AS BUILT SUBMITTED SEPT.2006 H RIC ND MO A RO D AD AN RI RO MB CA SITE EA ES 16 GL Y4 EA SH L RO DA AD D OD AD D IEL KF N A MO ON AD RO OA ER NS AR RO W. R. NEWELL, P. ENG. ACTING DIRECTOR, INFRASTRUCTURE SERVICES B Y RIV LE IE D B NT HU E DES SERVICES D'INFRASTRUCTURE AD RO SERVICES ET TRAVAUX PUBLIC WA H HIG R. G. HEWITT, P. ENG. ACTING DEPUTY CITY MANAGER PUBLIC WORKS AND SERVICES DEPARTMENT LM IN E TW AD RO D OA YR H OP BR NO H RT KEY MAP N.T.S. R WE GO AD RO NEPEAN LANDFILL CONTAMINATED GROUNDWATER EXTRACTION AND TREATMENT MOODIE DRIVE; CAMBRIAN ROAD TO BARNSDALE ROAD CONTRACT NO: ISB05-2029 JULY 2005 38260-00(007)GN-OT003 SEP 14/2006 NOTE: The location of the utilities is approximate only, the exact location should be determined by consulting the municipal authorities and utility companies concerned. The contractor shall prove the location of utilities and shall be responsible for adequate protection from damage. NO. REVISIONS BY DATE 1 ISSUED FOR TENDER GDS 6-JUL-2005 2 ISSUED FOR CONSTRUCTION GDS 15-SEP-2005 3 AS BUILT GDS 3 MAR 2006 NEPEAN LANDFILL CONTAMINATED GROUNDWATER EXTRACTION AND TREATMENT CONTRACT NO. ISB05-2029 DWG. NO. LEGEND AND INDEX TED WOYTOWICH, P. ENG W.R. NEWELL, P.ENG. B. MASON, P.ENG. Senior Project Manager Acting Director Infrastructure Services Acting Manager Construction Services Dwn: DRAWING NO. SYMBOLS -1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 PROPOSED EXISTING LEGEND PROPERTY LINE EDGE OF ASPHALT F PROPOSED FORCEMAIN E PROPOSED CONTROL AND POWER IN COMMON TRENCH O/H PROPOSED OVERHEAD LINES EDGE OF SHOULDER CENTRELINE OF DITCH 102.00 CONTOUR PROPOSED EXTRACTION WELL PROPOSED BALL VALVE FENCE UP EX-1 PROPOSED CHECK VALVE UTILITY POLE GUY WIRE S.I.B. STANDARD IRON BAR BELL PED. BELL TELEPHONE PEDESTAL BH-4 BOREHOLE LOCATION MW-7 MONITORING WELL LOCATION GRANULAR BASE COURSE SAND 001 B.R.M. Chkd: J.M. Des: G.D.S. Chkd: Date: JULY 2005 Scale: N.T.S. J.M. DESCRIPTION COVER SHEET LEGEND AND INDEX PLAN AND PROFILE, STATION 0+000 TO 0+140 PLAN AND PROFILE, STATION 0+140 TO 0+280 PLAN AND PROFILE, STATION 0+280 TO 0+420 PLAN AND PROFILE, STATION 0+420 TO 0+560 PLAN AND PROFILE, STATION 0+560 TO 0+700 PLAN AND PROFILE, STATION 0+700 TO 0+840 PLAN AND PROFILE, STATION 0+840 TO 0+980 PLAN AND PROFILE, STATION 0+980 TO 1+002 PLAN AND PROFILE, STATION 0+000 E TO 0+073 E DETAILS TREATMENT SYSTEM, FLOOR PLAN AND ELEVATIONS SITE PLAN AND LANDSCAPING PLAN GRADING AND DRAINAGE PLAN POWER DISTRIBUTION, SINGLE LINE DIAGRAM ELECTRICAL POWER, INSTRUMENT & LIGHTING LAYOUT SILTY CLAY CLAYEY SILT 2 SILTY SAND WATER LEVEL WATER TABLE GENERAL NOTES: DRAWING NOTES: 1. THE POSITION OF UTILITY POLES, OVERHEAD UTILITY LINES, CONDUITS, WATERMAINS, SEWERS, AND OTHER UTILITIES AND STRUCTURES ARE NOT NECESSARILY SHOWN ON THE CONTRACT DRAWINGS, AND WHERE SHOWN, THE ACCURACY OF THE POSITIONS OF THE SUCH UTILITIES AND STRUCTURES IS NOT GUARANTEED. 2. BEFORE STARTING WORK, THE CONTRACTOR SHALL CONFIRM THE POSITIONS AND EXACT LCOATIONS OF ALL SUCH UTILITIES AND SHALL ASSUME ALL LIABILITY FOR ANY DAMAGE CAUSED DURING THE COURSE OF THE CONTRACT WORK. 1. THESE DRAWINGS ARE OF A CONFIDENTIAL NATURE AND SHALL NOT BE REPRODUCED IN ANY MANNER, NOR USED FOR ANY PURPOSE WHATSOEVER EXCEPT BY WRITTEN PERMISSION OF CONESTOGA-ROVERS & ASSOCIATES. 2. THESE DRAWINGS ARE NOT APPROVED FOR CONSTRUCTION UNLESS STATUS INDICATES 'ISSUED FOR CONSTRUCTION', AND DRAWING IS SIGNED AND DATED. ALL DRAWINGS BEARING EARLIER DATE AND/OR REVISIONS IN NUMBER. 38260-00(007)GN-OT004 SEP 14/2006 NOTE: The location of the utilities is approximate only, the exact location should be determined by consulting the municipal authorities and utility companies concerned. The contractor shall prove the location of utilities and shall be responsible for adequate protection from damage. NO. REVISIONS BY DATE 1 ISSUED FOR TENDER GDS 6-JUL-2005 2 ISSUED FOR CONSTRUCTION GDS 15-SEP-2005 3 AS BUILT GDS 3-MAR-2006 NEPEAN LANDFILL CONTAMINATED GROUNDWATER EXTRACTION AND TREATMENT I:\Drawings\38000s\38260\38260-SOURCE\38260(SOURCE)-STAMP-GDS-6-JULY-2005.jpg CONTRACT NO. ISB05-2029 MOODIE DRIVE PLAN AND PROFILE STA. 0+000 TO STA. 1+140 DWG. NO. 002 Date: TED WOYTOWICH, P. ENG W.R. NEWELL, P.ENG. B. MASON, P.ENG. Senior Project Manager Acting Director Infrastructure Services Acting Manager Construction Services Dwn: B.R.M. Chkd: J.M. Des: G.D.S. Chkd: JULY 2005 Scale: HORIZONTAL 1:250 VERTICAL 1:50 J.M. CONSTRUCTION NORTH 0 0+060 EX-3 BH4-05 0+080 BH2-05 EX-2 E F E F E F E F E F E F 0+120 BH3-05 E F 11 0+100 EX-1 E F E F E F E F E F E F 0+040 BH1-05 11 0+020 0+000 CHAINAGE 0+000 IS LOCATED 140.00m SOUTH OF SOUTHERN BOUNDARY OF LOT 8 CONCESSION 5 E F BH5-05 101 .2 10 0.7 5 6 8m 3 UP 0+140 MW143-1 4 5 REFER TO DRAWING 3 1 UP UP 2 MW128-1 NOTE: 25mm AND 75mm DIAMETER COUPLES JOINED USING ELECTROFUSION COUPLER. EX-1 100 EX-2 100 E E E E E E ADDITIONAL FORCEMAIN PLACED AND CAPPED FROM EX-1 TO TREATMENT FACILITY BETWEEN EX-1 AND EX-2 F F 98 102 E E E E BH5-05 BH4-05 BH3-05 EXISTING GROUND, 2m WEST OF EDGE OF ASPHALT BH2-05 BH1-05 102 EX-3 BETWEEN EX-2 AND EX-3 F F F F F F F F F F F F 98 96 96 PS 95.91 PS 95.53 PI 95.44 PS 95.35 PI 95.07 PI 94.89 0+140 0+120 0+100 0+080 0+060 92 0+040 92 0+020 94 0+000 CHAINAGE 94 CHAINAGE 38260-00(007)CI-OT003 SEP 14/2006 NOTE: The location of the utilities is approximate only, the exact location should be determined by consulting the municipal authorities and utility companies concerned. The contractor shall prove the location of utilities and shall be responsible for adequate protection from damage. NO. REVISIONS BY DATE 1 ISSUED FOR TENDER GDS 6-JUL-2005 2 ISSUED FOR CONSTRUCTION GDS 15-SEP-2005 3 AS BUILT GDS 3-MAR-2006 NEPEAN LANDFILL CONTAMINATED GROUNDWATER EXTRACTION AND TREATMENT I:\Drawings\38000s\38260\38260-SOURCE\38260(SOURCE)-STAMP-GDS-6-JULY-2005.jpg CONTRACT NO. ISB05-2029 MOODIE DRIVE PLAN AND PROFILE STA. 0+140 TO STA. 1+280 DWG. NO. 003 Date: TED WOYTOWICH, P. ENG W.R. NEWELL, P.ENG. B. MASON, P.ENG. Senior Project Manager Acting Director Infrastructure Services Acting Manager Construction Services Dwn: B.R.M. Chkd: J.M. Des: G.D.S. Chkd: JULY 2005 Scale: HORIZONTAL 1:250 VERTICAL 1:50 J.M. CONSTRUCTION NORTH 0 6 8m E F E F E F E F E F E F E F 0+260 0+240 0+220 0+200 0+180 0+280 BH6-05 102.2 5 101.7 5 REFER TO DRAWING 4 E F E F E F E F E F E F E F E F E F E F E F BH5-05 4 UP 0+160 EX-3 E F 0+140 REFER TO DRAWING 2 UP 2 UP MW134-1 S.I.B. BH6-05 102.00 EXISTING GROUND, 2m WEST OF EDGE OF ASPHALT BH5-05 102 EX-3 102 E E E E E E E E E E E 100 BETWEEN EX-3 AND EX-4 F F F F F F F F F F F F F F F F F F F 100 98 98 96 96 PS 95.53 PI 95.07 0+280 0+260 0+240 0+220 0+200 92 0+180 92 0+160 94 0+140 CHAINAGE 94 CHAINAGE 38260-00(007)CI-OT003 SEP 14/2006 NOTE: The location of the utilities is approximate only, the exact location should be determined by consulting the municipal authorities and utility companies concerned. The contractor shall prove the location of utilities and shall be responsible for adequate protection from damage. NO. REVISIONS BY DATE 1 ISSUED FOR TENDER GDS 6-JUL-2005 2 ISSUED FOR CONSTRUCTION GDS 15-SEP-2005 3 AS BUILT GDS 3-MAR-2006 NEPEAN LANDFILL CONTAMINATED GROUNDWATER EXTRACTION AND TREATMENT I:\Drawings\38000s\38260\38260-SOURCE\38260(SOURCE)-STAMP-GDS-6-JULY-2005.jpg CONTRACT NO. ISB05-2029 MOODIE DRIVE PLAN AND PROFILE STA. 0+280 TO STA. 1+420 DWG. NO. 004 Date: TED WOYTOWICH, P. ENG W.R. NEWELL, P.ENG. B. MASON, P.ENG. Senior Project Manager Acting Director Infrastructure Services Acting Manager Construction Services Dwn: B.R.M. Chkd: J.M. Des: G.D.S. Chkd: Scale: HORIZONTAL 1:250 VERTICAL 1:50 J.M. R.S. CONSTRUCTION NORTH UP UP UP E F E F E F E F BH7-05 E F E F BH8-05 0+400 0+380 0+360 0+340 0+320 0+300 EX-4 BH21-05 E F 102. 102. 75 50 102.5 102. 7 0 5 2 4 6 8m REFER TO DRAWING 5 E F 0+420 E F E F E F E F E F E F E F E F E F E F 0+280 REFER TO DRAWING 3 0 E F JULY 2005 BH21-05 BH7-05 140 EXISTING GROUND, 2m WEST OF EDGE OF ASPHALT 102 E E E E 102 E E 104 E E E E EX-4 E E E BH8-05 S.I.B. BETWEEN EX-4 AND EX-5 100 F F F F F F F F F F F F F F F F F F F 100 98 98 96 96 PS 94.35 94 94 PI 93.89 92 0+420 0+400 0+380 0+360 0+340 0+320 0+300 0+280 CHAINAGE 92 CHAINAGE 38260-00(007)CI-OT003 SEP 14/2006 NOTE: The location of the utilities is approximate only, the exact location should be determined by consulting the municipal authorities and utility companies concerned. The contractor shall prove the location of utilities and shall be responsible for adequate protection from damage. NO. REVISIONS BY DATE 1 ISSUED FOR TENDER GDS 6-JUL-2005 2 ISSUED FOR CONSTRUCTION GDS 15-SEP-2005 3 AS BUILT GDS 3-MAR-2006 I:\Drawings\38000s\38260\38260-SOURCE\38260(SOURCE)-STAMP-GDS-6-JULY-2005.jpg NEPEAN LANDFILL CONTAMINATED GROUNDWATER EXTRACTION AND TREATMENT CONTRACT NO. ISB05-2029 MOODIE DRIVE PLAN AND PROFILE STA. 0+420 TO STA. 1+560 DWG. NO. 005 Date: TED WOYTOWICH, P. ENG W.R. NEWELL, P.ENG. B. MASON, P.ENG. Senior Project Manager Acting Director Infrastructure Services Acting Manager Construction Services Dwn: B.R.M. Chkd: J.M. Des: G.D.S. Chkd: JULY 2005 Scale: HORIZONTAL 1:250 VERTICAL 1:50 J.M. CONSTRUCTION NORTH UP E F BH8-05 BH9-05 E F E F E F E BH10-05 F E F EX-6 E F E F E F E F E F E F E F E F 0+500 BH12-05 0+520 0+460 103 .50 103. 25 E F BH11-05 EX-5 0+440 E F 103 104.00 .75 2 4 6 8m REFER TO DRAWING 6 E F 0+560 E F 0+540 E F 0 UP 0+480 E F 0+420 REFER TO DRAWING 4 UP EX-5 BH8-05 EX-6 BH12-05 BH11-05 104 BH10-05 BH9-05 I.B. EXISTING GROUND, 2m WEST OF EDGE OF ASPHALT 104 E E E E E E 102 E E E E E E E 102 AND TREATMENT PLANT BETWEEN EX-5 AND EX-6 F F F F F F F F F F F F F F F F F F F 100 100 98 98 96 96 94 PS 94.35 PS 94.35 PI 93.89 PI 93.89 94 0+560 0+540 0+520 0+500 0+480 0+460 0+440 92 0+420 92 CHAINAGE F CHAINAGE 38260-00(007)CI-OT003 SEP 14/2006 NOTE: The location of the utilities is approximate only, the exact location should be determined by consulting the municipal authorities and utility companies concerned. The contractor shall prove the location of utilities and shall be responsible for adequate protection from damage. NO. REVISIONS BY DATE 1 ISSUED FOR TENDER GDS 6-JUL-2005 2 ISSUED FOR CONSTRUCTION GDS 15-SEP-2005 3 AS BUILT GDS 3-MAR-2006 I:\Drawings\38000s\38260\38260-SOURCE\38260(SOURCE)-STAMP-GDS-6-JULY-2005.jpg NEPEAN LANDFILL CONTAMINATED GROUNDWATER EXTRACTION AND TREATMENT CONTRACT NO. ISB05-2029 MOODIE DRIVE PLAN AND PROFILE STA. 0+560 TO STA. 1+700 DWG. NO. 006 Date: TED WOYTOWICH, P. ENG W.R. NEWELL, P.ENG. B. MASON, P.ENG. Senior Project Manager Acting Director Infrastructure Services Acting Manager Construction Services Dwn: B.R.M. Chkd: J.M. Des: G.D.S. Chkd: Scale: HORIZONTAL 1:250 VERTICAL 1:50 J.M. CONSTRUCTION NORTH PROPOSED TREATMENT BUILDING 10.0m JULY 2005 0 2 4 6 8m E F F 104.25 O/H 10 4.5 0 S.I.B. 10.0m 6 OVERHEAD POWER AND TELEPHONE 11 104.5 E F E F E F UP E F E F 104.00 103.75 E F E F E F INSTALL SM RIGID INSULATION ACROSS DITCH ABOVE FORCEMAINS. UP INSTALL 38mm x 140mm PRESSURE TREATED BOARDS ABOVE ELECTRICAL CABLES IN DITCH E F E F E F E F F 104.50 F F REFER TO DRAWING 7 E F E F F 104.25 103.50 F 104. 104. 50 0+700 0+680 0+620 0+600 0+580 104.25 0+660 BH13-05 BH12-05 0+640 E F 0 104.00 103.75 103.50 0+560 REFER TO DRAWING 5 S.I.B. 105.00 75 UP 108 108 106 106 BH12-05 BH13-05 PROPOSED TREATMENT PLANT EXISTING GROUND, 2m WEST OF EDGE OF ASPHALT 104 F 104 E F E E E E E E E E E F PLANT TO DISCHARGE AND TREATMENT PLANT 102 F F F F F F F F F F F F F F F F F F F 102 0+700 0+680 0+660 0+640 0+620 0+600 0+580 CHAINAGE 100 0+560 100 CHAINAGE 38260-00(007)CI-OT003 SEP 14/2006 NOTE: The location of the utilities is approximate only, the exact location should be determined by consulting the municipal authorities and utility companies concerned. The contractor shall prove the location of utilities and shall be responsible for adequate protection from damage. NO. REVISIONS BY DATE 1 ISSUED FOR TENDER GDS 6-JUL-2005 2 ISSUED FOR CONSTRUCTION GDS 15-SEP-2005 3 AS BUILT GDS 3-MAR-2006 I:\Drawings\38000s\38260\38260-SOURCE\38260(SOURCE)-STAMP-GDS-6-JULY-2005.jpg NEPEAN LANDFILL CONTAMINATED GROUNDWATER EXTRACTION AND TREATMENT CONTRACT NO. ISB05-2029 MOODIE DRIVE PLAN AND PROFILE STA. 0+700 TO STA. 0+840 DWG. NO. 007 Date: TED WOYTOWICH, P. ENG W.R. NEWELL, P.ENG. B. MASON, P.ENG. Senior Project Manager Acting Director Infrastructure Services Acting Manager Construction Services Dwn: B.R.M. Chkd: J.M. Des: G.D.S. Chkd: JULY 2005 Scale: HORIZONTAL 1:250 VERTICAL 1:50 J.M. 104 . 105.50 105.25 105.00 104.50 EXISTING ROAD 104.75 CONSTRUCTION NORTH 0 2 4 6 8m 50 EXISTING GATE BELL F F F F F F F F F F F F F 105 106 106 105 .50 F F 0+820 0+780 0+760 0+740 0+720 105.2 5 F BH16-05 BH15-05 BH14-05 F REFER TO DRAWING 8 F UP UP 0+800 F 0+700 REFER TO DRAWING 6 F 105.00 104.50 106 .25 .00 .75 0+840 EXISTING ACCESS POINT TO TREATMENT BUILDING UP .50 S.I.B. 106.00 BH14-05 106 BH16-05 108 BH15-05 108 EXISTING GROUND, 2m WEST OF EDGE OF ASPHALT 106 104 PLANT TO DISCHARGE F F F F F F F F F F F F 104 F 0+840 0+820 0+800 0+780 100 0+760 100 0+740 102 0+720 102 0+700 CHAINAGE F F F F F F F CHAINAGE 38260-00(007)CI-OT003 SEP 14/2006 NOTE: The location of the utilities is approximate only, the exact location should be determined by consulting the municipal authorities and utility companies concerned. The contractor shall prove the location of utilities and shall be responsible for adequate protection from damage. NO. REVISIONS BY DATE 1 ISSUED FOR TENDER GDS 6-JUL-2005 2 ISSUED FOR CONSTRUCTION GDS 15-SEP-2005 3 AS BUILT GDS 3-MAR-2006 I:\Drawings\38000s\38260\38260-SOURCE\38260(SOURCE)-STAMP-GDS-6-JULY-2005.jpg NEPEAN LANDFILL CONTAMINATED GROUNDWATER EXTRACTION AND TREATMENT CONTRACT NO. ISB05-2029 MOODIE DRIVE PLAN AND PROFILE STA. 0+840 TO STA. 0+980 DWG. NO. 008 Date: TED WOYTOWICH, P. ENG W.R. NEWELL, P.ENG. B. MASON, P.ENG. Senior Project Manager Acting Director Infrastructure Services Acting Manager Construction Services Dwn: B.R.M. Chkd: J.M. Des: G.D.S. Chkd: JULY 2005 Scale: HORIZONTAL 1:250 VERTICAL 1:50 J.M. CONSTRUCTION NORTH 106.00 0 2 4 6 8m 108.00 107.00 107.00 BELL F F F F F F F F F 0+920 0+900 0+880 0+860 106 F F F BH19-05 BH18-05 107 107. 