GDS Commissioning Worksheet The stations on this worksheet are connected to the following lighting panel: Quick Checklist: GDS Network is run in a daisy chain configuration GDS Network does not exceed 1000 feet in total length The beginning and end GDS devices on the network have their terminatiors in the termination ON position The middle GDS devices on the network have their terminators in the termination OFF position To be completed by installing contractor Station Reference Number Station Location 1 Station Model Button Number GDS-1TLB 1 2 3 4 5 6 GDS-2TLB GDS-3TLB GDS-4TSB GDS-5TSB GDS-6TSB GDS-1TLB 2 GDS-2TLB GDS-3TLB GDS-4TSB GDS-5TSB GDS-6TSB GDS-1TLB 3 GDS-2TLB GDS-3TLB GDS-4TSB GDS-5TSB GDS-6TSB GDS-1TLB 4 GDS-2TLB GDS-3TLB GDS-4TSB GDS-5TSB GDS-6TSB GDS-1TLB 5 GDS-2TLB GDS-3TLB GDS-4TSB GDS-5TSB GDS-6TSB GDS-1TLB 6 GDS-2TLB GDS-3TLB GDS-4TSB GDS-5TSB GDS-6TSB GDS-1TLB 7 GDS-2TLB GDS-3TLB GDS-4TSB GDS-5TSB GDS-6TSB 1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 5 6 Describe what you want each button to do For example: ON/OFF, RAISE, LOWER, ALL ON, Panel Name & Relays Controlled ALL OFF