IEC SYSTEM FOR CONFIRMITY TESTING AND CERTIFICATION OF ELECTRICAL EQUIPMENT COMMITTEE OF TESTING LABORATORIES TESTING AND MEASURING EQUIPMENT/ALLOWED SUBCONTRACTING IEC 60598-1, Edition 8.0 (2014) Luminaires – Part 1: General requirements and tests “R” “S” “SF” “W” “3PPS” Clause 3.4 4.4.4 4.4.5 4.11.6 Required May be subcontracted, see OD 2012 Specialized Facility, see IECEE 02-2 Witness testing in the categories “MED” and “MEAS” Three Phase Power Supply required Measurement/testing Test of marking Lampholder pressure test Voltage across lampholders Electro-mechanical contact system 4.12.1/4.12.5 Screws and connections (mechanical) and glands testing 4.13.1/4.13.4 Mechanical strength tests 4.13.6/4.21.4 4.14.1/4.14.2 Adjusting devices testing 4.14.3 4.9.2/4.18.1 Insulating linings and sleeves tests / Resistance to corrosion 2015-04-23 CTL-OP 112 Ed 6.0 2013-05-24 Testing / measuring equipment / material needed Piece of cloth / Water / Petroleum spirit Test caps / Pressure device / Torque driver High voltage probe / Oscilloscope Low voltage variable current power supply, voltmeter, high voltage transformer Test screwdriver or spanner / Test rods Spring-operated impact test apparatus / Apparatus for ball impact tests / Conditioning cabinet (e.g. freezer) / Angle measuring device / Weighting device / Tumbling barrel test equipment Glass test shelves / Weighting device / Test apparatus for adjustable devices Heating cabinet, humidity cabinet, megaohmeter, high voltage transformer 1/3 Subcontracting R R R R R R R R © IEC – IECEE 2013 IEC SYSTEM FOR CONFIRMITY TESTING AND CERTIFICATION OF ELECTRICAL EQUIPMENT Clause 4.18.2 / Annex F 4.20 4.22 Measurement/testing Stress corrosion Rough service luminaires Attachment to lamps Photobiological hazard: UV radiation, retinal 4.24/Annex P blue light hazard 4.26 4.28 5.2.10.1 5.3 7.2.3 8.2.5 8.2.7 9.2.0 9.2.1/9.2.2 9.2.3,4,5,6,7, 8,9 9.3.1 10.2.1 10.2.2 10.3.1 11.2.1 2015-04-23 Short circuit protection test Fixing of thermal sensing controls Pull and torque tests on cord anchorage Internal wiring dimensions Earth continuity test Protection against electric shock tests / Capacitor discharge Solid object proof luminaire testing Dust proof luminaire tests Water proof luminaires testing Humidity tests Insulation resistance tests Electric strength tests Leakage current testing Creepage distances and clearances measurements CTL-OP 112 Ed 6.0 2013-05-24 COMMITTEE OF TESTING LABORATORIES Testing / measuring equipment / material needed Subcontracting Closeable glass vessel / test solution / Heating cabinet / Facilities to wash samples after test Vibration test equipment Weighing device UV radiation test instruments / retinal blue light hazard test instruments (Equipment List of IEC/TR 62778:2012, Edition 1.0) Goniophotometric measurement system Test chain / Weighting device Temperature change test instruments in accordance to IEC 60068-2-14, test Na Cord anchorage tests apparatus (pull and torque) Micrometer / Equipment for insulation thickness Earthing test equipment Standard test finger (IEC 60529) / Unjointed test finger Voltmeter / oscilloscope IP 3X (2,5 mm) / IP 4X (1 mm) probes Apparatus for proving protection against dust Apparatus for protection against water tests R Humidity cabinet Megaohmmeter High voltage transformer Leakage current tester Digital calliper (or equivalent) R R R R R 2/3 S R S R S R R R R R R R © IEC – IECEE 2013 IEC SYSTEM FOR CONFIRMITY TESTING AND CERTIFICATION OF ELECTRICAL EQUIPMENT Clause Measurement/testing 12.3.1 Endurance tests 12.4.1 Thermal tests 12.5.1e) Annex C Fig. C3 12.7.2 13.2.1 13.3.1 13.3.2 13.4.1 14 15 2015-04-23 Abnormal operation testing COMMITTEE OF TESTING LABORATORIES Testing / measuring equipment / material needed Subcontracting Thermal cabinet (35°C) / Endurance test equipment / Multimeter / Wattmeter Draught-proof enclosure (25°C) / Thermometer / Thermocouples / Voltage stabilizer / Multimeter / Wattmeter R Test circuit for metal halide luminaires R Test for luminaires with temperature sensing Relevant equipment of clauses 15.3 and 20.5, Equipment List of controls internal/external to the ballast or IEC 61558-1, Edition 2 - 2005 transformer Resistance to heat test Heating cabinet / Ball pressure test apparatus (see also CTL D.S. N. 391.mod) Resistance to flame test Needle flame test apparatus Resistance to ignition testing Glow-wire test apparatus Resistance to tracking test Proof tracking test device Screw terminals Torque drivers, test cables, pull device, micrometer, timer Screwless terminals Pull device, variable current source, voltmeter, heating cabinet, timer, test cables CTL-OP 112 Ed 6.0 2013-05-24 3/3 R R R R R R R R © IEC – IECEE 2013