Ground Water Permission to dig new wells

advertisement
Ground Water Department-Irrigation & CAD Department
Permission to dig new wells from Ground Water Department
1
2
3
Name of Approval / NOC / License /
Registration
Competent Authority
Stage
Processing Timeline
4
Approving Authority
5
Supporting Documents required
 Ground water requirement upto 1000 cu.m per day : Deputy Director –
Ground Water
 Ground water requirement Above 1000 cu.m per day : Director – Ground
Water
S.
Item
No. of
No.
copies
Ground Water Department
Pre-Establishment
15 days
1
6
Fee and mode of payment
7
Application Form
Location plan with existing bore wells and
2
Online
distance between bore well to bore well
preferably with survey nos.
2
Number of bores required with indicative
2
Online
locations
 Online payment through Single Desk system, fee is based on Water
requirement & Area to be surveyed as detailed in Annexure 1.
Application to be filed online through Single Desk system at:
https://www.apindustries.gov.in/APIndus/Index.aspx . Through Common
Application Form for Pre-Establishment available at:
http://www.apindustries.gov.in/APIndus/Data/GO/G.O%20for%20AP%20Si
ngle%20Desk%20Policy.pdf
Annexure 1
Fee is based on Water requirement & Area to be surveyed. The time required to survey the land based on the extent
is as follows:
o <=25 acres – 1 day;
o 25 to 50 acres – 2 days;
o 50 – 75 acres – 3 days;
o Additional day for each incremental 25 acres.
The estimation of survey charges per day is as follows.