THERMAL PERFORMANCE OF SUN LOUNGE line with doors a a b b b line with doors b a a a a a b b b Sun Lounge to have: b a a. Thermal separation from the heated area and the existing dwelling. Walls, doors and windows between the dwelling and extension should be insulated and draught-proofed to at least the same extent as the existing dwelling. a b. Independent temperature and controls to the heating system. c. Glazed elements should comply with L1B Table 1 and other thermal elements should have U-values no worse than L1B Table 2. beam 2 glazed area 100x100mm SHS GENERAL All workmanship and materials to comply with Building Regulations & British Standards. All materials to be fixed, applied or mixed in accordance with manufacturers instructions or specifications. All materials shall be suitable for their purpose. beam 4 [ horizontal ] 100x100mm SHS beam 5 [ raking ] beam 3 [ horizontal ] 100x100mm SHS 50x125mm C16 rafters @ 600mm ctrs beam 1 glazed area Dimensions shown to face of brick/block, and finished face of timber partitions. Structure to be tied in accordance with Building Regulations part A1 + A2. Elements of structure to be protected to achieve 30 minutes fire resistance. No work to proceed prior to approval of structural calculations. rwg rwg DECORATIVE TIMBER FRAMING DETAIL Structural and joinery timber to be preservative treated. All structural timber to be marked Dry or KD. Do not treat in any way that will re-introduce moisture. 1:20 [ to match existing ] FOUNDATIONS PROPOSED ROOF STRUCTURE 1:50 Minimum 600x200mm thick concrete strip foundations, min 1000mm deep to suit conditions. Final width and depth to be determined on site by the BCO. Foundations to be taken down to level below invert of any adjacent drainage. Refer to structural engineer’s drawings for details of foundations adjacent to tree. DINING existing Zinc standing seam finish, PE film & roofing membrane to Zinc manufacturer’s recommendations, 120mm Kingspan Thermaroof TR27 insulation, 19mm thick WBP plywood deck, 50x125mm C16 rafters at 600mm max ctrs, 12.5mm thick foil backed plasterboard soffit. existing BRICK/BLOCK WALLING LOUNGE Foundation grade block work/common brick below ground level. 4 courses min concrete commons below DPC to outer leaf of external walls. Polyethylene DPC, minimum 150mm above adjoining ground level and continuous with DPM. Cavity to terminate at least 225mm below the level of the lowest damp-proof course. 100mm blockwork outer leaf, 100mm thick cavity filled with Rockwool CWB full fill cavity wall batts, 100mm Aircrete 600Kg/m3 3N lightweight concrete blockwork inner leaf. 12.5mm thick plasterboard with skim finish finish Decorative timber framing to match existing External render to terminate at or above dpc level with a suitable bell cast. Finish with 2no coats Dulux Trade Weathershield Waterseal. Total construction to achieve 0.28 w/m2K refer to structural engineer's details for foundations adjacent to tree Timber framed, double-glazed units with low emissivity coating BRICK/BLOCK ACCESSORIES existing 50x150mm C16 floor joists @ 600mm ctrs 225mm long austentic stainless steel cavity ties to B.S. 1243, DD140 or BS EN 845-1, 750mm horizontally and 450mm vertically set in diamond pattern to give 5 No. ties per m2 min. Additional ties at 300mm cts vertically adjacent to openings. Timber flooring boards, polyethylene slipsheet, 50x150mm C16 grade floor joists at 600mm ctrs with insulation support battens, 100mm thick Quinn Therm QF rigid insulation, ventilated airspace SUN LOUNGE KITCHEN SUSPENDED GROUND FLOOR WC 100mm blockwork outer leaf, 100mm thick cavity filled with Rockwool CWB full fill cavity wall batts, 100mm Aircrete 600Kg/m3 3N lightweight concrete blockwork inner leaf. 12.5mm thick plasterboard with skim finish finish remove existing rwg Fix strip of insulation between wall and last joist. Cross ventilate subfloor void equivalent to 1500mm2 free ventilation per metre run