Form 1A- Kamla’s Ashirwad Bharatpur APPENDIX I (See paragraph-6) FORM 1 (I) S. No. 1. Basic Information Item Name of the project/s S. No. in the schedule 2. 3. Proposed capacity/area/length/tonnage to be handled/command area/lease area/number of wells to be drilled 4. New/Expansion/Modernization 5. 6. Existing Capacity / Area etc. Category of Project i.e. ‘A’ or ‘B’ M/s Sunny Real Construction Pvt. Ltd. Authorized Signatory Details “Kamla’s Ashirwad” A Proposed Group Housing Project by M/s Sunny Real Construction Pvt. Ltd. Category ‘B’ under item 8(a) of the schedule of Gazette Notification dated September 14th, 2006. Details of Proposed Construction 1. Total Plot Area 7546.46 Sq. m. 2. Built up Area 34916.41 Sq. m. 3. Gross Built up Area 37265.63 Sq. m. 4. Permissible Ground 35 % of plot area Coverage (2641.26 Sq. m.) 5. Utilized Ground 37.30 % of plot area Coverage (2815.04 Sq. m.) 6. Permissible FAR 2.25 +0.5 = 2.75 of plot area = 20752.76 Sq. m. 7. Utilized FAR 2.72 of plot area (20577.79 Sq. m.) 8. Permissible Height 36.58 m. 9. Road adjoining with 24.38m. Site 10. Setbacks Front 15.24 M., Rear & Side 9.14 m. 11. Achieved height 26.60 m upto Terrace Level. 34.20 m upto Machine Room 12. Proposed Green 21.63% of Plot Area Area (1632.62 Sq .m.) [382.99 Sq. m (5.07%) at Ground Level & 1023.11 Sq. m.(16.56%) at First Floor Level] 13. Total No. of Flat 268 Flats (2 BHK=124; 3 BHK = 144) Note: The Proponent will construct 25 E.W.S & 20 LIG flats having 2004.97 Sq. m. at Residential Plot No. B-04/04 & B-04/05, OMG CITY, Village Jhilara Bharatpur. Copy of Land documents and site plan of proposed units of EWS and LIG is enclosed as Annexure-XIII. New Project, No activity at project site has been undertaken except excavation work was at site. B TEAM Institute of Science & Technology Pvt. Ltd 1 EIA Consultant Form 1A- Kamla’s Ashirwad Bharatpur 7. 8. 9. 10. 11. 12. 13. 14. 15 16. 17. 18. Does it attract the general condition? If yes, please specify Does it attract the specific condition? If yes, please specify Location Plot/Survey/Khasra No. Village Tehsil District State Nearest railway station/airport along with distance in Kms. Nearest Town, city, District Headquarters along with distance in Kms. Village Panchayats, Zila Parishad, Municipal Corporation, Local body (complete postal addresses with telephone nos. to be given) Name of the applicant Registered Address Address for correspondence: Name Designation (Owner/ Partner/CEO) Address Pin Code E-mail Telephone No. Fax No. Details of Alternative Sites examined, if any. Location of these sites should be shown on a toposheet. Interlinked Projects Whether separate application of No No Bharatpur Group Housing Plot with UIT Lease Deed No 4929 Sector No. 3 Bharatpur Bharatpur Rajasthan The proposed site is well connected through a road network from two sides by 24.38 m., and one side by 9.14 m wide road. The nearby connecting public transport system is listed below: Bharatpur Railway Station at about 1.50 km towards NE of proposed site. Sanganer Airport at about 171 km towards WSW of proposed site. NH-11 is at about 3.50 km towards SE of proposed site. MDR (Bharatpur – Mathura) is at about 1.40 km towards ENE of proposed site. MDR (Bharatpur - Alwar) is about 2.00 km in toward NNW of the project site. The Project is situated in Bharatpur UIT Area. Urban improvement trust Bharatpur Address: UIT Bharatpur Krishna Nagar, Bharatpur, Rajasthan 321001 M/s Sunny Real Construction Pvt. Ltd C-10, Ranjeet Nagar Bharatpur Mr. Vishnu Kumar Goyal Director C-10, Ranjeet Nagar Bharatpur 321001 svmoilind@gmail.com 9414208305 Plot is an open land auctioned by UIT Bharatpur for residential purpose. Geographical locationLatitude - 27°13'33.14"N Longitude – 77°28'44.11"E No Not Applicable M/s Sunny Real Construction Pvt. Ltd. Authorized Signatory TEAM Institute of Science & Technology Pvt. Ltd 2 EIA Consultant Form 1A- Kamla’s Ashirwad Bharatpur 19. 20. 21. 22. 23. 