Ground Water Department-Irrigation & CAD Department Permission to dig new wells from Ground Water Department 1 2 3 Name of Approval / NOC / License / Registration Competent Authority Stage Processing Timeline 4 Approving Authority 5 Supporting Documents required Ground water requirement upto 1000 cu.m per day : Deputy Director – Ground Water Ground water requirement Above 1000 cu.m per day : Director – Ground Water S. Item No. of No. copies Ground Water Department Pre-Establishment 15 days 1 6 Fee and mode of payment 7 Application Form Location plan with existing bore wells and 2 Online distance between bore well to bore well preferably with survey nos. 2 Number of bores required with indicative 2 Online locations Online payment through Single Desk system, fee is based on Water requirement & Area to be surveyed as detailed in Annexure 1. Application to be filed online through Single Desk system at: https://www.apindustries.gov.in/APIndus/Index.aspx . Through Common Application Form for Pre-Establishment available at: http://www.apindustries.gov.in/APIndus/Data/GO/G.O%20for%20AP%20Si ngle%20Desk%20Policy.pdf Annexure 1 Fee is based on Water requirement & Area to be surveyed. The time required to survey the land based on the extent is as follows: o <=25 acres – 1 day; o 25 to 50 acres – 2 days; o 50 – 75 acres – 3 days; o Additional day for each incremental 25 acres. The estimation of survey charges per day is as follows.