20160801-5171 FERC PDF (Unofficial) 8/1/2016 2:49:29 PM 5400 Westheimer Court Houston, TX 77056-5310 713.627.5400 main Mailing Address: P.O. Box 1642 Houston, TX 77251-1642 August 1, 2016 Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426 Re: Algonquin Gas Transmission, LLC Access Northeast Project - Docket No. PF16-1-000 Supplemental Project Information Filing Dear Ms. Bose: On November 17, 2015, the Director of the Office of Energy Projects issued a letter in the above-referenced docket approving the request of Algonquin Gas Transmission, LLC (“Algonquin”) to commence the Federal Energy Regulatory Commission’s (“Commission”) Prefiling Review Process of its proposed Access Northeast Project (“Project”). Algonquin hereby submits supplemental information to assist Commission Staff, landowners, public officials and other stakeholders in their review of the Project. On May 31, 2016, Algonquin submitted draft Resource Report 13 in the captioned docket, which included a discussion of LNG trucking facilities at the proposed Project LNG liquefaction, storage, and vaporization facility in Acushnet, Massachusetts (“LNG Facility”). Following discussions with interested stakeholders, Algonquin is proposing to remove the LNG truck delivery services and related facilities from the LNG Facility design. Specifically, the changes to the design include: (i) removal of the LNG truck loading bays; (ii) substantial reduction in size, or removal, of the truck loop illustrated on the plot plan; (iii) related modification of LNG process piping and associated pipe rack(s); and (iv) other related changes to ancillary elements of the design to reflect removal of the LNG trucking facilities. These changes will be reflected in the final Resource Report 13 and plot plans included with the certificate application for the Project. Should you have any questions concerning this request, please contact me at (713) 627-4488 or Leanne Sidorkewicz at (713) 627- 4515. Sincerely, /s/ Berk Donaldson Berk Donaldson General Manager, Rates and Certificates cc: John Peconom Harry Jeudy 20160801-5171 FERC PDF (Unofficial) 8/1/2016 2:49:29 PM Document Content(s) Supplemental Project Information Filing.PDF...........................1-1