PARTITION OPPOSED BLADE DAMPER 150mm MIN. GUY WIRE SEAL, ALL SIDES PLENUM TRANS. FROM ROUND TO SQUARE CONNECTION. R AIR DUCT FOR SIZES SEE FLOOR PLAN UNVANED ELBOW (TYP. 2) DUCT WITH 1" ACOUSTICAL LINING, SIZE AS NOTED ON CHART UNLESS OTHERWISE NOTED ON PLAN DUCT D 20 GAGE SHEET METAL FLASHING SHEET BY MECHANICAL CONTR. 3" MIN. LAG SCREWS CURBED ROOF OPENING BY GENERAL CONTR. SEE PLANS FOR SIZES ROOF ROOF CEILING CONSULTANT TYPICAL CEILING DIFFUSER SIZING CHART ADJUSTMENT HANDLE KEY NOTES: 1. INSULATED FLEXIBLE DUCT - SHALL BE PRE-STRETCHED BEFORE INSTALLATION LENGTH NOT TO EXCEED 5 FEET. DIAMETER TO BE EQUAL TO DIFFUSER INLET SIZE. 2. SUPPORT FLEX DUCT SUCH THAT R=D/2 MIN. MARK CFM * SIZE (IN) TD-1 UP TO 400 14" OR 12x12 TD-2 401 TO 600 16" OR 18x12 TD-3 601 TO 800 18" OR 24x12 TD-4 801 TO 1000 20" OR 30x12 TD-5 1001 TO 1500 24" OR 30x16 TD-6 1501 TO 2000 28" OR 34x20 OVER 2000 1/2" MIN. CLEAR ALL AROUND DUCT LINING WHERE INDICATED Arup USA Inc 955 Massachusetts Avenue 4th Floor Cambridge, MA 02139 T 617 864 2987 F 617 864 6178 www.arup.com USE MULT TRD'S * UNLESS OTHERWISE NOTED 1 TYPICAL DIFFUSER TAKE-OFF DETAIL 2 TRANSFER DUCT DETAIL 3 GENERATOR FLUE ROOF INSTALLATION DETAIL 4 DUCT THROUGH ROOF DETAIL 100% CONSTRUCTION DOCUMENT SET VB SPRING VIBRATION ISOLATOR- REFER TO SPECIFICATIONS FOR STATIC DEFLECTION REQUIREMENTS (TYP 4) H INTERMEDIATE UNISTRUT IF FAN IS BELOW FINISHED CEILING THREADED ROD 45° THREADED HANGER ROD UP TO STRUCTURE NUTS W/LOCKWASHERS TYP. OF BOTH SIDES FAN SUSPENSION BRACKET 1/8" ANNEALED CLEAR GLASS 15° MAX (TYP) HEATING COIL AIR 6" MIN FLOW C SCREENED INLET PROVIDE WEATHER/STORM COLLAR 10" MIN 6" MIN VB F STAMP FLASHING. SEE ARCHITECTURAL DRAWINGS FOR DETAILS. EXHAUST FAN (INLINE TYPE) DI-ELECTRIC CONNECTION IF REQUIRED CONDENSATE RETURN MAIN D 1/2 D DUCT TRANSITION FT T R = 1/2 D FLEXIBLE CONNECTION BELT-DRIVE MOTOR 1" THK INSULATION ROOF CURB SMOKE DAMPER CLASS 1 LEAKAGE ALTERNATE HANGING LOCATION WITH 2"x 3 4" CHANNEL OR UNISTRUT SUPPORT EXHAUST DUCT 2"x2"x1/4" ANGLE WELDED TO SUPPORT BEAM 4" MOUNTING FLANGE NOTES: 1. PROVIDE ACCESS PANEL IN HARD CEILING LOCATIONS FOR FAN, MOTOR AND BACKDRAFT DAMPER ACCESS. OCI UNIT DAMPER ACTUATOR 2. PROVIDE ADEQUATE SERVICE SPACE AROUND FAN FOR FAN REMOVAL MOTOR, BELT & DRIVE ACCESS. 3. PROVIDE MINIMUM 3 DUCT DIAMETERS OF STRAIGHT DUCT ON INLET AND OUTLET OF FAN. 5 SINGLE STEAM COIL CONNECTION DETAIL 6 INLINE EXHAUST FAN DETAIL DAMPER TRAY 7 ELEVATOR VENT PENTHOUSE BACK DRAFT DAMPER (WHERE SCHEDULED) KEY NOTES: 1. FABRICATE IN ACCORDANCE WITH SMACNA LOW PRESSURE DUCT CONSTRUCTION STANDARDS OF MINIMUM 18 GAGE GALVANIZED STEEL. 2. MOUNT ON MINIMUM 12 INCH HIGH CURB BASE WHERE SIZE EXCEEDS 9" X 9". 3. ANGLE OF OPENING SHALL BE NO GREATER THAN 45° FROM THE HORIZONTAL. 8 DUCT PENETRATION GOOSENECK TERMINATION DETAIL ATTACH ANGLE TO PLENUM WITH SHEET METAL SCREWS AT 10" O.C. 8 7 6 5 4 3 2 1 07/17/15 06/30/15 05/07/15 04/06/15 01/15/15 12/18/14 08/29/14 06/10/14 MARK DATE 100% CONSTRUCT. DOC. SET TIER 1 PHASE 1 PERMIT SET 90% CONSTRUCT. DOC. SET 60% CONSTRUCTION PERMIT SET 100% DESIGN DEVELOPMENT SET 50% DESIGN DEVELOPMENT SET SCHEMATIC DESIGN SET FEASIBILITY STUDY SET DESCRIPTION PROJECT NUMBER: 21332 DRAWN BY: CHECKED BY: - SHEET TITLE MECHANICAL DETAILS SHEET 3 M-803 7/20/2015 3:02:47 PM PI PROVIDE ANGLE SUPPORT BETWEEN STRUCTURAL MEMBERS. SAME AS PER DUCTWORK DETAIL (OVER 60" SIZE) MIN. 24" LPS MAIN UMass Lowell North Quad Infrastructure Renewal (UMBA 13-L2) Lowell, MA SEE M8.03 DETAIL #4 FOR FLUE PIPE ROOF SUPPORT University of Massachusetts Building Authority University of Massachusetts Lowell ARCHITECT GENERATOR FLUE ROOF WALL SUPPORT CONSULTANT Arup USA Inc 955 Massachusetts Avenue 4th Floor Cambridge, MA 02139 T 617 864 2987 F 617 864 6178 www.arup.com EXPANSION BELLOWS WALL GUIDE 100% CONSTRUCTION DOCUMENT SET GENERATOR FLUE WALL SUPPORT FLUE EXHAUST STAMP GENERATOR EXHAUST SILENCER FLEXIBLE CONNECTION GENERATOR STEEL HOUSING D DAIN 8 7 6 5 4 3 2 1 07/17/15 06/30/15 05/07/15 04/06/15 01/15/15 12/18/14 08/29/14 06/10/14 MARK DATE 100% CONSTRUCT. DOC. SET TIER 1 PHASE 1 PERMIT SET 90% CONSTRUCT. DOC. SET 60% CONSTRUCTION PERMIT SET 100% DESIGN DEVELOPMENT SET 50% DESIGN DEVELOPMENT SET SCHEMATIC DESIGN SET FEASIBILITY STUDY SET DESCRIPTION PROJECT NUMBER: 21332 DRAWN BY: CHECKED BY: - SUPPORT CONCRETE PAD FALMOUTH HALL GENERATOR FLUE ELEVATION NTS MECHANNICAL DETAILS SHEET 4 M-804 7/20/2015 3:15:20 PM 1 SHEET TITLE North Quad Infrastructure Renewal UMass Lowell, Lowell, MA UMBA Project No. UMBA 13-L2 ICON architecture, inc. July 17, 2015 (Part of Work of Section 260002 – ELECTRICAL, Trade Bid Required) SECTION 263214 – INSTALLATION OF ENGINE GENERATORS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section. B. UMass Lowell Campus Electrical Standards; request most up to date standards at time of bid. 1.2 SUMMARY A. This Section includes installation of packaged engine-generator sets for [emergency] power supply with the following features: 1. 