24. interlinked project has been submitted? If yes, date of submission If no, reason Whether the proposal involves approval/clearance under: if yes, details of the same and their status to be given. (a) The Forest (Conservation) Act, 1980? (b) The Wildlife (Protection) Act, 1972? (c) The C.R.Z Notification, 1991? Whether there is any Government Order/Policy relevant/relating to the site? Forest land involved (hectares) Whether there is any litigation pending against the project and /or land in which the project is proposed to be set up? (a) Name of the court (b) Case No. (c) Orders/directions of the Court, if any and its relevance with the proposed project. Not Applicable Not Applicable No No No No (II) Activity 1. Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.) S. No. Information/ Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data 1.1 Permanent or temporary No Land use change in land use, land The proposed site is in the urban area of cover or topography Bharatpur which has mixed land use pattern of including increase in residential and commercial use. The proposed intensity of land use (with use of site is for residential. respect to local land use Therefore the proposed project will not plan) significantly differ from existing land use of locality and it will not bring any significant change in land use of locality. Yes Land cover Due to human activities land cover is either directly affected from activity like construction of roadM/s Sunny Real Construction Pvt. Ltd. TEAM Institute of Science & Technology Pvt. Ltd Authorized Signatory 3 EIA Consultant Form 1A- Kamla’s Ashirwad Bharatpur building leading to deforestation or indirectly from water diversion leading to lowering of the water table. The proposed project will not involve any deforestation only small work of site clearance will be done in which some shrubs and grasses will be removed. It will be balanced by planed landscaping on site. Excavation of soil will be involved. The total expected quantity of earthwork involved is about 11000 M3. The excavated soil will be balanced within site by back filling. Therefore the changes will be localized and insignificant. No 1.2 Clearance of existing land, vegetation and buildings? No 1.3 Creation of new land uses? No 1.4 Pre-construction investigations e.g. bore houses, soil testing? Construction works? Yes 1.5 Floor Built Up Area Gross Built Up Area Basement Stilt Floor First Floor Second Floor Third Floor Fourth Floor 5403.76 4261.46 2815.04 2761.05 2761.05 2761.05 5403.76 4273.29 3060.67 3022.52 3022.52 3022.52 The proposed site is in the urban area of Bharatpur district which has mixed land use pattern of residential and commercial use. The proposed use of site is for residential. Therefore the proposed project will not create new land uses that significantly differ from existing land use of locality as per the master plan. The soil investigation was carried out. The detailed Soil investigation report is enclosed as Annexure No XI. The Proposed Group Housing Project will involve construction of a Club House, and five Residential Blocks having (Basement, Stilt Floor +1st to 9th Floor). The construction details are tabulated below:- Yes F.A.R. Service Store All units are in Sq. m. -75.03 -599.25 105.67 -2064.94 93.2 61.36 2239.2 83.93 69.48 2239.2 83.93 69.48 2239.2 83.93 69.48 M/s Sunny Real Construction Pvt. Ltd. Authorized Signatory Topography The site is plane and will not involve any leveling activities. The proposed site does not involve any major natural drainage channel of locality therefore no changes in drainage pattern are envisaged. Currently the proposed site is not having any structures and vegetation therefore no clearance of site is envisaged. List of observed vegetations in study area is enclosed as Annexure XII. The project will involve plantation of 79 large canopy forming tress alongwith development of decorative lawns of herbs and shrubs. The proposed landscaping and plantation will have positive impact on environment. Corridor Lift Stair 89.42 145.13 275.28 275.28 275.28 275.28 45.84 45.84 45.84 45.84 45.84 45.84 47.32 59.15 82.81 82.81 82.81 82.81 TEAM Institute of Science & Technology Pvt. Ltd 4 EIA Consultant Form 1A- Kamla’s Ashirwad Bharatpur Fifth Floor Sixth Floor Seventh Floor Eighth Floor Ninth Floor Terrace Floor Total 2761.05 2761.05 2761.05 2761.05 2761.05 347.75 34916.41 3022.52 3022.52 3022.52 3022.52 3022.52 347.75 37265.63 2239.2 2239.2 2239.2 2239.2 2239.2 -20577.79 1.6 Demolition works? Yes 1.7 Temporary sites