00 .75 107.5 .25 F F 107 0 REFER TO DRAWING 9 F BH17-05 F 0+980 F 0+960 F UP 0+940 F 0+840 REFER TO DRAWING 7 F 107.00 UP 108 .75 .00 BH18-05 BH17-05 BH19-05 0 7.0 10 108 EXISTING GROUND, 2m WEST OF EDGE OF ASPHALT 106 PLANT TO DISCHARGE 104 F F F F F F F F F F F F F F F F F F F F 102 0+980 0+960 0+940 0+920 0+900 0+880 0+860 CHAINAGE 0+840 100 CHAINAGE 38260-00(007)CI-OT003 SEP 14/2006 NOTE: The location of the utilities is approximate only, the exact location should be determined by consulting the municipal authorities and utility companies concerned. The contractor shall prove the location of utilities and shall be responsible for adequate protection from damage. NO. REVISIONS BY DATE 1 ISSUED FOR TENDER GDS 6-JUL-2005 2 ISSUED FOR CONSTRUCTION GDS 15-SEP-2005 3 AS BUILT GDS 3-MAR-2006 I:\Drawings\38000s\38260\38260-SOURCE\38260(SOURCE)-STAMP-GDS-6-JULY-2005.jpg NEPEAN LANDFILL CONTAMINATED GROUNDWATER EXTRACTION AND TREATMENT CONTRACT NO. ISB05-2029 MOODIE DRIVE PLAN AND PROFILE STA. 0+980 TO STA. 1+002 DWG. NO. 009 Date: TED WOYTOWICH, P. ENG W.R. NEWELL, P.ENG. B. MASON, P.ENG. Senior Project Manager Acting Director Infrastructure Services Acting Manager Construction Services Dwn: B.R.M. Chkd: J.M. Des: G.D.S. Chkd: JULY 2005 Scale: HORIZONTAL 1:250 VERTICAL 1:50 J.M. CONSTRUCTION NORTH 0 2 4 6 8m BH25-05(S1) F F 0+000 E F 1+ 00 2. 05 1+000 0+980 108.00 1+020 F 108 .00 108.25 F REFER TO DRAWING 8 UP 0+010 E BH20-05 F S.I.B. 0E 0+02 REFER TO DRAWING 10 BH20-05 F EXISTING GROUND, 2m WEST OF EDGE OF ASPHALT 108 108 PLANT TO DISCHARGE F F 102 100 100 1+020 102 1+002 104 1+000 104 0+980 CHAINAGE F F 106 SEE DRAWING 10 106 CHAINAGE 38260-00(007)CI-OT003 SEP 14/2006 NOTE: The location of the utilities is approximate only, the exact location should be determined by consulting the municipal authorities and utility companies concerned. The contractor shall prove the location of utilities and shall be responsible for adequate protection from damage. NO. REVISIONS BY DATE 1 ISSUED FOR TENDER GDS 6-JUL-2005 2 ISSUED FOR CONSTRUCTION GDS 15-SEP-2005 3 AS BUILT GDS 3-MAR-2006 I:\Drawings\38000s\38260\38260-SOURCE\38260(SOURCE)-STAMP-GDS-6-JULY-2005.jpg NEPEAN LANDFILL CONTAMINATED GROUNDWATER EXTRACTION AND TREATMENT CONTRACT NO. ISB05-2029 MOODIE DRIVE PLAN AND PROFILE STA. 0+000E TO STA. 0+073E DWG. NO. 010 TED WOYTOWICH, P. ENG W.R. NEWELL, P.ENG. B. MASON, P.ENG. Senior Project Manager Acting Director Infrastructure Services Acting Manager Construction Services Dwn: B.R.M. Chkd: J.M. Des: G.D.S. Chkd: Date: JULY 2005 Scale: HORIZONTAL 1:250 VERTICAL 1:50 J.M. CONSTRUCTION NORTH 108.25 UP 2 4 6 8m 0E 0+04 0 E S.I.B. 0 F F F F 1+000 0 E F 0+ 05 E 0 0+02 0+010 E 02 .0 52 1+ 0 F F 107.0 0 108.00 BH25-05(S1) 0+000 E 3 0+0 BH20-05 E F 0+ 06 0 REFER TO DRAWING 9 3 0+ 07 2. 4 0+ E 07 0 E F FORCEMAIN TO GRAVITY DISCHARGE 108. F 00 DITCH LINER SURFACE WATER POND 5 BH20-05 F 0+980 108 108 106 106 TOPSOIL CONCRETE HEADWALL AS PER OPSD 804.030 SEE DETAIL 104 3 11 104 DISCHARGE LINE TO POND SEE NOTE 1, 2 AND DETAIL 5 11 102 102 2 m 3 OF 100mm STONE AT WATER LEVEL AROUND DITCH OUTLET SURFACE WATER POND 5 0+080E 0+060E 0+040E 0+020E CHAINAGE 100 0+000E 100 CHAINAGE 38260-00(007)CI-OT003 SEP 14/2006 NOTE: The location of the utilities is approximate only, the exact location should be determined by consulting the municipal authorities and utility companies concerned. The contractor shall prove the location of utilities and shall be responsible for adequate protection from damage. SURFACE RESTORATION, TO MATCH EXISTING CONDITIONS 6-JUL-2005 2 ISSUED FOR CONSTRUCTION GDS 15-SEP-2005 3 AS BUILT GDS 3-MAR-2006 NEPEAN LANDFILL CONTAMINATED GROUNDWATER EXTRACTION AND TREATMENT CONTRACT NO. ISB05-2029 DWG. NO. 011 TED WOYTOWICH, P. ENG W.R. NEWELL, P.ENG. B. MASON, P.ENG. Senior Project Manager Acting Director Infrastructure Services Acting Manager Construction Services 0.15 Chkd: C 0.30 0.90 B.R.M. NOTES: 1. EXTRACTION WELL TO BE LOCATED UNDER GRATE AND FRAME FOR REMOVAL OF WELL PUMP. J.M. Des: G.D.S. Chkd: Date: JULY 2005 Scale: HORIZONTAL 1:250 VERTICAL 1:50 J.M. F 1.00 0.30 WARNING TAPE 0.15 WEATHERPROOF POWER JUNCTION BOX - EX-1 ONLY GDS Dwn: 0.15 2.40 LADDER RUNGS ISSUED FOR TENDER EXISTING GRADE POWER AND CONTROL CABLES CONTROL JUNCTION BOX 1 DETAILS POWER DISCONNECT SWITCH 11 DATE WARNING TAPE COMPACTED SELECTED BACKFILL 2 BY F F PUMP CHAMBER ACCESS REVISIONS P EXTRACTION WELL SURFACE CASING. SEE NOTE 1 NO. UNDISTURBED EARTH HDPE FORCEMAIN (1 TO 7 PIPES) MINIMUM 75mm SPACING 2.0 FINAL GRADE. 3% SLOPE FROM EDGE OF EXISTING ASPHALT 3% FORCEMAIN AND CABLE DETAIL SECTION VIEW 3 N.T.S. 11 PROPOSED POWER AND CONTROL LINES 1.0 C F P GRANULAR BASE GRANULAR BASE F P 0.205 FLAT CAP PROPOSED 25mm HDPE FORCEMAIN 50mm HL3 50mm HL8 GRATE AND FRAME OPSD 401.030 F F 11 F F N.T.S. 0.60 P 1 C EXTRACTION WELL AND CHAMBER TYPICAL DETAIL - PLAN VIEW 0.15 F C COMPACTED SAND BEDDING F F 8.0 m 20mm CHAMFER (TYP.) 300 75mm GRAVITY FORCEMAIN PROVIDE CROSS SLOPE FOR DRAINAGE EXTRACTION WELL EX-3 5 0. 1.000 1.200 450 75 0.500 NATIVE SAND BACKFILL (COMPACT TO 95% MAXIMUM DRY DENSITY ASTM-D698) FLAT CAP C/W CAST IRON FRAME AND COVER REF: OPSD 701.010 AND OPSD 701.030 P 2.500 2.400 F F P C 4 F F C 1 1 300mm CORRUGATED STEEL ATLANTIC INDUSTRIES DOWNSLOPE DRAIN 600 F F C PROPOSED ASPHALT WIDENING AROUND CHAMBER EXISTING EDGE OF ASPHALT NATIVE SAND OPENING 3 N.T.S. 11 F F CONCRETE HEADWALL P 25mm HDPE FORCEMAIN TO TREATMENT FACILITY C NATIVE SAND PRECAST CONCRETE BASE CHAMBER FOR EX-1 AND EX-2 DEPTH DECREASED APPROXIMATELY 0.3m DUE TO GROUNDWATER CONDITIONS EXISTING EDGE OF SHOULDER 150mm THICK COMPACTED GRANULAR BASE EXISTING GRADE 13.5m AT 5% SLOPE P 0.305 PITLESS ADAPTER 0.705 P 12 CONCRETE HEADWALL AS PER OPSD 804.030 FORCEMAINS FROM EX-1 AND EX-2 2.4 300mm DITCH LINER 100mm STONE 150mm WELL CASING FORCEMAIN TO GRAVITY DISCHARGE WATER LEVEL EXISTING POND UNDISTURBED EARTH PRESSURE SENSOR (SEE TABLE FOR ELEVATIONS) EXTRACTION WELL DETAIL PLAN VIEW - EX-3 (TYP.) 4 N.T.S. 11 100mm x 100mm x 3m, PRESSURE TREATED TIMBER (TYP.) 30mm TO 25mm COUPLING 1.0m CONCRETE ANCHOR WELL PUMP EXTRACTION WELL AND CHAMBER TYPICAL DETAIL - SIDE VIEW 2 N.T.S. DISCHARGE DETAIL PROFILE VIEW 5 N.T.S. 11 EXTRACTION GROUND TOP OF SURFACE CASING WELL NO. (mAMSL) (mAMSL) RECOMMENDED FILTER MEDIA SCREENED INTERVAL (mAMSL) GRADE D30 (mm) D5 (mm) 97.285 TO 95.80 97.835 TO 96.35 98.235 TO 96.00 99.665 TO 94.50 99.965 TO 94.70 100.215 TO 95.00 0 1 1 0 0 0 0.73 1.05 1.05 0.73 0.73 0.73 0.50 0.85 0.85 0.50 0.50 0.50 11 EX - 1 EX - 2 EX - 3 EX - 4 EX - 5 EX - 6 100.44 100.99 101.39 102.82 103.12 103.37 98.46 98.09 99.37 100.46 100.88 101.03 RECOMMENDED SCREEN OPENING (mm) BOTTOM OF WELL (mAMSL) STATIC WATER LEVEL (mAMSL) 0.5mm (0.02 INCH) 0.75mm (0.03 INCH) 0.75mm (0.03 INCH) 0.5mm (0.02 INCH) 0.5mm (0.02 INCH) 0.5mm (0.02 INCH) 94.31 94.86 94.49 93.00 92.50 93.00 97.63 97.90 98.32 99.47 99.68 100.08 EXTRACTION PUMP INTAKE PRESSURE RATE ELEV. (P.I.) SENSOR (L / SEC) (mAMSL) ELEV. (P.S.) (mAMSL) 0.26 0.26 0.26 0.26 0.26 0.26 94.89 95.44 95.07 93.89 93.89 93.89 95.35 95.91 95.53 94.35 94.35 94.35 CONTROL SETTINGS UPPER LOWER 96.83 97.10 97.52 98.67 98.88 99.28 96.43 96.70 97.12 98.27 98.48 98.88 PUMP SELECTION MODEL MOTOR DETAILS 1 1/2 HP, 3 PHASE, 575V GRUNDFOS FRANKLIN 10E5 POLLUTION RECOVERY MOTOR 38260-00(007)CI-OT004 SEP 14/2006 7.00 NOTE: The location of the utilities is approximate only, the exact location should be determined by consulting the municipal authorities and utility companies concerned. The contractor shall prove the location of utilities and shall be responsible for adequate protection from damage. CONSTRUCTION NORTH NO. EXTERIOR VENT REVISIONS BY DATE 1 ISSUED FOR TENDER GDS 6-JUL-2005 2 ISSUED FOR CONSTRUCTION GDS 15-SEP-2005 3 AS BUILT GDS 3-MAR-2006 NEPEAN LANDFILL CONTAMINATED GROUNDWATER EXTRACTION AND TREATMENT ISB05-2029 TREAMENT SYSTEM FLOOR PLAN AND ELEVATIONS 12.5mm O.D. PVC CHEMICAL LINE CHEMICAL PUMP CONTRACT NO. DWG. NO. 012 0. 5% VENT STACK AND BIRDSCREEN SPILL CONTAINMENT BASE AUTOMATIC DAMPER 100mm SCHEDULE 80 PVC W.R. NEWELL, P.ENG. B. MASON, P.ENG. Senior Project Manager Acting Director Infrastructure Services Acting Manager Construction Services B.R.M. Chkd: J.M. Des: G.D.S. Chkd: JULY 2005 Scale: AS SHOWN J.M. ACCESS HATCH 300mm DIA 450mm DEEP PVC SUMP 50mm SCHEDULE 80 PVC 0.20 TRANSFER PUMP 750 FORCEMAINS FROM WELLS 75mm FORCEMAIN TO DISCHARGE HEATED TREATMENT PLANT FLOOR SLOPED 0.5% TOWARDS SUMP 75 SEE DETAIL CONTROL PANEL AIR STRIPPER ELECTRICAL CONTROL PANEL 3-15M REBAR AT BOTTOM TOP VIEW 1200 1 GRANULAR 'A' COMPACTED TO 100% STANDARD PROCTOR DENSITY 510 0.5% 200 (SPARE LINE) CONTROL AND POWER O CABLES TO /H EXTRACTION WELLS DISCHARGE PUMP 10M REBAR AT 300 E.W. (MID HEIGHT) REGRADE TO PROVIDE DRAINAGE AWAY FROM BUILDING 800 FORCEMAINS FROM WELLS EF-1 1-15M REBAR AT TOP 750 SEE DRAWING 16 FOR ELECTRICAL EQUIPMENT LAYOUT OVERHEAD POWER AND TELEPHONE 360 0.5% 550 600 NATURAL SAND 50mm HI 40 INSULATION UNDER THICKENING FRONT VIEW 200 HYDRO EMT 41mm STANDPIPE SM EXTERIOR INSULATION SIDE VIEW FLOOR PLAN ACCESS PLATFORM DETAIL FLOOR SLAB DETAIL SCALE: 1:40 SCALE: 1:20 SCALE: 1:25 5.50 2% SLOPE 2 250 75mm SCHEDULE 80 PVC 200 150 0.05 750 ACCESS PLATFORM BLOWER AIR INTAKE TO BLOWER Date: TED WOYTOWICH, P. ENG Dwn: 1.80 5.50 0.20 1.2m LEVEL SENSOR CHEMICAL STORAGE VAPOUR PHASE GRANULAR ACTIVATED CARBON 0.8 EQUALIZATION TANK CHEMICAL STORAGE 400 VENTILATION DAMPER 0.4 0 UNIT HEATER 7.00 FUTURE 50mm VENT WITH BIRD SCREEN 0.55 0.30 CHEMICAL STORAGE TANKS 100mm DISCHARGE 0.20 2.10 VAPOUR PHASE GRANULAR ACTIVATED CARBON CHEMICAL FEED PUMP EQUALIZATION TANK 2.30 2.00 STORAGE DRUMS BY OTHERS EXIT DOORS 3.15 FLOW METER (6) (TYPICAL) GLOBE VALVES EQUALIZATION TANK VENT INFLUENT TRANSFER PUMP 2.00 3.15 WALL MOUNTED CHEMICAL PUMP AIR OUT 15mm VALVE AND SAMPLING PORT (TYP.) 0.20 WASTE ACID DISPOSAL HOSE 2.00 0.15 2.00 0.20 25mm ISOLATION VALVE AIR STRIPPER FLOW METER TRANSFER PUMP 6 5 4 3 2 1 FM FM FM FM FM 7 (SPARE LINE) EQUALIZATION TANK 25mm ISOLATION VALVE SECTION A-A' RECIRCULATING LINE (AIR STRIPPER CLEANING) FM TO STORMWATER RECHARGE POND SECTION B-B' AIR IN SCALE: 1:40 15mm SAMPLE/ DRAIN PORT WITH BALLVALVE REMOVABLE STAINLESS STEEL BIRD SCREEN DISCHARGE PUMP (SPARE LINE) 5.50 7.00 FROM EXTRACTION WELLS 25mm SAMPLING PORT BLOWER STAINLESS STEEL U-BOLT/UNI-STRUT FASTENED TO BUILDING SKID-MOUNTED AIR STRIPPER PROCESS SCHEMATIC EFFLUENT TO 100mm DISCHARGE FORCEMAIN TO CARBON/VENT IFFLUENT FROM EQUAL TANK MAIN DISCONNECT ELECTRICAL/CONTROL PANEL 100mm SCHEDULE 40 PVC HEATER OUTPUT FILTER PANEL 600V SPLITTER SAMPLE PORT PLC PANEL VENTILATION DAMPER MAIN DISCONNECT 15KVA MOTOR CONTROL PANEL 15KVA TRANSFORMER PUMP DISPOSABLE PUMP WASTE ACID DISPOSABLE HOSE SECTION C-C' REMOVABLE CAP BLOWER BLOWER CARBON FILTER AIR STRIPPER 3.15 3.15 120/208V SECTION D-D' 0.50 EFFLUENT SAMPLE PORT SCALE: 1:40 38260-00(007)CI-OT005 SEP 14/2006 NOTE: The location of the utilities is approximate only, the exact location should be determined by consulting the municipal authorities and utility companies concerned. The contractor shall prove the location of utilities and shall be responsible for adequate protection from damage. NO. REVISIONS BY DATE 1 ISSUED FOR TENDER GDS 6-JUL-2005 2 ISSUED FOR CONSTRUCTION GDS 15-SEP-2005 3 AS BUILT GDS 3-MAR-2006 NEPEAN LANDFILL CONTAMINATED GROUNDWATER EXTRACTION AND TREATMENT ISB05-2029 SITE PLAN AND LANDSCAPING PLAN 104.75 CONSTRUCTION NORTH 5 4.7 10 0 SEE NOTE 1 AND 2 2 4 6 CONTRACT NO. 8m DWG. NO. 013 TED WOYTOWICH, P. ENG W.R. NEWELL, P.ENG. B. MASON, P.ENG. Senior Project Manager Acting Director Infrastructure Services Acting Manager Construction Services B.R.M. Chkd: J.M. Des: G.D.S. Chkd: JULY 2005 Scale: 1:250 J.M. 104.5 0 Dwn: Date: NOTES: 8.00 PROPOSED ACCESS ROAD 1. REMOVE ALL DEBRIS AND RUBBLE FROM SITE WITHIN 15m OF PARKING AREA AND ACCESS ROAD. TRANSPORT TO TRAIL ROAD FACILITY. GRADE AREA TO WEST. 2. 150mm TOPSOIL, SEED, AND STABILIZE WITH MIXED NATIVE GRASSES IN ACCORDANCE WITH OPSS 572 WITHIN 15 METRES OF ACCESS ROAD AND PARKING AREA. 16.000 104.50 5.50 SEE NOTE 1 AND 2 R2 .5 0 SEE NOTE 1 AND 2 105.25 104 .50 104.25 8.00 10 4.5 0 S.I.B. O/H OVERHEAD POWER AND TELEPHONE 10.00 F E 104.75 13.00 10.00 105.00 EXISTING ROAD PROPOSED PARKING AREA 104.50 7.00 0 104.5 F E F S.I.B. EXISTING GATE 0 104.25 EXISTING ACCESS POINT UP UP 104.50 104. 75 F 105.0 0 F F F F F F F 0+740 F 0+720 F 0+700 F 0+660 F 0+680 E E F 105.2 5 105 .50 38260-00(007)CI-OT006 SEP 14/2006 NOTE: The location of the utilities is approximate only, the exact location should be determined by consulting the municipal authorities and utility companies concerned. The contractor shall prove the location of utilities and shall be responsible for adequate protection from damage. NO. REVISIONS BY DATE 1 ISSUED FOR TENDER GDS 6-JUL-2005 2 ISSUED FOR CONSTRUCTION GDS 15-SEP-2005 3 AS BUILT GDS 3-MAR-2006 NEPEAN LANDFILL CONTAMINATED GROUNDWATER EXTRACTION AND TREATMENT CONTRACT NO. ISB05-2029 DWG. NO. 104.75 GRADING AND DRAINAGE PLAN BH22-05(TP) SWALE 1 2% 14 Senior Project Manager Acting Director Infrastructure Services Acting Manager Construction Services B.R.M. Chkd: J.M. Des: G.D.S. Chkd: Date: JULY 2005 Scale: 1:250 J.M. 4 10 4. 8 1 104 105.25 105.00 .50 10 4.5 0 S.I.B. O/H OVERHEAD POWER AND TELEPHONE 10.00 F E 8.00 104.75 EXISTING ROAD 13.00 4 .8 04 104.50 2% MATCH EXISTING GRADE PROPOSED PARKING AREA 90 2% 4. 0 1 5% 50 0 2% 7.00 10 4. 90 104.50 16.000 10.000 R2 . B. MASON, P.ENG. 1. ACCESS ROAD AND PARKING AREA, DRAIN WESTWARD, TOWARDS FORESTED WOOD LOT AT BACK OF CITY PROPERTY. 2. DELINEATION OF EXISTING WASTE AGGREGATE MATERIALS TO BE DISPOSED OF AT TRAIL ROAD LANDFILL. 