2' - 0 10 " (6 mm . AX M ) 4" (10 4" m) 2m N. MI (1 0 2 MI mm) N. 4" ( 10 2 MI mm) N. R R RUBEROID / GAFGLAS FLASHING OPTIONAL: 3/4" (19 mm) x 1" (25 mm) RIVETED AND SOLDERED TO APRON & NOTCHED TO PERMIT DRAINAGE SET FLANGE IN MASTIC WITH MOP-APPLIED MEMBRANES -NAIL TO NAILER & PRIME FLANGE BEFORE STRIPPING R R RUBEROID / GAFGLAS MEMBRANE BASE/PLY SHEETS TM ENERGYGUARD ROOF INSULATION DECK TURN PLY OF FELT DOWN OVER BLOCKING NOTE: 1. THIS DETAIL SHOULD BE USED ONLY WHERE THE DECK IS SUPPORTED BY THE OUTSIDE WALL. 2. TO INSTALL AFTER THE BUILDING IS COMPLETED. THIS DETAIL IS USED TO RELIEVE STANDING WATER IN AREAS ALONG THE ROOF EDGE. ALL ROOF SURFACES SHOULD BE SLOPED TO DRAIN. 3. ATTACH NAILER TO MASONRY WALL. REFER TO CURRENT FACTORY MUTUAL LOSS PREVENTION DATA SHEET 1-49. 4. WOOD NAILERS MAY BE SLOTTED FOR VENTING WHERE REQUIRED. 5. FLASHING FASTENED IN ACCORDANCE WITH EDGE DETAIL MB/BUR 20. 6. DO NOT USE MASTIC WITH TORCH-APPLIED MEMBRANES. SET PRIMED FLANGE IN HEAT-SOFTENED MEMBRANE ON TORCH-APPLIED AND HW SBS SYSTEMS. R GAFGLAS R WWW.GAF.COM 1 Campus Drive. Parsippany, NJ 07054 DRAWING # R SCUPPER THRU ROOF EDGE DETAIL SYSTEM 21 MB/BUR SCALE ISSUE/ REVISION DATE N.T.S. 7-01-14