used for construction works or housing of construction workers? Above ground buildings, structures or earthworks including linear structures, cut and fill or excavations Underground works including mining or tunneling? Reclamation works? Dredging? Offshore structures? Production and manufacturing processes? Facilities for storage of goods or materials? Facilities for treatment or disposal of solid waste or liquid effluents? Yes Facilities for long term housing of operational workers? New road, rail or sea traffic during construction or operation? Yes New road, rail, air, waterborne or other transport infrastructure including new or altered routes and stations, ports, airports etc? Closure or diversion of existing transport routes or infrastructure leading to changes in traffic movements? New or diverted transmission lines or pipelines? No 1.8 1.9 1.10 1.11 1.12 1.13 1.14 1.15 1.16 1.17 1.18 1.19 1.20 69.48 69.48 69.48 69.48 69.48 -617.20 275.28 275.28 275.28 275.28 275.28 -2712.07 45.84 45.84 45.84 45.84 45.84 -504.24 82.81 82.81 82.81 82.81 82.81 -851.76 No The proposed site is not having some old structures which will need demolition. They will be housed in temporary houses supported by flush WCs during construction period only. The maximum height of the project will be 34.20 m (upto machine room). Expected quantity of earth work involved is about 11000 M3. No tunneling activity is involved. No No No No No reclamation works involved Not involved Not applicable Not applicable Yes Temporary stores or sheds will be constructed for storage of construction materials. STP for treatment of sewage. STP treated effluent will be used for gardening and flushing of toilets. All excess treated water (36.00 KLD) will be discharged in drains maintained by UIT after taking necessary permission from UIT. All solid waste from different sections will be collected in separate bins. The non-organic waste shall be disposed off to authorized vendors. The organic waste will be converted into manure and used within premises for green belt development. Cabins for watchmen, gardeners etc and persons engaged in essential services. The existing infrastructure is sufficient to catchup for the need of such a small project, insignificant increase in traffic for transport of men & material is envisaged. The proposed project site has well connectivity through road, rail and air-transport therefore will not require any change in existing infrastructure. Yes Yes No No No public road or infrastructure is crossing or within the proposed site. No No pipeline or transmission line is crossing or within the proposed site. M/s Sunny Real Construction Pvt. Ltd. Authorized Signatory 83.93 83.93 83.93 83.93 83.93 -945.34 TEAM Institute of Science & Technology Pvt. Ltd 5 EIA Consultant Form 1A- Kamla’s Ashirwad Bharatpur 1.21 Impoundment, damming, culverting, realignment or other changes to the hydrology of watercourses or aquifers? Stream crossings? No The proposed site does not involve any major natural drainage channel of locality therefore no changes in drainage pattern are envisaged. No Abstraction or transfers of water from ground or surface waters? Changes in water bodies or the land surface affecting drainage or run-off? Yes The proposed plot is small in size and no natural drain is crossing the plot. Water will be taken from UIT supply. 1.25 Transport of personnel or materials for construction, operation or decommissioning? Yes 1.26 Long-term dismantling or decommissioning or restoration works? Ongoing activity during decommissioning which could have an impact on the environment? Influx of people to an area in either temporarily or permanently? Yes 1.29 Introduction of alien species? No 1.30 Loss of native species or genetic diversity? No 1.31 Any other actions? No 1.22 1.23 1.24 1.27 1.28 No The excess treated water will discharged in sewer line maintained by UIT after obtaining necessary permission. The proposed site does not involve any major natural drainage channel of locality therefore no such changes were envisaged. During construction phase material of construction will be transported to site from local market and other sources depending on availability. During operation stage the transportation activities