2. 3. 4. 5. B. 1.3 [Diesel] engine. [Unit-mounted] cooling system. [Unit-mounted] control and monitoring. Load banks. Outdoor enclosure. Related Sections include the following: 1. Section 263213 “Engine Generators” for owner furnished contractor installed generator equipment requirements. 2. Section 263600 "Transfer Switches" for transfer switches including sensors and relays to initiate automatic-starting and -stopping signals for engine-generator sets. DEFINITIONS A. Operational Bandwidth: The total variation from the lowest to highest value of a parameter over the range of conditions indicated, expressed as a percentage of the nominal value of the parameter. B. LP: Liquid petroleum. INSTALLATION OF ENGINE GENERATORS 263214 - 1 North Quad Infrastructure Renewal UMass Lowell, Lowell, MA UMBA Project No. UMBA 13-L2 1.4 ICON architecture, inc. July 17, 2015 CLOSEOUT SUBMITTALS A. Operation and Maintenance Data: For packaged engine generators to include in emergency, operation, and maintenance manuals. In addition to items specified in Section 011000 "Operation and Maintenance Data," include the following: 1. 1.5 List of tools and replacement items recommended to be stored at Project for ready access. Include part and drawing numbers, current unit prices, and source of supply. QUALITY ASSURANCE A. Installer Qualifications: Manufacturer's authorized representative who is trained and approved for installation of units required for this Project. 1. 2. Maintenance Proximity: Not more than [four] hours' normal travel time from Installer's place of business to Project site. Engineering Responsibility: Preparation of data for vibration isolators restraints of engine skid mounts, including Shop Drawings, based on testing and engineering analysis of manufacturer's standard units in assemblies similar to those indicated for this Project. B. Manufacturer Qualifications: A qualified manufacturer. Maintain, within [200 miles (321 km)] of Project site, a service center capable of providing training, parts, and emergency maintenance repairs. C. Source Limitations: Obtain packaged generator sets and auxiliary components through one source from a single manufacturer. D. Electrical Components, Devices, and Accessories: Listed and labeled as defined in NFPA 70, Article 100, by a testing agency acceptable to authorities having jurisdiction, and marked for intended use. E. Comply with ASME B15.1. F. Comply with NFPA 37. G. Comply with NFPA 70. H. Comply with NFPA 110 requirements for Level [1] emergency power supply system. I. Comply with UL 2200. 1.6 PROJECT CONDITIONS A. Interruption of Existing Electrical Service: Do not interrupt electrical service to facilities occupied by Owner or others unless permitted under the following conditions and then only after arranging to provide temporary electrical service according to requirements indicated: INSTALLATION OF ENGINE GENERATORS 263214 - 2 North Quad Infrastructure Renewal UMass Lowell, Lowell, MA UMBA Project No. UMBA 13-L2 1. 2. B. 1.7 ICON architecture, inc. July 17, 2015 Notify [Construction Manager] no fewer than [seven] days in advance of proposed interruption of electrical service. Do not proceed with interruption of electrical service without [Construction Manager's] written permission. Environmental Conditions: Engine-generator system shall withstand the following environmental conditions without mechanical or electrical damage or degradation of performance capability: 1. Altitude: Sea level to [1000 feet (300 m)] COORDINATION A. 1.8 Coordinate size and location of concrete bases for package engine generators. Cast anchor-bolt inserts into bases. Concrete, reinforcement, and formwork requirements are specified with concrete. WARRANTY A. 1.9 Special Warranty: Generator is pre purchased and comes with a 2 year warranty. All work carried out under this section shall be warrantied as per the general conditions of the project. MAINTENANCE SERVICE