Pre-Start Up Checklist McQuay RPS - Rooftop Units Please fill out this form and return it to Vemco 48 hours prior to desired start up date. Start up will not be scheduled until a completed checklist is returned. DELAYS IF, WHEN ARRIVING AT THE JOBSITE OUR SUPPORT TECHNICIAN IS DELAYED IN STARTING EQUIPMENT OR HAS TO RETURN TO THE JOB DUE TO ANY OF THE ITEMS BELOW BEING INCOMPLETE/FALISFIED OR, FOR ANY REASON NOT THE RESPONSIBILITY OF VEMCO, INC., EXPENSES INCURRED WILL BE CHARGED BACK TO THE REQUESTER OF START UP AT A RATE OF $750.00 / DAY PLUS MILEAGE AT $1.00 / MILE (FROM PORT TO PORT) Job Name: Address: Jobsite Foreman: Cell #: A. Is any shipping damage visible? B. Is unit installed level? C. Is the unit positioned to provide adequate free area for service and operation? D. Are fans properly aligned and tune freely? E. Has thermostat bulb been properly installed in the well? F. Does electrical service correspond to unit nameplate? Volts _________ Hertz _________ Phase _________ G. Has unit been adequately grounded? H. Has an adequate fused disconnect and fuses been installed? Fuse Amp Rating _________ I. Are all electrical power connections tight? J. Have compressor crankcase heaters been operating for 24 hours prior to start-up? K. Are setscrews on all pulleys, bearings and fans tight? L. Are all service and liquid line valves open? __________ __________ __________ __________ __________ _________ __________ __________ __________ __________ __________ __________ M. Have all shipping hold down plates been removed? __________ N. Does all field wiring conform to unit electrical diagram? __________ O. Has a flow switch been installed per IM Bulletin? __________ P. Does chiller and condenser water piping conform to the IM Bulletin? __________ Q. Is wind impingement against the air cooled condenser a consideration? __________ R. Description of unit location with respect to building structures i.e., buildings, fences, walls, other? _________________________________________________________________ _________________________________________________________________ _________________________________________________________________ ___ S. Has all field piping been leak tested at 100 psi (690 kPa)? T. Has system been properly evacuated and charged? U. Refrigerant R-__________ Circuit 1 __________ lbs. Circuit 2 __________ lbs. V. Does piping to unit appear to be adequately sized and installed according to the IM Bulletin? W. Is a liquid line filter-drier installed in each circuit? X. Is level of oil in sight glass visible but not more than ½ glass with compressors running? Y. Is a liquid line solenoid installed in each circuit? Z. Is expansion valve bulb properly installed and insulated? Design Controls 1. CHILLER Water pressure Drop: Water Temperatures: 2. CONDENSOR Water pressure Drop: Water Temperatures: __________ __________ __________ __________ __________ __________ __________ _______ psig (kPa) _______ Ft. (kPa) _______ gpm (lps) Entering _______ Leaving _______ _______ psig (kPa) _______ Ft. (kPa) _______ gpm (lps) Entering _______ Leaving _______ Equipment to be started Model No. ___________________ Serial No._________________ If you have any questions please contact John Sullivan 1-406-490-0888 Mark Liedtka 1-406-239-8933 or Carl Herden 1-406-672-2392 for assistance. We will be happy to assist in any way to avoid any delays in start up. Please return this complete form via fax/email to Sarah Butsch at 1-406-721-2941 (sarahb@vemcoinc.com). SIGNATURE: