Market Analysis of Used Building Materials in Metro Vancouver

advertisement
Market Analysis of Used Building Materials in Metro Vancouver
Prepared for
Metro Vancouver
February 2012
Kane Consulting
LOCO BC
Restraint Consulting
Urban Fabric
Market Analysis of Used Building Materials in Metro Vancouver
Prepared for Metro Vancouver by Kane Consulting, LOCO BC, Restraint Consulting, and Urban Fabric
2
February 2012
Market Analysis of Used Building Materials in Metro Vancouver
3
Table of Contents
Executive Summary ..................................................................................................................................... 5
I. Waste Generation..................................................................................................................................... 9
A - Methodology ....................................................................................................................................................................................................... 9
General Approach........................................................................................................................................................................................................... 9
Data Collection ................................................................................................................................................................................................................ 9
Gaps in Data Set ............................................................................................................................................................................................................10
Cross-Check with Other Statistics .........................................................................................................................................................................11
Residential New Construction ................................................................................................................................................................................11
Non-Residential New Construction ......................................................................................................................................................................14
Residential Renovations ............................................................................................................................................................................................15
Non-Residential Renovations ..................................................................................................................................................................................20
Residential Demolition...............................................................................................................................................................................................21
Non-Residential Demolition ....................................................................................................................................................................................22
B - Results ................................................................................................................................................................................................................. 23
C - Sensitivity of Key Assumptions .................................................................................................................................................................26
D - Projections ........................................................................................................................................................................................................ 27
II. Distribution Network ............................................................................................................................. 29
A - Existing Network ............................................................................................................................................................................................29
Used Building Material Stores ................................................................................................................................................................................29
Direct Sales of Used Building Materials .............................................................................................................................................................31
Recycling...........................................................................................................................................................................................................................31
III. Barriers to Improving Diversion ............................................................................................................ 35
A - Market Forces ..................................................................................................................................................................................................35
B - Performance Requirements ....................................................................................................................................................................... 36
C - Disaggregation and Disconnection .......................................................................................................................................................... 37
D - Lack of Infrastructure ...................................................................................................................................................................................38
E - Cultural Impediments ...................................................................................................................................................................................38
IV. Opportunities to Improve Diversion ...................................................................................................... 40
A - Market Support................................................................................................................................................................................................40
B - Entrepreneurial and Manufacturing Support ..................................................................................................................................... 42
C - Education and Training ................................................................................................................................................................................43
D - Support “5Rs Hierarchy” ............................................................................................................................................................................. 44
E - Job Site Organization .....................................................................................................................................................................................45
F - Central Facility .................................................................................................................................................................................................45
G - Connect Supply Chain ...................................................................................................................................................................................47
H - Stimulate Deconstruction ...........................................................................................................................................................................47
I - Design ...................................................................................................................................................................................................................48
J - Maintain Existing Building Stock ............................................................................................................................................................... 49
V. Best Practices ........................................................................................................................................ 50
A - Methodology .....................................................................................................................................................................................................50
B - Geographic Scan ..............................................................................................................................................................................................50
New York State ..............................................................................................................................................................................................................50
State of Massachusetts ...............................................................................................................................................................................................50
San Francisco .................................................................................................................................................................................................................50
Prepared for Metro Vancouver by Kane Consulting, LOCO BC, Restraint Consulting, and Urban Fabric
February 2012
Market Analysis of Used Building Materials in Metro Vancouver
4
Portland, Oregon ..........................................................................................................................................................................................................51
Cleveland, Ohio ..............................................................................................................................................................................................................51
Netherlands .....................................................................................................................................................................................................................51
C - Interventions ....................................................................................................................................................................................................51
Tax Credits .......................................................................................................................................................................................................................51
Reuse Centres .................................................................................................................................................................................................................52
Procurement ...................................................................................................................................................................................................................56
Industry Development, Training & Jobs .............................................................................................................................................................58
VI. Recommendations................................................................................................................................ 63
Recommendations for Immediate Action ................................................................................................................................................... 63
Creating Opportunities for Improved Diversion ............................................................................................................................................63
Strengthening Distribution......................................................................................................................................................................................63
Supporting the Market...............................................................................................................................................................................................63
Other...................................................................................................................................................................................................................................63
Recommendations for Medium-Term Action ............................................................................................................................................63
Creating Opportunities for Improved Diversion ............................................................................................................................................63
Strengthening Distribution......................................................................................................................................................................................63
Supporting the Market...............................................................................................................................................................................................63
Other...................................................................................................................................................................................................................................63
References ................................................................................................................................................ 64
Appendices................................................................................................................................................ 66
Appendix I – Detailed Results and Projections ......................................................................................................................................... 67
Appendix II – Population Projections ........................................................................................................................................................... 72
Appendix III – Material Specific Barriers to Reuse..................................................................................................................................73
Appendix IV – Interviews Conducted............................................................................................................................................................ 74
Appendix V – Material Categories & Waste Generation Composition Studies.............................................................................75
Prepared for Metro Vancouver by Kane Consulting, LOCO BC, Restraint Consulting, and Urban Fabric
February 2012
Market Analysis of Used Building Materials in Metro Vancouver
5
Executive Summary
The main objective of this study is to understand the supply chain of used building materials in Metro Vancouver to help
support policy that advances the practice of salvage and deconstruction in the region.
Part I of this project reviewed construction, renovation, and demolition activity in Metro Vancouver in order to develop
an estimate of the waste generated by these activities in both the residential and non-residential sectors. Permit data
for these activities, from 2005-2010, was obtained from every member municipality of Metro Vancouver, and this
information was then translated into the square footage of activity, and then into generated waste. Specific additional
projects such as roof replacements, driveway replacements, and interior renovations, were also estimated and
translated into generated waste. The methodology used in this project was developed by Franklin Associates (1998) and
was also used by the US Environmental Protection Agency (USEPA 2003).
Following this approach, it was estimated that 1.3 million tonnes of construction and demolition (C&D) waste is, on
average, generated annually in Metro Vancouver:
Material
Glass
Hazardous Waste
Metals
Mineral Aggregates
Other Materials
Other Organics
Plastics
Wood Waste
Total
%
1%
1%
13%
34%
10%
3%
4%
36%
100%
Avg Tonnes/Yr
9,560
9,642
165,788
445,087
126,574
40,210
55,173
469,755
1,321,788
Section I of the report details the methodology followed, and summarizes the results. Detailed results are provided in
Appendix I. An Excel spreadsheet, used to record and calculate the results of this study, accompanies the submission of
this report to Metro Vancouver.
The remainder of the report focuses on the market for used building materials in the context of the existing distribution
system, the current barriers to improving diversion, the opportunities for improving diversion and increasing the reuse
of building materials, and best practices in other jurisdictions. Interviews were conducted with representatives in
building design, construction, renovation, deconstruction, demolition, waste hauling, material reuse, material recycling,
and analysis of the system. Relevant literature was reviewed, and a number of case studies from other jurisdictions were
compiled.
Mineral aggregates constitute 34% of the C&D waste stream generated annually in Metro Vancouver (445,000 tonnes
annually). Concrete represents the bulk of this category, and is generally sent to a small number of Lower Mainland
concrete recycling facilities. These facilities crush the material to make road base, but have challenges finding markets
for their products in spite of offering what they feel is a high-quality product at a lower price than gravel. As a result,
their facilities are sometimes unable to accept all the concrete waste available which results in concrete being taken to
the landfill. Government support for the recycled concrete products market would help avoid this situation.
Wood constitute 36% of the C&D waste generated (470,000 tonnes annually), and include a wide range of items. Large
timbers (3” or thicker) are sold for reuse or re-sawing into flooring or furniture stock. Heritage value items are often sold
directly from job sites, and include windows, doors, cabinets, porch columns, siding, panelling, and flooring. The rest of
the wood waste generated (the vast majority) is chipped. Urban Wood Waste Recyclers process over 200,000 tonnes per
year, and 100% of their sales are to district energy projects in BC (such as Howe Sound Pulp and Paper which sells power
to BC Hydro).
Prepared for Metro Vancouver by Kane Consulting, LOCO BC, Restraint Consulting, and Urban Fabric
February 2012
Market Analysis of Used Building Materials in Metro Vancouver
6
Two general observations emerged with regard to the challenge of finding valuable markets for C&D wood waste. First,
there is generally an inverse relationship between a product’s place in the 5Rs hierarchy, and the potential volume of
wood waste that could be utilized in making that product. For example, the reuse of heritage items occupies an elevated
position in the 5Rs hierarchy (and commands a high dollar value per unit of wood), but is able to consume only a very
small portion of the waste generated. At the other extreme, chipping wood is able to consume the majority of the wood
waste generated, but occupies a low level in the 5Rs hierarchy (and commands a low dollar value per unit of wood).
Second, the low value of virgin timber severely limits the range of economically-viable options for reuse and recycling of
wood. One contractor interviewed noted that 30 years ago he had 25% of the wood waste on site he has today because
of the price of wood relative to labour. He explained that since a new 2x4 costs only $2, he is not going to pay a
carpenter $40/hr to de-nail and salvage a used one. If his crew makes a mistake in framing a wall, the whole wall goes in
the wood recycling bin.
There are currently four used building material stores in Metro Vancouver. Together they have approximately 30
employees, hold inventory in approximately 160,000 square feet of space, and turnover between 2,000 and 12,000
tonnes per year. Their collective volume represents less than 1% of the C&D waste generated annually, but research
indicates that this sector could possibly expand to handle 3% of the C&D waste generated annually.
Many of the construction and demolition firms , interviewed for this project currently claim to be achieving 70-95%
diversion, making Metro Vancouver’s goal of 80% diversion by 2015 readily attainable. The challenge now lies as much
in moving material up the 5Rs hierarchy, as it does in further increasing diversion.
Barriers to improving diversion and increasing the reuse of building materials were identified, and include:
• Market forces that result in labour and land being expensive, and materials being inexpensive. High
labour costs create a disincentive to utilize used building materials at the design, restoration, re-grading,
and installation stages. Expensive land makes it difficult for used building material stores to hold
significant inventory.
• Performance requirements that limit the use of used building materials. These requirements include
code changes, re-grading requirements, contracts that specify new materials covered by a warranty, and
energy performance and water conservation objectives.
• Disaggregation of supply such that each supplier of used building materials has a small inventory, much
is sold informally, and there is no way to capture the entire offering. Architects interviewed express
frustration at not being able to easily find what is available.
• Disconnection between each step in the construction process (design, construction, renovation,
deconstruction, diversion) which isolates decision-making and precludes the coordination that would
allow additional use of used building materials.
• Lack of infrastructure for supporting diversion into reuse and recycling, which includes too few drop-off
locations, lack of facilities for some materials (e.g. glass), pricing structures that don’t support small and
medium-scale recycling, and a lack of used building material stores able to support large projects.
• Cultural impediments, including customer/client preferences for new materials, a general lack of
awareness of deconstruction options, and the firm entrenchment of status-quo construction practices.
Opportunities for improving diversion and increasing the reuse of building materials were identified, and include:
• Supporting the market through government and institutional purchasing for core products (e.g. crushed
concrete as road base), visible products that illustrate the potential for used materials (e.g. flooring in
high-profile buildings), and mandatory minimum content requirements for used materials in public
projects and publicly-funded projects.
• Tax incentives have proven very helpful in other jurisdictions, and potential policies include tax
receipting for donated used materials, and the elimination of sales tax on used materials. Other market
incentives include reduced permit fees, density bonuses, and set-back leniencies when used building
materials are utilized.
Prepared for Metro Vancouver by Kane Consulting, LOCO BC, Restraint Consulting, and Urban Fabric
February 2012
Market Analysis of Used Building Materials in Metro Vancouver
•
•
•
•
•
•
•
•
7
Supporting entrepreneurs and manufacturing, including those involved with both recycling and valueadded product manufacturing. Offering technical assistance to entrepreneurs, partnership programs,
financing support, the provision of low-cost land, and the use of other economic development tools will
help establish a market pull.
Providing education and training in all aspects of the construction process, targeting architects,
demolition and renovation contractors, home-owners and clients, and waste haulers.
Ensuring job-site recycling practices, which are an effective way to reduce waste, are more widely
adopted.
Establishing a central facility such as a deconstruction hub emerged as a key strategy to improving
diversion. This facility should be non-profit, focus on used building materials and on wood but be
capable of receiving all C&D materials, and act as a hub in support of entrepreneurial activity. A virtual
inventory will help engage the design community, and a critical mass of inventory is necessary (not a few
hundred doors, but 10,000 doors). The wood processing aspect of the facility should be capable of
sorting, de-nailing, metal detection, chopping and re-grading, thickness sanding, gluing, and pressing
into new products. The facility should also be supported by multiple drop-off locations across Metro
Vancouver, including the Eco-Centres envisioned by Metro Vancouver.
Connecting the supply chain between the supply of used materials and the requirements of new
construction. This can be accomplished, in part, by working with institutions that have the capacity to do
this internally (e.g. universities and branches of government).
Stimulating deconstruction through mechanisms such as the City of Vancouver’s deconstruction strategy
which de-couples deconstruction from the building permit. Other approaches include offering an
accelerated development permit process, mandatory deconstruction for categories of buildings, and
establishing targets within the 5Rs hierarchy rather than simply overall diversion.
Designing for minimal waste through the use of common dimensions (e.g. not 9-foot ceilings), relaxing
demands for matching visible components, changing contract requirements to allow for used materials,
and designing for long-term expansion, durability and deconstruction.
Maintaining existing building stock by limiting the ability to take down buildings (e.g. new spec houses
and condos), offering incentives to retain buildings or move houses to a new location, and requiring a
minimum building lifespan as part of the development permit.
Recommendations for improving diversion from the C&D waste stream in Metro Vancouver were developed for both
immediate action and for medium-term action:
Immediate Action
1. Stimulate deconstruction through bylaw and permit incentives (Section IV-H).
2. Encourage the development of deconstruction training (Section IV-C).
3. Establish and promote targets for improved diversion within each level of the 5Rs hierarchy (Section IVD).
4. Research opportunities for tax incentives (Section IV-A)
5. Establish more distributed drop-off locations for all C&D waste stream materials (Section IV-F).
6. Establish purchasing policies that give preference to products from the C&D waste stream, and
encourage other institutions and levels of government to do the same (Section IV-A).
7. Collect permit, construction value, and square footage data from each municipality, from this point on,
in order to more accurately estimate C&D waste generation (Section I-A).
Medium-Term Action
1. Partner with professional organizations to create education programs about designing buildings for
minimal waste, long-term versatility, and deconstruction (Section IV-I).
2. Implement regulations and incentives to maintain the existing building stock (Section IV-J).
3. Establish a central non-profit facility (or facilities), focused on used building material and wood, but
capable of receiving all C&D materials, and organized as a hub in support of entrepreneurial activity
(Section IV-F).
Prepared for Metro Vancouver by Kane Consulting, LOCO BC, Restraint Consulting, and Urban Fabric
February 2012
Market Analysis of Used Building Materials in Metro Vancouver
8
4. Support entrepreneurial and manufacturing initiatives (Section IV-B)
5. Collect data from C&D reuse and recycling facilities to inform progress toward targets within 5Rs
hierarchy (Section IV-D.)
Prepared for Metro Vancouver by Kane Consulting, LOCO BC, Restraint Consulting, and Urban Fabric
February 2012
Market Analysis of Used Building Materials in Metro Vancouver
9
I. Waste Generation
A - Methodology
General Approach
An objective of this study was to estimate the mass and composition of waste that is generated annually, from 20052010, in Metro Vancouver from construction, renovation, and demolition activities. The first step in developing this
estimate was to obtain building permit data for these activities from every municipality in Metro Vancouver. An
estimate for un-permitted activity was then added to this core data.
The available data revealed the level of activity as measured by the number of permits and the dollar value of activities,
for new construction, renovation, and demolition, in both residential and non-residential sectors. This information was
then translated into the square footage of activity. We also estimated the number of specific additional projects for
which permits are not required, such as roof replacements, driveway replacements, and heating equipment
replacements. From this information, an estimate was generated for the total annual mass of waste and the
composition by material category.
In order to determine appropriate waste generation rates for this study, a number of published studies were reviewed
and interviews were conducted with individuals involved in the industry. 1 The most comprehensive study reviewed was
conducted by Franklin Associates (1998) in which a methodology was presented and followed, and summaries of waste
generation studies for multiple building types and locations in the United States were presented. A USEPA study was
conducted in 2003 that followed the Franklin Associates methodology and used the same waste generation rates, with
the exception of non-residential new construction. For the purposes of this study, the Franklin Associates methodology
is followed and their waste generation rates are used, with a few exceptions as noted in the detailed methodology.
To estimate the composition, by material, of the generated waste, the same composition tables that were used by
Franklin Associates (1998) are used in this study as well. These tables were generated from waste audits for new
construction, renovation, and demolition activities, in residential and non-residential projects, in various locations
around the United States. The appropriate tables used in the Franklin Associates study, from projects in Seattle,
Washington, are used based on the assumption that construction practices and materials utilized in Seattle would be
most similar to those in Metro Vancouver.
Data Collection
Each municipality in Metro Vancouver was requested to provide, for the years 2005-2010, the following data:
1. Residential construction permits: i) number for each year; ii) construction value for each year; iii) square footage
for each year (if available); iv) percentage on undeveloped land; v) estimate of un-permitted activity
2. Residential renovation permits, broken down by type (kitchen, bathroom, etc.)(if possible): i) number for each
year; ii) construction value for each year; iii) estimate of un-permitted activity
3. Residential demolition permits: i) number for each year; ii) square footage (if available); iii) categorized by age of
structure (if possible); iv) estimate of un-permitted activity
4. Non-residential construction permits: i) number for each year; ii) construction value for each year; iii) square
footage for each year (if available); iv) percentage on undeveloped land; v) estimate of un-permitted activity
5. Non-residential renovation permits: i) number for each year; ii) construction value for each year; iii) estimate of
un-permitted activity
6. Non-residential demolition permits: i) number for each year; ii) square footage (if available); iii) estimate of unpermitted activity
1
The studies reviewed include: 3R Demolition (2004), City of Anitoch (2004), Cosper (1993), Franklin Associates (1998), Freeman
(1994), Gordon (2003), Metro Vancouver (1999a), Santa Monica (2010), and Weber (2009).
Prepared for Metro Vancouver by Kane Consulting, LOCO BC, Restraint Consulting, and Urban Fabric
February 2012
Market Analysis of Used Building Materials in Metro Vancouver
10
The format and content of data collected by each municipality varied significantly. Some municipalities used a database,
others used spreadsheets, and some had only hand-written records until very recently. In some cases, municipal staff
provided print-outs of all permit activity detail, and in other cases summaries were provided.
The data generally not tracked or available from municipalities included:
• Square footage of construction
• Percentage of development on undeveloped land
• Estimate of unpermitted activity
• Breakdown of residential renovations by type (kitchen, bathroom, addition, etc.)
• Square footage of demolitions
The core data that was available from almost all municipalities consisted of:
• Residential new construction: number of permits; construction cost
• Residential renovations: number of permits; construction cost
• Non-residential new construction: number of permits; construction cost
• Non-residential renovations: number of permits; construction cost
• Demolitions: number of permits
Gaps in Data Set
Anmore: no data was available. Anmore’s data was estimated based on Anmore's portion of Metro Vancouver's total
population (0.0845%) 2.
Coquitlam: in 2005 and 2006, only totals were available for residential and non-residential construction (rather than a
breakdown between new construction and renovations). The totals provided for each of those years were
multiplied by the 2007-2010 average proportion of new construction versus renovation. The assumption is that
the same ratio will apply to 2005-2006. The same was done for demolition permits, for which the total only was
given in 2005 and 2006 (rather than a breakdown between residential demolitions and non-residential
demolition).
Langley City: only data for 2010 was available. So for 2005-2009, the 2010 data was applied to each of those years
according to the Metro Vancouver wide totals for each year in comparison to 2010. For example, if the Metro
Vancouver wide total for 2009 was 98% of 2010, the Langley City's 2010 data was multiplied by 98% to come up
with Langley City's 2009 figures. The result is the Langley City's pre-2010 numbers will rise and fall with the overall
trends, arriving at the actual 2010 data.
Maple Ridge: demolition permit data was not provided. Demolition permit data was estimated based on Maple Ridge's
portion of Metro Vancouver's total population.
New Westminster: Only totals were available for residential and non-residential construction (rather than a breakdown
between new construction and renovation). The totals provided were multiplied by the Metro Vancouver wide
proportion of new construction versus renovation. No data was available for demolition permits, so the figures
were estimated based on population.
Pitt Meadows: Only totals were available for residential and non-residential construction (rather than a breakdown
between new construction and renovation). The totals provided were multiplied by the Metro Vancouver wide
proportion of new construction versus renovation. No data was available for demolition permits, so the figures
were estimated based on population.
University Endowment Lands: no data was available. UEL’s data was estimated based on UEL's portion of Metro
Vancouver's total population (0.1893%).
2
Population figures used in this study were sourced from Metro Vancouver (2007).
Prepared for Metro Vancouver by Kane Consulting, LOCO BC, Restraint Consulting, and Urban Fabric
February 2012
Market Analysis of Used Building Materials in Metro Vancouver
11
Cross-Check with Other Statistics
The total construction value compiled in this study was compared with totals reported by Statistics Canada, and a total
variance of 1.6% was found. These results provide reasonable assurance that the data collected from the municipalities
for this study represents a verifiable picture of the overall level of new construction and renovation activity in Metro
Vancouver. The compared values are shown in Table 1.
Table 1: Comparison with Statistics Canada
This Study
Statistics Canada 3
Difference %
2005
$5,569,070,792
$5,650,982,000
-1.5%
2006
$6,694,826,246
$6,617,381,000
1.2%
2007
$7,383,093,850
$7,011,139,000
5.0%
2008
$5,699,624,269
$5,587,958,000
2.0%
2009
$3,942,344,774
$3,889,824,000
1.3%
2010
$5,760,351,707
$5,730,200,000
0.5%
Total
$35,049,311,638
$34,487,484,000
1.6%
Residential New Construction
Starting with the residential new construction permit data collected from each municipality, the construction values for
each municipality are broken down between 1-2 family homes and multi-unit residential buildings. Some municipalities
record these construction values separately, and some do not. Figure 1 shows the percentage of residential new
construction that was for 1-2 family homes, for each of the 11 municipalities that record this information separately.
Figure 1: 1-2 Family Home Construction Value as Percentage of Total Residential New Construction Value
3
(http://www.metrovancouver.org/about/publications/Publications/BuildingPermitsValuesTotal.pdf)
Prepared for Metro Vancouver by Kane Consulting, LOCO BC, Restraint Consulting, and Urban Fabric
February 2012
Market Analysis of Used Building Materials in Metro Vancouver
12
While there is significant variance between municipalities from year to year, two general trends seem to apply:
i.
There was a slight downward trend in the proportion of 1-2 family home construction until 2008,
and then a slight upward trend after 2008. This trend reflects market conditions in Metro Vancouver
as the condominium market was stronger between 2005 and 2008, and weaker between 2008 and
2010.
ii.
There was a higher proportion of 1-2 family home construction in less dense communities, such as
Maple Ridge, than in more dense communities, such as Vancouver.
For the 11 municipalities for which data was tracked, this actual data is used to separate the 1-2 family construction
from the multi-unit construction. For all other municipalities, the average percentage of 1-2 family construction is
applied to the total construction value reported by the municipality.
1-2 Family
Homes
The methodology followed for 1-2 family homes residential new construction is illustrated in the graphic above, and is
explained in the following detailed steps:
1. For each year, the total value of 1-2 family new construction in each municipality was divided by the
construction cost per square foot to determine the square footage of construction. The construction values
recorded by municipalities for each project are the higher value of either: i) the value declared by the project, or
ii) a calculated value based on the architectural plans and an assumed cost of construction per square foot.
This assumed cost of construction varies between municipalities. Some municipalities have developed their own
schedule for construction cost, and others use the software or printed tables produced by Marshall & Swift LLC
of Los Angeles. This study adopts the approach used by each specific municipality to determine the appropriate
construction cost per square foot for that municipality. When this information was not available, a Metro
Vancouver wide average of municipalities for which data was available is applied.
The range of assumed costs of construction varied from $69/sq. ft. in Surrey to $200/sq. ft. in West Vancouver,
with the overall average being $114/sq. ft. These numbers may not reflect actual costs of construction, but they
were the numbers that municipalities multiplied by square footage to determine their reported construction
values. Accordingly, these same numbers are used to calculate backwards to the square footage of construction.
For the municipalities that recorded the actual square footage of construction (Belcarra, Coquitlam, Delta, City
of Langley, and Surrey), this data is used.
The construction cost and square footage of residential new construction for the study years is shown in Table 2.
Table 2: Residential New Construction: Construction Cost and Square Footage
Cost (000s)
Sq. Ft.:
1-2 Family
Multi-Unit
Total
2005
$3,625,658
2006
$4,105,376
2007
$4,769,186
2008
$3,188,424
2009
$2,052,907
2010
$3,639,741
Avg
$3,563,549
13,593,567
20,665,684
34,259,251
14,426,910
24,130,794
38,557,704
13,394,908
27,753,933
41,148,840
11,491,651
17,903,838
29,395,489
10,289,456
9,599,792
19,889,248
15,480,472
17,790,122
33,270,594
13,112,827
19,640,694
32,753,521
2. The square footage of 1-2 family new construction was multiplied by a waste generation factor to determine the
total mass of waste produced during construction. The two waste generation factors used in this study come
Prepared for Metro Vancouver by Kane Consulting, LOCO BC, Restraint Consulting, and Urban Fabric
February 2012
Market Analysis of Used Building Materials in Metro Vancouver
13
from two separate reports: Franklin Associates (1998) and USEPA (2003). Franklin Associates (1998) used 4.38
lbs/sq.ft. and USEPA (2003) used 4.39 lbs/sq. ft.. This study uses the average of the two: 4.385 lbs/sq. ft.
3. The total waste produced was multiplied by the appropriate percentage for each component material group
listed in the Franklin Associates’ (1998) composition table from residential new construction in Seattle. The
percentages were taken from Franklin Associates (1998), and the tonnes shown in Table 3 are the result of
multiplying these percentages by the total waste.
Table 3: Residential New Construction (1-2 Family Homes)
Material
%
Avg Tonnes/Yr
Glass
0.03%
9
Hazardous Waste
0.50%
131
Metals
2.75%
717
Mineral Aggregates
29.16%
7,604
Other Materials
8.11%
2,115
Other Organics
1.51%
393
Plastics
5.36%
1,398
Wood Waste
52.58%
13,714
Total
100.00%
26,081
Multi-Unit Residential
The methodology for multi-unit residential new construction is the same as 1-2 Family residential new construction, with
the following exceptions:
1. The assumed construction cost per square foot for multi-unit residential new construction is different from 1-2
family residential new construction in some of the municipalities that use their own schedule. Also, the Marshall
& Swift cost of construction is different for multi-unit. In these instances, the appropriate multi-unit assumed
cost is used.
2. Non-residential new construction waste generation rate for multi-unit residential new construction is used. This
is based on the assumption that multi-unit new construction – which includes apartment complexes and
condominium towers – is more similar to non-residential new construction than it is to 1-2 family residential
construction. For example, more concrete and steel is typically used in these projects than in single-family
residential construction.
The USEPA (2003) waste generation rate for non-residential new construction is based on a larger sample size
than the Franklin Associates (1998) waste generation rate, and is from a more recent study. For these reasons,
the USEPA (2003) non-residential new construction rate of 4.34 lbs/sq. ft. is used instead of the Franklin
Associates (1998) rate of 3.89 lbs/sq. ft.
4. The total waste produced was broken down into various component material groups according to Franklin
Associates’ (1998) composition table from non-residential new construction in Seattle, rather than from
residential new construction. As with the waste generation rate, the approach used in this study assumes that
the non-residential composition table would better reflect the type of construction and materials used in multiunit residential construction than would the composition table for 1-2 family residential construction.
Prepared for Metro Vancouver by Kane Consulting, LOCO BC, Restraint Consulting, and Urban Fabric
February 2012
Market Analysis of Used Building Materials in Metro Vancouver
14
Table 4: Residential New Construction (Multi-Unit)
Material
%
Avg Tonnes/Yr
Glass
0.04%
16
Hazardous Waste
1.80%
696
Metals
10.20%
3,944
Mineral Aggregates
36.80%
14,229
Other Materials
12.92%
4,995
Other Organics
0.40%
155
Plastics
3.20%
1,237
Wood Waste
34.60%
13,378
Total
100.00%
38,649
Non-Residential New Construction
The methodology used for non-residential new construction is the same as residential new construction, except that no
distinction was made by type of building. Non-residential construction is much more heterogeneous than residential
construction, and as the US EPA notes, “[t]here are fewer material assessments for non-residential buildings, making the
average generation rates for C&D materials more uncertain.” (USEPA 2003, 10). Taking these limitations into account,
the Franklin Associates (1998) and USEPA (2003) methodology is used as follows:
1. Based on the value of construction data collected from each municipality, the square footage of construction is
calculated.
The construction value of non-residential new construction is recorded by each municipality because it is
necessary for the calculation of permit fees. However, very few municipalities record the square footage of
construction. The annual data from the two municipalities that provided this information (City of Langley, and
Surrey) ranged from $82/sq. ft. to $196/sq. ft., with an average of $139/sq. ft. For all other municipalities, the
average construction cost of $139/sq. ft. is used to calculate the square footage of non-residential new
construction. The totals are presented in Table 5.
Table 5: Non-Residential New Construction: Construction Cost and Square Footage
2005
Cost (000s)
Sq. Ft.
$885,334
6,369,315
2006
$1,408,676
10,134,359
2007
$1,503,033
10,813,187
2008
$1,061,469
7,636,466
2009
$697,758
5,019,839
2010
$766,921
5,517,415
Avg
$1,053,865
7,581,764
2. The square footage of construction for each year was multiplied by the waste generation rate for non-residential
new construction.
The USEPA (2003) waste generation rate for non-residential new construction is based on a larger sample size
than the Franklin Associates (1998) waste generation rate, and is from a more recent study. For these reasons,
the USEPA (2003) non-residential new construction rate of 4.34 lbs/sq. ft. is used instead of the Franklin
Associates (1998) rate of 3.89 lbs/sq. ft.
3. The total waste produced was broken down into various component material groups according to Franklin
Associates’ (1998) composition table from non-residential new construction in Seattle. The estimated waste
produced by category of material is shown in Table 6.
Prepared for Metro Vancouver by Kane Consulting, LOCO BC, Restraint Consulting, and Urban Fabric
February 2012
Market Analysis of Used Building Materials in Metro Vancouver
Table 6: Non-Residential New Construction
Material
%
Glass
0.04%
Hazardous Waste
1.80%
Metals
10.20%
Mineral Aggregates
36.80%
Other Materials
12.92%
Other Organics
0.40%
Plastics
3.20%
Wood Waste
34.60%
Total
100.00%
15
Avg Tonnes/Yr
6
269
1,522
5,493
1,928
60
478
5,164
14,919
Residential Renovations
As with the approach taken for residential new construction, the methodology for estimating residential renovation
waste begins by separating 1-2 family renovations from multi-unit renovations. Starting with the total number of
residential renovation permits that were collected from each municipality, the permits are broken down between 1-2
family home renovations, and multi-unit residential renovations. Some municipalities record these permits separately,
and some do not. Figure 2 shows the percentage of residential renovation permits (from 2005-2010) that were for 1-2
family homes, for each of the six municipalities that record this information separately.
Figure 2: 1-2 Family Home Permits as Percentage of Total Residential Renovation Permits
For the six municipalities that separated 1-2 family renovation permits from multi-unit renovation permits, this actual
data is used. For all other municipalities, the average of these six municipalities, for each year, is used to separate 1-2
family renovations from multi-unit renovations.
For the 1-2 family renovations, this study follows the Franklin Associates’ (1998) methodology that attempts to capture
renovation waste by job types that include kitchen renovations, bathroom renovation, driveway replacement, roof
replacement, and equipment replacement. Multi-unit renovation waste is estimated based on the total dollars spent on
multi-unit renovations as compared to 1-2 family renovations.
Prepared for Metro Vancouver by Kane Consulting, LOCO BC, Restraint Consulting, and Urban Fabric
February 2012
Market Analysis of Used Building Materials in Metro Vancouver
16
1-2 Family Homes
Rather than estimating waste generation from residential renovations based on the square footage of renovation
activity, estimates derived in this study are based on the number of different types of jobs undertaken. As Franklin
Associates point out: “Because of the wide variation in remodelling projects, waste assessments to determine the
generation per square foot are not very useful for estimating total generation. More important is the amount of material
produced per job.” (1998, 2-8). Accordingly, calculations in this study proceeded as follows:
1. The number of residential renovation permits for 1-2 family homes were determined as outlined above, and
then increased by a factor to account for unpermitted activity. The unpermitted activity is intended to capture
renovations for which a permit was required but not obtained, as well as for renovations for which a permit was
not required.
Estimates of unpermitted activity were obtained from three sources:
i)
Statistics Canada (1995) estimates that the underground economy involved in residential
renovations represents approximately 20% more labour cost than is reported on GST filings.
They assume that most of the materials are captured because they are purchased from
wholesale and retail outlets that report sales. So their estimate of 20% applies only to the labour
portion of residential renovations.
ii)
The Greater Vancouver Home Builders Association estimates that approximately 30% of
renovation activity is in the “cash economy.” (interview with Peter Simpson, 2011)
iii)
Municipal staff interviewed for this project estimate that the unpermitted activity could be as
high as 50%.
In light of these estimates, this study assumes that 33% more 1-2 family renovation jobs take place than those
for which permits are obtained. Accordingly, the number of permits each year is increased by 33% to give the
total number of jobs.
2. The number of renovation jobs is broken down into five categories, as per Franklin Associates (1998): major
bathroom, minor bathroom, major kitchen, minor kitchen, and additions and other renovations. To allocate the
total number of jobs into these categories, estimates of total annual jobs in the United States referenced by
Franklin Associates (1998) and USEPA (2003) are used. Franklin Associates based their estimates on data from
the National Association of Home Builders, and USEPA based their estimates on data from the Joint Center for
Housing Studies of Harvard University. This study averages the two data sets to estimate the percentage of total
renovation jobs represented by each renovation type. Table 6 shows the results.
3. The number of renovation jobs of each type was multiplied by the appropriate tonnes of waste per job. Franklin
Associates (1998) and USEPA (2003) each used the same number of tons per job, which are converted into
metric tonnes per job for the purposes of this study. Table 6 shows the resulting number of tonnes per job.
Table 6: Allocation of Renovation Jobs by Type & Waste Generation by Type
Type
Major Bathroom
Major Kitchen
Minor Bathroom
Minor Kitchen
Additions & Other
Franklin
USEPA
Used in
Study
18%
19%
27%
19%
19%
10%
8%
24%
20%
37%
14%
13%
25%
19%
28%
Avg # Jobs
810
781
1,462
1,129
1,624
5,806
Tonnes/Job
0.91
4.08
0.23
0.68
0.68
Prepared for Metro Vancouver by Kane Consulting, LOCO BC, Restraint Consulting, and Urban Fabric
Avg Tonnes/Yr
734
3,187
332
768
1,105
6,126
February 2012
Market Analysis of Used Building Materials in Metro Vancouver
17
Note: percentages shown are rounded and may not total 100%
4. For each year, the total number of tonnes of waste estimated to have been generated by these various types of
renovations was multiplied by the composition percentage from Franklin (1998) for residential renovations in
Seattle. The results are shown in Table 7.
Table 7: Residential Renovations (1-2 Family Homes)
Material
%
Avg Tonnes/Yr
Glass
1.00%
61
Hazardous Waste
0.10%
6
Metals
5.20%
319
Mineral Aggregates
31.20%
1,911
Other Materials
3.20%
196
Other Organics
0.80%
49
Plastics
3.00%
184
Wood Waste
55.50%
3,400
Total
100.00%
6,126
Multi-Unit Residential
The methodology used to estimate waste generation from 1-2 family home renovations is not applicable to multi-unit
residential renovations. This is because a single permit for a multi-unit residential renovation might cover many
individual kitchen, bathroom, or addition “jobs,” as understood in the context of 1-2 family renovations. In fact,
collected data indicates that the average construction cost per permit was $63,406 for 1-2 family renovations, and
$197,199 for multi-unit renovations, indicating that significantly more work is being done for each multi-unit renovation
permit.
Therefore, the amount of waste generated from multi-unit residential renovations is estimated by comparing the dollars
spent on multi-unit renovations to the dollar spent on 1-2 family home renovations. In doing so, it was assumed that the
amount of waste generated per dollar spent on renovations would be comparable between 1-2 family renovations and
multi-unit renovations; and that the waste stream composition would be similar. The specific steps are outlined as
follows:
1. The construction value for multi-unit renovations is increased by 33% to account for unpermitted renovations.
The rationale for doing so is the same as it was for increasing the number of 1-2 family renovation permits, as
outlined above.
2. The resulting construction value is divided by the construction value for 1-2 family renovations (also marked up
by 33%).
Table 8: Multi-Unit New Construction: Construction Cost as Percentage of 1-2 Family New Construction Cost
1-2 Family $
(000s)
Multi-Unit $
(000s)
Multi-Unit as %
of 1-2 Family
2005
2006
2007
2008
2009
2010
Avg
$326,207
$447,249
$341,171
$391,810
$323,930
$378,352
$368,120
$163,920
$192,118
$204,583
$291,879
$215,746
$245,150
$218,899
50%
43%
60%
74%
67%
65%
59%
Prepared for Metro Vancouver by Kane Consulting, LOCO BC, Restraint Consulting, and Urban Fabric
February 2012
Market Analysis of Used Building Materials in Metro Vancouver
18
3. This number, expressed as a percentage, is then multiplied by the tonnes of waste estimated for each material
from 1-2 family renovations. The results are shown in Table 9.
Table 9: Residential Renovations (Multi-Unit Residential)
Material
%
Avg Tonnes/Yr
Glass
1.00%
37
Hazardous Waste
0.10%
4
Metals
5.20%
190
Mineral Aggregates
31.20%
1,140
Other Materials
3.20%
117
Other Organics
0.80%
29
Plastics
3.00%
110
Wood Waste
55.50%
2,028
Total
100.00%
3,654
Driveway Replacements
The methodology used for estimating waste from driveway replacements is the one used by Franklin (1998) and USEPA
(2003), and is based on Statistics Canada data for the number of housing dwellings in Metro Vancouver. The
methodology is as follows:
1. Building categories in Metro Vancouver were grouped to estimate that there are 487,535 single-family
dwellings, duplexes, and row house units (Statistics Canada 2006). It is this category of residences, as
differentiated from apartment and condominium buildings, that are assumed to be close to the category of
residences used by Franklin Associates (residences with less than five units per structure)(1998).
2. As per Franklin Associates (1998) and USEPA (2003) it is assumed that 60% of these buildings have concrete
driveways, and that 3% of these are replaced every year. This calculation provides an estimated number of
concrete driveway replacement jobs each year. It is assumed that asphalt driveways are generally re-sealed,
coated and filled rather than replaced.
3. The annual number of concrete driveway replacement jobs is multiplied by the average weight per driveway,
and 100% of this waste is categorized as “mineral aggregates.”
Table 10: Driveway Replacements
# Driveways/Yr
8,776
Lbs per Job
17,982
Avg Tonnes/Yr
71,590
Roof Replacements
The methodology used for estimating waste from roof replacements is the one used by Franklin (1998) and USEPA
(2003), and is based on Statistics Canada data for the number of housing dwellings in Metro Vancouver. The
methodology is as follows:
Prepared for Metro Vancouver by Kane Consulting, LOCO BC, Restraint Consulting, and Urban Fabric
February 2012
Market Analysis of Used Building Materials in Metro Vancouver
19
1. The same housing inventory of 487,535 single-family dwellings, duplexes, and row house units (Statistics Canada
2006) that is used in estimating driveway replacements.
2. As per Franklin Associates (1998) and USEPA (2003) it is assumed that 67% of these buildings have asphalt roofs,
and that 25% of these buildings have wood roofs. In addition, as per Franklin (1998) and USEPA (2003), it is
assumed that 7% of the asphalt roofs and 5% of the wood roofs are replaced each year. This calculation provides
an estimated number of asphalt roof replacement jobs each year, and an estimated number of wood roof
replacement jobs each year.
3. The annual number of roof replacement jobs is multiplied by the average weight of waste per job. Franklin
(1998) had a slightly lower estimate of the weight per job than did USEPA (2003) for both asphalt roofs and
wood roofs. For the purpose of this study, the average of these two estimates is used.
100% of the waste from asphalt roof replacement jobs is categorized as “mineral aggregates,” and 100% of the
waste from wood roof replacement jobs is categorized as “wood.” Table 11 shows the results.
Table 11: Roof Replacements
# Jobs/Yr
Asphalt Roofs
Wood Roofs
22,865
6,094
Lbs per Job
3,380
2,900
Avg Tonnes/Yr
35,056
8,016
43,072
HVAC Equipment Replacements
The methodology used for estimating waste from HVAC equipment replacements is the one used by Franklin (1998) and
USEPA (2003), and is based on Statistics Canada data for the number of housing dwellings in Metro Vancouver. The
methodology is as follows:
1. The total number of residential dwelling units in Metro Vancouver, which was 807,900 in 2006 (Statistics
Canada, 2006) is used as a starting point. A recognized limitation of this approach is that this total is the number
of dwelling units rather than the number of buildings. However, it is assumed that the size of equipment is
related to the number of dwelling units serviced by it, and therefore any over-estimation in the number of
pieces of equipment replaced each year would be offset by under-estimation in the size of equipment.
2. Tables from Franklin Associates (1998) and USEPA (2003) are used to determine the percentage of these
dwellings that have various pieces of HVAC equipment, and how frequently these pieces of equipment are
replaced. In most cases the percentages used in the two studies are averaged. The exception to this is the
assumed frequency of replacement of central air conditioning units, for which data is used from the Office of
Energy Efficiency at Natural Resources Canada which found that 18% of homes in British Columbia have air
conditioning (Natural Resources Canada, 2003).
3. The annual number of replacement jobs for each type of equipment is multiplied by the weight of each piece of
equipment. Franklin (1998) and USEPA (2003) used the same weights for each piece of equipment, which is also
used in this study.
100% of the waste from HVAC equipment replacement is categorized as “other materials.” Table 12 shows the
results.
Prepared for Metro Vancouver by Kane Consulting, LOCO BC, Restraint Consulting, and Urban Fabric
February 2012
Market Analysis of Used Building Materials in Metro Vancouver
20
Table 12: HVAC Replacements
% of Homes
Type
Air Furnaces
Heat Pumps
Hot Water
System
Pipeless Furnace
Electric Units
Room Heaters
Stoves
Fireplaces
Central Air
%
Replaced/Yr
# Jobs
Lbs/Job
Tonnes/Yr
5%
5%
22,847
4,058
300
600
3,109
1,104
13%
3%
3,141
1,000
1,425
5%
6%
3%
2%
1%
18%
5%
7%
7%
3%
4%
5%
2,076
3,488
1,829
531
197
7,271
200
200
200
200
300
600
188
316
166
48
27
1,979
8,362
57%
10%
Non-Residential Renovations
Franklin (1998) attempted two approaches for estimating the mass of waste from non-residential renovations. In the
first approach they took the square footage of non-residential renovations and multiplied it by a waste generation
factor. The outcome of this approach was found to be “unreasonably low” and not reliable (Franklin Associates 1998, A5). The USEPA study concurred with this finding, stating:
“Very few material assessments are available for non-residential renovation. Additionally, the materials
assessments available do not have any consistency. Therefore, a methodology similar to the one used for
residential renovation cannot be used to estimate the materials generated during non-residential renovations.”
(USEPA 2003, 16)
Accordingly, both Franklin Associates (1998) and USEPA (2003) embraced a methodology that compares the dollars
spent on non-residential renovations to the dollars spent on residential renovations, and assumes that the waste
generated would be proportional. The same approach is followed in this study, as outlined below:
1. The dollars spent on non-residential renovations for each year are compared to the dollars spent on residential
renovations (after the 33% increase for unpermitted activity). Non-residential renovation expenditures, as a
percentage of residential renovation expenditures, are shown in Table 13.
Table 13: Non-Residential Renovations as Portion of Residential Renovations
$ Renovations
Residential $ (000s)
Non-Residential $
(000s)
Non-Residential as
% of Residential
2005
2006
2007
2008
2009
2010
Avg
$490,127 $639,367
$545,754
$683,689
$539,676
$623,502
$689,561 $700,047
$700,534
$935,679
$785,909
$884,891
$782,770
128%
137%
146%
142%
133%
141%
109%
$587,019
2. This percentage is then multiplied by the total residential renovation waste to determine an estimate for total
non-residential waste for each year.
3. For each year, the total number of tonnes of waste is multiplied by the composition percentage from Franklin
(1998) for non-residential renovations in Seattle. The results are shown in Table 14.
Prepared for Metro Vancouver by Kane Consulting, LOCO BC, Restraint Consulting, and Urban Fabric
February 2012
Market Analysis of Used Building Materials in Metro Vancouver
Table 14: Non-Residential Renovations
Material
%
Glass
0.03%
Hazardous Waste
0.90%
Metals
12.80%
Mineral Aggregates
21.81%
Other Materials
3.70%
Other Organics
1.70%
Plastics
8.00%
Wood Waste
51.02%
Total
100.00%
21
Avg Tonnes/Yr
47
1,600
22,757
38,775
6,578
3,022
14,223
90,706
177,709
Residential Demolition
1. The first step in calculating waste from demolitions is to break down the total number of demolition permits
between residential demolitions and non-residential demolitions. Seven of the municipalities (Belcarra,
Coquitlam, Delta, Langley Twp, Lions Bay, North Van City and Richmond) separated residential from nonresidential demolition permits. For all other municipalities it is assumed that the ratio of residential demolitions
to non-residential demolitions is the same as the ratio of residential new construction to non-residential new
construction. The ratio of dollars spent on residential new construction to the dollars spent on non-residential
new construction is applied to the total number of demolition permits to estimate the breakdown of residential
demolitions to non-residential demolitions.
2. The number of residential demolition permits for each year is then multiplied by the average square footage of a
residential demolition to give the total square footage of residential demolition for each year in the study.