of wall and maintain existing house subfloor ventilation. rwg Total construction to achieve 0.22 W/m2K. Minimum 600x200mm thick concrete strip foundations, min 1000mm deep to suit conditions SECTION 1-1 WARM PITCHED ROOF EXISTING GROUND FLOOR PLAN 1:50 Timber flooring boards. Polyethylene slipsheet 50x150mm C16 grade floor joists at 600mm ctrs with insulation support battens 100mm thick Quinn Therm QF rigid insulation. Ventilated airspace 1:100 Zinc standing seam finish PE film & roofing membrane to Zinc manufacturer’s recommendations 120mm Kingspan Thermaroof TR27 insulation 19mm thick WBP plywood deck. 50x125mm C16 rafters at 600mm max ctrs. 12.5mm thick foil backed plasterboard soffit. Total construction to achieve 0.18 W/m2K DRY LININGS Dry lining to existing party wall: 12.5mm plasterboard with vapour barrier on 75x50mm sw timber studs at 600 ctrs. Insulate between studs with 60mm Quinn-therm QF insulation. 50mm air gap between insulation/studs and existing wall. Total construction to give u-value of 0.28W/m2K. DINING WINDOWS/ DOORS/ ROOFLIGHTS Timber framed, double-glazed units with low emissivity coating to achieve 1.6 W/m2K, with 150mm wide DPC (to BS743). LOUNGE Window glazing within 800mm of floor to be in accordance with BS6206: 1981. Window glazing within 300mm of glazed door to be in accordance with BS6206: 1981 with safety glass to a height of 1500mm. Door glazing within 1500mm of floor to be toughened safety glass in accordance with BS6206 1981. Trickle ventilation to give 8000mm background ventilation. Patent glazing rooflights: Aluminium framed, double-glazed units with low emissivity coating to achieve 1.6 W/m2K, with 150mm wide DPC (to BS743). Capping powder coated to match zinc colour. RAINWATER GOODS Marley gutters (or similar) connected to existing hopper. Install to ensure the complete discharge of rainwater from the building without leaking. Obtain all components for each type of pipework/guttering from the same manufacturer unless specified otherwise. Provide for thermal and building movement when fixing and jointing, and ensure that clearances are not reduced as fixing proceeds. Use galvanized or nonferrous fastenings, suitable for the purpose and background, and compatible with the material being fixed or fixed to. EXISTING REAR ELEVATION 1:100 EXISTING LEFT SIDE ELEVATION 1:100 Set out gutters to a true line to ensure no ponding or backfall. Position high points of gutters as close as practical to the roof and low points not more than 50 mm below the roof. Overlap joints in direction of fall and seal as specified to make watertight. Ensure that roofing underlay is dressed into gutter. Fix pipework securely at centres specified by manufacturer and plumb true to line with additional supports as necessary to support pipe collars, particularly at changes in direction. Make changes in direction of pipe runs only where shown on drawings. Cut ends of pipes to be clean and square with burrs and swarf removed. ELECTRICAL All electrical works must be designed, installed, tested and commissioned by a person competent to do so to meet the requirements of Part P. All installations to comply with IEE regulations and all fittings to comply with British Standards. Provide a safe, well insulated, earth protected system capable of supplying the anticipated maximum demand. Accessories, fasteners, connectors,etc to be types recommended for the purpose by electrical equipment manufacturer. Avoid contact between dissimilar metals and use corrosion resistant fasteners in locations where moisture may occur. KITCHEN WC rev PROPOSED GROUND FLOOR PLAN 1:50 PROPOSED REAR ELEVATION 1:100 PROPOSED LEFT SIDE ELEVATION 1:100 ... ... ... collinsarchitecture 15 The Green, Caldy. CH48 2LA 0151 625 9210 07986 240214 ben@collinsarchitecture.co.uk www.collinsarchitecture.co.uk client Mr & Mrs Iggo scheme 8 Rathmore Road dwg title Proposed Plans & Elevations dwg no 1214 01 size A1 scale as shown