INSPECTION NOTE OF SHRI ARUNENDRA KUMAR, MEMBER MECHANICAL ON HIS VISIT TO ECR AND RWP/BELA ON 11 th & 12th MAY'13 Item I. A. 1. Action By Inspection of Rail Wheel Plant/Bela (Chhapra) Plant area:The Plant is designed for a capacity of 1 lac cast wheels per annum. The Plant and colonies are spread over an area of about 295 acres. 597 staff are in position, against a sanctioned strength of 1016. CAO mentioned that the machine commissioning is almost ready, with only a few machines left. CAO/RWP CAO may now move towards making the wheel as per plan. 2 The 1500t1' wheel turned out by RWP/Bela was released. 3 RWP/Bela should regularly organise specialized training for Technicians and Supervisors at Government or Private Institutes of repute. Specialized Training even at the level of AWMs and WMs should also be organized. There should be continuous skill development at all levels. Ca v.. Safety during work:Industrial safety training should be arranged for staff and supervisors from reputed institutions. 5 First Aid boxes have been provided in each section to provide first aid in case of an accident. However, First Aid boxes should be specialised in content, anticipating the type of injuries that are likely to take place in a particular section. 6 7 8 Safety at work place is of paramount importance. For this, proper housekeeping should be ensured in the Plant. "Working zones" and "prohibited/dangerous zones" should be clearly marked on the floor. Path ways for movement of staff and material handling equipment should be clearly defined and prominently marked. Safety counselling of staff should be arranged on a regular basis. Adequate staff facilities must be provided in the Plant. There should be arrangement for cold and safe drinking water. Safety equipments, as per safety norms, should be provided to the staff. The discipline of using the safety equipments should be inculcated among staff right from the beginning. For the visitors, a separate room should be earmarked for wearing the safety shoes, helmets, goggles, etc. before they enter the Plant area. CAO/RWP CAO/RWP CAO/RWP CAO/RWP CAO/RWP CAO/RWP 9 RWP/Bela has already started supplying wheels to the Zonal Railways. These wheels should be given to a nominated Workshop only, so that their CAO/RWP performance can be closely monitored. Necessary nomination should be issued by the Board. Adv./RS C. 10 Stores:The Main Store-1 was inspected. There is a need to utilize the vertical space more effectively, rather than proliferating the horizontal space of various Stores. 11 12 D. 13 Material Management Information System (MMIS) should be implemented on priority at the Depot level, and its access should also be provided to the Shop floor, so that they know about the actual availability of material in the Stores. One AC ward has been provided for keeping resins and other items, which have limited shelf- life. The area required to be cooled needs review. Another separation should be provided at entrance of the AC ward, so that the cooling can be maintained effectively. Canteen:The Canteen was inspected. Its upkeep was found unsatisfactory and neglect was evident. Proper arrangement should be made for ensuring hygiene and cleanliness in the kitchen, as well as in dining area. Area earmarked for washing of utensils also needs to be improved, as it was reported that the drainage is not proper. Dining tables and chairs should be provided in the Dining Hall, earmarked for the officers. The Dining Hall for the staff should be provided with desert coolers. The Roti maker was not being used. CAO/RWP Adv./RS CAO/RWP Adv./RS CAO/RWP Adv./RS CAO/RWP 14 Proper parking for cycles/two wheelers should be arranged for staff. CAO/RWP 15 As the production work has not started in full swing, staff should be gainfully employed for better housekeeping, cleaning of machines, horticulture, etc. CAO/RWP The officers and staff of RWP/Bela have done a commendable work in difficult environment. In order to encourage them, a group award of Rs.1 lac was announced. Secy./RB 16. II. ORH and Officers' Club: 1 The Officers' Club has been provided with a large hall. The requirements of good acoustics need to be addressed. CAO/RWP CAO/WP 2 A large community hall has been nominated as the Badminton Court, but it is not suitable for it. A separate Badminton Court should be developed with wooden floor. CAO also requested for a Swimming Pool and a Squash Court. This was agreed to. CAO/RWP CAO/WP 3 The rooms of the ORH have not been furnished. This should be done. CAO/RWP CAO/WP 4 The outside area of the Officers' Club and ORH should be developed as a green patch with flower beds and trees all around. A water fountain should also be planned near the entry. 5 Officers' Colony:- Two unfinished houses were inspected. There should be structural provision for window/split ACs in all the rooms. Suggestions of officers should be taken before finishing the Officers' houses. The height of the grill on the roof-parapet needs to be increased, so that there is no accidental fall. Surveillance cameras should be installed inside and outside the Plant as well as in the Colonies, as security will be a major issue at this remote location. Accordingly, the ongoing contractual provisions may be reviewed and modified suitably. CAO/RWP CAO/WP Porta Cabins, planned as temporary accommodation, were inspected. They should be properly furnished. There should be arrangement for a Kitchen & Dining Hall; and a Common Room, with facilities for entertainment. Desert coolers should be provided in all the Porta Cabins. CAO/RWP CAO/WP 6 Ill. RWP/Bela requested for the following 1 Posting of officers - particularly in Mechanical, CMT, Electrical and Engineering departments. 2 Issue of Gazette notification declaring Rail Wheel Plant/Bela, as an independent Production Unit; and subsequent separation of Accounts from ECR. 3 4 5 6 7 8 9 CAO/RWP CAO/WP assistance from Railway Board: AM/PU ML ME AM/PU Delegation of GM's powers to CAO/RWP/Bela - for which a proposal is already pending in the Board. AM/PU Deputation of about 50 Mechanical/CMT staff/officers on rotation basis from RWF/SBC, as the Melt and Mould Shops have not stabilised as yet. GM/RWF Permitting re-employment of retired CMAs and CMT officers of RWF/SBC. Adv./Mechanical, Railway Board to move the proposal. Adv./Mech Permission for selective outsourcing of melting and casting process alongwith the maintenance of critical M&P, as RWP/Bela does not have sufficient experienced staff. Posting of RPF staff, against 44 posts already sanctioned. Sanction of 157 additional posts for Stores department, for which a vetted proposal is already pending in the Board. There is a need for greater involvement of officers and staff in the working of the Bela Plant. The commitment needs to be improved as the job demands sustained attention. CAO/RWP DG/RPF Adv./RS CAO/RWP IV. ECR's presentation on 12.5.2013 along with GM/ECR The Access Control System, being provided in RWP/Bela and CRWP/HRT, should record time of attendance based on biometric identification and as per Mechanical code. There cannot be two timings for reporting — one at the Gate and another at the work place. 1 CAO/WP CME/ECR 2 The work of construction of staff quarters & colony of CRWP/HRT is to be followed up regularly. CAO/VVP 3 PPP proposal of DLF/Marhaura has to be finalised early. Railway's commitments regarding provision of land, road connectivity, rail connectivity & power supply have to be planned & completed. Issue of disbursement of compensation to land losers should be finalised at the earliest. I was informed that for power connectivity, a draft MOU has been sent to Railway Board. GM/ECR AM/PU 4 COS/ECR was asked to expedite the re-auction of sale of assets of M/s. Rohtas Industries Ltd. Adv./RS COS/ECR V. Presentation by ECR and comments thereon: 1. There has been a decline in train parting cases over ECR in 2012-13 as compared to that in 2011-12. An analysis of train parting cases should be done to identify the critical sections and causes to decide the plan of action. Video graph of critical sections along with track inputs can be incorporated in simulator training of drivers to improve their train handling skill which will help bring down train parting on