5.50 PROPOSED TREATMENT SYSTEM (FIN.FL. 105.00m) W.R. NEWELL, P.ENG. NOTES: 2% 2% 2% 5% PROPOSED ACCESS ROAD 5% 104.25 SEE NOTE 1 8.00 2% SEE NOTE 1 TED WOYTOWICH, P. ENG Dwn: 104.5 0 2% .75 2% 4 10 68 4. 10 014 0 104.5 EXISTING GATE F E F S.I.B. 104.25 EXISTING ACCESS POINT UP UP 104.50 E F E F F F F F F F F F F F F 104. 105.2 5 105.00 75 0+740 0+720 0+700 0+660 0+680 BH14-05 105 .50 8.000 PROPOSED FINISHED GROUND ELEV. 104.84m 100mm GRANULAR 'A' 450mm GRANULAR 'B' EXISTING GROUND ELEV. 104.50m 2% ACCESS ROAD TYPICAL CROSS SECTION 1 1:20 14 38260-00(007)CI-OT007 SEP 14/2006 NOTE: The location of the utilities is approximate only, the exact location should be determined by consulting the municipal authorities and utility companies concerned. The contractor shall prove the location of utilities and shall be responsible for adequate protection from damage. NO. 3 PHASE, 347/600V AC POWER SUPPLY FROM EXISTING POLE LINE ELECTRICAL ROOM REVISIONS BY DATE GDS 6-JUL-2005 JS 19-JUL-2005 1 ISSUED FOR TENDER 2 ADDENDUM NO.1 3 ISSUED FOR CONSTRUCTION GDS 15-SEP-2005 4 AS BUILT GDS 3 MAR 2006 NEW HYDRO OTTAWA OVERHEAD 347/600V SUPPLY #2 QUAD NEPEAN LANDFILL CONTAMINATED GROUNDWATER EXTRACTION AND TREATMENT CONTRACT NO. ISB05-2029 POWER DISTRIBUTION, SINGLE LINE DIAGRAM DWG. NO. 015 TED WOYTOWICH, P. ENG W.R. NEWELL, P.ENG. B. MASON, P.ENG. Senior Project Manager Acting Director Infrastructure Services Acting Manager Construction Services Dwn: B.R.M. Chkd: J.M. Des: G.D.S. Chkd: Date: JULY 2005 Scale: N.T.S. J.M. 100A 347/600V DISCONNECT W/ 100A FUSES SERVICE ENTRANCE RATED 4 #3 + GROUND RWU90 IN 41mm CONDUIT M 100A 7 JAW 347/600 3PH METER BASE WITH ISOLATED NEUTRAL BLOCK LP MOUNTING 120/208V PHASE MAINS 100A TYPE LOCATION 125A, 600V, 3PH POWER SPLITTER 4 #3 + #8 GROUND RWU90 IN 41mm CONDUIT PANEL VOLTAGE NEW DESCRIPTION HEATING UNIT (LP-H) 3 #4 + #8 GND RWU90 IN 41mm CONDUIT 3 #8 + #10 GND RWU90 IN 27mm CONDUIT 120/208V 100A 3 PH PANEL 15A 1PH 15A 1PH MAX. FUSE SIZE 35A, 3PH, 600V DISCONNECT 70AF 30A 600V 3PH DISCONNECT 15A 1PH 15A 1PH 3 #8 + #10 GND RWU90 IN 27mm CONDUIT 30 KVA 600:120/208V INTERIOR LIGHTS EXTERIOR LIGHTS RECEPTACLE RECEPTACLE 15A 1PH 4 #3+ #6 GND RWU90 IN 35mm CONDUIT SURFACE DISCONNECT SWITCH EXISTING DESCRIPTION BRKR BRKR 20 1 A 2 15 LIGHTS / 3 B 4 15 LIGHTS 3P 5 C 6 15 RECEPTACLE RECEPTACLES 15 7 A 8 15 * SEE NOTE SPARE 15 9 B 10 15 * SEE NOTE SPARE 15 11 C 12 15 * SEE NOTE PROSONIC LEVEL SENSOR 15 13 A 14 SPACE SPACE 15 B 16 SPACE SPACE 17 C 18 SPACE SPACE 19 A 20 SPACE SPACE 21 B 22 SPACE SPACE 23 C 24 SPACE FUSE DISCONNECT SWITCH SIZE AND VOLTAGE AS SHOWN DS TRANSFORMER VFD VARIABLE FREQUENCY DRIVE STARTER * NOTE: RELCOATED TO MAIN PLC PANEL 1.5 HP MOTOR, SIZE AS SHOWN 15A 1PH 3 #4 + #8 GND RWU90 IN 41mm CONDUIT METER BASE M RELOCATED TO MAIN PLC PANEL 15A 1PH MOTOR CONTROL PANEL (NEMA 4X) 15A 1PH 15A 1PH 30A, 3 PH, 600V DISCONNECT J.B. SPARE L.T. TANK LEVEL SENSOR LEVEL TRANSMITTER BRANCH CIRCUIT BREAKER SPARE TELEPHONE JACK 15A 1PH 20A 3PH CIRCUIT BREAKER (TYPICAL) S DS LIGHT SWITCH 3.3kW 3PH HEATING UNIT 120/208V DIRECT CONNECTION 30A 120/208V 3 PH, DISCONNECT SWITCH FUSES CB JUNCTION BOX 3 #12 + #10 GND RWU90 IN 21mm CONDUIT TX TRANSFORMER F CIRCUIT BREAKER (TYPICAL) PLC PANEL SURFACE MOUNTED DISTRIBUTION PANEL 3 KVA TRANSFORMER CB FLUORESCENT TYPE INTERIOR LIGHT A C B DISCONNECT SWITCH (TYPICAL) EMERGENCY COMBO LIGHT, W/ EXIT SIGN HPS TYPE EXTERIOR LIGHT PLC CONTROL POWER DS DS DS DS DS DS DS DS DS CIRCUIT BREAKER (TYPICAL) 1-3/C-#12 AWG + GND 1-3/C-#12 AWG + GND LINE REACTOR (TYPICAL) LR LR 1-3/C-#12 AWG + GND LR 1-3/C-#12 AWG + GND 1-3/C-#12 AWG + GND LR LR VFD 1-3/C-#12 AWG + GND LR VFD 1-3/C-#12 AWG + GND LR VFD 1-3/C-#12 AWG + GND 1-3/C-#12 AWG + GND WEATHER PROOF JUNCTION BOX OUTPUT FILTER CB CB SIZE 1 FVNR LR MOTORIZED AUTOMATIC DAMPER D/A T PLC PANEL VFD TP-PH VFD OUTPUT FILTER CB DUPLEX RECEPTACLE THERMOSTAT 1 CF-BLD 16 REFER TO DETAIL NUMBER ON DRAWING NUMBER 1-3/C-#12 AWG + GND IN 21mm CONDUIT OUTPUT FILTER OUTPUT FILTER PANEL J.B. PLC PANEL PLC PANEL 1-PAIR #18AWG PLC PANEL 1-PAIR #18AWG PLC PANEL 1-PAIR #18AWG PLC PANEL 1-PAIR #18AWG PLC PANEL 1-PAIR #18AWG 1-3/C-#12 AWG + GND DRIVE-RX ARMOURED SHIELD CABLE FOR LEVEL SIGNAL (TYPICAL) 1-3/C-#12 AWG + GND DRIVE-RX J.B. WEATHERPROOF FIELD MOUNTED JUNCTION BOX (TYPICAL) J.B. 1.5 HP 1-3/C-#12 AWG + GND DRIVE-RX J.B. L.T. DS 600V 30A WP 3PH LOCKABLE DISCONNECT (TYPCIAL OF 6) DS 600V 30A 3PH 1-3/C-#12 AWG + GND DRIVE-RX 1-3/C-#12 AWG + GND DRIVE-RX J.B. L.T. 1-3/C-#12 AWG + GND DRIVE-RX J.B. L.T. 1-3/C-#12 AWG + GND DRIVE-RX J.B. L.T. LAMP A 2-32W-T8 DESCRIPTION 4-1/2" CEILING MOUNTED FLUORESCENT LUMINAIRE C/W CLEAR ACRYLIC PRISMATIC WRAP AROUND DIFFUSER, WHITE IN COLOUR. 