The average home size in the City of Vancouver is between 2,700 and 3,300 sq. ft. of heated space, while the
national average for new home construction is around 2,200 sq. ft. 4 Recognizing that homes being demolished
were generally built many years ago, and that home sizes have risen over time, a smaller average home size for
the average demolished home is assumed. In consultation with Metro Vancouver, the average home being
demolished is assumed to be 2,000 square feet.
3. The total square footage of residential demolition is then multiplied by the waste generation factor from
Franklin Associates (1998) of 115 lbs/sq. ft. (including concrete).
4. The total waste generated each year is then broken down into material groupings according to the waste
composition table for residential demolition in Seattle, from Franklin Associates (1998). The results are shown in
Table 15.
Table 15: Residential Demolitions
Material
%
Glass
1.60%
Hazardous Waste
0.30%
Metals
5.30%
4
Avg Tonnes/Yr
3,863
724
12,796
Email from Chris Higgins, Canada Green Building Council, with reference to a study done by E3 Eco Group Inc.
Prepared for Metro Vancouver by Kane Consulting, LOCO BC, Restraint Consulting, and Urban Fabric
February 2012
Market Analysis of Used Building Materials in Metro Vancouver
Mineral Aggregates
Other Materials
Other Organics
Plastics
Wood Waste
Total
30.35%
3.20%
7.40%
2.40%
49.45%
100.00%
22
73,276
7,726
17,866
5,795
119,391
241,438
Non-Residential Demolition
1. The breakdown of total demolition permits between residential and non-residential permits, as outlined above,
provides the number of non-residential demolition permits.
2. The number of non-residential demolition permits for each year is then multiplied by the average square
footage of a non-residential demolition to give the total square footage of non-residential demolition for each
year in the study.
Natural Resources Canada’s Commercial and Institutional Building Energy Use Survey 2000 prepared an
inventory of all buildings in Canada with an area of at least 1,000 square feet, and with 50% or more of this area
devoted to commercial or institutional activities (Natural Resources Canada 2002). This inventory shows that
there are 16,681 such buildings in British Columbia, with a combined floor area of 26,937,221 square metres
(289,949,833 square feet). The average building size in British Columbia in this inventory is therefore 17,382
square feet. As such, it is assumed that the average non-residential demolition was of a 17,382 square foot
building.
3. The total square footage of non-residential demolition is then multiplied by a waste generation factor to
estimate the total waste from non-residential demolition.
Franklin Associates (1998) used a waste generation factor of 155 lbs/sq. ft., and USEPA (2003) used a waste
generation factor of 158 lbs/sq. ft.. The USEPA factor was based on the same waste audits referenced by
Franklin Associates, as well as additional audits conducted after the Franklin Associates study. For this study, the
USEPA (2003) factor of 158 lbs/sq. ft. is used.
4. The total waste generated each year is then broken down into material groupings according to the waste
composition table for non-residential demolition in Seattle, from Franklin Associates (1998). The results are
shown in Table 16.
Table 16: Non-Residential Demolitions
Material
%
Glass
0.80%
Hazardous Waste
0.90%
Metals
17.90%
Mineral Aggregates
28.40%
Other Materials
13.70%
Other Organics
2.70%
Plastics
4.60%
Wood Waste
31.00%
Total
100.00%
Avg Tonnes/Yr
5,521
6,212
123,543
196,013
94,556
18,635
31,749
213,958
690,186
Prepared for Metro Vancouver by Kane Consulting, LOCO BC, Restraint Consulting, and Urban Fabric
February 2012
Market Analysis of Used Building Materials in Metro Vancouver
23
B - Results
Utilising the methodology described above, it is estimated that between 2005 and 2010, an average of 1.3 million
tonnes per year of waste was generated by the construction, renovation, and demolition activities in Metro Vancouver.
Table 17 provides a summary, and Appendix I provides a table of results, including projections through to year 2041.
Table 17: Total Annual Average C&D Waste Generated
Material
%
Avg Tonnes/Yr
Glass
1%
9,560
Hazardous Waste
1%
9,642
Metals
13%
165,788
Mineral Aggregates
34%
445,087
Other Materials
10%
126,574
Other Organics
3%
40,210
Plastics
4%
55,173
Wood Waste
36%
469,755
Total
100%
1,321,788
The waste generated from demolition forms the largest portion of the waste stream. Results indicate that 70% of the
waste stream comes from demolition, 25% comes from renovations, and 5% comes from new construction. Figures 3, 4,
and 5 present the breakdown of average annual waste between new construction, renovation, and demolition (Figure
3); between residential and non-residential (Figure 4), and by combinations of these groupings (Figure 5).
Figure 3: Average Annual C&D Waste Generated by Activity
Prepared for Metro Vancouver by Kane Consulting, LOCO BC, Restraint Consulting, and Urban Fabric
February 2012
Market Analysis of Used Building Materials in Metro Vancouver
24
Figure 4: Average Annual C&D Waste Generated by Sector
Figure 5: Average Annual C&D Waste Generated by Activity and Sector
Prepared for Metro Vancouver by Kane Consulting, LOCO BC, Restraint Consulting, and Urban Fabric
February 2012
Market Analysis of Used Building Materials in Metro Vancouver
25
Over the six years of the study period, waste generation from new construction, renovation, and demolition varied as
shown in Figure 6.
Figure 6: Annual C&D Waste Activity
In terms of materials present in the waste stream, Figure 7 illustrates the annual breakdown of total waste by material
grouping.
Figure 7: Annual C&D Waste Generated by Source Category
Clearly wood, mineral aggregates, metals, and “other materials” form the vast majority of the waste stream. On
average, 470,000 tonnes of wood, 445,000 tonnes of mineral aggregates, 166,000 tonnes of metals, and 127,000 tonnes
of “other materials,” are generated annually, with these four categories represent 91% of the waste stream.
Figure 8 provides a further breakdown of the waste materials generated to allow for comparison of the contribution of
residential versus non-residential practices. Between 2005 and 2010, waste generated from the non-residential sector
represented approximately 65% of the waste, while the residential sector generated 35%. This overall ratio roughly
holds for some of the materials, such as wood, mineral aggregates, glass, and “other materials.” However, with some
materials, such as metals and hazardous waste, non-residential sources are responsible for a much higher portion than
their overall contribution.
Prepared for Metro Vancouver by Kane Consulting, LOCO BC, Restraint Consulting, and Urban Fabric
February 2012
Market Analysis of Used Building Materials in Metro Vancouver
26
Figure 8: Residential vs. Non-Residential Waste Generation By Material
C - Sensitivity of Key Assumptions
1. Use of USEPA (2003) non-residential new construction waste generation rate rather than Franklin Associates
(1998) rate for both multi-unit residential new construction and for non-residential new construction. The use of
the Franklin Associates (1998) rate would have resulted in a total decrease of 5,554 tonnes (0.4%) of C&D waste
per year.
2. Non-residential new construction square footage is calculated based on the average actual square footage data
obtained from the City of Langley and Surrey, converted into a cost per square foot. If, instead of using the
average cost per square foot from these two municipalities, the maximum cost per square foot of $196 was
used, the total C&D waste per year would drop by 4,339 tonnes (0.3%). If the minimum cost per square foot of
$82 was used, the total C&D waster per year would increase by 10,372 tonnes per year (0.8%).
3. Un-permitted activity is assumed to be 33% of permitted activity, and is applied to the cost and number of
permits for 1-2 family renovations (bathrooms, kitchens, additions) and multi-unit renovations. It is not applied
to the replacement of driveways, roofs, or HVAC equipment.
Non-residential renovations are calculated based on proportionate dollars spent on non-residential renovations
versus residential renovations. The assumption is that the tonnes of waste per dollars spent is the same for both
non-residential and residential renovations.
If the unpermitted activity is increased from 33% to 50%, this increases the dollars spent and the number of
permits for residential renovations, and some of the waste from residential renovations (from 1-2 family
bathrooms, kitchens, and additions, and from multi-unit renovations), but not the waste from driveway, roof,
and HVAC replacements. The total dollars spent on residential renovations increases by $75,032,540 (13%), but
the total residential waste only increases by 1,250 tonnes per year (1%). Doing so reduces the ratio of tonnes of
waste per dollar spent on residential renovations, and this reduced ratio is then applied to non-residential
renovations, reducing the waste from non-residential renovations by 18,651 tonnes per year (10%). The net
effect is an overall decrease in total C&D waste by 17,401 tonnes per year (1%).
If the unpermitted activity is decreased from 33% to 25%, this decreases the dollars spent and the number of
permits for residential renovations, and some of the waste from residential renovations (from 1-2 family
bathrooms, kitchens, and additions, and from multi-unit renovations), but not the waste from driveway, roof,
and HVAC replacements. The total dollars spent on residential renovations decreases by $35,309,431 (6%), but
the total residential waste only decreases by 588 tonnes per year (0.4%). Doing so increases the ratio of tonnes
Prepared for Metro Vancouver by Kane Consulting, LOCO BC, Restraint Consulting, and Urban Fabric
February 2012
Market Analysis of Used Building Materials in Metro Vancouver
27
of waste per dollar spent on residential renovations, and this increased ratio is then applied to non-residential
renovations, increasing the waste from non-residential renovations by 10,532 tonnes per year (6%). The net
effect is an overall increase in total C&D waste by 9,994 tonnes per year (1%).
4. The average size of homes being demolished is assumed to be 2,000 square feet. If the national average home
size of 2,200 square feet had been used in the calculation, the total C&D waste would increase by 24,144 tonnes
per year (2%). If the average Vancouver new home size of 3,000 square feet was used, the total C&D waste
would increase by 120,719 tonnes per year (9%). If the national average home size of 1,600 square feet was
used, the total waste would decrease by 48,287 tonnes per year (4%).
5. The average size of a non-residential demolition is assumed to be 17,382 square feet, and the waste generated
is 158 lbs/sq. ft. If the Franklin Associates waste generation factor of 155 lbs/sq. ft. had been used instead of the
USEPA factor of 158 lbs/sq. ft., the total C&D waste would be reduced by 13,105 tonnes per year (1%). If the
average size of a non-residential demolition is assumed to be 25% smaller (13,037 square feet instead of 17,382
square feet), the total waste would reduce by 172,527 tonnes per year (13%). If the average size of a nonresidential demolition is assumed to be 25% larger (21,727 square feet instead of 17,382 square feet), the total
waste would increase by 172,527 tonnes per year (13%).
D - Projections
On July 29, 2011, the Greater Vancouver Regional District Board adopted the Regional Growth Strategy (RGS) which
includes population projections of populations for each municipality to the years 2021, 2031, and 2041. For the
purposes of this study, these population projections are used to calculate the growth rate between these periods. The
calculated growth rates are then applied to the permit data obtained for 2010 and the same methodology used to
calculate waste generation rates and composition above is used to project the waste generation and composition in
2021, 2031, and 2041. A table of population projections and calculated growth rates for each Metro Vancouver
municipality can be found in Appendix II. Detailed projections are included in Appendix I. Figure 9 illustrates the
projected total waste in 2021, 2031, 2041, in comparison to 2010. Figure 10 illustrates the projected growth in waste by
material category.
Figure 9: Projected Total Waste Generation
Prepared for Metro Vancouver by Kane Consulting, LOCO BC, Restraint Consulting, and Urban Fabric
February 2012
Market Analysis of Used Building Materials in Metro Vancouver
28
Figure 10: Projected Waste by Material Category
Prepared for Metro Vancouver by Kane Consulting, LOCO BC, Restraint Consulting, and Urban Fabric
February 2012
Market Analysis of Used Building Materials in Metro Vancouver
29
II. Distribution Network
A - Existing Network
Used Building Material Stores
There are four active used building material retail operations in Metro Vancouver: Jack’s New and Used Building
Materials (Jack’s), Surrey New and Used Building Materials (SNU), Bent Nail New and Preowned Building Supplies (Bent
Nail), and the Habitat for Humanity ReStores (ReStore). At one time there were seven such operations in the lower
mainland, and Bent Nail has reduced its operation by 75% over the past five years. Two of the operations – Jack’s and
SNU – branched from the first used building materials operation in the lower mainland, started in 1947 by the
grandfather of Jack’s and SNU’s current owners. Interviewees said they feel there is no room in the marketplace for
other sellers of used building materials.
All four sell used building materials that include lumber, trim, siding, doors, windows, kitchen and bathroom cabinets,
sinks, tubs, toilets, and flooring. All four also sell new building materials consisting of discontinued items, cancelled
orders, surplus inventory, factory-direct, and bulk purchases. The sales of new materials are “a big part of the business”
for Jack’s, 50% of sales for SNU, and 40% of sales at ReStore.
ReStore acquires its inventory – both new and used materials – exclusively through donations from individuals and
organizations. The other three accept donations, as well as purchase used building materials. SNU indicated that 25% of
their inventory comes from donations, and 75% from their own purchases. Jack’s, SNU, and Bent Nail offer a salvage
service in which they purchase the salvage rights for an entire house, and base their purchase price on the most valuable
items. Used items are purchased for approximately 5-8% of their eventual sale price. They have salvage crews that then
go into the homes and remove all items of value, including many smaller items. They are looking for quality items in
good condition, and items with heritage value. As one representative put it, they want to buy items that are “really old,
or really new.” Some of the operations indicated an interest in expansion into scratched and damaged appliances, or
landscape soft goods (plants and trees).
All four operations indicated that their customer base includes people with cabins or cottages, individuals renovating a
basement suite, owners of heritage homes that want to match existing items, and the movie industry. The architect and
designer market is small, as is the non-residential market. SNU indicated that 90% of their sales are directly to homeowners, and that 95% of their inventory comes from residential buildings.
For-Profit Stores
Jack’s New and Used Building Materials has a facility in Burnaby that covers approximately 40,000 square feet of inside
and outside storage. They have a staff of 7, and accept between 2-12 tonnes per day of used building materials. Their
yard is full and as a result are very careful about bringing in only items that they know will sell. However, they own the
land next to their facility and could expand if warranted.
Surrey New and Used has a two acre site in Surrey, and one acre site in Chilliwack, that combined provide 80,000 square
feet of inventory. The have a staff of 15 and have been in business for 25 years.
Bent Nail New and Preowned Building Supplies has a 12,000 square foot facility in Abbotsford, and offers consignment
and salvage services.
Non-Profit Stores
Habitat for Humanity runs two ReStores in Metro Vancouver, with a third planned for 2012. The Vancouver store is
20,000 square feet, and the Burnaby store is 7,800 square feet. Each store has two paid managers, one paid truck driver,
and a significant number of volunteers. Combined sales are $1.4MM per year generated from 14,000-17,000
transactions ($82-$100 per transaction). As part of a 65-store network across Canada (with hundreds more in the US),
the ReStores are supported by significant brand and organizational capacity.
Prepared for Metro Vancouver by Kane Consulting, LOCO BC, Restraint Consulting, and Urban Fabric
February 2012
Market Analysis of Used Building Materials in Metro Vancouver
30
New products are sold for 50% less than retail, and generate 40% of sales. Used products are sold for 75-90% less than
retail, and generate 60% of sales. ReStore does not consider the sale of new items to be essential to their business plan,
and not all ReStores in Canada sell new products. The Metro Vancouver ReStores are considering expanding their
product line to include hard furniture, in addition to their current offering of office furniture.
ReStore’s entire inventory comes from donations: 30-40% from individuals, and 60-70% of donations from retailers,
manufacturers, the movie industry, and other organizations. In total, 70% of their donations are residential materials,
and 30% are non-residential. They feel a network of drop-off bins located across Metro Vancouver would help them
acquire more donations from those not wanting to travel great distance to their facility.
ReStore offers a tax receipt for some donated items. The tax receipt is based on fair market value, calculated as 50% of
the eventual sale value. Individual items are generally not receipted, nor are donations from Home Depot. Some smaller
manufacturers appreciate being given a tax receipt for donations, and donations of larger items (such as complete
kitchens) generate a tax receipt. Nevertheless, ReStore does not feel the ability to offer tax receipts is an important
driver for their business plan, while acknowledging that their American counterparts regularly rely on providing tax
receipts in exchange for donations.
Volunteer labour, however, is considered by ReStore to be essential for their success, and provides them with an
enormous advantage over their competition. ReStore is seeking to further leverage this advantage by partnering with
other non-profits (such as the Canadian Mental Health Association) to provide job skills training. They are also planning
to use volunteer crews to offer a salvage service, similar to the ones currently offered by Jack’s and SNU. While ReStore
cannot manufacture products because of CRA rules, they would like to partner with another non-profit that would use
some of the donated materials as feedstock for a manufacturing business.
Capacity
The total floor space of the four active used building material retailers is approximately 160,800 square feet. Based on
Jack’s stated turnover of between 2-12 tonnes per day in their 40,000 square feet, it is projected that total turnover of
all four retailers is approximately 8 to 48 tonnes per day 5, or 2,100 – 12,700 tonnes per year 6. This estimated mass
represents 0.16% to 0.96% of the 1.3MM tonnes of C&D generated annually in Metro Vancouver 7.
Notwithstanding the assertion from some interviewees in the business that there is not any more room in the
marketplace for another used building materials store, all the retail operations indicated a potential interest in
expansion. Dave Bennink, a Bellingham-based deconstruction consultant, stated that with the high tipping fees, cultural
attitude toward sustainability, and existing building stock in Metro Vancouver, he could have 100 full-time employees
engaged in deconstruction and selling of used building materials in Metro Vancouver. In contrast, there are currently 30
full-time employees at the four existing used building material stores 8, including their deconstruction staff, but not
including volunteers. Based on Bennink’s estimation of staffing levels, the existing total employment of 30 could more
than triple to 100. Assuming the turnover of material would increase proportionately, the mass of used building
materials handled by such facilities could increase to between 7,000 and 42,000 tonnes per year, 9 which would
represent between 0.5% to 3.2% of the 1.3 million tonnes of C&D generated annually in Metro Vancouver 10.
5
Low-end estimate: (2/40,000) x 160,800 = 8.04 tonnes per day. High-end estimate: (12/40,000) x 160,800 = 48.24 tonnes per day.
6
Low-end estimate: 8.04 tonnes x 22 working days per month x 12 months = 2,123 tonnes per year. High-end estimate: 48.24
tonnes x 22 working days per month x 12 months = 12,735 tonnes per year.
7
Low-end estimate: 2,123/1,321,788 = 0.16%. High-end estimate: 12,735/1,321,788 = 0.96%.
8
Jack’s has 7 full-time staff. SNU has 15 full-time staff. It is estimated that Bent Nail has 2 full-time staff. Re-Store has 6 full-time
staff.
9
Low-end estimate: (100/30) x 2,123 tonnes = 7,077 tonnes per year. High-end estimate: (100/30) x 12,735 tonnes = 42,450 tonnes
per year.
10
Low-end estimate: 7,077/1,321,788 = 0.54%. High-end estimate: 42,450/1,321,788 = 3.21%
Prepared for Metro Vancouver by Kane Consulting, LOCO BC, Restraint Consulting, and Urban Fabric
February 2012
Market Analysis of Used Building Materials in Metro Vancouver
31
Direct Sales of Used Building Materials
Most demolition, deconstruction, and renovation companies interviewed for this project reported efforts to sell used
building materials directly from the job site. The most common method is direct calls to each company’s established
network of contacts. These networks are reported in some cases to be small, and in other cases are extensive and
established. Each contact in the network is potentially interested in specific materials, and phone calls are material
specific. For example, flooring installers are commonly cited as contacts used to sell any valuable wood flooring being
removed. If the installer foresees an installation job for which the material could be used, the flooring is easily sold. Sales
depend on identifying an immediate end use for the material, and interviews revealed the difficulty in storing used
building materials, for both the buyer and the seller.
The other common avenue for direct sales is through on-line postings such as Craigslist or Kijiji. While these sites are
regularly used to distribute used building materials, they entail significant effort to identify serious buyers. From the
perspective of the buyer, interviews revealed that such web-based ad postings are not an efficient place to find
materials because the products are disaggregated, and the sellers are unknown. At the same time, used building
material stores cited Craigslist as a serious competitor.
Some demolition companies reported partnerships with other businesses, or ownership of associated businesses, that
would take the salvaged material and manufacture new products. Common examples include the re-sawing of lumber
into flooring, the manufacturing of mantles using salvaged timbers, and the production of wood furniture.
Recycling
Wood
Wood represents 36% (by weight) of the construction and demolition waste generated in metro Vancouver, averaging
470,000 tonnes annually. The category of C&D “wood” waste includes a wide range of structural materials (solid and
manufactured beams, lumber, sheet goods), temporary materials (plywood and lumber), coverings (flooring, siding,
panelling), trim and finished products (cabinets and built-in furniture, mouldings, mantles, railings), and packaging
(crating, dunnage, pallets). Further complicating this waste stream is the fact that wood waste is generated in a wide
range of sizes, from massive beams to sawdust. As authors of a previous study pointed out, “…wood waste is generated
along with many other waste streams, it is transported in mixed loads, and it appears in all key final disposal options”
(Penney et al, 2009, 30).
If a demolition or renovation project yields large timbers (generally 3” or thicker), they will be sold either directly by the
demolition firm or contractor, or through one of the many reclaimed timber operations in the lower mainland. These
larger-dimension timbers are generally available only from non-residential buildings. This portion of the waste stream is
highly valued and sought-after for re-use as is, for re-sawing into reclaimed flooring, or for re-sawing into vertical-grain
lumber for manufacturing furniture. Local artists, such as Brent Comber Originals, have made a profitable business out
of turning these large pieces of lumber into expensive pieces of furniture that may be rightfully understood as art. There
are a number of export brokers in the lower mainland that focus on selling large reclaimed beams into high-end projects
in the United States. While this portion of the waste stream is the most valuable, reclaimed timber companies
interviewed for this study reported that there are more timbers available than they can afford to buy.
Once the large beams have been removed and sold, there are some smaller-volume wood items that may be sold from
the demolition site, depending on the volume of such items, the value perceived by the demolition firm or contractor,
and the project timeline. These include heritage-value (or almost new) wood windows, doors, kitchen cabinets, porch
columns, trim and baseboards, fireplace mantels, and panelling. Solid wood flooring may be deemed worthy of removal
for sale, depending on how thin it is (old floors have often been sanded down many times), how brittle it is (old floors
often splinter upon removal), and other characteristics such as species, width, length, volume, and the ability of
reclaimed flooring brokers and installers to find a home for it. Wood exterior siding may be valuable depending on the
species, condition, and quantity. One demolition contractor interviewed indicated, however, that it’s easier to sell vinyl
siding than wood siding because it won’t break during deconstruction.
Prepared for Metro Vancouver by Kane Consulting, LOCO BC, Restraint Consulting, and Urban Fabric
February 2012
Market Analysis of Used Building Materials in Metro Vancouver
32
After the sale of these valuable items, the vast majority of the wood waste still remains, including smaller-dimension
lumber, partial sheets of plywood and OSB, broken and damaged flooring and siding, items that were glued in place or
cut to short lengths, staircases, roof trusses, painted fences and siding, pallets, and crating. It is this portion of the wood
waste stream that poses the greatest challenge in finding a valuable use that will keep it out of the landfill.
