Roof Flashing Details Index FD01 Interior Roof Drain Detail 2 FD02 Interior Drain with Gravel Stop Detail 3 FD03 Scupper Roof Drain Detail 4 FD04 Gutter Roof Drain Detail 5 FD05 Roof-Top Equipment Curb Detail 6 FD06 Roof-Top Metal Air Shaft Curb Detail 7 FD07 Roof-Top Wood Air Shaft Curb Detail 8 FD08 Roof Skylight Detail 9 FD09 Roof-Top Chimney Pipe Detail 10 FD10 Roof-Top Plumbing Vent Pipe Detail 11 FD11 Sheet Metal Pipe Enclosure Detail 12 FD12 Roof-Top Pipe Roller Support Detail 13 FD13 Structural Roof Deck Penetration Detail 14 FD14 Metal Covered Expansion Joint Detail 15 FD15 Premanufactured Expansion Joint Detail 16 FD16 Roof Area Divider Detail 17 FD17 Raised Metal Roof Edge Detail 18 FD18 Gravel Stop Metal Roof Edge Detail 19 FD19 Post Supported Roof Deck Flashing Detail 20 FD20 Wall Supported Roof Deck Flashing Detail 21 FD21 Concrete Wall Counterflashing Detail 22 FD22 Metal Wall Cap Flashing Detail 23 Fields Roof Systems Manual • (253) or (800) 627-4098 • www.fieldscorp.com FD01 Interior Roof Drain Detail Coverboard insulation Thermal insulation A 30” sq min, 1.5 lb to 4 lb lead, or 16 oz copper flashing adhered onto finished roof with M300 RubrMastic. Prime top surface of metal flashing with M400 RubrPrime and install M60 RubrPoly flashing sheets Drain strainer M60 RubrPoly flashing sheets Roof deck Tapered insulation Clamping ring Deck clamp Drain bowl Fields roof membrane sheets, metal flashing, & M60 RubrPoly flashing sheets all under clamping ring Fields M300 RubrMastic Fields roof membrane sheets Side View A 30” sq min, 1.5 lb to 4 lb lead, or 16 oz copper flashing adhered onto finished roof with M300 RubrMastic. Prime top surface of metal flashing with M400 RubrPrime and install M60 RubrPoly flashing sheets Clamping ring Drain strainer M60 RubrPoly flashing sheets Fields roof membrane sheets Tapered insulation Fields roof membrane sheets, metal flashing, & M60 RubrPoly flashing sheets all under clamping ring Notes 1. Metal deck sump pans are prohibited. 2. Type 1 dead level asphalt is prohibited in the drain sump area. Roof deck Drain bowl Thermal insulation Deck clamp Coverboard insulation Fields Roof Systems Manual • (253) or (800) 627-4098 • www.fieldscorp.com FD02 Interior Drain with Gravel Stop Detail A 30” sq min, 1 1/2 lb to 4 lb lead, or 16 oz copper flashing adhered onto finished roof with M300 RubrMastic. Prime top surface of metal flashing with M400 RubrPrime and install M60 RubrPoly flashing sheets A 1” x 4” sheet metal gravel stop, 36” sq min adhered in place with M300 RubrMastic M60 RubrPoly flashing sheets Drain strainer 4” M60 RubrPoly flashing sheets Thermal insulation Coverboard insulation Roof deck Tapered insulation Clamping ring Deck clamp Drain bowl Fields roof membrane sheets, metal flashing, & M60 RubrPoly flashing sheets all under clamping ring M300 RubrMastic Side View Fields roof membrane sheets A 30” sq min, 1 1/2 lb to 4 lb lead, or 16 oz copper flashing adhered onto finished roof with M300 RubrMastic. Prime top surface of metal flashing with M400 RubrPrime and install M60 RubrPoly flashing sheets Clamping ring Drain strainer A 1” x 4” sheet metal gravel stop, 36” sq min adhered in place with M300 RubrMastic M60 RubrPoly flashing sheets Fields roof membrane sheets M60 RubrPoly flashing sheets Tapered insulation Notes Fields roof membrane sheets, metal flashing, & M60 RubrPoly flashing sheets all under clamping ring 1. Metal deck sump pans are prohibited. 2. Type 1 dead level asphalt is prohibited in the drain sump area. Roof deck Drain bowl Thermal insulation Deck clamp Coverboard insulation Fields Roof Systems Manual • (253) or (800) 627-4098 • www.fieldscorp.com FD03 Scupper Roof Drain Detail High domed, capped, & gasketed fasteners 18” oc, depending upon wind zone and local conditions Bead of sealent Sheet metal scupper See “Raised Metal Roof Edge Detail FD17” for sheet metal fascia counterflashing A .75” x 3” min L shaped gravel guard secured to the scupper flange & notched to permit drainage 4” min 4” min 2” min Sheet metal conductor head Slope to the drain M60 RubrPoly flashing sheets Scupper fastened to blocking with fasteners 3” oc & staggered. Flange adhered into M300 RubrMastic & primed with M400 RubrPrime before installing M60 RubrPoly flashing sheets Fields roof membrane sheets M60 RubrPoly envelope sheet Coverboard insulation Treated wood nailers Thermal insulation M60 RubrPoly sheet extended below blocking Roof deck Side View Sheet metal