PURCHASING SECTION 13450 – 104 Avenue, Surrey, BC V3T 1V8 Tel: 604-590-7274 E-mail: purchasing@surrey.ca ADDENDUM NO. 1 REQUEST FOR PROPOSALS (RFP) No.: TITLE: ADDENDUM ISSUE DATE: CLOSING DATE AND TIME: 1220-030-2015-003 ARCHITECTURAL AND PROFESSIONAL DESIGN SERVICES – NEWTON RECREATION CENTRE EXPANSION JANUARY 27, 2015 ON OR BEFORE THE FOLLOWING DATE AND TIME (THE “CLOSING TIME”): TIME: 3:00 P.M. (LOCAL TIME) DATE: FEBRUARY 10, 2015 INFORMATION FOR PROPONENTS The following information is provided to answer questions raised by Potential Proponents for the above name project, to the extent referenced and shall become a part thereof. No consideration will be allowed for extras due to the Proponent or any sub-Proponent not being familiar with this addendum. This Addendum No. 1 contains two (2) pages in total. QUESTIONS AND ANSWERS Q1. Will the City make available to proponents the original base building drawings? A1. Yes. Q2. Can the City further define the Civil Site/Offsite Engineering scope of work? A2. Civil work will include addressing water pooling at existing parking lot and the side walk along the north side of the arena which faces the parking lot. The main objective is to ensure adequate drainage and eliminate ponding of water on the sidewalk and parking lot. This may require some extension of the drainage system but definitely requires at least selective asphalt restorations to get original design of surfaces sloping to catchbasins. Also will require addressing the speed control humps that were subsequently installed and block the original drainage paths. Q3. Please confirm an assumption for new Net Area and Gross Area – are proponents to use the proposed areas outlined in the Newton Expansion Visioning Report? -2- A3. The visioning report outlines the proposed program areas which can be used as a reference at this stage. Upon award those requirements will need to be assessed and reconfirmed with the City and stakeholders involved. Q4. We are planning to submit a proposal, will there be a site walkthrough? A4. There is no walkthrough scheduled for this RFP. Q5. Could you also provide a list of consultants that have worked on the existing building to date. Can the City confirm the original building Architect and Structural Engineer? A5. Since its opening in 1988 Newton Recreation Centre Wave Pool has undergone several expansions and upgrades. The following is a list of the consultants companies who worked on the main projects: 1986 – Recreation Centre New Construction the consultants were − − − − − (Architect) Barret-Culham Architects & Planners Geotechnical) Took Structural Laboratory Inc. (Structural) Jan Bobrowski & Partneres Ltd. (Mechanical & Electrical) Camrec Facilities Consultants Ltd. (Electrical – Pedestrian Lighting) R.P. Shaflik Engineering Ltd. 2009 – Multipurpose Addition the consultants were: − − − − − − (Architect) Bernard Perrenten Architecture Inc. (Geotechnical) Geopacific Consultants LTD. (Structural) JM Engineering (Mechanical & Electrical) Cobalt Engineering. (Civil) H.Y Engineering Ltd. Landscape) Topographics Landscape Architecture. END OF ADDENDUM All Addenda will become part of the RFP Documents.