A. Generator unit comes with 24 months maintenance contract. Engage the maintenance contractor at the end of installation to carry out all required maintenance. PART 2 - PRODUCTS 2.1 Generator shall be owner furnished, contractor installed. Unit shall be 200kW, diesel fueled with level II acoustic weatherproof enclosure. Coordinate all information with the construction manager. PART 3 - EXECUTION 3.1 EXAMINATION A. Formally receive pre purchased generator. Engage the generator manufacturer to perform pre start up checks on the unit prior to accepting for installation. Once accepted, store and handle unit as detailed in part 3 of this specification. B. Examine areas, equipment bases, and conditions, with Installer present, for compliance with requirements for installation and other conditions affecting packaged engine-generator performance. INSTALLATION OF ENGINE GENERATORS 263214 - 3 North Quad Infrastructure Renewal UMass Lowell, Lowell, MA UMBA Project No. UMBA 13-L2 ICON architecture, inc. July 17, 2015 C. Examine roughing-in of piping systems and electrical connections. Verify actual locations of connections before packaged engine-generator installation. D. Proceed with installation only after unsatisfactory conditions have been corrected. 3.2 INSTALLATION A. Comply with packaged engine-generator manufacturers' written installation and alignment instructions and with NFPA 110. B. Install packaged engine generator to provide access, without removing connections or accessories, for periodic maintenance. C. Install packaged engine generator on cast-in-place concrete equipment bases. Comply with requirements for equipment bases and foundations specified in [Section 033000 "Cast-in-Place Concrete."] [Section 033053 "Miscellaneous Cast-in-Place Concrete."] 1. Comply with requirements for vibration isolation devices specified in this section. D. Install Schedule 40, black steel piping with welded joints and connect to engine muffler. Install thimble at wall. Piping shall be same diameter as muffler outlet. Flexible connectors and steel piping materials and installation requirements are specified in Section 232116 Hydronic Piping Specialties." 1. E. 3.3 Install condensate drain piping to muffler drain outlet full size of drain connection with a shutoff valve, stainless-steel flexible connector, and Schedule 40, black steel pipe with welded joints. Flexible connectors and piping materials and installation requirements are specified in Section 232116 Hydronic Piping Specialties." Electrical Wiring: Install electrical devices furnished by equipment manufacturers but not specified to be factory mounted. CONNECTIONS A. Piping installation requirements are specified in other Sections. Drawings indicate general arrangement of piping and specialties. B. Connect fuel, cooling-system, and exhaust-system piping adjacent to packaged engine generator to allow service and maintenance. Coordinate extended generator flue with flue installer. Generator flue shall discharge 10’ above roof level. C. Connect engine exhaust pipe to engine with flexible connector. D. Connect fuel piping to engines with a gate valve and union and flexible connector. E. Ground equipment according to Section 260526 "Grounding and Bonding for Electrical Systems." Generator shall be a separately derived power source. INSTALLATION OF ENGINE GENERATORS 263214 - 4 North Quad Infrastructure Renewal UMass Lowell, Lowell, MA UMBA Project No. UMBA 13-L2 F. 3.4 ICON architecture, inc. July 17, 2015 Connect wiring according to Section 260519 "Low-Voltage Electrical Power Conductors and Cables." IDENTIFICATION A. 3.5 Identify system components according to Section 230553 "Identification for HVAC Piping and Equipment" and Section 260553 "Identification for Electrical Systems." FIELD QUALITY CONTROL A. Manufacturer's Field Service: Engage a factory-authorized service representative to inspect, test, and adjust components, assemblies, and equipment installations, including connections. Report results in writing. B. Perform tests and inspections and prepare test reports. 1. C. Manufacturer's Field Service: Engage a factory-authorized service representative to inspect components, assemblies, and equipment installations, including connections, and to assist in testing. Tests and Inspections: 1. NFPA 110 Acceptance Tests: Perform tests required by NFPA 110 that are additional to those specified here including, but not limited to, single-step full-load pickup test. 2. Battery Tests: Equalize charging of battery cells according to manufacturer's written instructions. Record individual cell voltages. a. b. c. d. 3. 