IEC SYSTEM FOR CONFIRMITY TESTING AND CERTIFICATION OF ELECTRICAL EQUIPMENT COMMITTEE OF TESTING LABORATORIES IEC 61558-1, ED. 1 (1997) – A1 (1998) TESTING AND MEASURING EQUIPMENT/ALLOWED SUBCONTRACTING Safety of power transformers, power supplies, reactors and similar products Part 1: General requirements and tests R=Required by Lab. S=May be subcontracted W=Witness testing 3PPS=Three Phase Power Supply required Clause 8.15 9.1 Measurement/testing Marking Protection against accessibility to hazardous live parts Output voltage and output current under load 11.1 / 12 / 13 measures / No-load output voltage measures / Short-circuit voltage test Heating test / Short circuit and overload 14.2/ 14.3 / 15.2 / protection test / Short circuit and overload 15.3 15.4 / 15.5 protection test for fail safe transformers 16.2 / 16.3 / 16.4 17.1 2010-06-14 Testing / measuring equipment / material needed R R Power supply, multimeter, amperometer, wattmeter - Protection against ingress of solid objects Power supply, impedances, ohmmeter, thermocouples, thermometer, amperometer, oven without air circulation if ta > 25°C, black wooden painted support, pull test device (N), copper discs painted black with thermocouples, electric strength test equipment, fuse link Spring hammer, steel plate, tumbling barrel, dynamometer and torque meter, calipers, weighing device (g) pull test device (N) - IP3X (2,5mm probe), IP4X (1mm probe) - Protection against ingress of dust and water - Dust chamber (IP 5X and IP 6X) - Apparatus for protection against water Mechanical strength tests Subcontracting R Piece of cloth, water, hexane Standard test finger (IEC 60529), test pin according to Figure 3, multimeter, oscilloscope / Measuring network (Annex J) 1/2 R R R tests R IEC 61558-1/A1/1998 IEC SYSTEM FOR CONFIRMITY TESTING AND CERTIFICATION OF ELECTRICAL EQUIPMENT Clause Measurement/testing 17.2 18.2 18.3 18.4 19.10 19.12.3 Humidity test Insulation resistance tests Dielectric strength tests Higher frequency test Ageing test / Impact test / Scratch test Insulated winding wires construction (according to IEC 60851-3/5/6) Strain test on socket-outlets Thermal cut-out tests (based on IEC 60730-1) / Tests on PTC resistor Protection against excessive flexing of cords Cord anchorage test / Pull test for terminals / Terminals contact pressure Protective earthing test Screws and connections (mechanical) and glands testing Creepage and clearance distances Distances through insulation Resistance to heat / fire tests 19.15 20.5 / 20.5.3 22.9.4 22.9.5 / 23.2 / 23.4 24.4 25 26.2 26.3 27.1 / 27.2 / 27.4 27.3 27.5 28 2010-06-14 Resistance to ignition testing Resistance to tracking test Resistance to rusting COMMITTEE OF TESTING LABORATORIES Testing / measuring equipment / material needed Subcontracting R R R R R Humidity cabinet Megaohmmeter High voltage transformer Frequency converter Heating cabinet / Spring hammer / Hardened steel pin Heating cabinet, high voltage transformer, mandrels Apparatus for torque measuring on socket Power supply (cycled), heating cabinet S R R Flexing test apparatus Torque meter / Dynamometer, test cables of various sizes R R Earthing test equipment R R Screwdriver or spanner, test rod Sliding caliper / Thickness caliper / Climatic chamber Mandrel apparatus Heating cabinet / Glow wire test apparatus / Ball pressure test apparatus (see also CTL D.S. N. 391.mod) Power supply, fuses, impedances, black painted wooden support Proof tracking test device Closeable glass vessel / Test solution / Heating cabinet / Facilities to wash samples after test 2/2 R R R R R R IEC 61558-1/A1/1998