Potential markets for wood waste identified for Metro Vancouver by Promise Consulting include “…fuel, fiber board
production, wood/plastic composites, agriculture/land applications, animal bedding, and reuse through social
enterprise.” (Penney et al, 2009, 83). While a complete review of these options is beyond the scope of this study, some
observations based on interviews conducted and data analysed for this study inform a general assessment of these
options.
First, there is generally an inverse relationship between the dollar value of a product per tonne, and the potential
volume of wood waste that could be utilized in making that product. The production of low-value products, such as
alternative daily landfill cover, is able to consume a large percentage of the wood waste stream, but commands a low
dollar value and is ecologically only marginally preferable to landfilling. This inverse relationship could also be
understood as an inverse relationship between a products’ place in Metro Vancouver’s 5Rs hierarchy, and the volume of
wood waste that could be utilized in making that product.
Dave Bennink of Re-Use Consulting, estimates that recycling options (such as those identified in the Promise Consulting
report (Penney et al, 2009)) require 11-13 times more energy, and entail 3-5 times more GHG emissions, than re-use
options (such as those available to large beams and other valuable wood products). Within the “recycling” category itself
there are clearly many tiers of ecological and economic preference, and Bennink argues that alternative daily landfill
cover “isn’t really recycling and shouldn’t be treated as such.” He points out that Recovery 1, a recycling company in
Washington State claims a 98% recycling rate for the co-mingled loads they accept, but in fact 61% of this is sold as
landfill cover 11.
At the same time, low-value commodities, such as alternative landfill cover, and fuel, have established markets for large
volumes. For example, Urban Wood Waste processes 200,000 tonnes per year of waste (Temreck, 2011), and interviews
for this project revealed that 100% of their sales are for fuel to district energy projects in BC. Urban Wood Waste has a
10-year contract with Howe Sound Pulp and Paper, who in turn sells the energy from burning wood waste, to BC Hydro.
Clearly this is an established market for a large volume of a product that is situated at the lower end of Metro
Vancouver’s 5Rs hierarchy.
Some recyclers of large volumes of C&D wood waste are exploring opportunities for producing a product further up
Metro Vancouver’s 5Rs hierarchy. Darman Recycling, a division of Cloverdale Fuels, accepts C&D wood material, and
states on their website that “We believe that if the waste is processed correctly, some of the waste could be used for
our chip production and eventually become pulp and fiberboard material.” Canfor used to operate a fibre board plant
that utilized wood waste from the lower mainland, but this plant closed in 2008.
Second, the low value of virgin timber severely limits the range of economically-viable options for reuse and recycling of
wood. This reality translates into a disincentive for construction companies to minimize their wood waste, a lack of
incentives for waste haulers to find alternatives to landfill disposal, and a very constrained market for those involved
with wood reuse or recycling.
Combined with the high value of labour, low lumber prices create a strong disincentive for construction firms to
minimize their wood waste. In an environment with 8-foot 2x4s costing $2 each, it is difficult to economically justify
paying a framer $40 per hour to spend time minimizing cutting waste. One contractor pointed out that thirty years ago
he experienced 25% of the wood waste on construction sites as there is today, but now wood is so cheap that if they
make a mistake on a wall, the whole wall just goes in the waste bin.
11
Note that in Metro Vancouver, alternative daily landfill cover is not counted as diversion.
Prepared for Metro Vancouver by Kane Consulting, LOCO BC, Restraint Consulting, and Urban Fabric
February 2012
Market Analysis of Used Building Materials in Metro Vancouver
33
The rates charged at wood facilities, such as Urban Wood Waste, are less than the tipping fees at landfills for mixed
waste, and even less for clean wood loads. However, speaking with waste haulers confirmed that these rate
discrepancies are not enough to cover the costs associated with sorting the wood out from other waste, and that mixed
waste and/or co-mingled loads (loads that contain different types of recyclables such as wood, metal and cardboard) are
the norm. Further, Urban Wood Waste charges a minimum of $27 for each load, versus the $10 minimum at landfills and
public transfer stations. As a result, smaller contractors and home renovators with less than one tonne of waste, are
financially encouraged to take their waste to the landfill. In fact, one demolition company interviewed asserted that if
Vancouver does not have financially-viable alternatives to the landfill, then the wood waste ban by 2015 will result in
“illegal dumping all over the place.”
Closely tied to this is the lack of a lumber re-use market because the costs involved with sourcing, de-nailing, and
transporting used lumber makes it often more expensive than new lumber. Demolition companies interviewed noted
that wood from residential construction is not worth salvaging for re-use, and that they only try to sell the larger
valuable lumber from non-residential buildings.
Concrete
Mineral aggregates, consisting mostly of concrete, represent 31% of the C&D waste stream in Metro Vancouver,
averaging 410,000 tonnes annually. Some contractors grind the concrete on site to be used as fill on site, but most of it
is hauled to a few large concrete recycling facilities. These facilities crush the concrete to make road base fill and
aggregate products of various diameters. In some cases, the facilities wash, screen, and sort the crushed concrete in
order to use it as input material for new concrete blocks that can be used for retaining walls and other new construction
applications.
To be recycled, the concrete needs to be clean and free from contaminates such as plastic. This requirement creates a
barrier for some waste haulers that line their bins with plastic, and also requires careful source separation. The
motivation for demolition contractors and waste haulers to provide sorted and uncontaminated concrete is the fact that
concrete recycling facilities often do not charge a tipping fee. Some facilities interviewed reported that they only charge
a tipping fee during very busy times of the year, and other reported that they only charge a tipping fee to companies
that are not also customers of their end products.
Waste haulers and demolition companies complained that the concrete recycling facilities sometimes close down during
busy periods, generally in the summer, when the haulers need access to those facilities most. When this happens, the
waste haulers have no choice but to take the concrete to the landfill.
Discussing these shut downs with the concrete recycling facilities revealed that the reason for these shut-downs was not
a lack of processing capacity, but rather a lack of market for their road base product. United Lock-Block alone can
process 300 tonnes per hour of used concrete. At eight hours per day, 22 days per month, United Lock-Block has an
annual capacity of over 600,000 tonnes, which is 46% more than the total annual C&D concrete waste from all of Metro
Vancouver. Given that United Lock-Block is only one of the facilities in Metro Vancouver able to crush concrete, there is
clearly enough capacity to recycle all the C&D concrete waste.
The bottleneck in the distribution of used concrete is the lack of market demand for recycled concrete products.
Specifically, it is the lack of demand for road base that causes the facilities to shut down during busy periods. Yet, this
lack of demand appears surprising. Concrete recyclers interviewed pointed out that their road base product is superior
to round gravel rocks because the pieces of crushed concrete have rough edges allowing them to better adhere and thus
offering a more stable base. The concrete recycling facilities claim that they have had engineering tests done to verify
the performance of their products. Further, the crushed concrete sells for half the price of fresh gravel. These
advantages have enticed private contractors and some municipalities within Metro Vancouver to use the recycled
concrete road fill successfully.
However, the concrete recyclers assert that the British Columbia Ministry of Transportation has refused to purchase any
of their road base, and instead uses only fresh gravel. Clearly the market for road base in the construction of highways
across the province is significant, and the concrete recyclers spoken to for this project expressed great frustration that
Prepared for Metro Vancouver by Kane Consulting, LOCO BC, Restraint Consulting, and Urban Fabric
February 2012
Market Analysis of Used Building Materials in Metro Vancouver
34
they feel excluded from this market. Given that the lack of market drives facility shut-downs and the diversion of
material to landfill, opening up the market for recycled concrete products should be given high priority.
Other Materials
Steel is purchased by recycling facilities so there is a very high rate of recycling and clear motivation for separation.
Some small-scale waste haulers will take the metal away for free so even small volumes of metal are generally separated
and taken for recycling. All contractors, demolition companies, and waste haulers interviewed for this project reported
that the metal is always separated and sent for recycling.
Cardboard can be sold for recycling in large enough quantities. Smaller contractors, however, expressed some
frustration that there are not drop-off locations for quantities larger than the household recycling volumes targeted by
the recycling centres at transfer stations. In addition, these household recycling centres are often too far from
construction sites to warrant special trips to recycle the cardboard that comes as packaging for numerous construction
materials.
Styrofoam is also a common packaging material, and demolition firms that have worked with the movie industry
reported a large volume of hard Styrofoam used in set construction. One demolition firm recommended that the volume
of Styrofoam be reduced in size, and discussions with Wastech indicate that they are exploring this option. The Capital
Regional District started a Styrofoam recycling pilot project in November 2011.
Nobody interviewed for this project was aware of a local option for recycling the C&D glass waste. This mass is
estimated to be about 1% of the C&D waste, or about 9,500 tonnes per year. Firms such as Bedrock Industries in Seattle
make products from recycled glass (wall tiles, glass curtains, gift items), but the C&D glass waste in Metro Vancouver is
mostly landfilled.
Prepared for Metro Vancouver by Kane Consulting, LOCO BC, Restraint Consulting, and Urban Fabric
February 2012
Market Analysis of Used Building Materials in Metro Vancouver
35
III. Barriers to Improving Diversion
Metro Vancouver’s Integrated Solid Waste and Resource Management plan calls for 80% overall diversion in the
demolition, land clearing and construction sector by 2015 (Metro Vancouver 2010, 5). The definition of “diversion” that
informs this target is the “conventional definition” that includes everything other than landfilled material and material
incinerated at Metro Vancouver’s waste-to-energy facility in Burnaby (Metro Vancouver 2010, 5).
Interviews conducted for this project revealed that construction and demolition firms are currently claiming diversion
rates between 75% and 95%. On the construction side, one contractor said they “only work with guys that care” and are
able to regularly achieve over 85% diversion. One interviewee claimed that on the Dockside Green project in Victoria (a
LEED Platinum project) they achieved over 90% diversion, but that Vancouver projects usually come in around 75-80%
diversion. Another contractor reported 70% to 87% diversion depending on the ability to separate materials on site.
Contractors reported further that standard diversion for LEED projects is over 75%, and one large commercial and
residential contractor reported they achieve between 80% and 95% on all projects.
On the demolition side, one demolition company claimed that 90% diversion is standard on commercial LEED projects.
Another reported that 75% is standard, and another claimed they regularly achieve over 80% diversion. Litchfield
Demolition claims an average rate of 92%. 12
Given the current success of construction and demolition firms in achieving a C&D diversion rate that appear to
approximate Metro Vancouver’s objective for 2015 (using the definition of “diversion” in the Integrated Solid Waste and
Resource Management plan), it is recommended that the challenge for Metro Vancouver lies as much in increasing the
value of products diverted from landfill (moving products up the 5Rs hierarchy) as it is in increasing the diversion rate
above 80%. Accordingly, this report identifies barriers and opportunities related to increasing the value of products as
well as barriers related to further increasing the overall diversion from landfill. Together, these are referred to as
barriers and opportunities related to “improving” diversion.
A - Market Forces
The pricing structure related to construction and demolition assigns high values to labour and land in Metro Vancouver,
and low values to materials. As one contractor stated, “it’s all about time and money.” This assignment of values creates
a number of barriers to improving diversion, and generally encourages mixed waste bins destined for the landfill, while
discouraging the reuse of used materials.
At the design stage, specifying used building materials adds cost because of the legwork required to research the
availability of materials. Given the disaggregation of materials and inconsistent supply (as discussed below) it can take
significant effort to find suitable used building materials. Should they be found and sourced, the cost savings may be
negligible (or may even cost more than new), and are easily erased by wages paid to design teams to find them. Some
firms reported that using used materials on small projects is easier, but with large projects it’s economically inefficient
and generally not pursued.
This same dynamic of high labour costs versus low material costs applies to the labour associated with deconstruction
and the careful removal of salvageable materials, the preparation of materials for reuse, the transportation and storage
of materials, any necessary engineering reviews, and the possible modification of construction practices to incorporate
used materials. In some cases these costs are considerable.
In the demolition phase – especially when a building permit has already been issued and the project’s critical path
progress hinges on site clearance – significant time pressure comes to bear. If salvaging materials and sorting waste on
site causes delays over conventional demolition and off-site sorting; then this becomes a significant financial
12
[http://www.dlitchfield.com/en/demolition_services.html]
Prepared for Metro Vancouver by Kane Consulting, LOCO BC, Restraint Consulting, and Urban Fabric
February 2012
Market Analysis of Used Building Materials in Metro Vancouver
36
disincentive that hinders deconstruction. One commercial contractor interviewed pointed out that site preparation must
be done as quickly as possible, and salvaging of materials, in their experience, just slows down the process.
Green building efforts are significantly influenced by green building rating systems such as LEED (Leadership in Energy
and Environmental Design). However, many contractors interviewed for this project felt that the LEED credit for reuse
dissuades the reuse of material because the point threshold is too high. One architect asserted that with concrete
buildings the point threshold is “impossible” to meet, and suggested that LEED should have point thresholds for each
division rather than for the entire project. Given how accepted LEED has become in the marketplace, it’s inability to
effectively encourage the use of used building materials has left used building materials behind as the green building
community focuses on other strategies and materials.
Waste haulers charge by the size and number of bins. As such, it costs a construction project more money to have
multiple bins on site in order to separate waste, and waste haulers will not do this unless required to do so by the
contractor. The waste hauling industry is quite competitive, and haulers are reluctant to provide any extra service to
clients that will increase costs and make the haulers less likely to win the bid for a job. Interviews revealed that most
bins picked up by waste haulers are co-mingled, and contractors generally do not require source separation of materials.
The willingness to minimize waste on a construction site is dictated significantly by the relationship between material
costs and labour costs. As outlined in the section on wood recycling above, labour costs are quite high in Metro
Vancouver in comparison to material costs, and therefore it’s cheaper to have extra material on site and increase the
waste of material if doing so results in labour cost efficiencies.
A strong economy makes people less interested in the potential to save money by using used building materials, but it
also means that more demolitions and more renovations are taking place. In a slow economy the reverse is true: people
may be more interested in looking for less expensive used materials, but there are fewer demolitions and renovations.
As a result, the demand for used materials rises at times when the supply of used materials drops, and vice versa,
creating a mismatch between supply and demand.
High real estate prices in Metro Vancouver add additional urgency to the construction process because of the large
amount of capital tied up in financially unproductive real estate. The high cost of land also makes it difficult for
businesses that have high space requirements per dollar of revenue. The sale or processing of large, low-value items,
and the holding of inventory for long periods of time, are viable business models only if land prices are relatively low.
Consequently, used building material distributors face a significant challenge with regards to land prices in Metro
Vancouver. This also applies to developers and designers that look to source used materials early in the design stage to
ensure they are available upon construction. In these cases, storage of the materials may be prohibitively expensive.
One architect pointed out that the cost of land for storage of used materials is a huge barrier in Metro Vancouver – one
that is not present in other jurisdictions, such as Alberta.
The high cost of land (leading to limited space) was often cited as a cause for the relatively low inventory of existing used
building material dealers, and this low inventory in turn was frequently pointed to by designers and contractors as a
critical limitation to their ability to utilize used building materials. With this limited ability to hold a large inventory, the
time pressure to sell materials from a job site increases, and the ability to find higher-value uses decreases.
B - Performance Requirements
Performance requirements create barriers for utilizing used building materials because of code specifications, contract
and warranty requirements, energy performance, and cultural preferences.
Evolving building codes change the baseline of acceptability for many products, and make it problematic to reuse these
products at the same value as the original use. These code changes relate to structural, performance, and safety
features, rather than aesthetic features, and therefore less affect items of heritage value or more visible items. For
example, lumber dimensions that used to be acceptable for structural applications such as roof trusses or load-bearing
walls, are often no longer large enough to meet code requirements. Deconstruction of homes often yields 2x4s which
were used to frame load-bearing walls, which can no longer be used in similar applications because of code changes that
Prepared for Metro Vancouver by Kane Consulting, LOCO BC, Restraint Consulting, and Urban Fabric
February 2012
Market Analysis of Used Building Materials in Metro Vancouver
37
require 2x6 framing.
Even if the code did not change for a particular application, reuse of the lumber in a similar application requires that it
be re-graded, something that requires time, money, and effort. Most virgin lumber is graded at a sawmill as part of the
production process where significant economies of scale are captured and the grading of lumber does not add
significant cost. In contrast, re-grading used lumber is done infrequently and in small volumes. Structural steel also
needs to be re-graded for reuse in structural applications. Fixtures with a water usage rating (faucet, toilet) would likely
no longer meet code and its reuse runs counter to municipal and Metro Vancouver efforts to reduce water usage.
A number of interviewees noted the requirement for new products in construction contracts. This is standard practice in
the industry and reflects clients’ desires for product warrantees. One architect noted that this was particularly the case
in institutional and governmental work. Related to warranty requirements, is the standardization of building materials
according to third-party labelling programs such as the one operated by the Canadian Standards Association (CSA),
whose labels are applied to new products.
Ironically, the green building movement has created a barrier to reuse of used building materials because of the focus on
energy performance. High-performance materials, especially building envelope materials such as windows and doors,
have improved significantly in recent decades and used materials from older buildings cannot match their energy
performance. Single-pane windows have little value in the envelope of new construction, but can be used in unheated
spaces (sheds, warehouses, carports, outhouses, boathouses) or interior walls.
Contemporary health and safety requirements also create a barrier to the reuse of some building materials. Items
containing hazardous materials, such as asbestos, must be safely disposed of rather than reused. Items painted with
lead paint must be stripped of the paint before reuse, and lumber pressure-treated with chromated copper arsenate
(CCA) contains arsenic and has limited reuse possibilities. Standards related to fire resistance have also changed over
time and new construction requires some doors to be fire-rated according to current standards – a threshold that many
older doors cannot meet.
Poorly built houses make deconstruction much less desirable. As used building material dealers pointed out, it is the
“really old or really new” houses that are of most value. Other houses, especially if built poorly with low-quality material
or those that have been damaged by envelope failure or poor maintenance, yield relatively few valuable materials. One
demolition firm noted that houses built in the 1970s and 1980s generally have very little value.
C - Disaggregation and Disconnection
The disaggregated supply of used building materials includes the reality that each used building material dealer has a
relatively small and independent inventory, much of the used material supply is sold informally by demolition firms and
contractors through their unique network of contacts, a significant portion of the used materials are sold through
Craigslist and other online postings, and those seeking used materials have no effective way of capturing the entire
offering of used materials at any given time. The disconnection barrier includes the reality that each step in a building’s
lifecycle – from design through construction, renovation, deconstruction, and diversion of materials – is fairly isolated
from the other steps, and the actors within each of these steps are also isolated from each other. These two barriers –
disaggregation and disconnection – combine to create a formidable set of barriers to improving the diversion of
materials.
Architects interviewed for this project consistently pointed out the challenges they face in determining the availability of
used building materials. They have trouble specifying used materials because they cannot find enough consistent supply
of materials to reliably write those materials into project specifications. The threshold of availability for being able to do
so is fairly high because the given material must be available at the time of specification writing in order to evaluate it
for suitability, must be available at the time of construction, and must be available in sufficient quantities that
contractors bidding on the project are equally able to source the material and provide a competitive bid. For visible
items, the threshold may be even higher because aesthetic as well as quality requirements must be met. For example, a
large-scale project attempting to specify used interior doors may need dozens of the same door, and each must be
equivalent in terms of size, performance, look, and condition.
Prepared for Metro Vancouver by Kane Consulting, LOCO BC, Restraint Consulting, and Urban Fabric
February 2012
Market Analysis of Used Building Materials in Metro Vancouver
38
It is easier for designers to source used materials for smaller-scale projects simply because fewer of each item is
required, yet the disaggregation of material still demands significant effort. Individual homeowners that enjoy the
search and do not place significant value on their time may more easily overcome the barrier of disaggregation, but this
is a small portion of the potential market.
Closely intertwined with the barrier of disaggregated supply, is the disconnection between each stage in the life-cycle of
a building, and between the actors involved in the construction process. The design for new construction or renovation
of a building is generally done without reference to the materials available from demolition on that site, and without
communication with the demolition firm. This is clearly a lost opportunity to incorporate existing materials already on
the site, and to minimize the waste stream flowing from demolition activities on the site. Status quo construction
focuses on the use of the building immediately after occupancy, rather than with an eye to long-term uses, potential
renovations, or eventual deconstruction. As such, materials are often glued together with bonding agents that frustrate
eventual deconstruction, fasteners are used that cause damage to materials when removed, and assemblies are
constructed without regard to ease of disassembly.
Within the design and construction phase of a building’s life-cycle, each step is relatively isolated from the ones
occurring before, concurrently, and after. As one architect pointed out, the construction process is “linear, piecemeal,
and traditional.” As such, there is often little thought given to minimizing waste at one stage of construction by utilizing
material from another stage, and demolition steps are seen as simply necessary for preparing the site for construction,
rather than a potential source of material or design ideas. The disconnection between various steps in design and
construction precludes creative opportunities to minimize waste, reuse materials, and leverage design synergies.
D - Lack of Infrastructure
A frequently cited barrier to both the diversion of waste and the sourcing of used materials is the lack of infrastructure
for used materials and C&D waste recycling. Some interviewees felt there is a lack of transparency regarding where C&D
waste goes when it leaves job sites, and felt this reduced the motivation to take steps towards diverting waste or
sourcing used materials. Others felt that there are just not enough convenient locations for taking C&D materials for
diversion, and it’s therefore too difficult to distribute separated materials.
There are only a few wood recycling facilities, and Urban Wood Waste has a pricing structure that encourages smallscale haulers and contractors to take their wood to the landfill. Other materials either do not have a dedicated facility
(e.g. glass), or are served by facilities that are inconveniently located at a great distance from many construction sites. A
major waste hauler interviewed reported that they used to sort material, but they no longer do because there are not
enough facilities to take the material and it’s not economically feasible to do so.
It was asserted by some demolition firms that the used building material stores are too small to accept materials from
large-scale demolitions or commercial projects. Some contractors also stated that these stores won’t take much of what
they have available from job sites. Other contractors complained that the best items at these stores seem to be reserved
for other customers, and that they have had difficulty in finding the items they are seeking.
E - Cultural Impediments
Cultural attitudes related to used materials also create a significant barrier. The preference for exclusively new materials
is wide spread, and the attitude that used building materials are of poor quality and low status is common. Architects
interviewed for this project bemoaned this attitude and felt it was a significant struggle to convince clients of the merits
of used materials. One noted that the attitude in other countries, such as Switzerland, is very different and therefore
much easier to have client support for maximizing the use of used materials.
At the design stage in construction, architects point out there is very minimal desire on behalf of clients to incorporate
used building materials. This cultural resistance comes from clients and building owners across the full spectrum of size
and institutional type. In cases where clients or consumers express interest in used building materials, it is often because
of an interest in the character and aesthetics of reused materials, and the ability of featured used materials to tell a
story. These aspects may create an opportunity for increased market pull to begin to change habitual and well worn
Prepared for Metro Vancouver by Kane Consulting, LOCO BC, Restraint Consulting, and Urban Fabric
February 2012
Market Analysis of Used Building Materials in Metro Vancouver
39
ways of operating in the construction industry, but this material usage is quite limited and does not represent a
significant percentage of overall usage in most buildings. Reuse is by no means a regular or extensive practice in the
industry.
At the renovation or demolition stage, it is the opinion of the used building material dealers and deconstruction firms we
interviewed that most people are not fully informed about the deconstruction option. For those that are aware of the
option to retain a deconstruction firm, or sell the salvage rights to one of the used building material dealers, there
appears to be a misconception regarding how long it might take, and a related misconception that the overall revenue
from the sale of materials would be less than the cost of time lost during construction. Deconstruction experts, however,
emphasize that the additional time taken for deconstruction is minimal, usually a total of two or three days for a single
family home. In part this misunderstanding stems from the fact that what is slated for demolition is generally
understood to be of little value, and the owner and construction team are preoccupied with the new structure to be
built in its place.
Traditional construction practices see only new materials as inputs, and treat used materials as waste. Contemporary
status quo practices have opened up to the need for recycling waste, but the mainstream construction industry
generally does not see used materials as forming any significant part of the input stream. In part this is because
construction trades are strongly motivated to do what is easiest, and new materials are generally easier to work with
than used ones. Building inspectors are also geared towards status quo practices, and many interviewees asserted that
inspectors need to be more open to granting equivalency status to used materials.
Other contractors interviewed for this project feel that all the used building materials suitable for reuse are currently
being reused, and that pushing further in this regard could create resistance in the industry.
Prepared for Metro Vancouver by Kane Consulting, LOCO BC, Restraint Consulting, and Urban Fabric
February 2012
Market Analysis of Used Building Materials in Metro Vancouver
40
IV. Opportunities to Improve Diversion
Improving diversion is understood to include both increasing the percentage of C&D waste that is not disposed of in
landfill, and also moving diverted material further up the “5Rs hierarchy” identified by Metro Vancouver in its Integrated
Solid Waste and Resource Management plan (Metro Vancouver, 2010, 5). The opportunities to do so include a
combination of leveraging the private sector (supporting the market for used materials, supporting entrepreneurial and
manufacturing efforts, improving job-site practices, launching a central facility, connecting the supply chain, and
designing for improved diversion), as well as public sector initiatives (education program, reinforcing the 5Rs hierarchy,
stimulating deconstruction, and maintaining the existing building stock).
In general these opportunities rest of the assumption that greater lasting success will be achieved by directing market
forces to make improved diversion cost effective and easy, than will be achieved by isolated command and control
government policy mechanisms. Nevertheless it is essential that various levels of government play an active role in
shaping market incentives and opportunities, and that measures are implemented in the appropriate sequence, as
outlined in Section VI.
A - Market Support
Traditional construction practices and building life-cycle assumptions are predicated on a one-way flow of virgin material
into the construction of a building that serves a particular purpose until such time that the building is reduced to a pile
of waste and removed in order to allow for the construction of a replacement building. Market forces are aligned with
these assumptions such that the path of least economic resistance is to follow this one-way flow of material. Critical to
improving diversion is re-configuring these market forces in support of a two-way and non-linear flow of materials.
Doing so includes government and institutional procurement policies, tax and other incentives, and entrepreneurial
support.
Government and Institutional Purchasing
Government and institutional procurement has the potential to support emerging opportunities for the reuse of C&D
materials, to show leadership in the marketplace, and to allow market transformation in product areas for which
governments are the largest customer. It was suggested by interviewees that this may be an opportunity for
governments to demonstrate leadership by using their own buildings to experiment with the adoption of reused
materials. This could be undertaken in a controlled way with a select set of materials and a series of pilot projects. The
pilots could be studied to examine the extra time and cost that is required, as well as examine the risks that might be
assumed in the reuse. It was suggested that governments or institutions would share that information with designers,
builders, and developers to facilitate wider scale adoption of reused materials. Institutions such as universities have an
interest in being cutting-edge in their sustainability efforts, as well as in the technical results of pilot initiatives, and this
should be leveraged to support the market.
With some products, such as crushed concrete suitable for road base, the government is the largest customer and it is
therefore essential for success of this product that governments purchase this material. As discussed above, concrete
recyclers in Metro Vancouver are struggling to find customers for their products, in spite of high product quality and a
lower price than virgin material. The Ministry of Transportation could play a key role in supporting the market for this
product by purchasing crushed concrete for road base instead of fresh gravel. Other levels of government, while smaller
consumers of gravel than the provincial government, could do the same. As one recycler interviewed said, “anything
that Metro wants recycled, they will help make it happen by buying the products made from the recycled materials.”
The situation with crushed concrete is the most compelling for immediate government purchasing, but the same
potential role would be valuable for all used building materials and products with recycled content from C&D waste. In
some cases, purchases of highly visible items, such as reclaimed lumber flooring, can provide significant momentum for
entrepreneurs seeking an opportunity to illustrate the potential of their product, and governments are well suited to
provide this opportunity. In other cases, a less visible, but technically innovative product, such as laminated lumber
products made from used lumber, can be tested out through government purchases or partnerships with universities
Prepared for Metro Vancouver by Kane Consulting, LOCO BC, Restraint Consulting, and Urban Fabric
February 2012
Market Analysis of Used Building Materials in Metro Vancouver
41
interested in the results.
Beyond government procurement policies are various levels of direct market support, including mandatory
requirements for public buildings, and requirements for publicly-funded projects. A step-wise approach to increasing the
requirements for purchases of used building materials as the supply chain develops, and a harmonized approach
between various levels of government, may provide the most effective approach to leveraging government purchasing
power.
Tax Incentives
Interviews for this project revealed the enormous power that tax receipts for donations of used building materials play
in the US market, and suggested numerous opportunities for leveraging the tax system in Canada in support of improved
diversion. As discussed in Section V, US tax law allows for tax receipts to be given by non-profit used building material
stores to the donors of used building materials. The tax receipt is given up-front for the appraised value of the materials,
in some cases for the value of an entire house. Interviews confirmed that these tax receipts are seen as essential for
driving the supply of materials to used building material stores in the US, including the Rebuilding Exchange in Chicago,
the authors of whose market study reviewed the methodology for this report. Tax receipts can be for tens of thousands
of dollars in donations, and clearly provide a significant incentive for careful deconstruction and donation of valuable
materials.
In Metro Vancouver there are two existing approaches to providing tax receipts for donations of used building materials.
ReStore only provides tax receipts for some donations, and does so based on the eventual sale value of the item. The
Vancouver Heritage Foundation obtains an up-front appraisal of donated items, and provides an immediate tax receipt
based on this value. ReStore feels that the receipting process is a “grey area” for Canada Revenue Agency (CRA), but the
Vancouver Heritage Foundation cites a written response from CRA that supports their approach. ReStore indicates that
the ability to offer tax receipts is not essential to their business model, and yet the greater ability to offer tax receipts for
up-front donations in the US has clearly given an advantage to non-profit operations over for-profit distributors of used
building materials. The situation in Metro Vancouver is very different with multiple for-profit used building material
stores not only actively competing with non-profit operations, but also having the largest share of the marketplace.
While the ability to offer tax receipts is in federal and provincial jurisdiction, further analysis of the potential for
increased receipting opportunities is warranted. It is also possible for local governments to provide property tax or
building permit fee incentives for donations of used building materials to local non-profit dealers. Such an option may be
best pursued in combination with the central facility concept outlined in this section.
Tax incentives have a role at other stages in the life-cycle of used building materials. The use of used building materials
could also be supported through reductions in property taxes for an initial period of time, reduced building permit fees,
density bonuses, set-back leniency, or other incentives. A more direct incentive would be the elimination of PST or GST
on purchases of used building materials.
Other Support
The market for used building materials may not always be in Metro Vancouver, or even in Canada. Interviews revealed
the export of used lumber from California to Mexico, and there may be similar opportunities for the sale of used building
materials into jurisdictions outside of BC. Brokers of large reclaimed timbers, for example, often sell timbers from BC
buildings into construction projects in Montana (high-end ranches) or California (high-end homes). These opportunities
may have drawbacks from a carbon perspective, but nevertheless support the reuse of valuable building materials and
create economic momentum for used building material entrepreneurs in Metro Vancouver. Programs to assist exporters
of used building materials may help stimulate a larger sector that, with increased size and strength from foreign sales,
may be better able to develop products for the local market.
Interviews revealed that, in general, the materials that are reused are ones that have a high value, such as largedimensional timber that cannot be easily found in the market, and character materials such as older wooden
floors, mouldings, and heritage fixtures that can create a signature space and a “story.” The value of this storytelling potential is worth the additional effort and cost that may be required to utilize these materials. Even if
Prepared for Metro Vancouver by Kane Consulting, LOCO BC, Restraint Consulting, and Urban Fabric
February 2012
Market Analysis of Used Building Materials in Metro Vancouver
42
governments do not directly purchase these materials, they are in a position to help tell the story by highlighting
private sector successes in utilizing used building materials. While uses that tell a compelling story in a highlyvisible way may not constitute a large percentage of the materials in a given building, these stories can help
increase awareness among potential users, increase competition among firms in the industry, and help form a
reality in which used building materials are a valued part of construction practices.
B - Entrepreneurial and Manufacturing Support
Entrepreneurial energy is essential to overcoming many of the barriers outlined in Section III. In some cases this support
might take the form of technical assistance or financial support, and in other cases it might take the form of focused
economic development activities including incentives, marketing, provision of land, or political support in establishing a
business.
Used building material businesses and recycled content building material businesses have potentially many synergies
with each other, and it is advisable to support both categories of businesses within the broader objective of improving
diversion. For example, the careful removal of valuable used building materials creates an approach to deconstruction
that allows the time necessary for the proper separation of materials necessary for recycling inputs. At the same time, a
successful recycling operation may apply their understanding of the material flow to create higher-value products
including the reuse of materials as appropriate. Interviews with used lumber dealers revealed business plans that
incorporate the direct re-sale of valuable timbers, as well as the recycling of less-valuable timbers into flooring. Similarly,
United Lock-Block produces both crushed concrete, as well as new concrete blocks made from recycled concrete. In
short, effective support for used building materials necessitates support for high-value recycling efforts as well. Doing so
increases the likelihood for the range of businesses involved with improving diversion to become successful, and
therefore more able to invest in innovative ways of creating value from the C&D waste stream.
Wood waste recycling provides significant opportunity both because of the volume of C&D wood waste, and because of
the versatility of wood. The production of fibreboard from wood waste may again be possible, even though Canfor
closed their lower mainland plant in 2008.
C&D wood waste has the potential to be made into other products for reuse in construction, including finger-jointed
studs, cross-laminated timbers, and structural insulated panels. Finger-jointed studs are made from shorter pieces of
lumber and glued into full-length, non-load-bearing studs. Combined with the recovery of lumber for reuse, the shorter
pieces could be thereby be directed away from lower-value uses and into finger-joint production. Cross-laminated
timbers consist of layers of dimension lumber glued together at right angles to form solid wood panels. Structurlam in
Penticton produces these products that are sold as wall assemblies. Encouraging the use of used lumber in this process
would provide a valuable use for a significant portion of the C&D wood waste stream. Similarly, structural insulated
panels (SIPs), which are made by sandwiching insulating foam between two layers of oriented strand board (OSB), could
incorporate a significant volume of C&D wood waste if these panels are made from OSB that includes recycled C&D
wood waste content. SIP Building Systems in Nanaimo and EcoSIP in Duncan are two BC companies that manufacture
SIPs.
Supporting entrepreneurial activities that would improve diversion can take many forms, including the provision of
technical assistance. Technical assistance includes help with business planning, research and development, pilot projects
to connect supply with product development, product testing, and market support. Closely tied to this is the provision of
capital through grants or loans, something that could be done in partnership between governments, foundations, and
lending institutions. A coherent approach of technical assistance and funding, has the potential to go a long way in
supporting the entrepreneurial energy necessary to improve diversion.
Local governments have significant expertise in the area of economic development, and programs such as Vancouver’s
Green Capital initiative are perfectly suited to attracting entrepreneurial activity and manufacturing operations that seek
to improve diversion. Economic development in support of improving C&D waste diversion should be designed to help
entrepreneurs overcome the market barriers outlined in Section III. The provision of free or low-cost land may help
significantly in attracting businesses and allowing them to locate in places that are convenient for waste haulers. As
Prepared for Metro Vancouver by Kane Consulting, LOCO BC, Restraint Consulting, and Urban Fabric
February 2012
Market Analysis of Used Building Materials in Metro Vancouver
43
discussed below, local government economic development initiatives are well suited to creating centralized facilities
that can act as a hub for synergistic C&D reuse and recycling businesses.
C - Education and Training
Education programs related to C&D material reuse and recycling exist in many forms, and programs targeting trades and
the construction industry have helped increase appreciation and understanding of the opportunities. Green building
rating systems, such as LEED and Built Green, have also helped in the area of education and awareness. Nevertheless,
numerous interviews revealed a continued desire for more education and awareness programs targeting the design
community, contractors and trades, consumers and homeowners, demolition companies, and waste haulers. BC Wood
was often cited as an example of a government-funded program aimed at market transformation, and many
interviewees felt a similar, strong program aimed at strengthening the market for used building materials would be
helpful.
Architects and designers might benefit from specific information about where to source used building materials, about
projects that have been successful in utilizing used materials, and about strategies for overcoming the barriers outlined
in Section III. Private sector businesses involved in improving diversion have a vested interest in educating design
professionals, and they could be strong partners in delivering this information.
Deconstruction training programs are available through organizations such as Re-Use Consulting, and should be made
available to all individuals involved with construction and demolition. Demolition contractors may benefit from better
understanding an alternative approach to taking down a building and be better able to protect the value of materials.
Renovation contractors may learn to better incorporate existing materials in the renovation, reduce waste during the
site preparation phase, and communicate opportunities for reuse to their clients. New construction contractors or
builders may learn how to build in such a way that eases deconstruction, and learn about opportunities for alternatives
to adhesives and hard-to-remove fasteners. Designers may also benefit from deconstruction training so that they are
better able to design for deconstruction and avoid designs that make deconstruction particularly difficult.
Contractors and trades may benefit from training programs aimed at helping to reduce the waste on site, including the
elements outlined below in the sub-section entitled “job site organization.” These training programs can be reinforced
through contractual requirements, penalties, and reporting requirements. Contractors and trades might also benefit
from information about successful strategies for utilizing used building materials, for working with the inevitable
shortcomings of used materials, and for overcoming the barriers outlined in Section III. The many industry and trade
associations have significant reach within the construction industry, and partnerships with these organizations to deliver
programs could yield greater benefits than government programs alone.
The movie industry was often cited during interviews as being especially wasteful with their set construction practices.
One interviewee asserted that movie sets are held together with significant amounts of strong adhesives and nails and
fasteners that are difficult to remove. As a result, set deconstruction is very challenging, and the movie industry is
typically not interested in doing so. In addition, union contracts on movie sets preclude volunteer labour for site
deconstruction, so non-profit used building material operations such as ReStore are not able to effectively repurpose the
waste from movie sets. A dialogue with the movie industry, leading to options for alternative practices and a potential
education program may help to improve diversion from the movie industry.
Since client demand frequently drives whether material is re-used during a renovation, education programs aimed at
home-owners and consumers may be effective. Interviews with architects and construction firms confirmed that it is
generally aesthetic or sentimental reasons that motivate clients to reuse existing materials, or source used materials
from other buildings. Education programs aimed at supporting this approach, and addressing some of the hesitancies in
doing so, may help improve the number of clients that seek used materials. Such education programs could also be
enhanced with information about the other benefits associated with choosing used materials, and with success stories
from other projects that have utilized used materials.
In the case of non-residential projects, clients may benefit from information about inspirational stories from other
projects, and about the sustainability brand values that can be communicated through the use of used materials. Design
Prepared for Metro Vancouver by Kane Consulting, LOCO BC, Restraint Consulting, and Urban Fabric
February 2012
Market Analysis of Used Building Materials in Metro Vancouver
44
firms may be very supportive of such an education program. A number of architects and contractors interviewed for this
project noted that there is no demand from non-residential clients for the reuse of materials with the exception of high
value or heritage materials. Contractors commented that they simply implement the wishes of their clients as outlined
in the specifications and plans and therefore have little influence over the material choices. To create demand one
needs to work at the client (homeowner, institution, developer) level to begin to create a market for these products.
Institutional decision makers, such as universities and places of higher learning, may be particularly attractive targets for
such education campaigns as they are positioned to provide some leadership in changing mindsets around reuse of
materials.
Demolition firms and waste haulers may appreciate a program that provides current information about opportunities for
improving diversion, including listings of facilities, rates, hours of operation, and the ability of facilities to report back on
their reuse and recycling of materials.
D - Support “5Rs Hierarchy”
Metro Vancouver’s Integrated Solid Waste and Resource Management plan calls for 80% overall diversion in the
demolition, land clearing and construction sector by 2015 (Metro Vancouver 2010, 5). The definition of “diversion” that
informs this target is the “conventional definition” that includes everything other than landfilled material and material
incinerated at Metro Vancouver’s waste-to-energy facility in Burnaby (Metro Vancouver 2010, 5). As discussed above,
80% diversion under this definition is regularly being achieved on projects across Metro Vancouver. Accordingly, the
challenge is now to both increase this above 80%, as well as increase the value of products diverted from landfill
(moving products up the 5Rs hierarchy).
The five categories of waste identified by Metro Vancouver in their Integrated Solid Waste and Resource Management
plan are (Metro Vancouver 2010, 5):
1. Reduce waste at source
2. Reuse where possible
3. Recycle products at the end of their useful life
4. Recover energy or materials from the waste stream
5. Manage residuals in an environmentally sound manner
In order to motivate improved diversion, it is recommended that each category of diversion outlined in Metro
Vancouver’s Integrated Solid Waste and Resource Management plan should be assigned a target percentage, and be
tracked separately. Doing so will disaggregate the single “diversion” target that currently represents everything other
than straight landfill, will clarify C&D waste objectives, will create better information about the current state of
diversion, and it will encourage an increase in the value of products. In short, setting targets for each category within the
5Rs hierarchy will help move C&D waste up the 5Rs hierarchy.
Monitoring the results of activities within these categories may be challenging, but could be addressed with a revised
reporting strategy. Green building programs such as LEED require submittals from waste haulers, and it has been
suggested that waste haulers should be licensed to help ensure the reliability of their diversion reporting. However the
category of waste hauler includes far too many actors of various scales, from large companies with waste bins, to
individuals with pickup trucks, and licensing them all might prove impossible. Instead, facilities that accept C&D
materials could be licensed to provide simple tallies of the materials received, both for their own records and to be
distributed back via haulers to the building owner or project manager. The owner or project manager could then use the
source documents to verify their diversion of C&D waste through various channels. The facility could use the same
documents to verify inputs, and be audited to verify where their materials went, according to the 5Rs hierarchy.
Co-mingled bins sorted off site and handled by appropriate facilities could be audited to ensure they have a reliable
system for tallying how much waste goes into each of the 5Rs hierarchy categories. California has such a system of thirdparty certifiers for distribution from co-mingled bins, and their program could be looked to as an example.
Further reinforcing the 5Rs hierarchy requires the right tipping fee structures and material bans. Tipping fees should be
high, but not so high that they encourage illegal dumping. Dave Bennink of Reuse Consulting in Washington State feels
Prepared for Metro Vancouver by Kane Consulting, LOCO BC, Restraint Consulting, and Urban Fabric
February 2012
Market Analysis of Used Building Materials in Metro Vancouver
45
that the tipping fees established by Metro Vancouver (between $97 and $107 per tonne) are right where they should be,
in contrast to US fees for which $40 per tonne is the high-end of the range. Some US municipalities have very low fees,
such as Cleveland at $24, Youngstown Ohio at $11, and Buffalo at $32 with a discount given for higher amounts of
waste.
However, Vancouver Landfill accepts demolition loads, that are at least 80% wood, delivered in tandem and tridem
trailers for only $40 per tonne – a rate that significantly lower than the Metro Vancouver fees, and is too low to create a
structural incentive for higher and better uses. Tipping fees should always be a bit more than the recycling fees to create
a structural incentive for recycling.
Ultimately un-sorted loads should not be allowed at the landfill, but bans on materials should be done only in
conjunction with the creation of infrastructure and markets.
E - Job Site Organization
The importance of job site organization as a strategy to reduce waste and sort materials is well understood and
documented. Nevertheless, interviews revealed that many approaches to job site organization are not widely adopted
and that there still remains room for improvement. Even firms that excel in this area indicated in interviews that they
need to continually reinforce their approach, offer training, and implement penalties as necessary.
One contractor interviewed for this project pointed out that by having a central area for all waste bins, rather than
having them scattered around the job site, trades are not motivated to put waste in the wrong bin simply because it is
closer to them. The same contractor reported significant success in implementing a system of penalties for
contaminated bins in which all trades are fined if any bin is contaminated. This system creates effective peer pressure
among all those working on a job site, and has helped this contractor reduce contamination.
Central cutting areas have long been recommended in order to allow for the reuse of materials, and for ensuring the
wood offcuts are all in one physical location. Given the current dynamic between labour and material costs, there is
significant pressure to have multiple cutting locations on site if doing so makes labour more efficient. However,
minimizing the number of cutting areas, or insisting on one cutting area on smaller jobs, remains an important strategy
for reducing waste and making it easier to find offcuts that could be utilized.
There is a difference of opinion about whether there is usually room on a job site to separate materials before having
them removed by a waste hauler. It seems to depend on who is running a particular site, their level of organization, and,
of course the physical constraints. In situations where there is no physical room, it is possible to have “live load” bins of
certain materials so that multiple bins do not need to be stored on site. A waste hauler interviewed felt that the
competitive nature of their industry precludes bidding on jobs with an offer of multiple bins for source separation
because the value-added of such service will be overshadowed by the increased cost. Instead, they recommend
mandated site separation of materials so that all waste haulers would be forced to bid on the same service.
Site organization is supported by education programs, as well as diligent management of the site. There is significant
turnover of individuals on a job site as the stages in construction are completed, and as various trades come and go.
Project managers must communicate and reinforce their approach to site organization and waste management for it to
be successful.
F - Central Facility
A central non-profit facility, focused on used building material and wood, but capable of receiving all C&D materials, and
organized as a hub in support of entrepreneurial activity, is a central recommendation that emerged during this project.
Architects and designers express frustration at the disaggregation of supply and their inability to determine which used
building materials might be available for projects. Contractors express frustration at the inconvenience in sourcing
suitable used materials, and the lack of necessary volume. Clients and homeowners are generally unaware of the option
to utilize used materials and are daunted by the effort required. Waste haulers and contractors express frustration with
Prepared for Metro Vancouver by Kane Consulting, LOCO BC, Restraint Consulting, and Urban Fabric
February 2012
Market Analysis of Used Building Materials in Metro Vancouver
46
the need to take different materials to different locations, often by travelling great distance, and the shortage of
facilities that will take certain materials.
These frustrations could all be addressed through a large, central facility that focuses on used building materials and
wood, but accepts all other materials as well. The used building material operation would be established as a non-profit
organization with significant storage capacity, and would provide a large-scale inventory of used building materials. As a
non-profit it would be able to issue tax receipts for donations, could participate on job training programs, and could
leverage volunteer labour. The wood portion of the facility would sort and process wood waste in order to maximize its
ability to return as inputs into construction. As a hub, the facility could support a range of entrepreneurial and
manufacturing ventures predicated on a consistent supply of C&D waste.