will be due to cars, two wheelers and other vehicles of the residents. There is no old structure on the site which will be dismantled during site preparation. No Not applicable Yes During construction phase, there will be inward and outward movement of local labour in the construction site. However during the post construction phase, there will be regular movement of residents, visitors and other related persons. The residential apartment will house about 1340 persons which will not bring any significant increment in total population of locality. Only the plant/ tress of local species and suitable for the region will be planted. There are no grown trees on the proposed site, some shrubs and grasses will be removed. The same will be amply compensated by proposed plantation and landscaping. - 2. Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are nonrenewable or in short supply): S. No. Information/checklist confirmation M/s Sunny Real Construction Pvt. Ltd. Authorized Signatory Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data TEAM Institute of Science & Technology Pvt. Ltd 6 EIA Consultant Form 1A- Kamla’s Ashirwad Bharatpur 2.1 Land especially undeveloped or agricultural land (ha) Yes 2.2 Water (expected source & competing users) unit: KLD Yes The proposed site is in developing urban area and the site has been converted for residential purpose by UIT and allocated to project proponent. During construction phase water requirement will be 11.00 KLD which will be met from authorized water suppliers. In post construction phase daily water requirement will be about 139.50 KLD. 81.50 KLD- Fresh water from UIT supply. 2.3 2.4 Minerals (MT) Construction material – stone, aggregates, and /soil (expected source-MT) No Yes 58.00 KLD- Recycled water from STP. The construction will involve use of Stone, Stone Grit, Sand, bricks and timber. The Stone and Stone grit is available from various queries operative around Jaipur City. The source of sand will be river bed sand from river Banas in Tonk District, 2.5 Forests and timber (source –MT) 2.6 Energy including electricity and fuels (source, competing users) Unit: fuel (MT), energy (MW) Yes During operation phase: 1330.00 KW Yes 2.7 Details are enclosed as Annexure I. Timber will be obtained from authorized local timber merchant. During construction phase : 80 KW Any other natural resources (use appropriate standard units) Yes The power will be received from JVVNL at 33 KV supply voltage, it will be stepped down to 0.433 KV through two transformers each of 1000 kVA rating. To backup the power demand in common and essential areas during power failure, it is proposed to provide two D.G. Sets of 125 kVA and 62.50 kVA capacity. Solar energy will be utilized for lighting of common areas and solar water heaters for providing hot water to residents. It will result in energy saving equal to 1712 KWH/Day. 3. Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health. S. No Information/checklist confirmation 3.1 Use of substances or materials, which are hazardous (as per M/s Sunny Real Construction Pvt. Ltd. Authorized Signatory 7 Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data No The proposed project will not use any hazardous material. Hazardous material in TEAM Institute of Science & Technology Pvt. Ltd EIA Consultant Form 1A- Kamla’s Ashirwad Bharatpur MSIHC rules) to human health or the environment (flora, fauna, and water supplies) 3.2 Changes in occurrence of disease or affect disease vectors (e.g. insect or water borne diseases) No 3.3 Affect the welfare of people e.g. by changing living conditions? Yes 3.4 Vulnerable groups of people who could be affected by the project e.g. hospital patients, children, the elderly etc., Any other causes No 3.5 No proposed project will be generated only as used lubricating oil from DG Set which can cause health hazard. This used oil will be sold to authorized recyclers. The project is of a building construction. The waste water as well as MSW is proposed to be disposed of in appropriate manner therefore the project will not lead to change in occurrence of diseases or affect disease vectors. The urban cities including Jaipur are suffering from shortage of adequate and hygienic living