scupper Notes 1. This detail shall be installed only where the deck is supported by the outside wall. A .75” x 3” min “L” shaped gravel guard secured to the scupper flange & notched to permit drainage Sealant See “Raised Metal Edge Detail FD17” for sheet metal fascia counterflashing Scupper fastened to blocking with fasteners 3” oc & staggered. Flange adhered into M300 RubrMastic & primed with M400 RubrPrime before installing M60 RubrPoly flashing sheets M60 RubrPoly flashing sheets 2. This detail may be adapted to roof edges as shown in Interior Roof Drain Detail FD01. Fields roof membrane sheets 3. Roof surfaces shall be sloped for positive drainage. Coverboard insulation sloped to the drain 4. Attach wood nailer to wall with suitable fasteners. Thermal insulation 5. Wood blocking shall be slotted for venting wet filled decks. 6. Scupper opening through roof edge shall be 2’ or less. Roof deck M60 RubrPoly envelope sheet Sheet metal conductor head. M60 RubrPoly sheet extended below blocking Fields Roof Systems Manual • (253) or (800) 627-4098 • www.fieldscorp.com FD04 Gutter Roof Drain Detail Sheet metal edge flashing with gravel stop lip. Flange primed with M400 RubrPrime before installing M60 RubrPoly flashing sheets Fields roof membrane sheets M60 RubrPoly flashing sheets M60 RubrPoly envelope sheet Fasteners 3” oc & staggered Gutter spacers alternately spaced from brackets M60 RubrPoly flexible sheet closure into gutter Roof deck Continuous cleat Wood nailers Gutter brackets supported 12” to 36” oc depending upon conditions Sheet metal gutter Turn down Continuous sheet metal closure fastened 18” oc Flange adhered into M300 RubrMastic M60 RubrPoly sheet extended to overlay metal closure Side View M60 RubrPoly flashing sheets Notes 1. In climates where the winter temperature remains below freezing for extended periods of time, install Raised Metal Roof Edge Detail FD17 and interior drains, or through curb scuppers to drain the roof. Sheet metal edge flashing with gravel stop lip. Flange primed with M400 RubrPrime before installing M60 RubrPoly flashing sheets M60 RubrPoly flexible sheet closure into gutter Continuous cleat Fasteners 3” oc staggered Gutter spacers alternately spaced from brackets Fields roof membrane sheets M60 RubrPoly envelope sheet Turn down 2. Gutter brackets are required to be at least one gauge heavier than gutter stock. Sheet metal gutter 3. Attach wood nailer to wall or deck with suitable fasteners. 4. Gutter expansion joints shall be installed at appropriate intervals commensurate with the type of metal. Roof deck Wood nailers Gutter brackets supported 12” to 36” oc depending upon conditions Continuous sheet metal closure fastened 18” oc M60 RubrPoly sheet extended to overlay metal closure Fields Roof Systems Manual • (253) or (800) 627-4098 • www.fieldscorp.com FD05 Roof-Top Equipment Curb Detail Sheet metal cover with receiver for counterflashing Install bolts into sealant 10” nominal flashing height Neoprene pad Removable sheet metal counterflashing High domed, capped, & gasketed fasteners 18” oc, depending upon wind zone and local conditions Fasteners 8” oc Fields roof membrane sheets extended 2” min above top of cant Wood cant fastened to wood nailers M60 RubrPoly flashing sheets extended to a min height of 8” Wood curb Fields roof membrane sheets Wood nailers Coverboard insulation Thermal insulation Roof deck Side View Sheet metal cover with receiver for counterflashing Install bolts into sealant Noeprene pad Notes High domed, capped, & gasketed fasteners 18” oc, depending upon wind zone and local conditions Removable sheet metal counterflashing 1. This detail allows for roof maintenance around supported equipment. The continuous support design shall be installed in light weight structural systems so as to distribute the equipment weight across two or more structural support members. A min of 2’ of horizontal clearance shall be provided for removal and replacement of roofing and flashing between parallel supports. A min of 3’ of vertical clearance from roof surface to bottom of supported equipment shall be provided. 2. Attach wood nailer to deck with suitable fasteners. 