The physical location should be integrated with a virtual location that provides a current inventory of all used building
materials. Ideally this virtual location would include not only the materials on site, but also the materials available at
other Metro Vancouver used building materials dealers. Interviews with used building materials dealers indicated that
maintaining such a virtual site would entail considerable effort to keep up-to-date because inventory changes too
quickly, and each item is different in terms of damage. However, without this effort, the design community will remain
reluctant to specify used materials, and it will be harder to encourage contractors and homeowners. Interviews clearly
indicated strong support by architects for a web-based clearinghouse of used materials, whether it is a wiki, centrally
organized, or a combination of these approaches. There are a number of existing US-based web sites that may serve as
models, including Buildingsurplus.com, PlanetReuse.com, and CMDepot.com.
Large scale projects require available materials in large quantities, and only by aggregating supply – both physically and
virtually – will used building materials be considered a viable option for larger projects. One interviewee asserted that
having a few hundred doors in one location is not nearly enough, and until there are 10,000 doors in one location the
use of used materials will remain marginalized.
A physical facility of this nature is well suited to job training and partnering with non-profit organizations. There are
already numerous examples in Metro Vancouver that follow this model, including the Fab Shop, run by Tradeworks
Training Society, which incorporates job training programs with wood product manufacturing.
Having a centralized wood collection site would allow economies of scale to be captured in the aggregation of materials,
green-chain style sorting, and bulk processing. Job training programs could assist with the sorting, de-nailing, and metal
detection. The facility could partner with other organizations for various subsequent steps in manufacturing including
chopping and re-grading, thickness sanding, gluing and pressing into laminated products, and grade stamping for reuse
or review by an engineer. Other wood that was deemed non-structural could be sold from the site and be utilized for
fencing, and other small project that do not require structural wood. The wood collection facility would allow wood to
be delivered unsorted, and through various stages of processing and sorting, could be efficiently made ready to re-enter
the market.
The physical location should act also as a hub that supports entrepreneurial activity, as discussed above that relies on
the C&D waste stream as input material. This physical proximity is an important catalyst for the innovation and industrial
ecological relationships that can maximize the value of products.
Further analysis is needed to determine whether more than one such facility is warranted in Metro Vancouver, but
certainly multiple drop-off centres are required. “Eco-Centres” are already envisioned by Metro Vancouver, and these fit
perfectly with the concept of multiple drop-off centres collecting material for a central hub facility. Interviews with
residential contractors indicated a strong willingness to support initiatives that make C&D waste disposal easy, and
contractors were unanimously supportive of a central facility. A central facility is also of benefit to demolition firms and
waste haulers that do not want to take different materials to different locations.
Larger demolition and deconstruction projects will also benefit from a large central location that could accept significant
quantities of used building materials from both non-residential and residential buildings. As noted in Section III, there
are space and time limitations at job sites, and demolition firms often have nowhere to take large quantities of used
materials for resale. In support of deconstruction firms that do not have space for large quantities of material, the
Prepared for Metro Vancouver by Kane Consulting, LOCO BC, Restraint Consulting, and Urban Fabric
February 2012
Market Analysis of Used Building Materials in Metro Vancouver
47
central facility could accept this material by purchasing it directly, selling the items on consignment, or providing storage
space at low cost.
During the interview and research stages of this project we identified three separate organizations that are in various
stages of initiating new used building material stores in Metro Vancouver. Some of these organizations bring significant
resources to the table, and clearly there is a shared assessment that additional centres are needed. Given this
momentum it seems likely that new capacity for storage and distribution of used materials will emerge, however these
efforts may not be structured to overcome the barriers identified in Section III of this report, and may not leverage all
the potential synergies. It is recommended that Metro Vancouver convene a conversation with interested parties to
explore options for maximizing the potential of a central facility with multiple partners.
G - Connect Supply Chain
Connections need to be made between the supply of used building materials, and the opportunities in new projects. The
supply side includes the used building materials available in the inventory, as well as the material in structures slated for
demolition or deconstruction. With low inventory available at any given time, the success of connecting supply with
demand rests on timing.
In situations where one entity is involved with the supply of used materials as well as with the new construction project,
connecting supply with demand is fairly straight forward. One interviewee pointed to the new Trout Lake Community
Centre in Vancouver that was built in part from blow-down lumber from Stanley Park. In this case, one entity, the
Vancouver Parks Board, owned both the material salvaged from Stanley Park and the new community centre so the
connection was easy.
When the connections are not so direct, the design team must invest effort early in the process to identify sources of
used materials that will be available at the time of construction. The general contractor should be brought in early as
well so that options for used materials can be discussed. If appropriate materials are found, they may need to be
purchased and stored for a long period of time before construction. This may work best with institutional builders, such
as universities that have significant space, or in partnership with a central used building material facility. Successfully
connecting supply with demand may also require slowing down the construction timelines so that materials can be
researched, specified, sourced, obtained, stored, and incorporated.
The supply chain for used building materials also needs to be strengthened so that bottlenecks are cleared, resiliency is
established, and multiple links are forged. Currently the supply of used building materials is made available through a
small number of distributors or in short-term sales from demolition sites, each creating surges of materials and
inconsistent supply. If the market is not ready when the materials are available, the opportunity is frequently lost. If
supply is not available at the time when material is required, then builders may become frustrated and the supply chain
is not resilient enough to offer other options. By increasing the volume of material and connections in the supply chain,
it is possible for the system to become significantly more reliable and encourage further activity from both suppliers and
customers.
H - Stimulate Deconstruction
The practice of deconstruction needs to become more widespread, in both residential and non-residential settings. The
City of Vancouver moved ahead in this regard in July 2011 as their Council “…supported the recommendation that the
Zoning and Development Bylaw be amended to allow a building permit to demolish by deconstruction to be issued in
advance of a development permit, in order to allow the necessary time to complete deconstruction.” (City of Vancouver
2011). Decoupling deconstruction from the building permit relieves the significant time pressure that comes to bear on
the site preparation stage of construction, and allows careful deconstruction and maximization of value from the C&D
waste stream. Other ways to stimulate deconstruction include offering an accelerated building permit in addition to the
decoupling now offered by the City of Vancouver. The accelerated development permit offer must be structured so that
there is still ample time for slow deconstruction, while still providing for a slightly faster processing of development
permits.
Prepared for Metro Vancouver by Kane Consulting, LOCO BC, Restraint Consulting, and Urban Fabric
February 2012
Market Analysis of Used Building Materials in Metro Vancouver
48
The licensing of deconstruction activities also offers an avenue for stimulating deconstruction. If deconstruction firms
are required to undergo training and licensing in exchange for exclusive access to projects receiving incentives for
deconstruction (e.g. decoupled or accelerated permits), they will be provided with a motivation for focusing on
deconstruction and improving diversion.
Interviews revealed significant resistance on the part of demolition firms to a deposit system for meeting diversion
targets. Instead, incentives in the form of reduced permit fees or other benefits to the project manager that could then
be passed along to the deconstruction firm were preferred. If deposits are required, they should be in the form of a
letter of credit held centrally by Metro Vancouver, rather than individual cash deposits held by each municipality. As one
demolition firm representative stated: “If I have to put cash up in each municipality, I’ll go broke.”
Inter-municipal co-operation could take other forms to stimulate deconstruction as well. Rather than requiring
deconstruction firms to obtain a business license from each municipality in which it does work, a third party could
provide certification or licensing that is valid within each member municipality.
As discussed above with regards to Metro Vancouver’s “5Rs hierarchy,” increasing the value of C&D waste can be
stimulated by tying deconstruction to specific targets within this hierarchy rather than an overall diversion target that
includes everything except landfill.
Contractors have an important role to play in stimulating deconstruction through the writing of specifications. Often the
deconstruction or demolition activities are carried out as sub-contracts and their diversion targets are set within those
contracts. Ensuring that all bids offer minimum deconstruction by writing such requirements into the bid will ensure a
level playing field for all deconstruction/demolition firms. By asserting the value of deconstruction it may also stimulate
competition among bidders on the value they can add to C&D waste.
As market forces begin to further push deconstruction, and as capacity increases, mandatory deconstruction for all
buildings, or categories of building type or ownership, will help secure deconstruction as the norm. However, as
discussed elsewhere, it is essential that markets and infrastructure are developed concurrently with mandatory
diversion requirements.
I - Design
Building design has an enormous effect on the amount of C&D waste generated during construction, renovation, and
deconstruction or demolition. Accordingly, building designs should be encouraged to minimize waste during all these
stages, and be designed to last for as long as possible.
Designing for minimal waste includes ensuring that designs facilitate the use of common dimensions and standard
building materials. For example, nine foot ceilings result in more waste than do eight foot ceilings since sheet goods and
lumber come in eight foot and ten foot lengths.
Incorporating used materials into building design can be more easily accomplished if there are fewer demands for large
quantities of visually-similar materials. For example, the C.K. Choi building at UBC was designed to allow different
materials in different sections of the building. One demolition firm interviewed was involved in this project and noted
how much easier it was to supply used materials, such as different sub-set of matching doors for each of the floors
instead of requiring matching doors for the entire building.
Changing building specifications and contract requirements to allow for used materials will go a long way to stimulating
the market. Architects and contractors interviewed recognized how effective this strategy might be, and noted that
working with larger institutions, such as universities, might allow this to happen sooner. Governments also have a role to
play in providing for used material specifications in the design of their buildings.
Buildings should also be designed for durability, long-term lifespan, eventual vertical additions, and deconstruction.
LEED Canada recognizes the importance of designing for durability by assigning credits for doing so, and this approach
should become standard practice. Design should anticipate that a building may eventually be renovated or expanded
vertically, and should include structural components to allow for this. One contractor interviewed spoke proudly of a
Prepared for Metro Vancouver by Kane Consulting, LOCO BC, Restraint Consulting, and Urban Fabric
February 2012
Market Analysis of Used Building Materials in Metro Vancouver
49
current project in which they are reinforcing a building to allow for additional stories, rather than razing the building and
starting from scratch. Design for expansion may make the difference between whether or not a future demolition needs
to take place.
Design and building for deconstruction is critical to maximizing the value of building materials available at the time of
deconstruction. Current building practices require extensive use of adhesives and fasteners that make deconstruction
difficult and damage to materials inevitable. Nail guns and excessive use of extremely strong construction adhesives are
frequently cited as examples. Many buildings are designed as one-offs, filled with detail and complexity that renders
much of their materials unusable. For example, roof trusses used in homes are often custom sizes and are challenging to
reuse.
In contrast, designing for the standardization of materials and sizes of materials will make these materials more
appealing for ultimate reuse. Commercial buildings, particularly industrial buildings, are built out of more standard
materials and are more frequently reused. An inspiring example is the Centre for Interactive Research on Sustainability
(CIRS) building at UBC, which is being designed for deconstruction. Architects involved say that this takes more design
time but will ultimately require less construction time. It is constructed out of modular panels that will be highly
reusable and also easily transformed into other applications. As these practices develop, and over a longer time horizon,
building codes should require these practices.
Complementing building design is the design of materials themselves. Since product manufacturers are responsible for
the design of materials, a powerful way to spur design for reuse is to require that the manufacturers take back the
materials when no longer needed in the building. This extended producer responsibility (EPR) concept could be applied
to materials themselves, including concrete and wood, as well as the packaging materials. Once the manufacturers are
responsible for taking back the material, they have a strong motivation for ensuring they are designed for reuse, or for
establishing a valuable recycling program.
J - Maintain Existing Building Stock
Since demolition is the largest source of C&D waste, the ultimate way to reduce the amount of C&D waste is to limit the
ability to take down existing buildings. Demolition firms interviewed for this project repeatedly noted how common it is
for them to demolish a spec home that has never been lived in, or to gut a brand new condo so the new owners can
reconstruct the interior to their taste. Clearly these are extreme examples that run counter to Metro Vancouver’s
objectives of reducing C&D waste.
It is obviously difficult to place extreme restrictions on the freedom of a building owner to replace an existing building;
however some steps in this direction are warranted. Incentives to retain buildings and modify or expand, rather than
destroying the building, would help adjust the economic arguments in favour of demolition. Minimum lifespan
requirements for new construction, perhaps five years or more, would act to curtail the most extreme situations of
demolishing a brand new building that has never been used, and perhaps encourage higher-quality construction of spec
homes if it is certain that someone will occupy the structure.
The movement towards laneway housing often results in the tearing down of existing garages. Incentives to maintain
the existing structure and incorporate it into the laneway housing might also reduce the number of garage demolitions.
While garages are not large structures, interviews with those involved with laneway housing revealed that garages
generally do not yield valuable used materials because the lengths of material are relatively short.
Maintaining heritage structures is already well established, but these programs could be expanded and strengthened.
Incentives could also be provided for the removal of an entire house so that it could be used intact in another location.
There are a number of companies that move whole houses, and their efforts could be combined with programs aimed at
providing housing to those unable to afford new construction.
Prepared for Metro Vancouver by Kane Consulting, LOCO BC, Restraint Consulting, and Urban Fabric
February 2012
Market Analysis of Used Building Materials in Metro Vancouver
50
V. Best Practices
This best practices review assesses the success of several government programs, policies and incentives, in regions
outside Canada, that promote or mandate deconstruction, foster market development for used building materials, and
develop related green jobs. It was not intended as a comprehensive review of C&D waste diversion or green jobs
programs.
A - Methodology
An initial geographic scan was performed of best practices in deconstruction in the United States and Europe. It looked
at high-level practices in two US states (New York, Massachusetts), three US municipalities (San Francisco, Cleveland,
Portland), and one European Country (Netherlands). Emerging from the scan were a variety of interventions that help
foster the market for used building materials:
• Tax credits for donations of used building materials
• Regulations requiring material salvage and recycling during demolition
• Construction & demolition (C&D) regulations such as landfill bans
• Government procurement to salvage building materials through the deconstruction of their own buildings
• Reuse centres that act as used building material depots, some of which also offer deconstruction services and
consulting
• Programs to foster the deconstruction industry, provide training and develop green jobs
In order to look more deeply at best practices, the analysis also included an intervention focus, with a deeper look at:
• Tax credits for donations of used building materials
• Government procurement to salvage building materials through the deconstruction of their own buildings
• Reuse centres that act as used building material depots, some of which also offer deconstruction services and
consulting
• Programs to foster the deconstruction industry, provide training and develop green jobs
B - Geographic Scan
New York State
• Local industry is well developed, with 16 used building materials reuse stores in the state
• Government support has funded a NYC pilot and a regional education centre
• New York City Department of Sanitation runs an online materials exchange
• Build It Green! NYC (demolition services, warehouse, refashioned used materials) has provided green jobs
training for 120 people since 2005
State of Massachusetts
• State has a comprehensive approach that includes policy, education, and market development.
• Department of Environment’s 2010 Draft Solid Waste Master Plan identifies C&D waste as a priority for
diversion and market development.
• Massachusetts plans to stimulate new recycling markets through state agency procurement practices and
support (grants and loans) for expanding recycling/composting businesses.
San Francisco
• State and city regulations aimed at reducing waste
• California law (AB939) requires municipalities to divert 50 percent of waste from landfills by 2000
• San Francisco achieved, by 2008, their 2010 target of 75% diversion from landfill, and has since set a new target
of zero waste by 2020
• San Francisco requires a minimum of 65% diversion from all construction, demolition or remodeling projects.
Prepared for Metro Vancouver by Kane Consulting, LOCO BC, Restraint Consulting, and Urban Fabric
February 2012
Market Analysis of Used Building Materials in Metro Vancouver
•
51
Local non-profit The ReUse People (TRP) started in San Diego/Tijuana that shipped C&D materials to Mexico for
reuse, and is now located in Oakland (see reuse centre case studies in Section V-C).
Portland, Oregon
• Similar to San Francisco with state and municipal regulation
• Portland projects with a value of over $50K in construction costs must divert 75% of their construction waste,
and must provide a plan for doing so
• The following must be recycled: rubble (concrete, asphalt), land clearing, cardboard, metal and wood
Cleveland, Ohio
• Government focus on deconstruction of abandoned buildings in downtown core and residential neighbourhoods
• Driven by declining economy, rustbelt city – excess of abandoned buildings which raised safety concerns, no
time pressure on deconstruction
• Desire to create green jobs for people re-entering society from prison
• Deconstruction pilot project for green jobs being paid for by the Cleveland Foundation and the City, but are
managed by Neighborhood Progress Inc. (partnerships with non profits and foundations)
Netherlands
• Effective, policy-driven approach that has achieved 90% overall waste diversion (less than 10% waste to
incinerators).
• Netherlands is a signatory to the European Union Landfill Directive (1999), with successive targets for reduction
of landfilled municipal waste to 75% (by weight) of the 1995 baseline by 2010, 50% by 2013 and 35% by 2020.
• A landfill ban on C&D waste with high tipping fees (63,50 € in 2001).
• Comingled wastes are separated at government certified material sorting plants. And landfills accept waste only
from certified operators, who sort and certify loads.
• The Building Materials Decree also limits the materials left on site and mixed with soil after demolition, but also
stipulates what materials can be reused (ex. recycled aggregate in place of gravel in concrete) that encourages
industry’s acceptance of reuse.
• Netherlands 12 provinces regulate disposal of C&D wastes. They gain info about waste streams and monitor
disposal and processing by requiring quarterly reports from waste collection and processing companies.
• Used building material reuse and recycling is estimated to be as high as 90%. Asphalt, concrete and mixed
granulates are used in road building, and flyash is used in new concrete. Almost all flyash produced in the
country is currently used in concrete.
C - Interventions
A variety of interventions are used across North America to foster the market for used building materials, to develop
deconstruction skills in the construction industry and create green jobs, and to reduce C&D waste to landfill. Key
interventions include tax credits, government procurement, reuse centres, and programs to foster the deconstruction
industry, provide training and develop green jobs.
Tax Credits
One of the most significant drivers encouraging deconstruction practices and building materials reuse in the US is the
availability of tax credits. Tax credits are provided to individuals for donating used building materials to charitable
organizations. Tax credits reduce the cost of deconstruction on the average home from almost three times the cost of
demolition to 90% less than demolition costs, from $36,300 to $1,300 (see Table 18). This important financial incentive
helps homeowners to make the decision to deconstruct rather than demolish and thereby foster the market for used
building materials by providing a steady stream of materials to donation centres.
Used building materials reuse stores can apply for charitable status (501(c)(3)) that allows them to issue tax receipts for
the assessed value of donations. The Internal Revenue Service’s IRS Publication 526 on Charitable Contributions of
Prepared for Metro Vancouver by Kane Consulting, LOCO BC, Restraint Consulting, and Urban Fabric
February 2012
Market Analysis of Used Building Materials in Metro Vancouver
52
property (household items) governs the donation of used building materials. A fair market value of the donation must be
determined by the charitable organization.
The following example created by The ReUse People illustrates how significant tax credits can be in the business case for
deconstruction13. It compares the costs of a typical full-house deconstruction project with a typical demolition.
Assuming a 2,400 sq.ft. house with a two-car attached garage, composition roofing, wood siding, drywall, raised
foundation, single-pane wood windows and tongue and groove hardwood floors, they estimate after-tax savings of
$11,700 ($13,000 net cost for demolition, versus $1,300 net cost for deconstruction). Although values will vary widely
depending upon the location, age, style, and condition of the house, the type of construction and materials used,
topography of the property, landfill rates and other factors, this example shows that tax credits are an important part of
encouraging deconstruction and used building material reuse in the US.
Table 18: Estimated Economic Benefits of Deconstruction
Activity
Lowering the house to the ground and disposal of
debris
Removal of concrete and hardscape
Appraisal of salvaged materials
Total cost
Appraised value of donation
Tax savings
Net cost
Re-use
Solution
$28,800
$5,000
$2,500
$36,300
$100,000
$ 35,000
$1,300
Traditional
Demolition
$8,000
$5,000
$13,000
$13,000
Reuse Centres
Building reuse centres are of central importance to developing the market for used building materials. Many building
reuse centres in the US have been supplying the residential market for many years, and often offer deconstruction
services and deconstruction training services. The centres highlighted below provide storage and retailing of used
building materials, deconstruction services and deconstruction training. These centres play an important role in
fostering the market for used building materials, since they provide both the salvage services and the retailing needed to
market materials that had been previously disposed of. They also create expertise on the supply and demand sides of
the developing market, and help provide these services to other groups throughout the US through their deconstruction
consulting and training services.
Two successful, long-term centres were interviewed to assess their success factors and challenges as follows:
The Reuse People - Oakland, California
The Reuse People (TRP) is a non-profit organization dedicated to reducing the solid waste
stream by salvaging building-related materials and distributing them for reuse. TRP
employs about 25 people and operates two retail warehouses in Oakland and San Diego,
where people can purchase salvaged materials. It also runs a deconstruction company, a
deconstruction training programme and a consulting service. TRP started in April 1993 as
part of a drive to help provide building materials to flood victims in Tijuana, Mexico. The
drive collected and donated over 400 tonnes of building materials (valued at US$ 1.2
13
The ReUse People calculations, shown in Table 18, assume a combined federal and state tax bracket of 35%. They note that the
total materials to be salvaged (lumber, cabinets, plumbing, electrical fixtures, doors, windows, etc.) would generally be appraised
somewhere between $87,500 and $120,000 if the materials are in good usable condition, and have therefore assumed an appraised
house value of $100,000. Note also that the cost of obtaining an appraisal ($2,500 in this example) is deductible on Schedule A or IRS
form 1040.
Prepared for Metro Vancouver by Kane Consulting, LOCO BC, Restraint Consulting, and Urban Fabric
www.thereusepeople.org
February 2012
Market Analysis of Used Building Materials in Metro Vancouver
53
million) and demonstrated that there was a need and market for used building materials. Based on this success, TRP
opened its first materials distribution warehouse in San Diego in 1993. The business grew and TRP found itself unable to
keep up with the consumer demand for materials. Three years after it first opened, TRP started its own deconstruction
company as a way to ensure sufficient flow of materials to their retail warehouse. As demand continued to grow, they
began training and certifying contractors to do deconstruction and also added The Reuse Institute, a consulting service.
Regulatory framework and incentives
A range of state and municipal regulations has been introduced in California to reduce waste going to the landfill. In
1989, the California legislature passed the Integrated Waste Management Act (AB 939), which required municipalities to
reduce landfill waste by 25% percent by 1995 and 50% by 2000. While most municipalities easily met the 1995 target,
far fewer were able to meet the 50% reduction target by 2000.
San Francisco has been very progressive in its waste reduction policies and programmes. By the time AB 939 was
introduced, San Francisco had already set goals to reduce its solid waste by 32% by 1992 and by 43% by 2002; these
targets were adjusted to conform to AB 939. The city achieved a 50% diversion rate shortly after rolling out its “Fantastic
Three” program in 1999. The program involved a colour-coded system to make recycling easy for residents, with each
colour indicating the material accepted (blue=recycling, green=organics, black=landfill).The city then decided to pursue
higher diversion rates than those required by the State.
In 2002, San Francisco also adopted a target of diverting 75% of its materials from the landfill by 2010 (which it achieved
in 2008). It has now set a new target of zero landfill waste by 2020. In 2006, the City and County of San Francisco
adopted ordinance No. 27-06, which created a mandatory programme to maximize the recycling of mixed construction
and demolition debris. The ordinance requires that at least 65% of the material generated from construction, demolition
or remodelling be diverted from the landfill. Construction and demolition debris must be transported off-site by a
registered transporter and taken to a registered facility for processing.