conditions. This has resulted in mushrooming of unauthorized Colonies which lacks basic amenities. The proposed project will provide all basic amenities and hygienic and comfortable living conditions. There are a number of Schools, Colleges, Hospitals etc but it is a small group housing project and will not affect vulnerable group of people. - 4. Production of solid wastes during construction or operation or decommissioning (MT/month) S. No. Information/checklist confirmation 4.1 4.2 Spoil, overburden or mine wastes Municipal waste (domestic and commercial wastes) Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data No Not applicable. Yes According to the building construction manual of MoE&F the rate of waste generation in residential building is 0.41 Kg/day/person. In the Residential Section of project, out of total domestic waste, 40 % will be the wet garbage and rest (60 %) will be dry garbage. The solid waste so generated will be first segregated as plastic, glass, paper and other waste separately and disposed off as per MSW Rules, 2000 (amended up to date). Generation of Waste from Residential Section(kg/day) = 0.41 X Estimated Population = 0.41 x 1340 = 549.40 kg/day Wet Garbage @ 40% Total Waste Generated = 219.76 kg/day Dry waste @60% Total Waste Generated = 329.64 Kg/day From Commercial Section = 60%(0.41 X 50) = 12.30 kg/day Wet Garbage @ 40% Total Waste Generated = 4.92 kg/day Dry waste @60% Total Waste Generated = 7.38 Kg/day M/s Sunny Real Construction Pvt. Ltd. Authorized Signatory TEAM Institute of Science & Technology Pvt. Ltd 8 EIA Consultant Form 1A- Kamla’s Ashirwad Bharatpur Total Waste Generated = 561.70 Say 562.00 kg/day Total Dry Waste Generated = 337.02 Say 337.00 kg/day Total Wet Waste Generated = 224.68 Say 225.00 kg/day 4.3 Hazardous Hazardous Rules) 4.4 Other industrial process wastes No 4.5 4.6 Surplus product Sewage sludge or other sludge from effluent treatment Construction or demolition wastes No Yes Redundant machinery or equipment Contaminated soils or other materials Agricultural wastes Other solid wastes No 4.7 4.8 4.9 4.10 4.11 wastes (as per waste Management Yes No Used lubricating oil from DG Set will be generated during construction of the building. Waste oil will be properly stored and sold to authorized recyclers. Not applicable as the proposed project is of construction and will not involve any industrial activity. Not applicable , Residential Apartment Dried sludge from STP will be used as manure for plants after treatment. Construction wastes will be used for road construction. All machinery after construction will be removed from site No such material envisaged No No Not applicable Not applicable Yes 5. Release of pollutants or any hazardous, toxic or noxious substances to air (Kg/hr) S.No Information/checklist confirmation 5.1 Emissions from combustion of fossil fuels from stationary or mobile sources 5.2 Emissions from production processes Emissions from materials handling including storage or transport 5.3 5.4 5.5 5.6 Emissions from construction activities including plant and equipment Dust or odours from handling of materials including construction materials, sewage and waste Emissions from incineration of waste Yes Yes M/s Sunny Real Construction Pvt. Ltd. Authorized Signatory Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data Yes The only source of pollution will be two D.G. Sets of 125 and 62.50 kVA capacity. The emissions will be discharged through vent of proper height. D.G Set will conform to emission limits as prescribed under E P Act- 1986 and having acoustic arrangement as per EP Act- 1986. The D.G Set will carry ‘Type approval Certificate’. No Dust will generate during transportation and unloading of material. The measures to minimize the effects are given in Environmental Management Plan. The measures to minimize the effects are given in Environmental Management Plan. Yes The measures to minimize the effects are given in Environmental Management Plan. No No such operations are envisaged. No burning of waste will be practiced. TEAM Institute of Science & Technology Pvt. Ltd 9 EIA Consultant Form 1A- Kamla’s Ashirwad Bharatpur 5.7 Emissions from burning of waste in open air (e.g. slash materials, construction