SIMULTANEOUS REVIEW SUBMITTAL PACKET NEW COMMERCIAL DEVELOPMENTS AND/OR TENANT IMPROVEMENTS The City of Avondale provides a simultaneous review for all commercial projects requiring Building and Engineering permits. It is designed to streamline projects through both departments consecutively to ensure a cohesive review process throughout the life of the project. Other benefits to you are: Less plan sets required More efficient plan review Less trips to/from our office Faster permitting process New Commercial Developments A simultaneous review of Building and Engineering applications is required for all new commercial developments. The final approval letter from the Planning Division will include this packet (Simultaneous Review Submittal Packet) and direct you through your submittal. If you have any questions or concerns, please contact your Planning Project Manager. Tenant Improvements Not all tenant improvements require an Engineering Permit. If you’re unsure whether your project requires an Engineering permit, please contact the Engineering Department – contact information on Page 2. If your project does not require an Engineering Permit, you may submit only to Building – application located in packet on Page 4. If only Building has been submitted, the Building Plans Examiner may determine during first review that an Engineering Permit is required. If so, second review will encompass both Building and Engineering submittals and the remainder of the process will follow the process set forth in this packet. Review times are as follows, excluding holidays: First Review – Three weeks All Subsequent Reviews – Two Weeks ALL SUBMITTALS AND REDLINE PICKUPS WILL INCLUDE BOTH BUILDING AND ENGINEERING PERMIT APPLICATIONS ALL FEES MUST BE PAID AT TIME OF SUBMITTAL/RESUBMITTAL INCOMPLETE SUBMITTALS WILL NOT BE ACCEPTED Development Services & Engineering Department 11465 W. Civic Center Drive, #110, Avondale, AZ 85323 Phone (623) 333-4004 Fax (623) 333-0402 TDD (623) 333-0010 www.avondale.org/developmentservices Page 1 of 3 Updated 03/07/12 SIMULTANEOUS REVIEW SUBMITTAL PACKET INCOMPLETE SUBMITTALS WILL NOT BE ACCEPTED Required Applications for Submittal: Building Review Submittal Form: Submittal fees are located in the Review Submittal Fees Section of the Building Review Submittal Form. For questions regarding submittal fees or requirements, please contact Building staff at emailbuilding@avondale.org or 623-333-4027. Engineering Submittal Form: The submittal fee is located in the Engineering Plan/Report Review Submittal Requirements section of the Engineering Submittal Form. For questions regarding submittal fees or requirements, please contact the Engineering Plan Review Division at emailengineeringplanreview@avondale.org or 623-333-4219. Required Application for Fire Sprinkler/Alarm Permits AFTER Engineering/Building Permits issued: Fire Review Submittal Form: This form is used for all commercial development, excluding public/private/charter schools. The submittal fee is located in the Review Submittal Requirements section of the Fire Review Submittal Form. For questions regarding submittal fees or requirements, please contact Building staff at emailbuilding@aovndale.org or 623-333-4027. Fire Code Plan Review Application: This form is used for all public/private/charter schools. There is no submittal fee. For questions regarding submittal requirements, please contact Fire Prevention staff at fireprevention@avondale.org or 623-3336140. NOTE: The Building Permit will not be issued until the Engineering permit has been approved and issued. ALL SUBMITTALS AND REDLINE PICKUPS WILL INCLUDE BOTH BUILDING AND ENGINEERING PERMIT APPLICATIONS ALL FEES MUST BE PAID AT TIME OF SUBMITTAL/RESUBMITTAL INCOMPLETE SUBMITTALS WILL NOT BE ACCEPTED Development Services & Engineering Department 11465 W. Civic Center Drive, #110, Avondale, AZ 85323 Phone (623) 333-4004 Fax (623) 333-0402 TDD (623) 333-0010 www.avondale.org/developmentservices Page 2 of 3 Updated 03/07/12 COMMERCIAL PROJECT REVIEW CHECKLIST Required Documents for Submittal: All Building Construction Documents and Engineering Civil Plans/Reports must be sealed and submitted to Development Services Center as follows: Building Review Submittal Form: 4 copies of completed Building Review Submittal Form 4 copies of Design Review Approval Letter 4 complete sets of Building Construction Document Plans to include: o Approved Site Plan o Engineered Conceptual Plans for Fire Sprinkler/Alarm Plans 2 bound set of Geotechnical Report 2 bound sets of the Building Manufacturer Specifications pertaining to project (Project Manual) 2 bound sets of the Building Engineering Calculations (Structural Calculations) Engineering Submittal Form: Refer to the Engineering department’s Required Deliverables Checklist o This checklist is customized for each project to ensure staff has all documentation st needed to conduct a complete review for the applicant at 1 submittal. o The checklist will be created, attached to this packet, and given to the applicant at Site Plan Approval. o For questions regarding the Engineering Submittal Form or Required Deliverables Checklist, please contact the Engineering Plan Review Division – contact information on Page. 2. NOTE: All deviations from the list above must be accompanied by documentation from the staff member approving the deviation. ALL SUBMITTALS AND REDLINE PICKUPS WILL INCLUDE BOTH BUILDING AND ENGINEERING PERMIT APPLICATIONS ALL FEES MUST BE PAID AT TIME OF SUBMITTAL/RESUBMITTAL INCOMPLETE SUBMITTALS WILL NOT BE ACCEPTED Development Services & Engineering Department 11465 W. Civic Center Drive, #110, Avondale, AZ 85323 Phone (623) 333-4004 Fax (623) 333-0402 TDD (623) 333-0010 www.avondale.org/developmentservices Page 3 of 3 Updated 03/07/12 BUILDING REVIEW SUBMITTAL FORM INCOMPLETE OR ILLEGIBLE FORMS CANNOT BE PROCESSED Project Name: Date: Project Address: Bldg/Ste#: Tenant Applicant (Check One): Architect Contractor Owner Other Company Name: Address: City: St: Zip: Contact: Phone: Fax: Contact: Phone: Fax: Owner Address: City: St: Phone: Fax: City: AZ Tax ID #: St: Zip: Avondale Business License #: Owner Name: Zip: Contractor Name: Contact: Address: AZ ROC: License #’s: PLAN SUBMITTAL REQUIREMENTS 1. ALL PLANS AND RELATED DOCUMENTS SHALL BE BOUND. 2. PLANS AND RELATED DOCUMENTS WILL NOT BE ACCEPTED FOR REVIEW UNTIL ALL INFORMATION IS SUBMITTED. REVIEW SUBMITTAL FEES Commercial Up to 10,000 SF 10,001-20,000 SF 20,001 SF and up Tenant Improvement $1600.00 $2800.00 $5000.00 Up to 10,000 SF $250.00 10,001 SF and up $1400.00 Single Family Dwelling Per Plan $450.00 Commercial – According to Simultaneous Review Submittal Packet Commercial Revisions/Deferred Submittals - 3 complete sets of plans, 2 sets of related calculations Tenant Improvements - 3 complete sets of plans Residential House Plans - 3 complete sets of plans, calculations, and soils report (if required) Residential Additions, Alterations - 2 complete sets of plans TYPE OF SUBMITTAL CHECK ONE – A SEPARATE FORM REQUIRED FOR EACH TYPE OF PLAN REVIEW Commercial Tenant Improvement Revision Other House Plan Remodel Addition Other Development Services & Engineering Department 11465 W. Civic Center Drive, #110, Avondale, AZ 85323 ▪ Phone (623) 333-4004 ▪ Fax (623) 333-0402 ▪ TDD (623) 333-0010 www.avondale.org/developmentservices ▪ www.avondale.org/engineering Page 3 of 9 Updated 06-29-11 