According to Ted Reiff, President of TRP, these regulations have not influenced or assisted TRP in any significant way.
However, in his opinion the LEED programme has had a strong and positive impact on TRP. LEED offers credits for the
percentage of construction waste diverted, but its primary benefit to TRP has been in promoting green building and
educating the private and public sector. One of TRP’s main challenges is getting people to understand that
deconstruction is available and that it is an economically viable option. As a non-profit enterprise it lacks sufficient
resources to do public education. The most important and effective incentive has been TRP’s ability to offer a tax
deduction to private building owners. The tax deduction is based on the value of the materials salvaged from the
deconstruction process and reduces the homeowners’ adjusted gross taxable income 14. According to Mr. Reiff, this has
been a key factor in helping TRP to source materials. He notes that without it, they would not have been anywhere near
as successful as they have been. The value of the materials can often offset the cost of deconstruction and provides a
powerful incentive for homeowners. The tax reduction is determined according to an independent appraisal of materials
and other IRS regulations.
Economic aspects
TRP is financially self-sustaining and from its outset was founded on the principle that it should be able to support itself
by providing products and services that the market wants to buy. Mr. Reiff funded the initial start-up costs himself.
What little grant money that it has received has been for the expansion of its warehouses; it never uses grant money to
cover operations costs and has not received any stimulus money from the Obama administration’s green jobs initiative.
It has, however, benefited indirectly from these funding sources, since some of their clients have received it and used it
to purchase TRP services.
14
The tax deduction should not be confused with a tax credit. A tax credit is a sum deducted from the total amount of tax that a
taxpayer owes the state.
Prepared for Metro Vancouver by Kane Consulting, LOCO BC, Restraint Consulting, and Urban Fabric
February 2012
Market Analysis of Used Building Materials in Metro Vancouver
54
The bulk of TRP’s revenue is evenly divided between its retail warehouses, deconstruction services and project
management services. TRP does not charge to train and certify deconstruction specialists, but instead receives a “pay as
you go” project management fee from the people it has trained for each deconstruction job that they do. The
organization’s consulting arm is quite small and represents only about 10% of their revenue stream. Revenue goes
mainly to expanding the programme. Any funds remaining after operations expenses are covered go to the community,
in the form of cash or donated materials.
TRP’s client base for both deconstruction and retail services is primarily residential. Almost all deconstruction projects
are single-family dwellings. TRP has not done any government contracts, largely because California law requires that any
workers on government contracts be paid wages agreed by the government union, which according to Mr. Reiff are
almost double that of private sector wages. Given the extra labour costs associated with deconstruction versus
demolition, this has made government work cost prohibitive for TRP.
In terms of numbers, homeowners make up the largest client base for the retail store. But the largest single purchasers
are owners of mid-priced, multi-family buildings who are maintaining buildings or replacing materials damaged by
tenants. Salvaged items are resold anywhere from 10-75% of new value, with most items selling at 50-75% of new value.
Impact
Because TRP’s mandate is to divert as much waste as possible, they attempt to recover as much as possible when
deconstructing buildings. TRP accepts all types of reusable building materials, including: lumber (longer than six feet),
windows, doors, sinks, cabinets, roofing tile, flooring, siding, plywood, hardware, and building materials. TRP does not
accept concrete, asphalt, or wood materials that need to be ground or crushed.
Since its inception, over 300,000 tonnes of reusable materials have been diverted from the landfill, either through TRP’s
deconstruction services or its certified deconstruction contractors. TRP now deconstructs about 300 building each year
and in a typical project is able to recycle or reuse about 85% of materials. TRP’s operations have generated
approximately 350 green jobs.
Plans are underway to expand to 25 to 30 major and smaller metropolitan areas across the United States. TRP has
already begun placing full-time managers in many of these locations to work with local groups, such as Habitat for
Humanity. It has also started designing a warehouse certification training programme that it hopes to have up and
running by the spring of 2012.
The Rebuilding Centre – Portland, Oregon
The Rebuilding Centre was started in 1998 by a local non-profit organization (Our United Villages) to encourage reuse of
building materials. Based in Portland, the Rebuilding Centre
employs about 35 people and now accepts the region's largest
volume of used building and remodelling materials. It operates a
retail warehouse and a deconstruction service, offers courses,
and produces a green furniture line (ReFind Furniture) using
materials that are difficult to resell.
The Rebuilding Centre was founded by current Executive
Director Shane Endicott, to generate revenue for Our United
Villages. Previously four used building materials resale
operations had already failed in the area, so Mr. Endicott
invested some time researching and interviewing the failed
organizations, thrift stores, local non-profits and for-profits (like
Home Depot) to determine what would enable such an
enterprise to be successful. The ReBuilding Centre opened a
retail warehouse in a temporary location in 1998 and moved to
Prepared for Metro Vancouver by Kane Consulting, LOCO BC, Restraint Consulting, and Urban Fabric
www.rewww.rebuildingcen
February 2012
Market Analysis of Used Building Materials in Metro Vancouver
55
its current, permanent location in the following year. In 1999 it launched its deconstruction services and in 2001 a valueadded furniture line.
Regulatory framework and incentives
The City of Portland first began regulating C&D debris in 1995, requiring that all projects with a value of US$25,000 or
greater recycle a minimum of 50% of construction debris. Currently, all building projects where the total job cost
exceeds US$50,000 must recycle 75% of the solid waste produced on the job site. This includes mandatory diversion
from the landfill of rubble (concrete/asphalt), land clearing debris, corrugated cardboard (packaging), metal and wood. A
pre-construction recycling plan form must be completed and violators are subject to a US$500 fine for a first violation.
As of 2009, the City of Portland’s Green Building Policy requires that for City-owned facilities, at least 85% of all
construction, remodelling and demolition waste for new construction and major renovations be recycled. Metro’s
Enhanced Dry Waste Recovery Program (EDWRP), launched in 2009, requires that all mixed dry waste (primarily
construction and demolition debris) generated in the metro region is delivered to a material recovery facility. This aims
to ensure that recyclable materials such as wood, cardboard and metal are first removed from mixed loads before
disposal.
Mr. Endicott indicated that because there is little capacity to enforce regulations, waste reduction policies have not been
a major driver in the success of The Rebuilding Centre. As with The Reuse People in Oakland, The Rebuilding Centre has
501(c)(3) non-profit status and is able to provide deconstruction clients with a tax deduction for their donated materials,
which is a major incentive. While there is no specific policy in place to support enterprises that reuse construction waste,
the Rebuilding Centre has benefited from government assistance in some areas. They continue to receive government
contracts and also received some government funding to cover their initial capital costs. When they were getting
started, Metro (Portland’s regional government) helped them with some financing, promotion (through their website
and other avenues) and with media coverage to raise their profile.
Economic aspects
In its initial start-up phase, The Rebuilding Centre benefited from funding and donations from a variety of public and
private sector sources to cover capital costs. These included grants from foundations, a reduction in land and building
purchase costs (by private owner), donations for equipment (local businesses sold them trucks, fork lifts and other
equipment at half price) and loans from different government sources. They did not receive any green jobs stimulus
funding or other federal funds. In the initial start-up their financial situation was often difficult – while employees were
always paid, Mr. Endicott did not take a salary for several months and at one point they had to put US$15,000 on a
volunteer’s credit card to stay afloat. One of their major funding sources was a low interest loan from the Portland
Development Commission, where they were able to qualify for $50,000 for every job created in a three-year period
(they estimated they would create 14 jobs), because they were located in an “empowerment zone” where government
was trying to encourage job growth. The Centre used grant money for capital costs only and is self-sustaining in terms of
operations costs. The Centre will make use of roughly 2000 volunteers in 2011.
The majority of The Centre’s revenue comes from its retail sales operations, followed by its deconstruction company and
its furniture line. Together these now generate about US$ 2.4 million in revenue annually; prior to the recession they
brought in about US$ 3 million annually. The recession has also decreased the number of yearly deconstruction jobs and
led to a reduction in personnel. Prior to the economic downturn The Centre employed about 60 people and 6
deconstruction crews. This has now dropped to 35 employees and 1 ½ construction crews. The Centre’s major start-up
cost was the capital outlay to purchase the land and the building for their warehouse. Labour is now their biggest cost,
particularly for deconstruction (where it is the main cost), followed by the cost of servicing their debt. A range of client
types use the retail store, though most are residential, “do it yourself” homeowners. The ReBuilding Centre’s store
inventory is priced at 50 to 90% off the regular retail prices. Homeowners are also the main customers of the
deconstruction service, although they have some commercial clients. About 10-20% of their deconstruction work is
government related.
Prepared for Metro Vancouver by Kane Consulting, LOCO BC, Restraint Consulting, and Urban Fabric
February 2012
Market Analysis of Used Building Materials in Metro Vancouver
56
Impact
The Rebuilding Centre accepts anything that can be reused, regardless of its resale value, provided that they can find a
use for it. Materials accepted include lumber, trim and siding, doors, glass/mirrors, windows, kitchen and bathroom
cabinets, sinks, toilets, appliances, tubs, fencing, floor coverings, lighting and other items. In the past they have
occasionally had to put moratoriums on certain items when they had excess stock, but this rarely happens now. If they
are unable to accept an item, they always make the donor aware of their options to dispose or reuse the item. The
Rebuilding Centre does not accept materials containing hazardous substances, including asbestos-containing materials,
PCBs, toxic or flammable products, batteries, contaminated plumbing, or containers that may have held chemicals of
any kind. A complete list of accepted materials is available on their website. The Centre offers a free pick-up service,
using its fleet of eight biodiesel-powered vehicles. Approximately 80% of all donations and the majority of the lumber
coming into The ReBuilding Centre arrive through the pick-up service.
The Building Centre did about 100 deconstruction projects in 2011 and typically did 150-200 jobs per year prior to the
recession. It diverts approximately 8 tonnes per day of reusable building and remodelling materials from landfills. The
Centre freely shares all of its expertise and has served as an incubator, with many former employees going on to create
or work in similar warehousing and deconstruction business. The total number of green jobs created is not available, but
the deconstruction process employs 6-8 people for every one person employed in standard demolition. The Rebuilding
Centre also regularly donates used building materials to locally based grassroots organizations seeking materials for
projects or to assist people in need. Last year, The Centre donated materials with a market value of over $50,000 to
more than 100 organizations. At present, the Rebuilding Centre’s model is locally based and they do not have plans for
other locations.
One of the biggest barriers to starting this operation was locating and purchasing suitable land and a building. According
to Mr. Endicott, assistance to establish a centre in a suitable location would be one of the most critical elements of any
government support. He thinks that the free materials pick-up service has also been critical to ensuring a flow of
materials, as many people simply would otherwise not make the effort to get the materials to The Centre. Given the
challenges and hurdles he encountered, Mr. Endicott also stressed the importance involving people with high levels of
commitment and passion for this type of project. If government is unable to support them with direct financing,
assistance with marketing, business planning and other business-related aspects will still be extremely useful.
Procurement
Procurement has the potential to be an important driver of the market for used building materials. Governments
responsible to reduce C&D waste have begun using policies and practices relating to their own buildings as a means to
foster the deconstruction industry. Since governments are often large property owners, they can foster business
development in deconstruction and green jobs by requiring deconstruction in their own buildings. This provides
opportunities for deconstruction training, and also fosters a steady stream of used building materials that helps to
develop the market.
Procurement is only an effective market lever when there is a long-term strategy to develop the industry. The most
innovative programs (New Haven, Kansas City) have coupled government procurement requiring deconstruction with
green jobs training in deconstruction to ensure that opportunities for employment are created alongside capacity
building in the sector.
The biggest building owners have an important role to play. The US Military’s recent efforts to reduce its building stock
provided the opportunity to salvage used building materials and develop the deconstruction industry. Although the
Military’s many deconstruction pilot projects have shown promising results, each base has its own approach, and the
military lacks a coordinated, federal approach to building decommissioning that includes deconstruction and used
building material salvage. Such a policy could help provide a steady supply of materials around which both
deconstruction skills within the construction industry and demand for used building materials could develop, assuming
that there is support in other areas of industry development.
Prepared for Metro Vancouver by Kane Consulting, LOCO BC, Restraint Consulting, and Urban Fabric
February 2012
Market Analysis of Used Building Materials in Metro Vancouver
57
Procurement requirements of large organizations have the opportunity to promote deconstruction practices, building
material reuse and recycling. Governments are typically large land and building owners, who also have the mandate to
promote reuse and recycling, and to create markets for used building materials to increase employment.
Multnomah County, Oregon
Multnomah County has completed several contracts that encourage material reuse by requiring deconstruction. As a
policy, they have also taken a leadership position in mandating (since February 7, 2011) that proposal procurements
allocate at least 25% of total evaluation points to sustainability. In an RFP for the deconstruction of the Mela Building in
2011, they asked proponents to describe their approach to salvaging and recycling all materials, anticipated waste
materials and proposed methods for reuse, recycling and disposal, and how they will provide assurance of accurate
reporting.
Another example from Multnomah County is from a 2010 bid for a construction manager/general contractor for the
Sellwood Bridge Replacement Project. They asked proponents to describe their approach to integrating sustainable
practices including deconstruction, re-use of materials, origin of materials, the types and costs of materials, the location
of material manufacture, among other environmental concerns.
State of Massachusetts
Massachusetts is the only US state with C&D material bans. These state-wide bans have helped foster the recycling
industry, and the state now has 21 C&D processing facilities. C&D processors have lower tipping fees than landfills. The
State is also working to stimulate new recycling markets through state agency procurement practices and support
(grants and loans) for expanding recycling/composting businesses.
Massachusetts is working to increase the recycling rate for C&D materials (excluding asphalt, brick and concrete - ABC)
to 50% by 2020 as a goal under the 2010 Massachusetts Draft Solid Waste Management Plan. A key action related to
this objective is to coordinate C&D materials recycling with other State Agencies by working with them to secure
commitments encouraging the diversion of C&D materials from disposal including changing construction specifications.
Targeted agencies are the Department of Environment (MassDEP), the Division of Capital Asset Management (DCAM),
the Department of Transportation (MassDOT) and the Massachusetts Port Authority (Massport).
DCAM is responsible for capital asset management, construction and renovations of state owned buildings, including
hospitals. The MassDEP worked with DCAM to create a construction specification requiring bidders to develop a Waste
Management Plan (WMP). The WMP includes an objective to achieve a 75% or greater recycling rate (by weight),
requires new construction and/or renovation projects of 20,000 square feet or greater to divert 100% of clean gypsum
wallboard waste from disposal to recycling and/or reuse, and to maximize recycling of many other materials including
lumber, wood sheet materials, wood trim, metals and glass. Although much of C&D waste is comingled, DCAM looks for
contractors to include in their WMP plan provisions to source separate gypsum at the site to reduce the potential of
contaminating other materials with gypsum dust. Doors or other items from a building might be salvaged, and the
remaining mixed waste will be taken to a C&D processing facility. The contract language requiring 75% recycling forces
the contract to the better C&D facilities that can achieve higher recycling rates than others.
None of the requirements specify deconstruction, salvage or reuse over recycling. MassDEP reports that deconstruction
does happen, but not to the degree that they would like it to. Prior to the 2008 recession, there was more focus on
deconstruction. Many people were buying homes, tearing them down and rebuilding. MassDEP was working with towns
in the state to encourage deconstruction by having ReStore’s deconstruction crew complete light deconstruction (nonstructural salvage) prior to demolition. However the recycling grant money that covered some of the transportation
costs wasn’t sustained. Future plans are for MassDEP to work more closely with DCAM, MassDOT and Massport to
encourage contract language changes.
Prepared for Metro Vancouver by Kane Consulting, LOCO BC, Restraint Consulting, and Urban Fabric
February 2012
Market Analysis of Used Building Materials in Metro Vancouver
58
US Military
The US Military has in several instances used procurement requirements to disassemble buildings and salvage building
materials. This approach is driven by several programs to reduce the number of their US base buildings by approximately
21%. Construction, renovation, and demolition activities will significantly increase during this period, with the potential
to create a large amount of C&D waste. The Military also has a directive to reduce its solid waste, and the US Army has
piloted deconstruction projects in many areas.
The Military’s Unified Facilities Criteria (UFC) provide planning, design, construction, sustainment, restoration, and
modernization criteria, and apply to the Military Departments, the Defence Agencies, and the Department of Defence
Field Activities. UFC 1-900-01 “Selection of Methods for the Reduction, Reuse and Recycling of Demolition Waste”
outlines the costs, benefits and approach for deconstruction and recycling. 15 It appears that deconstruction of US Army
buildings has the potential to both foster the market for used building materials and build capacity in organizations
providing deconstruction services. For instance, when five buildings were deconstructed at Fort Campbell, a
considerable amount of materials, especially wood, sold by word of mouth from the job site, with more and repeat
customers returning as deconstruction progressed. The availability of the materials and a steady, known, supply seemed
to foster the market for used materials quite quickly.
Even though deconstruction is emerging as a technique to disassemble military bases, the Department of Defence has
no uniform policy to deconstruct, despite the mandate for bases to reduce their solid waste. 16 A more systematic
approach could go a long way to foster the industry. For example at a US Military project in Fort McCoy, the original bid
solicitations received only a modest response, but increased as the program became known in the local industry. In Fort
Knox, the greater the number of buildings assigned to the same contractor, the less material recovered. Habitat for
Humanity (HfH) has stated that if the Army or the Department of Defence (DoD) were to initiate a large-scale program of
building deconstruction, HfH would further develop its national capabilities as a non-profit deconstruction contractor.
Large organizations like governments and the military have the power to affect the industry greatly by creating clear
policies that help foster a steady supply of projects and used building materials around which the industry can develop.
New Haven, Connecticut
The City of New Haven trains existing construction contractors in deconstruction and materials salvage (see Industry
Development, Training & Jobs). Their procurement approach ensures that they use those same contractors for cityfunded construction projects. The “Small Business Initiative Construction Program” ensures small, minority and womenowned business (SBEs) participation in construction contracts that are financed (in whole or in part) by the City Of New
Haven by awarding all contracts under $125,000 to SBEs, and removing the need for public bids for contracts under
$50,000.
Industry Development, Training & Jobs
There have been many efforts to foster the industry, provide training and create green jobs in deconstruction. The 2009
American Recovery & Reinvestment Act (ARRA) funded many recent programs in the US. Several are tied to a surplus of
abandoned buildings in impoverished areas. Both these factors are short-term attempts to foster the sector,
contributing only to the development of short-term supply and increased capacity, without addressing the demand or
long-term availability of supply. They are therefore unlikely to contribute toward a lasting market for used building
materials.
Training programs help foster capacity in deconstruction, materials salvage, to help diversify existing construction
businesses, and to improve the capacity of the market to respond to government procurement. The best programs
address more than capacity development, and several of them are creating green jobs within reuse centres. For
15
http://www.wbdg.org/ccb/browse_cat.php?o=29&c=4
16
Biocycle. 2000. Deconstruction Shifts from Philosophy to Business. Accessed October 26, 2011 from
http://www.greeneconomics.net/Deconstruction.htm
Prepared for Metro Vancouver by Kane Consulting, LOCO BC, Restraint Consulting, and Urban Fabric
February 2012
Market Analysis of Used Building Materials in Metro Vancouver
59
example, The ReUse People provides the training for free, taking a commission on graduates work only once they
perform work under contract by the organization. Programs like the one in Newhaven train workers within existing small
construction businesses, strengthening existing businesses while developing deconstruction capacity. Other programs
provide training in deconstruction among many other construction skills, to ensure graduates have many opportunities
to enter the construction workforce. This approach to train existing businesses and train new workers with multiple
opportunities to enter the existing trade is a more long-term approach where it seems possible to create capacity within
the existing workforce, while training new workers and creating green jobs.
In order to foster development of the deconstruction industry, it is important to foster both the supply of materials and
demand for those materials. Where efforts to deconstruct are in place by enough organizations, it helps to foster both a
supply of materials and opportunities for job training and business expansion. The availability of materials helps to
create demand for reused materials, especially where used building material retailers exist.
The deconstruction industry provides training in material collection (deconstruction, salvage, sorting, transportation),
sales (retailing, wholesaling, consignment), and value-added processing (wood shops, work shops, repairs). The US
Bureau of Labour Statistics (BLS) defines green jobs as either jobs in businesses that produce goods or provide services
that benefit the environment or conserve natural resources, or jobs in which workers’ duties involve making their
establishment’s production processes more environmentally friendly or use fewer natural resources. 17
Many deconstruction businesses providing green jobs training have three lines of business: training/consulting,
deconstruction services, and a material reuse store. US green jobs in deconstruction have typically been in material
collection. Many organizations are now providing certified training programs. According to green jobs training NPO
Working for Green, deconstruction provides many benefits including excellent entry point for emergent worker, job
readiness, exposure to technical skills, team-based and multiple entry and exit points. 18 ReUse People also cite
deconstruction-training serves as an entry point to virtually every trade within the larger construction industry.
Many deconstruction and job skills training programs are based in areas of the US with many abandoned buildings. For
instance, in Cleveland, Ohio deconstruction has been driven by a declining economy in a rustbelt city where an excess of
abandoned buildings have raised safety concerns and no time pressure on deconstruction. The desire to create green
jobs for people re-entering society from prison was the impetus for a deconstruction pilot project for green jobs being
paid for by the Cleveland Foundation, City and managed by the NPO Neighborhood Progress Inc.
In Indianapolis, the Unsafe Building Program focuses on workforce development and removal of unsafe structures. It has
created 70 jobs for the formerly incarcerated through a local NPO Working 4 Green using stimulus funds.
Although government contracts would seem the most obvious place to encourage industry development, training and
green jobs development, in California there is a stumbling block in that government contracts require higher wage rates
than those paid by deconstruction contractors. Government contracts are covered by labour standards that require fair
treatment of labour, including wage levels, which can negatively affect the industry. 19
Larger projects like those administered by the US Military have been pilot projects that use a variety of methods to
administer the deconstruction process. In some cases they used staff, in other cases their own contractors, and in other
cases subcontracted to an NPO with deconstruction expertise. This does little to encourage the development of
17
Bureau of Labour Statistics. 2011. Presentation to Building Materials Reuse Association. Accessed October 25, 2011 from
http://bmra.org/media/decon11/Presentations/WorkforceMaggi.pdf.
18
Working for Green. 2011. Presentation to Building Materials Reuse Association. Accessed October 24, 2011 from
http://bmra.org/media/decon11/Presentations/13Radice.pdf
19
US Department of Labour. 2009. Presentation to Building Materials Reuse Association. Accessed October 25, 2011 from
http://bmra.org/media/decon11/Presentations/Workforce%20-%20Collated2009Presentations.pdf
Prepared for Metro Vancouver by Kane Consulting, LOCO BC, Restraint Consulting, and Urban Fabric
February 2012
Market Analysis of Used Building Materials in Metro Vancouver
60
specialized skills training within the industry. 20 Most of the training programs highlighted below work with non-profits
and are focused on the unemployed, however innovative approaches are highlighted in which Newhaven attempts to
work with existing businesses to develop such skills and where Kansas City requires existing businesses to hire training
program graduates for government deconstruction projects.