4. 5. 6. D. Measure charging voltage and voltages between available battery terminals for full-charging and float-charging conditions. Check electrolyte level and specific gravity under both conditions. Test for contact integrity of all connectors. Perform an integrity load test and a capacity load test for the battery. Verify acceptance of charge for each element of the battery after discharge. Verify that measurements are within manufacturer's specifications. Battery-Charger Tests: Verify specified rates of charge for both equalizing and floatcharging conditions. System Integrity Tests: Methodically verify proper installation, connection, and integrity of each element of engine-generator system before and during system operation. Check for air, exhaust, and fluid leaks. Exhaust-System Back-Pressure Test: Use a manometer with a scale exceeding 40-inch wg (120 kPa). Connect to exhaust line close to engine exhaust manifold. Verify that back pressure at full-rated load is within manufacturer's written allowable limits for the engine. Exhaust Emissions Test: Comply with applicable government test criteria. Coordinate tests with tests for transfer switches and run them concurrently. INSTALLATION OF ENGINE GENERATORS 263214 - 5 North Quad Infrastructure Renewal UMass Lowell, Lowell, MA UMBA Project No. UMBA 13-L2 ICON architecture, inc. July 17, 2015 E. Test instruments shall have been calibrated within the last 12 months, traceable to standards of NIST, and adequate for making positive observation of test results. Make calibration records available for examination on request. F. Leak Test: After installation, charge system and test for leaks. Repair leaks and retest until no leaks exist. G. Operational Test: After electrical circuitry has been energized, start units to confirm proper motor rotation and unit operation. H. Test and adjust controls and safeties. equipment. I. Remove and replace malfunctioning units and [retest] as specified above. J. Retest: Correct deficiencies identified by tests and observations and retest until specified requirements are met. K. Report results of tests and inspections in writing. Record adjustable relay settings and measured insulation resistances, time delays, and other values and observations. Attach a label or tag to each tested component indicating satisfactory completion of tests. L. Infrared Scanning: After Substantial Completion, but not more than 60 days after Final Acceptance, perform an infrared scan of each power wiring termination and each bus connection. Remove all access panels so terminations and connections are accessible to portable scanner. 1. 2. 3. M. 3.6 Replace damaged and malfunctioning controls and Follow-up Infrared Scanning: Perform an additional follow-up infrared scan 11 months after date of Substantial Completion. Instrument: Use an infrared scanning device designed to measure temperature or to detect significant deviations from normal values. Provide calibration record for device. Record of Infrared Scanning: Prepare a certified report that identifies terminations and connections checked and that describes scanning results. Include notation of deficiencies detected, remedial action taken, and observations after remedial action. Output circuit breaker settings: Life safety power systems are to selectively coordinate to 0.01s. Select and set generator main circuit breaker based on outcome from “26057 OVERCURRENT PROTECTIVE DEVICE COORDINATION STUDY”. Engage vendor for information on circuit breaker to include in overcurrent protective study, and then follow up with vendor to come to site and reset any circuit breaker settings, or generator controller settings requiring adjustment prior to completion. DEMONSTRATION A. Engage a factory-authorized service representative to train Owner's maintenance personnel to adjust, operate, and maintain packaged engine generators. Refer to Section 017900 "Demonstration and Training." INSTALLATION OF ENGINE GENERATORS 263214 - 6 North Quad Infrastructure Renewal UMass Lowell, Lowell, MA UMBA Project No. UMBA 13-L2 3.7 ICON architecture, inc. July 17, 2015 FUEL A. Provide all fuel required for testing. B. Hand over generator system to owner after all acceptance testing is complete with all generator fuel tanks fully filled. END OF SECTION 263213 INSTALLATION OF ENGINE GENERATORS 263214 - 7 North Quad Infrastructure Renewal UMass Lowell, Lowell, MA UMBA Project No. UMBA 13-L2 ICON architecture, inc. July 17, 2015 SECTION 263600 - TRANSFER SWITCHES (Part of Work of Section 260002 – ELECTRICAL, Trade Bid Required) PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section. B. UMass Lowell Campus Electrical Standards; request most up to date standards at time of bid. 1.2 SUMMARY A. Section includes transfer switches rated 600 V and less, including the following: 1. 