ENGINEERING SUBMITTAL FORM CITY ID NUMBER: ENG – 12 – _________ Project Name: Date: Project Location: Construction Description: Applicant (check one): □ Owner □ Architect □ Engineer □ Contractor □ Other Owner/Developer: Phone: Contact: Email Address: Address: City: St: Applicant: Zip: Phone: Contact Person: Address: AZ ROC License #: Email Address: City: AZ Tax ID #: Commercial Multi-family St: City Sales Tax License #: Zip: DEVELOPMENT IMPROVEMENT TYPE Single Family Residential Other: ENGINEERING PLAN/REPORT REVIEW SUBMITTAL REQUIREMENTS 1. This Engineering Submittal Form must be completed and accompany all initial plan and report submittals together with a required deliverables checklist. 2. For commercial/multifamily plans, please review the simultaneous review packet located at www.avondale.org. 3. All plans and reports must be in compliance with the most current edition of the City of Avondale General Engineering Requirements Manual and the City of Avondale Supplement to MAG Standard Details and Specifications for Public Works. Please contact the Engineering Department if you are uncertain which version is the latest. 4. All plans, reports and related documents shall be bound separately. 5. A separate cover sheet utilizing the City template must be submitted with each plan submittal type (e.g. G&D, Water, Sewer, Paving, etc.) with the exception of commercial/multifamily improvement plans, which require only one comprehensive coversheet. The City template may be found at www.avondale.org. 6. The Plan Review fee is $375/sheet for 1st thru 3rd reviews, and $475/sheet for all reviews thereafter. The fee is calculated and collected at the time of each submittal. 7. The report and technical document review fee is $120/hour for the 1st thru 3rd reviews, and $200/hour for all reviews thereafter. This fee is calculated after each review and collected at the consecutive submittal. Engineering Department 11465 W. Civic Center Drive, #120, Avondale, AZ 85323 Phone (623) 333-4200 Fax (623) 333-0420 TDD (623) 333-0010 www.avondale.org/engineering Updated 05-03-12 Fire Prevention Division 11465 W. Civic Center Dr. Avondale, Arizona 85323 Phone: (623) 333-6000 Fax: (623) 333-0600 FIRE CODE PLAN REVIEW APPLICATION NOTE: INCOMPLETE OR ILLEGIBLE APPLICATIONS CANNOT BE PROCESSED Project Name: Project Address: Suite #: Contractor: Address: Suite #: City: St: Zip: AZ ROC#: AZ Tax License #: City of Avondale Business License #: Contact Person: Phone: PLAN SUBMITTAL REQUIREMENTS NOTE: PLANS WILL NOT BE ACCEPTED FOR REVIEW UNTIL ALL APPROPRIATE INFORMATION IS SUBMITTED All fire protection system plans submitted for a permit must be submitted by a contractor with a current Business License issued by the City of Avondale. THREE (3) COMPLETE sets of plans, specifications, cut sheets, calculations, etc. All fire sprinkler and fire alarm plans must be sealed by a qualified professional registrant. Fire sprinkler plan submittal must comply with NFPA 13 and Avondale Fire Rescue Policy. Fire alarm plan submittal must comply with NFPA 72 and Arizona AFAA Submittal Requirements. TYPE OF SUBMITTAL & FEES CHECK ONE - SEPARATE APPLICATION REQUIRED FOR EACH TYPE OF PLAN REVIEW Fire Sprinkler System Fire Apparatus Access Fire Alarm/Detection System High Piled or Rack Storage Hood & Duct Fire System Flammable or Combustible Liquids Water System/Fire Hydrants Hazardous Materials Underground Fireline Modification Alternative Methods or Materials Temporary Use Type: Other: AVONDALE FIRE RESCUE USE ONLY Date Received: Date Reviewed: By: Fire Code Fee: $ Acct# 101-6300-00-4370 Permit #: FIRE MARSHAL COMMENTS Approved as submitted Approved with changes indicated Disapproved Make changes and resubmit