10” nominal flashing height Fasteners 8” oc Fields roof membrane sheets extended 2” min above top of cant M60 RubrPoly flashing sheets extended to a min height of 8” Wood curb Fields roof membrane sheets Wood nailers Coverboard insulation Wood cant fastened to wood nailers Thermal insulation Fields Roof Systems Manual • (253) or (800) 627-4098 • www.fieldscorp.com Roof deck FD06 Roof-Top Metal Air Shaft Curb Detail Sheet metal flashing receiver Sealing material Min of 2 high domed, capped, & gasketed fasteners 18” oc per side, depending upon wind zone and local conditions 10” nominal flashing height Equipment mounting curb Wood nailer Removable sheet metal counterflashing Fasteners 8” oc Fields roof membrane sheets extended 2” min above top of cant M60 RubrPoly flashing sheets extended to a min height of 8” Alternate curb bearing location for heavy weight loading conditions Fields roof membrane sheets Coverboard insulation Equipment Thermal insulation Base of unit shall extend .5” min beyond top of curb Roof deck Sealing material shall be continous on top of the curb Sheet metal flashing receiver Install a min of 2 high domed, capped, & gasketed fasteners 18” oc per side, depending upon wind zone and local conditions 1” min below top of curb Flashing receiver Fasteners Wood nailer Side View Equipment mounting curb Sealing material Removable sheet metal counterflashing Wood nailer Fasteners 8” oc M60 RubrPoly flashing sheets Fields roof membrane sheets extended a min of 2” above top of cant: Not shown for clarity Equipment mounting curb Insulation 10” nominal flashing height Counterflashing M60 RubrPoly flashing sheets extended to a min height of 8” Notes 1. The top wood nailer of the curb & the seal strip shall be supplied by the curb manufacturer. 2. Attach the treated wood nailer to deck with suitable fasteners. Fields roof membrane sheets Coverboard insulation 3. Mechanical units shall be installed after the roof membrane and flashings have been installed. Alternate curb bearing location for heavy weight loading conditions Fields Roof Systems Manual • (253) or (800) 627-4098 • www.fieldscorp.com Thermal insulation Roof deck FD07 Roof-Top Wood Air Shaft Curb Detail Sealing material 10” nominal flashing height Wood curb Sheet metal flashing receiver Min of 2 high domed, capped, & gasketed fasteners 18” oc per side, depending upon wind zone and local conditions Removable sheet metal counterflashing Wood nailers Fasteners 8” oc Wood cant to brace curb Fields roof membrane sheets extended 2” min above top of cant M60 RubrPoly flashing sheets extended to a min height of 8” Fields roof membrane sheets Coverboard insulation Equipment Thermal insulation Base of unit shall extend .5” min beyond top of curb Roof deck Side View Sealing material shall be continous on top of curb Sealing material 1” min below top of curb Min of 2 high domed, capped, & gasketed fasteners 18” oc per side, depending upon wind zone and local conditions Sheet metal flashing receiver Flashing receiver Fasteners Wood nailer Removable sheet metal counterflashing Counterflashing Fasteners 8” oc 10” nominal flashing height M60 RubrPoly flashing sheets Fields roof membrane sheets extended a min of 2” above top of cant: Not shown for clarity M60 RubrPoly flashing sheets extended to a min height of 8” Notes 1. Attach wood nailer to the deck with suitable fasteners. 2. The equipment shall be set after the roof membrane and flashings have been installed. Wood cant to brace curb Wood nailers Fields Roof Systems Manual • (253) or (800) 627-4098 • www.fieldscorp.com Fields roof membrane sheets Coverboard insulation Thermal insulation Roof deck FD08 Roof Skylight Detail Double dome skylight installed by others Skylight frame with weep holes Min of 2 high domed, capped, & gasketed fasteners 18” oc per side, depending upon wind zone and local conditions 10” nominal flashing height Removable sheet metal counterflashing Fasteners 8” oc Fields roof membrane sheets extended 2” min above top of cant M60 RubrPoly flashing sheets to a min height of 8” Fields roof membrane sheets Coverboard insulation Thermal insulation Wood nailers and curb Roof deck Wood cant to brace curb Side View Double dome skylight installed by others Skylight frame with weep holes Min of 2 high domed, capped, & gasketed fasteners 18” oc per side, depending upon wind zone and local condition Removable sheet metal counterflashing 10” nominal flashing height Fasteners 8” oc Fields roof membrane sheets extended a min of 2” above top of cant M60 RubrPoly flashing sheets extended to a min height of 8” Fields roof membrane sheets Coverboard insulation Thermal insulation Note Roof deck 1. Attach treated wood nailer to deck with suitable fasteners. Wood cant to brace curb Wood nailers and curb