debris) No 5.8 Emissions from any other sources No Waste would be collected and handed over to the authorized vendor and biodegradable waste will be converted into manure by Organic Waste Converter. - 6. Generation of Noise and Vibration, and Emissions of Light and Heat: S. No. Information/Checklist confirmation 6.1 From operation of equipment e.g. engines, ventilation plant, crushers 6.2 From industrial or similar processes From construction or demolition From blasting or piling 6.3 6.4 Yes/No Yes but negligible No Yes No Details thereof (with approximate quantities/rates, wherever possible) with source of information data with source of information data Noise generated by equipment will be nominal. The measures to minimize the effects are given in Environmental Management Plan. It is a construction project. But insignificant to result in any adverse effect on environment. Not involved 6.5 From construction or operational traffic Yes 6.6 From lighting or cooling systems From any other sources No During construction phase the noise will be generated from movement of vehicles, earthwork, concrete mixer etc. Silent generators will be used. No - 6.7 7. Risks of contamination of land or water from releases of pollutants into the ground or into sewers, surface waters, groundwater, coastal waters or the sea: S. No. Information/checklist confirmation 7.1 7.2 7.3 Yes/No From handling storage, use or spillage of hazardous materials From discharge of sewage or other effluents to water or the land (expected made and place of discharge) Yes By deposition of pollutants emitted to air into the land or into water No Yes M/s Sunny Real Construction Pvt. Ltd. Authorized Signatory Details thereof (with approximate quantities/rates, wherever possible) with source of information data Used lubricating oil from D.G Set will be properly stored and sold to authorized recyclers. The Sewage generated will be treated and handled properly to minimize the impact. During construction phase septic tank soak pit system would be provided and during operation phase STP would be provided. The only source of pollution will be two D.G. Sets of 125 and 62.50 kVA capacity. The emissions will be discharged through vent of proper height. D.G Set will conform to emission limits as prescribed under E P Act- 1986 and having TEAM Institute of Science & Technology Pvt. Ltd 10 EIA Consultant Form 1A- Kamla’s Ashirwad Bharatpur 7.4 7.5 From any other sources Is there a risk of long term build up of pollutants in the environment from these sources? No No acoustic arrangement as per EP Act- 1986. The D.G Set will carry ‘Type approval Certificate’. Not envisaged. 8. Risk of accidents during construction or operation of the Project, which could affect human health or the environment S. No. Information/checklist confirmation 8.1 8.2 8.3 From explosions, spillages, fires from storage, handling, use or production of hazardous substances From any other causes Could the project be affected by natural disasters causing environmental damage (e.g. floods, earthquakes, landsides, cloudburst etc)? Yes/ No No No Yes Details thereof (with approximate quantities/rates, wherever possible) with source of information data These operations are not involved. There is no history of such disasters. Proper safety measures as per Disaster Management Plan will be adopted to face such incidents. 9. Factors which should be considered (such as consequential development) which could lead to environmental effects or the potential for cumulative impacts with other existing or planned activities in the locality. S. No. Information/checklist confirmation 9.1 9.2 Lead to development of supporting. cities, ancillary development or development stimulated by the project which could have impact on the environment e.g.: Supporting infrastructure (Roads, power supply, waste or waste water treatment etc.) Housing development Extractive industries Supply industries Other Lead to after-use of the site, which could have an impact on environment Yes/ No This is a small project and will not exert any significant negative impact. No No M/s Sunny Real Construction Pvt. Ltd. Authorized Signatory Details thereof with approximate quantities/rates, wherever possible) with