2. 1.3 Automatic transfer switches. Remote annunciation systems. ACTION SUBMITTALS A. Product Data: For each type of product indicated. Include rated capacities, weights, operating characteristics, furnished specialties, and accessories. B. Shop Drawings: Dimensioned plans, elevations, sections, and details showing minimum clearances, conductor entry provisions, gutter space, installed features and devices, and material lists for each switch specified. 1.4 INFORMATIONAL SUBMITTALS A. 1.5 Qualification Data: For [manufacturer]. CLOSEOUT SUBMITTALS A. Operation and Maintenance Data: For each type of product to include in emergency, operation, and maintenance manuals. In addition to items specified in Section 017823 "Operation and Maintenance Data," include the following: 1. 2. Features and operating sequences, both automatic and manual. List of all factory settings of relays; provide relay-setting and calibration instructions, including software, where applicable. TRANSFER SWITCHES 263600 - 1 North Quad Infrastructure Renewal UMass Lowell, Lowell, MA UMBA Project No. UMBA 13-L2 1.6 ICON architecture, inc. July 17, 2015 QUALITY ASSURANCE A. Manufacturer Qualifications: Maintain a service center capable of providing training, parts, and emergency maintenance repairs within a response period of less than eight hours from time of notification. B. Testing Agency Qualifications: An independent agency, with the experience and capability to conduct the testing indicated, that is a member company of the InterNational Electrical Testing Association or is a nationally recognized testing laboratory (NRTL) as defined by OSHA in 29 CFR 1910.7, and that is acceptable to authorities having jurisdiction. 1. Testing Agency's Field Supervisor: Person currently certified by the InterNational Electrical Testing Association or the National Institute for Certification in Engineering Technologies to supervise on-site testing specified in Part 3. C. Source Limitations: Obtain [automatic transfer switches] and [remote annunciators] through one source from a single manufacturer. D. Electrical Components, Devices, and Accessories: Listed and labeled as defined in NFPA 70, by a qualified testing agency, and marked for intended location and application. E. Comply with NEMA ICS 1. F. Comply with NFPA 70. G. Comply with NFPA 110. H. Comply with UL 1008 unless requirements of these Specifications are stricter. 1.7 FIELD CONDITIONS A. Interruption of Existing Electrical Service: Do not interrupt electrical service to facilities occupied by Owner or others unless permitted under the following conditions and then only after arranging to provide temporary electrical service: 1. 2. 1.8 Notify [Construction Manager] no fewer than [seven] days in advance of proposed interruption of electrical service. Do not proceed with interruption of electrical service without [Construction Manager's] written permission. COORDINATION A. Coordinate size and location of concrete bases. Cast anchor-bolt inserts into bases. Concrete, reinforcement, and formwork requirements are specified in Section 033000 "Cast-in-Place Concrete." TRANSFER SWITCHES 263600 - 2 North Quad Infrastructure Renewal UMass Lowell, Lowell, MA UMBA Project No. UMBA 13-L2 ICON architecture, inc. July 17, 2015 PART 2 - PRODUCTS 2.1 MANUFACTURED UNITS A. Contactor Transfer Switches: 1. Manufacturers: Subject to compliance with requirements, [provide products by the following] a. b. c. d. e. f. g. h. i. 2.2 AC Data Systems, Inc. Caterpillar; Engine Div. Emerson; ASCO Power Technologies, LP. Generac Power Systems, Inc. GE Zenith Controls. Kohler Power Systems; Generator Division. Onan/Cummins Power Generation; Industrial Business Group. Russelectric, Inc. Spectrum Detroit Diesel. GENERAL TRANSFER-SWITCH PRODUCT REQUIREMENTS A. Indicated Current Ratings: Apply as defined in UL 1008 for continuous loading and total system transfer, including tungsten filament lamp