account of poor driving skills. CME/ECR 2. Access control system for staff at CRW /Harnaut should be properly designed so that their attendance is marked after biometric identification. CME/ECR 3 For the new assets such as CRW/Harnaut, man power planning should be judiciously formulated for optimum labour productivity. CME/ECR 4 Areas such as; environment, housekeeping, uniform to staff, canteen, parking, security and attendance should be looked into with care in the new workshop at Harnaut, so that proper work culture develops right at the beginning. CAO/VVP CME/ECR Consumption of water in coach cleaning needs to be scientifically reduced. Interior cleaning should be generally by wet mopping. Recycling of water after treatment should be resorted to. CME/ECR 5 6 Pest and rodent control treatment in coaches should be supervised and monitored properly to enhance their effectiveness. 7 The interior of coaches of trains in which OBHS has been provided must be litter and garbage free when they reach the terminating stations so that the litter does not get carried to washing lines where the trains go there for maintenance. CME/ECR CME/ECR 8 Suitable method should be found for cleaning of blankets in mechanized laundry. 9 Since the coach bodies of LHB coaches are made of stainless steel and require special tools and devices for cutting to access trapped passengers when they are involved in accidents. Break down staff should be trained in handling LHB coaches. 10 With the decline in the number of accidents it has become imperative that the break down staff associated with 140t crane operation are given proper exposure in handling accidents in curves, cuttings and other difficult terrains so that they are able to discharge their duties efficiently at the time of accidents. VII. 1 CME/ECR CME/ECR CME/ECR Assistance required by ECR: Sanction of the proposal for setting up a coaching complex at Patliputra at a cost of Rs 69.85 Crs sent to Board vide letter no. ECR/CAO/CAN/1861/Pt-VI/7344 dated 06.05.2013 as material modification of Ganga Rail-cum-Road Bridge project. MT FC AM/PU 2 ECR coaches after POH at LLH and GKP are not being sent in time. The Railway should conduct coordination meeting with ER & NER every month. CME/ER & CME/NER to organise. AM/PU CME/ER CME/NER 3 Allotment of additional LWSCN coaches to ECR to tide over shortage as only 2 spare coaches are available against bare requirement of 46. MT AM/PU 4 Inadequate supply of overhauled ICF wheels from LLH and GKP shops to ECR. Present supply is around 60% of the requirement. AM/PU EDME 5 Supply of overhauled LHB wheels from LLH shop needs to improve. 6 RSP sanction for ICF trolleys for crashworthy coaches is required for use as unit exchange spare during 10H. ECR has 300 crashworthy coaches. AM/PU EDME/W AM/PU EDME/Chg. 7 Supply of initial spares by DLW for WDG4 locos allotted to PTRU shed. CME/DLW 8 Allotment of fund to the tune of Rs. 8.43 Crs under RSP for providing MEP with VCD in 22 diesel locos for which sanction in pink book item No. 1092/10-11 is available. EDME/Tr. a) Relaxation of rules for condemnation of surplus MG wagons as in the case of MG coaches. EDME/Chg. 10 Construction of quarters at Harnaut for CRW/HRT. CAO/WP 11 Enhancement of GM's lump sum power on M&P for purchase of machines for mechanized laundry equipment for augmenting the existing capacity or for replacement. FC 12 Creation of posts for new assets over ECR such as newly built and upcoming C-category workshops, DEMU shed at SEE etc. requires MS Railway Board's consideration as matching surrender to the extent may not be possible. 13 There are 05 vacancies in Senior Scale & 04 in JA Grade. At least 02 Sr Scale & 02 Junior Scale Officers are urgently required. AM/PU 14 Proposal for creation of 19 posts of Stores Department for CRW/Harnaut are pending with Rly Board. This needs to be sanctioned. AM/PU Member Mechanical Railway Board No.: 2010/M(W)/509/1 1. 2. 3. 4. 5. ML, ME, FC, MT, MS, DG/RPF AM/ME, AM/PU, AM/Staff, Adviser/ME(P), Adviser(RS) All Indian Railways & PUs GM/ECR, GM/RWF, CAO/WP/ECR, CAO/RWP, CME/ECR, COS/ECR EDMENV, EDME/Chg., EDME/Tr.