Fields Roof Systems Manual • (253) or (800) 627-4098 • www.fieldscorp.com FD09 Roof-Top Chimney Pipe Detail Temperature appropriate elastomeric sealer Drawband or weld umbrella to stack Insulate void for cold stack 10” nominal flashing height Min of 2 high domed, capped, & gasketed fasteners 18” oc per side, depending upon wind zone and local condition Removable sheet metal counterflashing Fasteners 8” oc Fields roof membrane sheets extended 2” min above top of cant Metal or gypsum liner M60 RubrPoly flashing sheets extended to a min height of 8” Varies Fields roof membrane sheets Wood nailers and curb Coverboard insulation Wood cant to brace curb Thermal insulation Roof deck Side View Temperature appropriate elastomeric sealer Drawband or welded umbrella to stack Metal or gypsum liner is required Insulate void for cold stack Min of 2 high domed, capped, & gasketed fasteners 18” oc per side, depending upon wind zone and local conditions Removable sheet metal counterflashing Notes 1. This detail allows the opening to be completed before the stack is placed. 10” nominal flashing height Fasteners 8” oc Fields roof membrane sheets extended a min of 2” above top of cant M60 RubrPoly flashing sheets extended to a min height of 8” 2. The clearance necessary between the gypsum or metal liner and the stack, and the need for insulation, will depend on the temperature of the material emited through the stack. Fields roof membrane sheets 3. Attach treated nailer to the deck with suitable fasteners. Wood nailers & curb Coverboard insulation Wood cant to brace curb Thermal insulation Fields Roof Systems Manual • (253) or (800) 627-4098 • www.fieldscorp.com FD10 Roof-Top Plumbing Vent Pipe Detail Form top of flashing 1” down into pipe Soft metal pipe flashing Plumbing vent stack Apply M300 RubrMastic at juncture of pipe penetration through roof membrane 6” min flange 4” min 4” min M60 RubrPoly flashing sheets Fields roof membrane sheets Coverboard insulation Thermal insulation Roof deck Adhere flange with M300 RubrMastic. Prime top of flange with M400 RubrPrime before flashing with M60 RubrPoly Side View Form top of flashing 1” down Plumbing vent stack Soft metal pipe flashing Apply M300 RubrMastic at juncture of pipe penetration through roof membrane Adhere flange with M300 RubrMastic. Prime top of flange with M400 RubrPrime before flashing with M60 RubrPoly sheets Notes 1. Soft metal pipe flashing: Minimum sheet lead of 2.25 lb per sq ft or Minimum sheet copper of 16 oz per sq ft n nf mi 6” mi 4” 4” 2. If using copper flashing over an iron or steel pipe, insert a separator sheet wrapped around pipe, to separate the copper flashing from direct contact with pipe so as to reduce galvanic reaction. mi n lan ge M60 RubrPoly flashing sheets 3. Vent stacks and other pipes shall have a min of 12” clearance on all sides from walls, curbs, and other projections to facilitate correct flashing & maintenance. Fields Roof Systems Manual • (253) or (800) 627-4098 • www.fieldscorp.com Fields roof membrane sheets Coverboard insulation Thermal insulation Roof deck FD11 Sheet Metal Pipe Enclosure Detail Slope sheet metal enclosure for drainage Insulate void to prevent condensation Sheet metal or flex tube collar 10” nominal flashing height Slope pipes down and away from hood Install sheet metal flashing receiver Min of 2 high domed, capped, & gasketed fasteners 18” oc per side, depending upon wind zone and local conditions Removable sheet metal counterflashing Fasteners 8” oc Wood cant to brace curb Fields roof membrane sheets extended 2” min above top of cant Wood nailers and curb M60 RubrPoly flashing sheets extended to a min height of 8” Min 4” clearance from pipe to top of curb & min 2” between pipes Fields roof membrane sheets Coverboard insulation Side View Thermal insulation Roof deck Slope sheet metal enclosure for drainage Insulate void to prevent condensation Sheet metal or flex tube collar Slope pipes down and away from hood Min 4” clearance from pipe to top of curb & Min 2” between pipes Sheet metal flashing receiver Min of 2 high domed, capped, & gasketed fasteners 18” oc per side, depending upon wind zone and local conditions Removable sheet metal counterflashing 10” nominal flashing height Fasteners 8” oc Notes Fields roof membrane sheets extended a min of 2” above top of cant M60 RubrPoly flashing sheets to a min height of 8” 1. This detail eliminates pitch pockets for piping penetrations through the roof. Pitch pocket installations are prohibited. 2. Attach treated wood nailer to deck with suitable fasteners. Fields Roof Systems Manual • (253) or (800) 627-4098 • www.fieldscorp.com Fields roof membrane sheets Coverboard insulation Thermal insulation Roof deck Wood cant to brace curb FD12 Roof-Top Pipe Roller Support Detail 10” nominal flashing height Adjust vertically and horizontally See “Roof-Top Equipment Curb Detail FD05” for curb construction Install bolts in sealant Notes 1. It is required that pipes & conduits be installed in other locations other than on the roof. However, where pipes and conduits are absolutely necessary on the roof, a pipe roller support is required. 2. This detail is designed to eliminate roof damage due to expansion and contraction of pipes & conduits. Fields Roof Systems Manual • (253) or (800) 627-4098 • www.fieldscorp.com FD13 Structural Roof Deck Penetration Detail Structural member Insulate void to prevent condensation Welded plate sealed watertight 10” nominal flashing height Min of 2 fasteners 18” oc per side, depending upon wind zone and local conditions Removable sheet metal counterflashing. Fasteners 8” oc Fields roof membrane sheets extended a min of 2” above top of cant. M60 RubrPoly flashing sheets extended to a min height of 8”. Fields roof membrane sheets Coverboard insulation Thermal insulation Roof deck Wood cant to brace curb Side View Wood nailers and curb Structural member Insulate void to prevent condensation Welded plate sealed watertight Min of 2 high domed, capped, & gasketed fasteners 18” oc per side, depending upon wind zone and local conditions Removable sheet metal counterflashing Notes 1. This detail eliminates pitch pockets for structural penetrations through the roof. Pitch pockets are prohibited. 10” nominal flashing height Fasteners 8” oc Fields roof membrane sheets extended a min of 2” above top of cant M60 RubrPoly flashing sheets to a min height of 8” Fields roof membrane sheets 2. This curbed system allows for movement in the structural member without damaging the roof system membrane. Coverboard insulation Thermal insulation Roof deck 3. Attach treated wood nailer to deck with suitable fasteners. Fields Roof Systems Manual • (253) or (800) 627-4098 • www.fieldscorp.com Wood cant to brace curb FD14 Metal Covered Expansion Joint Detail Flexible vapor retarder to serve as insulation retainer attached to top of curb Sheet metal expansion joint cover Drive cleat or standing seam joint Install compressible insulation Extend M60 RubrPoly flashing sheets 10” nominal flashing height Install flexible waterproof membrane closure Min of 2 high domed, capped, & gasketed fasteners 18” oc per side, depending upon wind zone and local conditions Fasteners 8” oc Bevel top of both wood curbs to drain to one side Fields roof membrane sheets extended 2” min above top of cant M60 RubrPoly flashing sheets extended to a min height of 8” Fields roof membrane sheets Coverboard insulation Thermal insulation Side View Roof deck Wood nailers and curb Sheet metal expansion joint cover Wood cant to brace curb Flexible waterproof membrane closure Bevel top of both wood curbs to drain to one side Fasteners 8” oc Flexible vapor retarder to serve as insulation retainer attached to top of curb Min of 2 high domed, capped, & gasketed fasteners 18” oc per side, depending upon wind zone and local conditions 10” nominal flashing height M60 RubrPoly flashing not shown for clarity Notes Fields roof membrane sheets extended a min of 2” above top of cant M60 RubrPoly flashing sheets to a min height of 8” Compressible insulation 1. This detail allows for building movement in both directions. Fields roof membrane sheets Coverboard insulation Thermal insulation 2. Flashing requirements are the same for both sides of expansion joint. Roof deck Wood cant to brace curb 3. Attach treated wood nailer to deck with suitable fasteners. Wood nailers & curb Fields Roof Systems Manual • (253) or (800) 627-4098 • www.fieldscorp.com FD15 Premanufactured Expansion Joint Detail Extend M60 RubrPoly flashing sheets Premanufactured expansion joint cover Flexible waterproof membrane closure 10” nominal flashing height Flexible vapor retarder to serve as insulation retainer Min of 2 high domed, capped, & gasketed fasteners 18” oc per side, depending upon wind zone and local conditions Fasteners 8” oc Bevel top of both wood curbs to drain to outside. Fields roof membrane sheets extended 2” min above top of cant. M60 