source of information data The project is within municipal area of Jaipur with well developed infrastructure. This is a construction project. TEAM Institute of Science & Technology Pvt. Ltd 11 EIA Consultant Form 1A- Kamla’s Ashirwad Bharatpur 9.3 9.4 Set a precedent for later developments Have cumulative effects due to proximity to other existing or planned projects with similar effects No The project will be developed strictly as per UIT bye laws. It is a construction project and will be used for non polluting activities with full civic facilities like water supply, sewage treatment and ventilation etc. No (III) Environmental Sensitivity S. No. Areas 1 2 3 4 5 6 7 8 9 10 Name/Identity Areas protected under Lohagarh Fort international conventions, national or local legislation for their ecological, landscape, cultural or other related value Areas which are important or Keoladeo sensitive for ecological National Park reasons –Wetlands, watercourses or other water Sujan Ganga bodies, coastal zone, lake biospheres, mountains, forests Areas used by protected, Keoladeo important or sensitive species National Park of flora or fauna for breeding, nesting, foraging, resting, over wintering, migration Inland, coastal, marine or Sujan Ganga underground waters lake About 3.52 km towards SE from project boundary. About 1.40 km towards ESE from project boundary. About 3.52 km towards SE from project boundary. About 1.40 km towards ESE from project boundary. CFCD Nalah About 5.72 km towards ESE from project boundary. Inland Seasonal Water Bodies At about 0.10 km toward SE, 0.50 km toward ESE, 0.80 km toward ESE and 0.50 km toward SE of the project site. It is a small project no such route cross through the plot. State, National boundaries Routes or facilities used by the public for access to recreation or other tourist, pilgrim areas Defense installations Densely populated or built-up area Areas occupied by sensitive man-made land uses (hospitals, schools, places of worship, community facilities) Areas containing important, high quality or scare No No None Yes Yes Yes M/s Sunny Real Construction Pvt. Ltd. Authorized Signatory Aerial distance (within 15 km.) Proposed project location boundary About 1.50 km towards ESE from project boundary. The project is located in urban area of Bharatpur. Number of Schools, places of worship and hospitals are there in Jaipur but the project will not make any significant impact on these. No such area containing important high quality or scare resource like TEAM Institute of Science & Technology Pvt. Ltd 12 EIA Consultant Form 1A- Kamla’s Ashirwad Bharatpur 11 12 resources (ground water resources, surface resources, forestry, agriculture, fisheries, tourism minerals) Areas already subjected to pollution or environmental damage.(those where existing legal environmental standards are exceeded) Areas susceptible to natural hazard which could cause the project to present environmental problems (earthquakes, subsidence, landslides, erosion, flooding or extreme or adverse climatic conditions) surface water body, agriculture, fisheries, minerals) forestry, tourism None No Bharatpur is located in semi-arid region and except for cloud burst in 1981 there is no history of floods or land slide. Soil in Jaipur is generally sandy and cohesion less, mildly sloping hence there is no threat of subsidence. Jaipur is under seismic zone II as per NBC 2005. Hence it is a safe region. However, in structural design provision for earthquake forces have been made. Map of India showing seismic zones of India is enclosed as Annexure- XXVII. (b) “I hereby given undertaking that the data and information given in the application and enclosures are true to the best of my knowledge and belief and I am aware that if any part of the data and information submitted is found to be false or misleading at any stage, the project will be rejected and clearance give, if any to the project will be revoked at our risk and cost.” Date: Place: Jaipur Vishnu Kumar Goyal (Director) M/s Sunny Real Construction Pvt. Ltd. C-10 Ranjeet Nagar Bharatpur, svmoilind@gmail.com ; 9414208305 M/s Sunny Real Construction Pvt. Ltd. Authorized Signatory TEAM Institute of Science & Technology Pvt. Ltd 13 EIA Consultant