Submittal Register – Entry and Receipt – Page 1 of 3 Identify the Change Submittal Register – Entry Submittal Setup Number Revision Description Status = Not Yet Submitted Specification Section Spec Sub Section Type Notes * * * * * * * * Submittal Assignment Once a company has been awarded: Responsible Company Due Date * * Note: An Excel template is available on the Project Controls site that can be used to batch upload submittal register items. Contact Project Controls to upload the information into Prolog. Note: To create a submittal register item based on an existing record, open a Submittal Register record to use as the basis for the new item. In the Number field, type a number for the new record and press Tab. Select Yes to create a new record using information from the current record. Note: The Quick Edit button on the list view can be used to assign the Responsible Company to multiple records at one time. Note: For shop drawings, there are two methods of entry: (1) each individual drawing can be entered as a Register Item or (2) each submission of drawings can be entered as a Register Item. In the case of second option, if any drawings require resubmission, they shall be tracked as a new revision and noted appropriately in the Notes field. Submittal Register – Entry and Receipt – Page 2 of 3 Identify the Change If you are using the numbering convention as Spec Section – Number (03300-001), perform the following steps to find the next sequential number. In picklist view, click Filter. A QuickFilter window will appear, change the select field to Number, change the Operator to Is Like, and enter the spec section of the submittal you are processing. Click OK. The picklist will now be filtered to show only the records for that spec section. Sort by number to find the last record in that series. Make note of this number and then click add to create a new record using the next sequential number for the spec section, in this example 033000-00207. Submittal Register – Entry and Receipt – Page 3 of 3 Identify the Change Submittal Register – Received from Sub/Vendor Submittal Register Receipt Status = Submitted Responsible Company Supplier (As Required) Actual Date * * * The Status and Actual Date fields may also be entered on the Submittal Packages screen. * Submittal File Attachment Quick Upload Attach the file reviewed by Skanska. Note: The Quick Edit button on the list view can be utilized to assign the Responsible Company to multiple records at one time. Submittal Packages – Entry – Page 1 of 2 Identify the Change Submittal Packages – Entry Submittal Packages – Package Items Number Rev Description Author Company Contact Author Package Number (Optional) Importance (Optional) Add Submittal Rec_d On Status = Submitted * * * Add Submittal Select Register Items * * * Submittal Packages – Package Items * * * Submittal Packages – Entry – Page 2 of 2 Identify the Change Submittal Packages – Reviewers and Notes From Company / Contact (Skanska) To Company / Contact Sent Date Due Date Misc Package Notes Sent For = Approval Sent Via (leave blank if using Converge) * * * * * * * * * Note: If you are using the submittal package numbering convention as: Sequence – CSI Number (001-03300) where each CSI Number has its own sequence, contact your Project Controls Contact to enable Submittal Packages auto incrementing per CSI. Once auto incrementing per CSI is turned on, the team shall enter the 5 digit CSI Number into the second number field when creating new packages. Field 1 will auto populate with the next three digit package number in that CSI number’s sequence. Submittal Transmittal – Send to Reviewer – Page 1 of 1 Identify the Change Submittal Transmittal – Send to Reviewer Submittal Transmittal Wizard With a Submittal Package open, select the “Create Submittal Transmittal” icon from the top menu (or select Tools, Submittal Transmittal). Submittal Transmittal – General Date Package Quantity Confirm all other information * * Submittal Transmittal – Courtesy Copies Add contacts to courtesy copy Note: Skip this step if Prolog Converge is being used to transfer submittals for approval. Submittal Packages – Received from Reviewer – Page 1 of 2 Identify the Change Submittal Packages – Received from Reviewer Submittal Packages – Package Items Status = Reviewed Action Action Logged By (reviewer) Note: Action and Action Logged By are entered by the reviewer if using Converge. * * * Submittal Packages – Reviewers and Notes Returned Date Optional – Reviewer’s General Comments Save Note: Returned Date and Comments are entered by the reviewer if using Converge. * * Submittal Packages – Received from Reviewer – Page 2 of 2 Identify the Change Submittal Packages – Received from Reviewer (Resubmission Required) Submittal Packages – Create New Package Create Package Rev Set Up New Submittal Register Records (Yes) Set Up New Submittal Register Status = Not Yet Submitted Due Date Follow instructions from the beginning of the process for the re-submitted item. Continue these instructions for return of items to subcontractor for resubmission. * * Submittal Packages – Send to Sub/Vendor – Page 1 of 2 Identify the Change Submittal Packages – Send to Sub/Vendor Submittal Packages – Package Items * Returned Date Returned Closed Closed Box * * Submittal Transmittal Wizard Highlight the added row for the sub/vendor and select the “Create Submittal Transmittal” icon from the top menu (or select Tools, Submittal Transmittal). Submittal Transmittal – General Date Package Quantity Confirm all other information * * * Submittal Packages – Send to Sub/Vendor – Page 2 of 2 Identify the Change Submittal Transmittal – Courtesy Copies Add contacts to courtesy copy Submittals – Page 1 of 9 Submittal Register – General 1 2 5 3 6 9 4 7 8 10 11 12 13 1 Number* 2 3 4 Revision Description Status 5 6 Specification Section Spec Sub Section 7 8 9 10 11 Responsible Company Supplier Type Notes Action 12 Due Date 13 Actual Date Submittal Register Number – Two Options: (a) Spec Section – Sequential Number (Example: 03300-001) (b) Sequential 5-digit number Submittal Register Revision Number (0 for first submission) Brief description of the submittal item Initial status = “Not Yet Submitted” Submitted for record only = “Record” Received from sub/vendor = “Submitted” Received from reviewer = “Reviewed” (entered in Submittal Packages module) Specification Section (5 digits) Paragraph from the Specification Section where the requirement for the submittal is stated Company required to provide the submittal Supplier or manufacturer of the product (as required) Select the type of submittal (i.e. Certifications, Samples, etc.) Optional – Any notes for clarification or comment Blank for outgoing submittal; action to be entered in Submittal Packages module Date the submittal is due to be submitted by the subcontractor/ vendor Date the submittal is received from the subcontractor/vendor Submittals – Page 2 of 9 * Note: For shop drawings, there are two methods of entry: (1) each individual drawing can be entered as a Register Item or (2) each submission of drawings can be entered as a Register Item. In the case of second option, if any drawings require resubmission, they shall be tracked as a new revision and noted appropriately in the Notes field. Note: An Excel template is available on the Project Controls site that can be used to batch upload submittal register items. Contact Project Controls to upload the information into Prolog. Note: To create a submittal register item based on an existing record, open a Submittal Register record to use as the basis for the new item. In the Number field, type a number for the new record and press Tab. Select Yes to create a new record using information from the current record. Note: The Quick Edit button on the list view can be used to assign the Responsible Company to multiple records at one time. Submittals – Page 3 of 9 Submittal Register – Files 1 1 Quick Upload Select this box to browse for the Submittal Register file as provided by the subcontractor/vendor. Submittals – Page 4 of 9 Submittal Packages – Package Items 1 2 3 4 5 6 7 8 9 10 1 Number 11 12 13 14 15 16 Submittal Package Number – Two Options: (a) Sequential 5-digit number (b) Sequential Number– CSI Number (001-09250) 2 Rev Submittal Package Revision Number (0 for first submission) 3 Description Brief description of the submittal package 4 Closed Select this box once the submittal package has been closed (no further action required) 5 Author Company Select the subcontractor/vendor who provided the package 6 Contact Select the contact who provided the submittal package 7 Author Package Number Optional – Enter the number used by the sub/vendor for the submittal package 8 Importance Optional – Select the importance of the submittal package 9 Item Enter a unique item number for each Submittal Register line 10 Status Revise “Submitted” to “Reviewed” when returned from reviewer 11 Action Enter the action to be taken on this submittal item as directed by the reviewer (i.e. “Approved as Noted”) 12 Action Logged By Select the person who reviewed the submittal (from Skanska) 13 Ret Date Date the submittal is returned to the subcontractor/vendor 14 Notes Optional – Any miscellaneous notes about the submittal item 15 Returned Select this box once the submittal has been returned 16 Closed Select this box once the submittal item has been closed (no further action required) Note: If a register item has been returned as “Revise and Resubmit”, it shall be marked “Returned” but not “Closed”. Select “Create Package Rev” and a new submittal package will be created with new revision numbers on the register items requiring approval. Submittals – Page 5 of 9 Submittal Packages – Reviewers and Notes 1 2 3 10 From Company From Contact To Company To Contact Sent Date Due Date 7 8 9 Returned Date Misc Package Notes Reviewer’s General Comments Sent For Sent Via 10 11 5 6 7 9 8 1 2 3 4 5 6 4 11 Skanska USA Building Inc. Enter the name of the contact sending the submittal Enter the name of the company the submittal is being sent to Enter the name of the contact the submittal is being sent to Enter the date the submittal package is sent from Skanska Enter the date the submittal package is due back from the reviewer. This date will auto-calculate once the Sent Date is entered. Enter the date the submittal package is returned from the reviewer Optional – Enter any miscellaneous notes about the package Optional – Enter any comments made by the reviewer Select “Approval” Select the manner in which the package is sent to the reviewer. Leave blank if Prolog Converge is used. Note: Enter a line for the review by the Owner or consultant only. Do not enter a line for Skanska’s internal review. Submittals – Page 6 of 9 Submittal Packages – Files 1 1 Quick Upload Select this box to browse for the Submittal Package file as provided by the reviewer. Submittals – Page 7 of 9 Submittal Transmittal – General 1 2 3 4 7 5 6 8 10 9 1 2 3 4 Date Submittal Number Attention Package Action 5 6 Package Quantity Due Date 7 Transmitted For 8 9 Delivered Via Transmitted By 10 Remarks Submittal Transmittal Date Select the submittal package to be sent Enter the name of the contact the submittal is being sent to Select “For Your Approval” for submittal being sent for review. Leave blank for transmittal to subcontractor/vendor. Leave as “1” Enter the date the submittal package is due back from the reviewer. Leave blank for transmittal to subcontractor/vendor. Select “Approval” for submittal being sent for review. Select “Action” for transmittal to subcontractor/vendor. Select the manner in which the package is sent Select the name of the person sending the transmittal (from Skanska) Optional – Enter any comments specific to the submittal package Submittals – Page 8 of 9 Submittal Transmittal – Detailed Items 1 1 Courtesy Copies Select any contacts to copy on the transmittal Submittals – Page 9 of 9 Submittals – Settings The following settings can be customized for project specific requirements. Contact Project Controls to modify any of these settings. Submittal Packages – Increment per CSI This setting controls whether the number is incremented by the next sequential number per CSI, or by the next sequential number regardless of CSI. This applies only if the Auto Increment setting is on. Submittal Packages – Review Time Submittal Packages – Use CSI List Submittal Transmittal – Tel/Fax with Address Default number of days for consultants to review and return Submittal Packages (0 to 365). Default is 14. Use CSI drop-down list for the second part of Submittal Package numbers. Default is No. Include the Telephone and Fax numbers in the Address field of Submittal Transmittals. Default is Yes. Default is Yes.