RubrPoly flashing sheets extended to a min height of 8” Install compressible insulation Fields roof membrane sheets Coverboard insulation Thermal insulation Wood nailers and curb Roof deck Side View Wood cant to brace curb Premanufactured expansion joint cover Flexible waterproof membrane closure M60 RubrPoly flashing sheets not shown for clarity 10” nominal flashing height Flexible vapor retarder to serve as insulation retainer attached to top of curb Notes Bevel top of both wood curbs to drain to outside Fasteners 8” oc Min of 2 high domed, capped, & gasketed fasteners 18” oc per side, depending upon wind zone and local conditions Fields roof membrane sheets extended a min of 2” above top of cant Compressible insulation M60 RubrPoly flashing sheets extended to a min height of 8” Fields roof membrane sheets 1. This detail allows for building movement in both directions. Coverboard insulation Thermal insulation 2. Flashing requirements are the same for both sides of expansion joint. 3. Attach treated wood nailer to deck with suitable fasteners. Roof deck Wood cant to brace curb Wood nailers & curb Fields Roof Systems Manual • (253) or (800) 627-4098 • www.fieldscorp.com FD16 Roof Area Divider Detail Sheet metal area divider cover 10” nominal flashing height Min of 2 high domed, capped, & gasketed fasteners 18” oc per side, depending upon wind zone and local conditions Fasteners 8” oc Bevel top of both wood curbs to drain to outside Fields roof membrane sheets extended 2” min above top of cant. M60 RubrPoly flashing sheets to a min height of 8” Fields roof membrane sheets Coverboard insulation Wood nailers and curb Thermal insulation Wood cant to brace curb Roof deck Side View Install sheet metal area divider cover Bevel top of both wood curbs to drain to outside Notes 1. An area divider shall be designed as a raised double wood member attached to a securely fastened wood base plate that is anchored to the roof deck. Area dividers shall be located between the roof ’s expansion joints at about 150’ to 200’ intervals, depending upon climatic conditions. Area dividers are prohibited from restricting the flow of water. 10” nominal flashing height Fasteners 8” oc Min of 2 high domed, capped, & gasketed fasteners 18” oc per side, depending upon wind zone and local conditions Fields roof membrane sheets extended a min of 2” above top of cant M60 RubrPoly flashing sheets extended to a min height of 8” Fields roof membrane sheets Coverboard insulation 2. The flashing requirements are the same for both sides of the area divider. 3. Attach the treated wood nailer to the deck with suitable fasteners. Thermal insulation Roof deck Wood cant to brace curb Wood nailers & curb Fields Roof Systems Manual • (253) or (800) 627-4098 • www.fieldscorp.com FD17 Raised Metal Roof Edge Detail f ho t g len al ch met a e r eet g x fo er sh shin a t fla ’m e 12 erim nter p ou c Sheet metal counter flashing Min of 2 high domed, capped, & gasketed fasteners 18” oc per side, depending upon wind zone and local conditions 1/2” gap Fasten M60 RubrPoly flashing sheets 8” oc Sheet metal joint cover plate in 2 beads of sealant Fasten wood cant to blocking 4 mi ” n M60 RubrPoly flashing sheets extended a min of 4” beyond base of cant M60 RubrPoly flashing sheets 1” min below blocking First M60 RubrPoly flashing sheet extended below the blocking Fields roof membrane sheets Coverboard insulation Thermal insulation Roof deck Treated wood nailers Side View Continuous cleat Sheet metal counter flashing First M60 RubrPoly flashing sheet extended below the blocking Fasten M60 RubrPoly flashing sheets layer a min of 8” oc Min of 2 high domed, capped, & gasketed fasteners 18” oc per side, depending upon wind zone and local conditions M60 RubrPoly flashing sheets 4” minimum 1. Attach the treated wood nailers to the wall or deck with suitable fasteners. 2. Wood blocking shall be slotted for venting wet filled decks. 3. This detail shall be installed only where the deck is supported by the outside wall. 1” minimum below blocking Notes M60 RubrPoly flashing sheets extended a min of 4” beyond base of cant Fields roof membrane sheets Coverboard insulation Thermal insulation Roof deck Wood cant to blocking Treated wood nailers Continuous cleat Fields Roof Systems Manual • (253) or (800) 627-4098 • www.fieldscorp.com FD18 Gravel Stop Metal Roof Edge Detail of th g n h le tal eac et me r e fo ax ter sh shing m a ’ e 12 erim ter fl p oun c Sheet metal joint cover plate a minimum 6” wide installed in 2 beads of sealant 1/2” gap Flange 4” min width 3” min width Fasteners 3” oc & staggered 3” min width 4” mi When installing a mineral sheet as the reflective surfacing, install metal flange and associated M60 RubrPoly sheets beneath the mineral cap n 1” min below blocking Sheet metal gravel stop adhered in M300 RubrMastic. Prime flange with M400 RubrPrime before installing M60 RubrPoly sheets M60 RubrPoly envelope sheet Fields roof membrane sheets Coverboard insulation Thermal insulation Roof deck Treated wood nailers One M60 RubrPoly sheet extended below blocking Side View Continuous cleat Sheet metal gravel stop, installed in M300 RubrMastic. Prime flange with M400 RubrPrime before installing M60 RubrPoly flashing sheets Notes M60 RubrPoly envelope sheet Fasteners 3” oc staggered 1. Rigid metal flanges are prohibited from being installed between the roofing sheets. See “Raised Metal Roof Edge Detail FD17” for perimeter construction. 3. Attach treated wood nailer to the wall with suitable fasteners. 4. Wood blocking shall be slotted for venting wet filled decks. 5. Frequent nailing of sheet metal flange is required to minimize thermal movement. Fields roof membrane sheets 1” min below blocking 2. This detail shall be installed only where the deck is supported by the outside wall. When installing a mineral sheet as the surfacing, install metal flange and associated M60 RubrPoly flashing sheets beneath the mineral cap Tapered coverboard insulation edge Coverboard insulation Thermal insulation Roof deck One M60 RubrPoly sheet below the blocking Continuous cleat Fields Roof Systems Manual • (253) or (800) 627-4098 • www.fieldscorp.com FD19 Post Supported Roof Deck Flashing Detail Continuous through wall flashing installed by others Weep holes installed by others Tooled polyurethane sealant installed by others Fasteners 24” oc Sheet metal reglet Lap 3” with bead of sealant Lap 3” at joints Removable sheet metal counterflashing Secure & adhere M60 RubrPoly sheet closure to wall 2” wide clip 30” oc M60 RubrPoly flashing sheets extended Fasteners 8” oc Fields roof membrane sheets extended a min of 2” above top of cant Flexible vapor retarder with compressible insulation M60 RubrPoly flashing sheets extended to a min height of 8”: Cover top of flashing sheets with M60 RubrPoly vapor retarder Treated wood cant to brace curb Fields roof membrane sheets Coverboard insulation Side View Thermal insulation Roof deck Continuous through wall flashing installed by others Tooled polyurethane sealant installed by others Sheet metal reglet Fasteners 24” oc Removable sheet metal counterflashing Secure & adhere M60 RubrPoly sheet closure to wall M60 RubrPoly flashing sheets extended Notes 2” wide clip 30” oc Fasteners 8” oc 1. This detail should be installed where there is any possibility that differential movement will occur between the deck and a vertical surface. The wood members should not be fastened to the wall. 2. The joints in the sheet metal counterflashing shall not be soldered. 3. Attach treated wood nailer to deck with suitable fasteners. Fields roof membrane sheets extended a min of 2” above top of cant M60 RubrPoly flashing sheets extended to a min height of 8”: Cover top of flashing sheets with M60 RubrPoly vapor retarder Fields roof membrane sheets Coverboard insulation Thermal insulation Roof deck Install treated wood cant to brace curb 4. This detail is not for use with lightweight fills. Flexible vapor retarder with compressible insulation Fields Roof Systems Manual • (253) or (800) 627-4098 • www.fieldscorp.com FD20 Wall Supported Roof Deck Flashing Detail Continuous through wall flashing installed by others Weep holes installed by others Tooled polyurethane sealant installed by others Fasteners 24” oc Sheet metal reglet Lap 3” with bead of sealant Lap 3” at joints 2” wide clip 30” oc Seal top of flashing with a 3 layer application: 2 layers of M300 RubrMastic and 1 layer of P74 PolyWeb Fasteners 8” oc M60 RubrPoly flashing sheets extended Prime masonry with M400 RubrPrime Fields roof membrane sheets extended a min of 2” above top of cant M60 RubrPoly flashing sheets extended to a min height of 8” Fields roof membrane sheets Coverboard insulation Thermal insulation Side View Roof deck Fasten treated wood cant to nailers Continuous through wall flashing installed by others Tooled polyurethane sealant installed by others Sheet metal reglet Fasteners 24” oc Removable sheet metal counterflashing Seal top of flashing with a 3 layer application: 2 layers of M300 RubrMastic and 1 layer of P74 PolyWeb Fasteners 8” oc 2” wide clip approx. 