loads not exceeding 30 percent of switch ampere rating, unless otherwise indicated. B. Tested Fault-Current Closing and Withstand Ratings: Adequate for duty imposed by protective devices at installation locations in Project under the fault conditions indicated, based on testing according to UL 1008. C. Solid-State Controls: Repetitive accuracy of all settings shall be plus or minus 2 percent or better over an operating temperature range of minus 20 to plus 70 deg C. D. Resistance to Damage by Voltage Transients: Components shall meet or exceed voltage-surge withstand capability requirements when tested according to IEEE C62.41. Components shall meet or exceed voltage-impulse withstand test of NEMA ICS 1. E. Electrical Operation: Accomplish by a nonfused, momentarily energized solenoid or electricmotor-operated mechanism, mechanically and electrically interlocked in both directions. F. Switch Characteristics: Designed for continuous-duty repetitive transfer of full-rated current between active power sources. 1. Switch Action: Double throw; mechanically held in both directions. 2. Contacts: Silver composition or silver alloy for load-current switching. Conventional automatic transfer-switch units, rated 225 A and higher, shall have separate arcing contacts. G. Neutral Switching. Where four-pole switches are indicated, provide [neutral pole switched simultaneously with phase poles]. TRANSFER SWITCHES 263600 - 3 North Quad Infrastructure Renewal UMass Lowell, Lowell, MA UMBA Project No. UMBA 13-L2 ICON architecture, inc. July 17, 2015 H. Annunciation, Control, and Programming Interface Components: Devices at transfer switches for communicating with remote programming devices, annunciators, or annunciator and control panels shall have communication capability matched with remote device. I. Factory Wiring: Train and bundle factory wiring and label, consistent with Shop Drawings, either by color-code or by numbered or lettered wire and cable tape markers at terminations. Color-coding and wire and cable tape markers are specified in Section 260553 "Identification for Electrical Systems." 1. 2. 3. J. 2.3 Designated Terminals: Pressure type, suitable for types and sizes of field wiring indicated. Power-Terminal Arrangement and Field-Wiring Space: Suitable for top, side, or bottom entrance of feeder conductors as indicated. Control Wiring: Equipped with lugs suitable for connection to terminal strips. Enclosures: General-purpose NEMA 250, Type [1] complying with NEMA ICS 6 and UL 508, unless otherwise indicated. AUTOMATIC TRANSFER SWITCHES A. Comply with Level 1 equipment according to NFPA 110. B. Switching Arrangement: Double-throw type, incapable of pauses or intermediate position stops during normal functioning, unless otherwise indicated. C. Manual Switch Operation: Under load, with door closed and with either or both sources energized. Transfer time is same as for electrical operation. Control circuit automatically disconnects from electrical operator during manual operation. D. Manual Switch Operation: Unloaded. Control circuit automatically disconnects from electrical operator during manual operation. E. Signal-Before-Transfer Contacts: A set of normally open/normally closed dry contacts operates in advance of retransfer to normal source. Interval is adjustable from 1 to 30 seconds. F. Digital Communication Interface: Matched to capability of remote annunciator or annunciator and control panel. G. Automatic Transfer-Switch Features: 1. 2. Undervoltage Sensing for Each Phase of Normal Source: Sense low phase-to-ground voltage on each phase. Pickup voltage shall be adjustable from 85 to 100 percent of nominal, and dropout voltage is adjustable from 75 to 98 percent of pickup value. Factory set for pickup at 90 percent and dropout at 85 percent. Adjustable Time Delay: For override of normal-source voltage sensing to delay transfer and engine start signals. Adjustable from zero to six seconds, and factory set for one second. TRANSFER SWITCHES 263600 - 4 North Quad Infrastructure Renewal UMass Lowell, Lowell, MA UMBA Project No. UMBA 13-L2 3. 4. 5. 6. 