120V 60HZ MANUFACTURER PEERLESS PEL-41-232-120-EL OR EQUAL 1-PAIR #18AWG DS VFD CABLE MODEL - DRIVE-RX BY ALCATEL CANADA WIRE (TYPICAL) 1-3/C-#12 AWG + GND DRIVE-RX TYPE DS 600V 30A 3PH 600V 30A 3PH 2 HP 2 HP 3 HP TRANSFER PUMP P7 DISCHARGE PUMP BLOWER P8 BL1 J.B. L.T. L.T. DS DS DS DS DS 1.5 HP 1.5 HP 1.5 HP 1.5 HP 1.5 HP POWER DISTRIBUTION SINGLE LINE DIAGRAM EXTRACTION WELL PUMP EX-1 EXTRACTION WELL PUMP EX-2 EXTRACTION WELL PUMP EX-3 EXTRACTION WELL PUMP EX-4 EXTRACTION WELL PUMP EX-5 EXTRACTION WELL PUMP EX-6 38260-00(007)EL-OT001 SEP 14/2006 NOTE: The location of the utilities is approximate only, the exact location should be determined by consulting the municipal authorities and utility companies concerned. The contractor shall prove the location of utilities and shall be responsible for adequate protection from damage. NO. REVISIONS 1 ISSUED FOR TENDER 2 ADDENDUM NO.1 3 ISSUED FOR CONSTRUCTION BY DATE GDS 6-JUL-2005 JS 19-JUL-2005 GDS 15-SEP-2005 NEPEAN LANDFILL CONTAMINATED GROUNDWATER EXTRACTION AND TREATMENT CONTRACT NO. ISB05-2029 ELECTRICAL POWER, INSTRUMENT & LIGHTING LAYOUT DWG. NO. 016 Date: TED WOYTOWICH, P. ENG W.R. NEWELL, P.ENG. B. MASON, P.ENG. Senior Project Manager Acting Director Infrastructure Services Acting Manager Construction Services Dwn: 4/0 BARE COPPER GROUND CONDUCTOR LOOP B.R.M. Chkd: J.M. Des: G.D.S. Chkd: JULY 2005 Scale: N.T.S. J.M. CONSTRUCTION NORTH DRAWING NOTES: 12"x12" OUTSIDE AIR OPENING C/W BIRDSCREEN AND AUTOMITIC DAMPER. DAMPER SHALL BE TAMCO SERIES 9000 THERMALLY INSULATED C/W 2-POSITION NORMALLY CLOSED ELECTRIC ACTUATOR. 4/0 BARE COPPER GROUND CONDUCTOR 3.00m CEILING MOUNTED UNIT HEATER SHALL BE TRANE MODEL No. UHEC-032AACA, OR APPROVED EQUAL. UNIT SHALL BE C/W WALL MOUNTED ELECTRIC THERMOSTAT. 0 0.2 0.4 ROOF MOUNTED EXHAUST FAN SHALL BE GREENHECK MODEL No. G-065-D, 1/30TH HP, HIGH SPEED ONLY, OR APPROVED EQUAL. 0.6m DIRECT BURIED POWER AND CONTROL CABLE FOR EXTRACTION WELLS. TWO POWER CABLES (ONE ACTIVE, ONE SPARE NOT CONNECTED) FOR WELL EX-1. EXTERIOR VENT B LP-4 INSTALL GROUND LOOP USING 4/0 BASE COPPER CONDUCTOR DIRECTLY BURIED AT 300mm OR DEEPR UNDER SURFACE. 2 LP-12 INSTALL 8 GROUND RODS. 3050mM x 20mm (3/4" X 120") COPPER CLAD STEEL AS PER DETAIL. C LP-1,3,5 TSL 100 LP-2 UH-1 LP-4 TSH 101 HS 160 M 160 LP-7 LP-7 METERING PUMP MP1 SC 160 LSHH 151 TO D/A VENT STACK AND BIRDSCREEN SPILL CONTAINMENT BASE LP-12 2 VAPOUR PHASE GRANULAR ACTIVATED CARBON A GENERAL NOTES: LSH 150 TO EF-1 M 1 x 70 WATT METAL HALIDE, EXTERIOR WEATHERPROOF WALL PACK CUTOFF HID FIXTURE, WITH LOW TEMPERATURE HPF 120V HIGH POWER FACTOR PULSE START BALLAST. MEAL HALIDE LAMP. PHOTOCELL, DIE CAST ALUMINUM HOUSING, CLEAR POLYCARBONATE REFLECTOR, ALUMINUM REFLECTOR, NATURAL ALUMINUM FINISH. MANUFACTURER: LITHONIA, TWAC GROUND BAR CHEMICAL STORAGE 1. CONTROLS: LEVEL SENSOR - CONTROL OF EF-1 AND AUTOMATIC (MOTORIZED) DAMPER SHALL BE THROUGH WALL MOUNTED THERMOSTAT WITH MANUAL OVERIDE BY 3.00m CONTROL OF UH-1 SHALL BE THROUGH WALL MOUNTED LE 140 ACCESS HATCH CHEMICAL STORAGE A 300mm DIA 450mm DEEP PVC SUMP A TRANSFER PUMP M 70 SMOKE DETECTOR LP-6 EQUALIZATION TANK LP-9 SD 130 METHANE DETECTOR 3 LSH 160 AE 110 LP-12 FLOWMETER WELL #6 FIT 60 FE 60 FLOWMETER WELL #5 FIT 50 FE 50 FLOWMETER WELL #4 FIT 40 FE 40 FORCEMAINS FROM WELLS AIR INTAKE TO BLOWER FIT 30 FE 30 FLOWMETER WELL #2 FIT 20 FE 20 FLOWMETER WELL #1 FIT 10 FE 10 FORCEMAINS FROM WELLS H BLOWER A M 90 FLOWMETER WELL #3 O/ CONTROL PANEL EF-1 O/H 75mm FORCEMAIN TO DISCHARGE 915 (SPARE L INE) 16 METHANE DETECTOR TRANSMITTER 30kVA 600-120/208V TRANSFORMER 100A 600V 3 PH DISCONNECT SWITCH 70AF 3.00m MOTOR CONTROL PANEL PLC PANEL TX DS DS CADWELD #LPE-EG2Q DS GROUND BAR SUPPORT 4/0 BARE COPPER GROUND CONDUCTOR JUMPER FINISHED FLOOR H AIT O/ 100A 347/600V 100AF DISCONNECT SWITCH SERVICE ENTRANCE RATED LP-6 AIR STRIPPER C P 30A 600V 3 PH DISCONNECT SWITCH 125A 600V 3PH SPLITTER OUTPUT FILTER PANEL (ABOVE) GROUND BAR 2 455 1 M 80 COPPER GROUND BAR MAIN BUILDING DISCONNECT SWITCH H O/ O/H DISCHARGE PUMP 2 CONCRETE FLOOR SLAB 4 #3 +GND IN 41mm CONDUIT 3.00m FLOOR PLAN OVERHEAD POWER AND TELEPHONE H O/ 100A 7 JAW 347/600V METER BASE WITH ISOLATED NEUTRAL BLOCK 41mm EMT STANDPIPE FOR HYDRO OTTAWA WITH WEATHER MASK CADWELD #TAC-2Q2Q 4/0 BARE COPPER GROUND CONDUCTOR LOOP H O/ 4/0 BARE COPPER GROUND CONDUCTOR H M 100A 120/208V 3PH DISTRIBUTION PANEL 2 O/ 4 #3 RWU90 + GROUND IN 41mm CONDUIT 4/0 BARE COPPER GROUND CONDUCTOR LOOP TYPICAL GROUNDING BAR DETAIL 1 1:10 16 H O/ 38260-00(007)EL-OT002 SEP 14/2006