30” oc Notes Fields roof membrane sheets extended a min of 2” above top of cant 1. This detail shall be installed where the deck is supported by the wall. M60 RubrPoly flashing sheets to a min height of 8” Fields roof membrane sheets 2. The joints in the sheet metal counterflashing shall not be soldered. 3. A fiber cant may be adhered in ambient or hot asphalt in place of wood cants. Coverboard insulation Thermal insulation Roof deck Wood cant to nailers Fields Roof Systems Manual • (253) or (800) 627-4098 • www.fieldscorp.com FD21 Concrete Wall Counterflashing Detail Exposed smooth concrete surface shall be waterproofed by others Sealant at wall joints installed by others shall be compatible with counterflashing sealant Apply polyurethane sealant & tool to facilitate water run off Expanding shank fasteners a min of 12” oc depending upon wind zone & local conditions Lap 3” at joints Sheet metal counterflashing Compressible elastomeric tape to span irregularities 2” wide clip a min of 30” oc Seal top of flashing with a 3 layer application: 2 layers of M300 RubrMastic and 1 layer of P74 PolyWeb Prime concrete with M400 RubrPrime above wood nailer and below top of counterflashing Fasteners 8” oc Bevel cut top of wood curb to drain Fields roof membrane sheets extended a min of 2” above top of cant Fasten wood cant to nailers M60 RubrPoly flashing sheets to a min height of 8” Side View Fields roof membrane sheets Coverboard insulation Thermal insulation Roof deck Wood nailers Exposed smooth concrete surface shall be waterproofed by others Apply polyurethane sealant & tool to facilitate water run off Expanding shank fasteners a min of 12” oc, depending upon wind zone & local conditions Compressible elastomeric tape to span irregularities Seal top of flashing with a 3 layer application: 2 layers of M300 RubrMastic and 1 layer of P74 PolyWeb Sheet metal counterflashing Notes Fasteners 8” oc 1. This detail shall be installed where the deck is supported by the wall. 2” wide clip approx. 30” oc 2. Attach the treated wood nailer to the deck with suitable fasteners. M60 RubrPoly flashing sheets to a min height of 8” 3. A fiber cant may be adhered in ambient or hot asphalt in place of wood cants. Fields roof membrane sheets extended a min of 2” above top of cant Fields roof membrane sheets Coverboard insulation Thermal insulation Roof deck 4. Counterflashing detail shall be a 2 piece reglet and counterflashing. Fastened wood cant to nailers Bevel cut top of wood curb to drain Fields Roof Systems Manual • (253) or (800) 627-4098 • www.fieldscorp.com FD22 Metal Wall Cap Flashing Detail f ho ngt ap e l ch lc r ea meta o f t x ma shee 12’ rapet pa Sheet metal joint cover plate min 6” wide set in 2 beads of sealant .5” gap Sheet metal parapet cap High domed, capped, & gasketed fasteners 18” oc, depending on wind zone and local conditions Continuous membrane liner Extend M60 RubrPoly flashing sheets 1” min below blocking Seal top of flashing with a 3 layer application: 2 layers of M300 RubrMastic and 1 layer of P74 PolyWeb Install fasteners 8” oc Install continuous beveled cedar siding tapered shim Install treated wood nailers Prime concrete with M400 RubrPrime Extend Fields roof membrane sheets a min of 2” above top of cant Install M60 RubrPoly flashing sheets between 8” min to 14” max height Fields roof membrane sheets Coverboard insulation Thermal insulation Wood cant fastened to nailers Side View Roof deck Sheet metal parapet cap 1/2” gap Continuous membrane liner Continuous beveled cedar siding tapered shim Notes 1. This detail shall be installed when the roof deck is supported by the wall. See “Post Supported Roof Deck Flashing Detail FD19”. 2. Attach treated wood nailer to deck with suitable fasteners. 1” min below blocking M60 RubrPoly flashing sheets High domed, capped, & gasketed fasteners 18” oc depending on wind zone and local conditions Fasteners 8” oc Fields roof membrane sheets extended a min of 2” above top of cant M60 RubrPoly flashing sheets to a min height of 8” Fields roof membrane sheets Coverboard insulation Thermal insulation Roof deck 3. A fiber cant may be adhered in ambient or hot asphalt in place of wood cants. Wood cant fastened to nailers Continuous cleat Fields Roof Systems Manual • (253) or (800) 627-4098 • www.fieldscorp.com