Application to Connect Form Generating Systems above 5MW The contact details for our Customer Solutions Managers are provided in Section 22 of our NICC 270 – Connection of large embedded generation Information Required Site Details Description Information, Notes & Feedback (attach information separately as required) Customer NMI (if available) Site Address End User (Customer) Name End User (Customer) ABN End User Postal Address Phone Number Email Representative Name Nominated Postal Address Representative Phone Number Details Email Do you have an existing connection to our Network or do you need a new connection? Frequency of Connection of Generating System Connection Arrangement Installation Details New Connection Testing (once per month) Other (ie base load or peaking) Export Connection Capability Operating Philosophy Program Details Existing Connection Non Export Attach to form, to describe: Expected Generating Unit operating duration Loss and return of SA Power Networks supply Construction Start & Completion Date Forecast Generating System connection date Single Line Diagram (SLD) Protection SLD Customer cable sizes and lengths Anticipated Export Energy (kWh) Site Layout Drawing Control Room Layout Attach to form Attach to form, unless shown on SLD Attach to form Attach to form Form Effective 13/01/2015 Version 2 www.sapowernetworks.com.au Application to Connect Form Generating Systems above 5MW (continued) Generating System Technical Information Requirements Symbol Data Description Units Value Remark Generating System VCON NMC Nominal voltage at connection to network Total Station net maximum capacity (NMC) kV MW (sent out) Generator Design Data PAUX Qmax Number of identical generating units and identification names or numbers List or table of plant, control systems and protection systems, applicable to this generating unit, for which data has been provided. Rated MVA Rated MW (Sent Out) Dispatch pattern (If known) Auxiliary load at PMAX Rated reactive power output at PMAX PMIN Minimum Load NGU MBASE PSO Text Text MVA MW (Gen) Graph MW MVAr MW (sent out) Transformer GTW GTVG GTRn GTTRn GTZ1n GTZOn Transformer identification number If this is a generating unit transformer, the list of generating units to which this information applies Number of windings Vector group (refer to Note1) Rated MVA of each winding Principal tap rated voltages Positive sequence impedance of each winding Zero sequence impedance of each winding (including any neutral earthing impedance applied) Earthing arrangement Text Text No Text MVA kV/kV (a + jb)% on100 MVA base on VCON (a + jb)% on100 MVA base on VCON Text, diagram Form Effective 13/01/2015 Version 2 www.sapowernetworks.com.au Page 2 of 6 Application to Connect Form Generating Systems above 5MW (continued) Generating System Technical Information Requirements (continued) Symbol GTAPR Data Description Tapped winding Tap change range Units Value Remark Text, diagram kV - kV Synchronous Machine Data MBASE GEN Q+ PMAX Q+ PMIN QPMAX QPMIN NP Synchronous machine nameplate rating (MVA) Maximum lagging Reactive power at PMAX Maximum lagging Reactive power at PMIN Minimum lagging Reactive power at PMAX Minimum lagging Reactive power at PMIN Number of poles RA Stator resistance RF Rotor resistance XD XDD XDDD TDO TDDO TKD MVA MVAr export MVAr export MVAr export MVAr export Text % on100 MVA base on VCON % on100 MVA base on VCON % on100 MVA base on VCON % on100 MVA base on VCON % on100 MVA base on VCON Direct axis unsaturated synchronous reactance Direct axis unsaturated transient reactance Direct axis unsaturated sub-transient reactance Direct axis open circuit sub-transient time s constant Direct axis open circuit sub-transient time s constant Direct axis damper leakage time constant s Synchronous Machine Excitation System Data Details of the excitation control system described in functional block diagram from showing: voltage control system (AVR); power system stabiliser (PSS); MVA Function block diagram If fitted Form Effective 13/01/2015 Version 2 www.sapowernetworks.com.au Page 3 of 6 Application to Connect Form Generating Systems above 5MW (continued) Generating System Technical Information Requirements (continued) Symbol Data Description exciter; over-excitation limiter; under-excitation limiter; stator current limiter (if fitted); flux (V/f) limiter (if fitted); manual restrictive limiter (if fitted); and any other limiters that may restrict excitation system operation. Units Value Remark Functional block diagram Synchronous Machine Protection Systems Details of the protection system showing principles of operation, trigger levels, switching times, etc Text/ Diagram Asynchronous Machine Data (doubly fed) MBASE GEN Q+ PMAX Q+ PMIN QPMAX QPMIN NP SLIP Asynchronous machine nameplate rating (MVA) Maximum lagging Reactive power at PMAX Maximum lagging Reactive power at PMIN Minimum lagging Reactive power at PMAX Minimum lagging Reactive power at PMIN Number of poles Slip at PMAX MVA MVAr export MVAr export MVAr export MVAr export Text Text % on100 MVA base on VCON RS Stator resistance XS Stator leakage reactance unsaturated and at VTGEN % on100 MVA base on VCON RM Iron loss resistance, referred to the stator % on100 MVA base on VCON Form Effective 13/01/2015 Version 2 www.sapowernetworks.com.au Page 4 of 6 Application to Connect Form Generating Systems above 5MW (continued) Generating System Technical Information Requirements (continued) Symbol XM RR XR Data Description Magnetizing reactance, referred to the stator unsaturated and at VTGEN Rotor resistance at rated slip, referred to the stator Rotor reactance, referred to the stator unsaturated and at VTGEN Units Value Remark % on100 MVA base on VCON % on100 MVA base on VCON % on100 MVA base on VCON Asynchronous Machine Protection Systems Details of the protection system showing principles of operation, trigger levels, switching times, etc Text/ Diagram Photovoltaic Cell Array MBASE GEN Nameplate rating of array MW Photovoltaic Cell Protection Systems Details of the protection system showing principles of operation, trigger levels, switching times, etc Text/ Diagram Mechanically or Electronically Switched Capacitor, Reactor or Resistor Details of the control system showing principles of operation, trigger levels, switching times, discharge times, etc. 3 phase electrical connection diagram, including earthing arrangements. Details of how this controller interfaces with the primary electrical or mechanical control systems (if applicable), or how this controller effects its control action. Text/ Diagram Functional block diagram Text/ Diagram Static VAR Compensator, Thyristor Controlled (SVC) BASE VNOM SCD Nameplate rating MVA Rated voltage kV Capability diagram (reactive power versus Chart voltage) Form Effective 13/01/2015 Version 2 www.sapowernetworks.com.au Page 5 of 6 Application to Connect Form Generating Systems above 5MW (continued) Generating System Technical Information Requirements (continued) Symbol Data Description GTW GTVG GTRn GTTRn Number of windings Vector group Rated MVA of each winding Principal tap rated voltages GTZ1n Positive sequence impedance of each winding GTZOn Zero sequence impedance of each winding GTAPR Earthing arrangement Tapped winding Tap change range Units Value Remark No Text MVA kV/kV (a + jb)% on100 MVA base on VCON (a + jb)% on100 MVA base on VCON Text, diagram Text, diagram kV - kV Fault Ride Through Control System Data Details of the fault ride through control system showing principles of operation, trigger levels, etc. Details of the fault ride through control system described in function block diagram form, in accordance with NER Rule S5.2.4 (b) Text/ Diagram Function block diagram Other Generating Unit Control System Data Details of the control system showing Text/ Diagram principles of operation, trigger levels, etc. Details of the control system described in Function function block diagram form, in block diagram accordance with NER Rule S5.2.4 (b) Note 1: SA Power Networks requires no zero sequence current contribution into the Network under fault conditions (typically achieved by a transformer with a delta on the network side). Form Effective 13/01/2015 Version 2 www.sapowernetworks.com.au Page 6 of 6