SUGGESTED RECESSED MOUNTING FOR
SUGGESTED
RESCESSED MOUNTING
FOR
COMMERCIAL
HID LITES
Series F8-V6, F5-V5, G8-V8
COMMERCIAL HID LITES
Series F8-V6, F5-V5, G8-V8
FLANGE
FLANGE
Remove
lens
frameassembly
assemblyby
by loosening
loosening all
1.1.Remove
lens
frame
allcaptive
captivescrews.
screws.
Squeeze
two
safetywire
wirehinges
hinges or
or unclip
snells,
whichever
is being
used.
2.2.Squeeze
thethe
two
(2)(2)safety
unclipthe
thetwo
two(2)(2)safety
safety
snells,
whichever
is being
3.
Remove
the
reflector
and
ballast
cover
by
turning
the
quarter-turn
fasteners.
used.
NOTE:the
Onreflector
the V7, V5
and
V8, instead
remove
the four (4) wing nuts.
3. Remove
and
ballast
cover of
byquarter-turn
turning thefasteners,
quarter-turn
fasteners.
4.
Remove
the
tape
securing
the
four
(4)
swing
bars
to
the
housing.
NOTE: On the V7, V5, and V8, instead of quarter-turn fasteners, remove the four (4) wing nuts.
Place luminaire
ceilingthe
opening
andswing
turn the
four
bar screws clockwise until luminaire
4.5.Remove
the tape into
securing
four (4)
bars
to(4)
theswing
housing.
pulls up securely to the ceiling. NOTE: If there isn't plenum access it will be necessary to connect
5. Place luminaire into ceiling opening and turn the four (4) swing bar screws clockwise until wiring before completely installing luminaire.
luminaire pulls up securely to the ceiling. NOTE: If there isn’t plenum access it will be necessary 6. Make all necessary wiring connections.
to connect wiring before completely installing luminaire.
7. Replace ballast cover, reflector, install lamp, safety wire hinges or safety snells and lens assembly.
6. Make all necessary wiring connections.
7. Replace ballast cover, reflector, install lamp, safety wire hinges or safety snells and lens assembly.
GRID
GRID
1. Remove lens frame assembly by loosening all captive screws.
1.2.Remove
lens
assembly
by hinges
loosening
all captive
Squeeze
theframe
two (2)
safety wire
or unclip
the twoscrews.
(2) safety snells, whichever is being used.
2.3.Squeeze
the
(2) safety
wire hinges
(2) safety
snells, whichever is being Remove
thetwo
reflector
and ballast
cover or
by unclip
turning the
the two
quarter-turn
fasteners.
used.
4.
Remove the mounting hardware and place the luminaire into the grid opening.
3.5.Remove
reflector
andbar
ballast
by turning
fasteners.
Securethe
luminaire
to "T"
using cover
furnished
bracketsthe
andquarter-turn
screws.
Make all
connections.
4.6.Remove
thenecessary
mountingwiring
hardware
and place the luminaire into the grid opening.
Replace
ballast cover,
install
lamp, safety
wireand
hinges
or safety snells
5.7.Secure
luminaire
to “T” reflector,
bar using
furnished
brackets
screws.
and
lens
assembly.
6. Make all necessary wiring connections.
7. Replace ballast cover, reflector, install lamp, safety wire hinges or safety snells and lens assembly.
RACQUETBALL
RACQUETBALL
Assemble
andinstall
Installprovided
provided plaster
plaster frame.
1.1.Assemble
and
frame.
Remove
lens
frameassembly
assemblyby
by loosening
loosening all
2.2.Remove
lens
frame
allcaptive
captivescrews.
screws.
Squeeze
two
safetywire
wirehinges
hinges or unclip
snells,
whichever
is being
used.
3.3.Squeeze
thethe
two
(2)(2)safety
unclipthe
thetwo
two(2)(2)safety
safety
snells,
whichever
is being
4.
Remove the reflector and ballast cover by turning the quarter-turn fasteners.
used.
Remove
tape securing
the four
(4) swing
bars tothe
thequarter-turn
housing.
4.5.Remove
thethe
reflector
and ballast
cover
by turning
fasteners.
Place luminaire
ceilingthe
opening
andswing
turn the
four
(4)the
swing
bar screws clockwise until luminaire
5.6.Remove
the tape into
securing
four (4)
bars
too
housing.
pullsluminaire
flush to the
ceiling.
NOTE:
If there
access
it will bar
be necessary
to connect
wiring
6. Place
into
ceiling
opening
andisn't
turnplenum
the four
(4) swing
screws clockwise
until
before completely installing luminaire.
luminaire pulls flush to the ceiling. NOTE: If there isn’t plenum access it will be necessary to 7. Make all necessary wiring connections.
connect wiring before completely installing connections
8. Replace ballast cover, reflector, install lamp, safety wire hinges or safety snells and lens assembly.
7. Make all necessary wiring connections.
8. Replace ballast cover, reflector, install lamp, safety wire hinges to safety snells and lens assembly.
Cardboard lampholder guard must be removed prior to lamping.
Cardboard Lampholder Guard Must Be Removed Prior To Lamping.
Cleaning Instructions: Wipe luminaire with a soft cloth slightly dampened with warm, soapy water.
On stainless steel units, tightly adhering deposits may be removed by using a stainless steel polishing powder.
Never use steel wool or steel brushes on stainless steel. Always rub in the direction of the polish lines.
Note: All luminaires to be installed by a qualified electrician.
Mounting and electrical hardware not supplied by Paramount Industries unless otherwise noted.
PARAMOUNTINDUSTRIES, INC.
Paramount Industries, Inc.
800-521-5405
Fax 800-852-7154
www.paramountlighting.com
REVISED 06/2012
Download