7. Voltage/Frequency Lockout Relay: Prevent premature transfer to generator. Pickup voltage shall be adjustable from 85 to 100 percent of nominal. Factory set for pickup at 90 percent. Pickup frequency shall be adjustable from 90 to 100 percent of nominal. Factory set for pickup at 95 percent. Time Delay for Retransfer to Normal Source: Adjustable from 0 to 30 minutes, and factory set for 10 minutes to automatically defeat delay on loss of voltage or sustained undervoltage of emergency source, provided normal supply has been restored. Test Switch: Simulate normal-source failure. Switch-Position Pilot Lights: Indicate source to which load is connected. Source-Available Indicating Lights: Supervise sources via transfer-switch normal- and emergency-source sensing circuits. a. b. 8. 9. 10. 11. 12. Normal Power Supervision: Green light with nameplate engraved "Normal Source Available." Emergency Power Supervision: Red light with nameplate engraved "Emergency Source Available." Unassigned Auxiliary Contacts: Two normally open, single-pole, double-throw contacts for each switch position, rated 10 A at 240-V ac. Transfer Override Switch: Overrides automatic retransfer control so automatic transfer switch will remain connected to emergency power source regardless of condition of normal source. Pilot light indicates override status. Engine Starting Contacts: One isolated and normally closed, and one isolated and normally open; rated 10 A at 32-V dc minimum. Engine Shutdown Contacts: Time delay adjustable from zero to five minutes, and factory set for five minutes. Contacts shall initiate shutdown at remote engine-generator controls after retransfer of load to normal source. Engine-Generator Exerciser: Solid-state, programmable-time switch starts engine generator and transfers load to it from normal source for a preset time, then retransfers and shuts down engine after a preset cool-down period. Initiates exercise cycle at preset intervals adjustable from 7 to 30 days. Running periods are adjustable from 10 to 30 minutes. Factory settings are for 7-day exercise cycle, 20-minute running period, and 5minute cool-down period. Exerciser features include the following: a. b. c. 2.4 ICON architecture, inc. July 17, 2015 Exerciser Transfer Selector Switch: Permits selection of exercise with and without load transfer. Push-button programming control with digital display of settings. Integral battery operation of time switch when normal control power is not available. REMOTE ANNUNCIATOR SYSTEM A. Functional Description: Remote annunciator panel shall annunciate conditions for indicated transfer switches. Annunciation shall include the following: 1. 2. 3. Sources available, as defined by actual pickup and dropout settings of transfer-switch controls. Switch position. Switch in test mode. TRANSFER SWITCHES 263600 - 5 North Quad Infrastructure Renewal UMass Lowell, Lowell, MA UMBA Project No. UMBA 13-L2 4. B. Failure of communication link. Annunciator Panel: LED-lamp type with audible signal and silencing switch. 1. 2. 3. 4. 2.5 ICON architecture, inc. July 17, 2015 Indicating Lights: Grouped for each transfer switch monitored. Label each group, indicating transfer switch it monitors, location of switch, and identity of load it serves. Mounting: Flush, modular, steel cabinet, unless otherwise indicated. Lamp Test: Push-to-test or lamp-test switch on front panel. REMOTE ANNUNCIATOR AND CONTROL SYSTEM A. Functional Description: Include the following functions for indicated transfer switches: 1. 2. 3. 4. 5. 6. 7. B. 2.6 Indication of sources available, as defined by actual pickup and dropout settings of transfer-switch controls. Indication of switch position. Indication of switch in test mode. Indication of failure of digital communication link. Key-switch or user-code access to control functions of panel. Control of switch-test initiation. Control of time-delay bypass for transfer to normal source. Malfunction of annunciator, annunciation and control panel, or communication link shall not affect functions of automatic transfer switch. In the event of failure of communication link, automatic transfer switch automatically reverts to stand-alone, self-contained operation. Automatic transfer-switch sensing, controlling, or operating function shall not depend on remote panel for proper operation. SOURCE QUALITY CONTROL A. Factory test and inspect components, assembled switches, and associated equipment. Ensure proper operation. Check transfer time and voltage, frequency, and time-delay settings for compliance with specified requirements. Perform dielectric strength test complying with NEMA ICS 1. PART 3 - EXECUTION 3.1 INSTALLATION A. Annunciator and Control Panel Mounting: Flush in wall, unless otherwise indicated. B. Identify components according to Section 260553 "Identification for Electrical Systems." C. Set field-adjustable intervals and delays, relays, and engine exerciser clock. TRANSFER SWITCHES 263600 - 6 North Quad Infrastructure Renewal UMass Lowell, Lowell, MA UMBA Project No. UMBA 13-L2 3.2 ICON architecture, inc. July 17, 2015 CONNECTIONS A. Wiring to Remote Components: Match type and number of cables and conductors to control and communication requirements of transfer switches as recommended by manufacturer. Increase raceway sizes at no additional cost to Owner if necessary to accommodate required wiring. B. Ground equipment according to Section 260526 "Grounding and Bonding for Electrical Systems." C. Connect wiring according to Section 260519 "Low-Voltage Electrical Power Conductors and Cables." 3.3 FIELD QUALITY CONTROL A. Perform the following tests and inspections[ with the assistance of a factory-authorized service representative]: 1. 2. 3. After installing equipment and after electrical circuitry has been energized, test for compliance with requirements. Perform each visual and mechanical inspection and electrical test stated in NETA Acceptance Testing Specification. Certify compliance with test parameters. Measure insulation resistance phase-to-phase and phase-to-ground with insulationresistance tester. Include external annunciation and control circuits. Use test voltages and procedure recommended by manufacturer. Comply with manufacturer's specified minimum resistance. a. b. c. d. 4. Check for electrical continuity of circuits and for short circuits. Inspect for physical damage, proper installation and connection, and integrity of barriers, covers, and safety features. Verify that manual transfer warnings are properly placed. Perform manual transfer operation. After energizing circuits, demonstrate interlocking sequence and operational function for each switch at least three times. a. b. c. d. e. f. Simulate power failures of normal source to automatic transfer switches and of emergency source with normal source available. Simulate loss of phase-to-ground voltage for each phase of normal source. Verify time-delay settings. Verify pickup and dropout voltages by data readout or inspection of control settings. Perform contact-resistance test across main contacts and correct values exceeding 500 microhms and values for 1 pole deviating by more than 50 percent from other poles. Verify proper sequence and correct timing of automatic engine starting, transfer time delay, retransfer time delay on restoration of normal power, and engine cooldown and shutdown. TRANSFER SWITCHES 263600 - 7 North Quad Infrastructure Renewal UMass Lowell, Lowell, MA UMBA Project No. UMBA 13-L2 5. ICON architecture, inc. July 17, 2015 Ground-Fault Tests: Coordinate with testing of ground-fault protective devices for power delivery from both sources. a. Verify grounding connections and locations and ratings of sensors. B. Coordinate tests with tests of generator and run them concurrently. C. Report results of tests and inspections in writing. Record adjustable relay settings and measured insulation and contact resistances and time delays. Attach a label or tag to each tested component indicating satisfactory completion of tests. D. Remove and replace malfunctioning units and retest as specified above. E. Prepare test and inspection reports. F. Infrared Scanning: After Substantial Completion, but not more than 60 days after Final Acceptance, perform an infrared scan of each switch. Remove all access panels so joints and connections are accessible to portable scanner. 1. 2. 3. 3.4 Follow-up Infrared Scanning: Perform an additional follow-up infrared scan of each switch 11 months after date of Substantial Completion. Instrument: Use an infrared scanning device designed to measure temperature or to detect significant deviations from normal values. Provide calibration record for device. Record of Infrared Scanning: Prepare a certified report that identifies switches checked and that describes scanning results. Include notation of deficiencies detected, remedial action taken, and observations after remedial action. DEMONSTRATION A. [Engage a factory-authorized service representative to train] Owner's maintenance personnel to adjust, operate, and maintain transfer switches and related equipment as specified below. Refer to Section 017900 "Demonstration and Training." B. Coordinate this training with that for generator equipment. END OF SECTION 263600 TRANSFER SWITCHES 263600 - 8