Training Programs
California
California’s ReUse People has a training division – The ReUse Institute (TRI) - working to deliver deconstruction and
building-material salvage training to unemployed and underemployed workers, urban youth, ex-offenders and other
populations. The 14-day deconstruction-training course is accredited by the State of California, Bureau of Private
Postsecondary and Vocational Education and is offered through the Vocational Technical School of Los Angeles. TRI has
trained many demolition, general building and remodelling contractors and their workers. They also provide training to
other clients including the City of Chicago. 21
Washington
The training/consulting division of Washington’s ReUse Consulting offers deconstruction certification courses at four
levels. They claim to manage the largest deconstruction training program in the USA, training 140 people per year,
working with demolition contractors, deconstruction companies, pilot projects, and buildings owners.
New York City
New York City’s Build It Green! (BIG) is a non-profit retail outlet for salvaged and surplus building materials. A second
location is opening in late 2011 in Brooklyn. BIG also has a deconstruction service, including a special kitchen
deconstruction crew to recover kitchen materials from new condo owners who immediately remodel. BIG provides
green jobs training opportunities in their warehouse, often partnering with other groups who coordinate the training.
For example, the Non-traditional Employment for Women program provides training and placement services for
women in the skilled construction, utility, and maintenance trades. As part of their training, the women learn about
construction, woodworking, and safety at BIG’s reuse centre. BIG also partners with the Consortium for Worker
Education (CWE), a non-profit agency providing training, education and employment services to people from
disadvantaged communities. CWE program provides training and placement in construction trade unions to over 75,000
workers per year. BIG helps CWE provide hands-on education.
Wisconsin
Wisconsin’s Construction/Deconstruction Training Program is a 12-week Pre-Apprenticeship Certificate Training (PACT)
program where participants receive multiple certifications, including Lead Safe Renovator, OSHA 10, OSHA Focus Four
and Asbestos Supervisor. The project is a partnership between the Wisconsin Community Services Workforce
Development Division and the Home Builders Institute. It is aimed at providing economically disadvantaged individuals
with hands-on training and job placement to create long-term employment in the home building, construction and
deconstruction industries. The goal of the funding for the program is to reduce poverty, revitalize low-income
communities and empower low-income individuals and families to become self-sufficient. 22
Connecticut – Hartford & New Haven
Public Works Technical Bulleting 200-1-45. 2007. Deconstruction of WWII-Era Wood Framed Buildings. Accessed October 26, 2011
from www.wbdg.org/ccb/ARMYCOE/PWTB/pwtb_200_1_45.pdf
20
21
The ReUse People. No Date. Deconstruction Training: About The ReUse Institute. Accessed October 24, 2011 from
http://deconstructiontraining.org/node/1
22
National Association of Home Builders. 2010. Nation’s Building News: Home Builders Institute. Wisconsin
Construction/Deconstruction Training Program Graduates 14. Accessed October 26, 2011 from
http://www.nbnnews.com/NBN/issues/2010-07-12/Home+Builders+Institute/index.html
Prepared for Metro Vancouver by Kane Consulting, LOCO BC, Restraint Consulting, and Urban Fabric
February 2012
Market Analysis of Used Building Materials in Metro Vancouver
61
The Hartford Housing Authority (HHA) initiated a pilot project to deconstruct six public housing units. As part of the
development proposals, HHA required the contractor to organize a deconstruction-training program for the public
housing residents. The HHA developed a request for proposal to target developers and contractors that had experience
with materials recovery and were willing to participate in training the public housing residents. 23 The project trained
nine public housing residents, and diverted more than 50% of all materials (40% through salvage and 10% through
recycling). As a follow-up to the project, the Housing Authority established a joint venture company owned by the
workers, the Housing Authority and a private demolition and construction firm. 24
The City of New Haven has taken an innovative approach to promoting deconstruction and used building materials
recovery. The City is promoting deconstruction job training to promote business expansion, job growth and capacity
building. This project is the result of a collaborative effort between the New Haven Small Construction Business
Development within the Office of Economic Development, New Haven Regional Contractors’ Alliance, Work Force
Alliance and the Northeast Recycling Council. Funding for the project is provided by Work Force Alliance through the
American Recovery and Reinvestment Act, with deconstruction training provided by ReUse People. The program is
innovative because it teaches green contractor skills to existing contractors to develop and strengthen business, and
makes at least 50 percent of the materials from deconstructed buildings available for reuse. 25
Dayton, Ohio
Ohio’s Pathways Out of Poverty Project recruits, screens and provides 5 weeks of training disadvantaged individuals to
earn jobs in deconstruction, green construction/remodelling and building performance. Participants must live in a highpoverty zip code and either be unemployed, have no or very low income, be an ex-offender or be without a high school
diploma. Special effort is made to recruit veterans who fit the criteria. The project deconstructs abandoned buildings,
sells materials at a local used material supply stores, thrift stores, or into other markets as far away as LA and Japan. As
of September 23, 2011, 173 disadvantaged individuals had completed the training. They are assisted in finding
employment in green construction and deconstruction trades. Despite a difficult job market, 91 participants have
entered the workforce, despite 78% having some type of criminal background. Of the 91 who entered employment, 71
are currently working. 26 The Pathways program ends in January 2012. Partners are currently seeking funding to
continue recruitment, screening and training. The DWP deconstruction project has enough work to continue for the next
two years, guaranteeing jobs and a supply of reclaimed materials for that period.
Chicago, Illinois
Chicago has partnered with non-profit groups Breaking Ground and the Safer Foundation on a $4.6 million 2-year
program to provide deconstruction job training and temporary jobs for 140 of the formerly incarcerated. The City
believes it is the largest deconstruction program in the nation, working to build the deconstruction market in the
Chicago area. The program deconstructs city-owned buildings, salvaging materials for re-use. The program not only
provides income and job training and attempts to foster the deconstruction industry to Chicago. The Boeing Company
provided a two-year grant to the Chicago Workforce Investment Council for advice from a leading deconstruction expert
on designing the program and building a future market for deconstruction. 27 A recent report projecting Chicago’s green
23
Jacoby, Ryan Michael. 2001. THESIS ABSTRACT. Deconstruction: A Tool for Reform as the Construction and Demolition Industry
Moves Toward Sustainability. Accessed October 24, 2011 from http://www.p2pays.org/ref/03/02282.pdf
24
Ibid.
25
Appel, Allan. 2010. New Haven Independent. Green Demolition Underway. Accessed October 24, 2011 from
http://www.newhavenindependent.org/index.php/archives/entry/green_demolition_breaks_ground_in_new_haven/
26
Miami Valley Regional Planning Commission. No date. Pathways Green Jobs Training Grant. Accessed October 24, 2011 from
http://www.mvrpc.org/projects/pathways/pathways-green-jobs-training-grant
27
City of Chicago. 2010. Accessed October 24, 2011 from
http://www.cityofchicago.org/city/en/depts/mayor/press_room/press_releases/2010/march_2010/0311_ex_offenders.html
Prepared for Metro Vancouver by Kane Consulting, LOCO BC, Restraint Consulting, and Urban Fabric
February 2012
Market Analysis of Used Building Materials in Metro Vancouver
62
jobs development to 2015 expects that 33 jobs will be created in deconstruction (hybrid) and 84 jobs in deconstruction
(manual), along with an additional 178 jobs in C&D Recycling.
Kansas City, Missouri
A Kansas City program uses both training and procurement to build the deconstruction industry. It trained fourteen
individuals in the first stage of an 18-month program funded by the ARRA. The program provides deconstruction training
to workers who will then work to eliminate blighted buildings. The project has several partners: Energy Works KC, MidAmerica Regional Council (MARC), The Office of the City Manager, The Department of Dangerous Buildings, Ivanhoe
Community Center, The Full Employment Council (FEC), Habitat for Humanity Kansas City and The Reuse People.
The program further builds the industry by providing training for contractors interested in bidding to deconstruct
blighted buildings. Potential contractors are required to attend a two-day deconstruction workshop by The ReUse
People. They are toured through potential deconstruction sites, and are coached in estimating material reuse and
bidding techniques. In order to support the jobs training program, successful contractors are required to hire at least
two graduates from the worker-training program. 28
28
The ReUse People. 2011. Intelligent Use of Tax Dollars. Accessed November 25, 2011 from
http://thereusepeople.org/content/intelligent-expenditure-tax-dollars
Prepared for Metro Vancouver by Kane Consulting, LOCO BC, Restraint Consulting, and Urban Fabric
February 2012
Market Analysis of Used Building Materials in Metro Vancouver
63
VI. Recommendations
Recommendations for Immediate Action
Creating Opportunities for Improved Diversion
1. Stimulate deconstruction through by-law and permit incentives (Section IV-H).
2. Provide deconstruction training (Section IV-C).
3. Establish and promote targets for improved diversion within each level of the 5Rs hierarchy (Section IV-D).
4. Research opportunities for tax incentives (Section IV-A)
Strengthening Distribution
5. Establish more distributed drop-off locations for all C&D waste stream materials (Section IV-F).
Supporting the Market
6. Establish purchasing policies that give preference to products from the C&D waste stream, and encourage other
institutions and levels of government to do the same (Section IV-A).
Other
7. Collect permit, construction value, and square footage data from each municipality, from this point on, in order to
estimate C&D waste generation (Section I-A).
Recommendations for Medium-Term Action
Creating Opportunities for Improved Diversion
1. Partner with professional organizations to create education programs about designing buildings for minimal waste,
long-term versatility, and deconstruction (Section IV-I).
2. Implement regulations and incentives to maintain the existing building stock (Section IV-J).
Strengthening Distribution
3. Establish a central non-profit facility (or facilities), focused on used building material and wood, but capable of
receiving all C&D materials, and organized as a hub in support of entrepreneurial activity (Section IV-F).
Supporting the Market
4. Support entrepreneurial and manufacturing initiatives (Section IV-B)
Other
5. Collect data from C&D reuse and recycling facilities to inform progress toward targets within 5Rs hierarchy (Section
IV-D.)
Prepared for Metro Vancouver by Kane Consulting, LOCO BC, Restraint Consulting, and Urban Fabric
February 2012
Market Analysis of Used Building Materials in Metro Vancouver
64
References
3R Demolition. 2004. “Summary of Deconstruction/Demolition Project.”
Bradley, Guy, M.E. Rinker, Sr., and Eleanor M. Gibeau. 2003. A Guide to Deconstruction. Gainesville, FL: Deconstruction
Institute.
Burgoyne, Dan. Undated. Construction & Demolition (C&D) Waste Diversion in California. West Sacramento: California
Department of General Services.
California Environmental Protection Agency. 2001. Deconstruction Training Manual: Waste Management Reuse and
Recycling at Mather Field. Sacramento: Integrated Waste Management Board.
Chini, Abdol R., and Stuart F. Bruening. 2003. “Deconstruction and Materials Reuse in the United States.” In The Future
of Sustainable Construction - 2003. (14 May).
City of Anitoch. 2004. “Standardized Generation Rates.” Anitoch, California.
City of Vancouver. 2011. “Deconstruction,” Planning - By-law Administration Bulletins, Effective October 4.
Cosper, Stephen D., William H. Hallenbeck, and Gary R. Brenniman. 1993. Construction and Demolition Waste:
Generation, Regulation, Practices, Processing, and Policies. Chicago: University of Illinois and Chicago.
Cunningham Environmental Consulting, et al. 1997. Construction, Demolition and Landclearing Debris Waste
Composition Study: Final Report, prepared for Seattle Public Utilities. Seattle: Seattle Public Utilities (September).
Deconstruction/Demolition Planning Committee. 2000. Proceedings: Regional Symposium – From Demolition to
Deconstruction (May 3, 1999). Burnaby: Greater Vancouver Regional District.
Fisher, Henry. 2008. 2008 Metro Area Construction and Demolition Waste Recycling Report. Saint Paul, MN: Minnesota
Pollution Control Agency.
Franklin Associates. 1998. Characterization of Building-Related Construction and Demolition Debris in the United States.
Prepared for the U.S Environmental Protection Agency, Municipal and Industrial Solid Waste Division, Office of
Solid Waste (Report No. EPA530-R-98-010).
Freeman, Del. 1994. “The Deconstruction of C&D Waste: Nailing Down the Numbers.” Waste Age (June 1): 36-38.
Gordon, Susie, Chris Jennings, and Henry Jeanes. 2003. “Capturing Wood from Construction Stream.” In BioCycle (Aug):
51-53.
Griggs, Julian and Kathy Grant. 1998. Summary Report: Demolition Materials Diversion Symposium. Prepared for DMDS
Steering Committee. Vancouver: Dovetail Consulting.
Kernan, Paul, and Mark Kerschbaumer. 2003. Construction and Demolition Waste Management Study. Squamish-Lillooet
Regional District.
Kucheran, Julianne. 2011. Envisioning Pacific Community Resources as a Deconstruction Social Enterprise. Vancouver:
Pacific Community Resources.
Marshall & Swift. 2011. Residential Cost Handbook. Los Angeles: Marshall & Swift.
Melnychuk, Phil. 2011. “Stepping Up Construction Cleanup.” Maple Ridge News (Nov 4).
Metro Vancouver. 1999. “Demolition & Salvage Facts.” Burnaby: Greater Vancouver Regional District.
Metro Vancouver. 1999a. “Job Site Recycling Facts.” Burnaby: Greater Vancouver Regional District.
Metro Vancouver. 2007. “2006 Census Bulletin #1: Population and Dwelling Counts.” Burnaby: Metro Vancouver.
Prepared for Metro Vancouver by Kane Consulting, LOCO BC, Restraint Consulting, and Urban Fabric
February 2012
Market Analysis of Used Building Materials in Metro Vancouver
65
Metro Vancouver. 2010. Integrated Solid Waste and Resource Management. Burnaby: Metro Vancouver.
Metro Vancouver. 2010a. 2040 Shaping our Future - Regional Growth Strategy. Bylaw No. 1136.
Metro Vancouver . 2011. “Metro Vancouver Total Building Permits” from Statistics Canada, Produced by BC Stats.
Metro Vancouver. 2011a. Metro Vancouver Housing Data Book. Burnaby: Metro Vancouver.
Morris, Jeffrey. 2009. Environmental Life Cycle Assessment of Waste Management Strategies with a Zero Waste
Objective. Prepared for Belkorp Environmental Services. Olympia, WA: Sound Resource Management Group, Inc.
NAHB Research Center. 2001. Report on the Feasibility of Deconstruction: An Investigation of Deconstruction Activity in
Four Cities. Prepared for Office of Policy Development and Research. Washington: U.S. Department of Housing
and Urban Development.
Natural Resources Canada. 2002. Survey 2000: Commercial and Institutional Building Energy Use – Detailed Statistical
Report. Ottawa: Energy Publications, Office of Energy Efficiency, Natural Resources Canada.
Natural Resources Canada. 2003. 2003 Survey of Household Energy Use (SHEU) – Summary Report.
Natural Resources Canada. 2010. 2007 Survey of Household Energy Use – Summary Report. Ottawa: Natural Resources
Canada’s Office of Energy Efficiency.
Prism Economics & Analysis. 2010. Underground Economy in Construction – It Costs Us All. Prepared for the Ontario
Construction Secretariat. Etobicoke: Ontario Construction Secretariat.
Penney, S., et al. 2009. Wood Waste Management Capacity Study. Prepared for Metro Vancouver. Mission: Promise
Consulting.
Reid, Roisin and Lorne Johnson. 2009. Wood Waste Symposium: Summary of Presenter and Break-Out Group Feedback.
Prepared for Metro Vancouver. Ottawa: The Boxfish Group.
Santa Monica Office of Sustainability and the Environment. 2010. “Appendix A: Materials: Waste Generation Rates”
[http://www.smgov.net/Departments/OSE/Categories/Green_Building/Guidelines/Appendices/Waste_Generatio
n_Rates.aspx].
Shaurette, Mark. 2005. “Demolition Contractors’ Perceptions of Impediments to Salvage and Reuse of Wood Structural
Components.” In Journal of Green Building 1, no. 2 (Jan 19): 145-163.
Statistics Canada. 1995. “The Size of the Underground Economy in Canada.” Statistics Canada – Cat.No. 13-603E, No.2.
Statistics Canada. 2006. “Structural Type of Dwelling and Housing Tenure and Presence of Mortgage for the Occupied
Non-farm, Non-reserve Private Dwellings of Canada, Provinces, Territories, Census Metropolitan Areas and Census
Agglomerations, 2006 Census (Geography=Vancouver).”
Temreck, Scott. 2011. “Urban Wood Waste,” Metro Vancouver Sustainable Region TV, episode 35.
United States Environmental Protection Agency (USEPA). 2003. Estimating 2003 Building-Related Construction and
Demolition Materials Amounts.
Walker, Maura H., et al. 2005. DLC Waste Composition Study of the Ecowaste and Vancouver Landfills (prepared for
Greater Vancouver Regional District). Burnaby: Garner Lee Limited.
Weber, Rachel, Susan Kaplan, and Hannah Sokol. 2009. Market Analysis of Construction and Demolition Material Reuse
in the Chicago Region. Chicago: University of Illinois (commissioned by the Delta Institute).
Prepared for Metro Vancouver by Kane Consulting, LOCO BC, Restraint Consulting, and Urban Fabric
February 2012
Market Analysis of Used Building Materials in Metro Vancouver
66
Appendices
Prepared for Metro Vancouver by Kane Consulting, LOCO BC, Restraint Consulting, and Urban Fabric
February 2012
Market Analysis of Used Building Materials in Metropolitan Vancouver
67
Appendix I – Detailed Results and Projections
Prepared for Metro Vancouver by Kane Consulting, LOCO BC, Restraint Consulting, and Urban Fabric
February 2012
Market Analysis of Used Building Materials in Metropolitan Vancouver
Prepared for Metro Vancouver by Kane Consulting, LOCO BC, Restraint Consulting, and Urban Fabric
68
February 2012
Market Analysis of Used Building Materials in Metropolitan Vancouver
Prepared for Metro Vancouver by Kane Consulting, LOCO BC, Restraint Consulting, and Urban Fabric
69
February 2012
Market Analysis of Used Building Materials in Metropolitan Vancouver
Prepared for Metro Vancouver by Kane Consulting, LOCO BC, Restraint Consulting, and Urban Fabric
70
February 2012
Market Analysis of Used Building Materials in Metropolitan Vancouver
Prepared for Metro Vancouver by Kane Consulting, LOCO BC, Restraint Consulting, and Urban Fabric
71
February 2012
Market Analysis of Used Building Materials in Metropolitan Vancouver
72
Appendix II – Population Projections
Population projections are from Metro Vancouver’s Regional Growth Strategy (Metro Vancouver 2010a). Bowen Island and University Endowment Lands
are not included in the Regional Growth Strategy so the Metro Vancouver average was used.
Municipality
Anmore
Belcarra
Burnaby
Coquitlam
Delta
Electoral Area A
Langley City
Langley Township
Lions Bay
Maple Ridge
New Westminster
North Vancouver City
North Vancouver District
Pitt Meadows
Port Coquitlam
Port Moody
Richmond
Surrey
Tsawwassen
Vancouver
West Vancouver
White Rock
Metro Vancouver Total
2006
1,900
700
210,500
119,600
99,000
11,600
24,900
97,300
1,400
71,500
60,500
47,500
87,000
1,600
54,500
28,700
182,700
413,000
800
601,200
45,400
18,900
2,195,000
Population
2021
2031
2,800
3,600
800
900
277,000
314,000
176,000
213,000
109,000
118,000
24,000
29,000
32,000
35,000
146,000
188,000
1,600
1,900
95,000
113,000
80,000
92,000
56,000
62,000
98,000
105,000
22,000
23,000
68,000
76,000
39,000
44,000
225,000
252,000
578,000
668,000
4,000
6,000
673,000
705,000
51,000
56,000
23,000
25,000
2,780,000
3,129,000
2041
4,400
1,000
345,000
224,000
123,000
30,000
38,000
211,100
2,000
132,000
102,000
68,000
114,000
24,000
85,000
50,000
275,000
740,000
8,500
740,000
60,000
27,000
3,400,000
Prepared for Metro Vancouver by Kane Consulting, LOCO BC, Restraint Consulting, and Urban Fabric
Annual Growth Rate
2006 -2021
2.81%
0.96%
1.98%
2.80%
0.69%
5.33%
1.81%
2.94%
0.96%
2.05%
2.02%
1.18%
0.85%
20.59%
1.59%
2.21%
1.50%
2.43%
12.18%
0.81%
0.83%
1.41%
1.70%
February 2012
Total Growth Rate
2021-2031
2031-2041
28.57%
22.22%
12.50%
11.11%
13.36%
9.87%
21.02%
5.16%
8.26%
4.24%
20.83%
3.45%
9.38%
8.57%
28.77%
12.29%
18.75%
5.26%
18.95%
16.81%
15.00%
10.87%
10.71%
9.68%
7.14%
8.57%
4.55%
4.35%
11.76%
11.84%
12.82%
13.64%
12.00%
9.13%
15.57%
10.78%
50.00%
41.67%
4.75%
4.96%
9.80%
7.14%
8.70%
8.00%
12.55%
8.66%
Market Analysis of Used Building Materials in Metropolitan Vancouver
73
Appendix III – Material Specific Barriers to Reuse
In addition to the thematic and specific barriers to improving diversion outlined in Section III, are the following materialspecific barriers to reuse.
Flooring – Wood
• May be too thin due to numerous sandings and re-finishings
• May be brittle and splinter upon removal
Flooring – Other Materials
• Tile and laminate may be held in place with strong adhesives that lead to breaking of material upon removal
Roof Trusses
• Trusses are typically designed for a specific usage and are not always reusable in any application, requiring a
building to be designed with the trusses in mind. This is mostly applicable to unique, high-value trusses in
boutique, visible applications
• Existing trusses may not meet code requirements, and their reuse may require the approval of an engineer
Bricks
• Bricks are often damaged during deconstruction, and it is difficult to know the service life of brick that has been
exposed to the elements
• May have only non-structural applications (interior material for its decorative value or as a landscaping
material), rather than as a structural material
Electrical fixtures
• Code changes not permit the use of older fixtures in construction where a permit is required, and electrical
fixtures often have value only through the recycling of metals
Plumbing fixtures
• While heritage-value fixtures (claw-foot tubs, character sinks) are strong candidates for reuse, most other
fixtures do not meet current requirements for water use and run contrary to sustainability objectives related to
water conservation. High-volume toilets in particular have a weak market for reuse
Windows
• Many windows are difficult to reuse because they no longer provide desirable energy efficiency of new
windows, but could be used in unheated spaces including sheds and auxiliary buildings
Prepared for Metro Vancouver by Kane Consulting, LOCO BC, Restraint Consulting, and Urban Fabric
February 2012
Market Analysis of Used Building Materials in Metropolitan Vancouver
74
Appendix IV – Interviews Conducted
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
Stefan Aepli, Walter Francl Architecture
Glenn Alexander, Absolute Demolition & Renovations
Richard Babcock, Urban Wood Waste
Ron Bates, Tham Demolition
Ralph Belisle, T.Q. Construction
Dave Bennink, Reuse Consulting
Garrett Buckingham, Wood Knot, Waste Knot
Robert Capar, Maison D’etre
Dwayne Doornbosch, Bird Construction
Jay Drew, United Lock-Block Ltd.
Michael Driedger, Perkins + Will
Shane Endicott, The Rebuilding Center
Don Fenby, Richter Nine Construction
Corinne Fulton, 3R Demolition
Kevin Hanvey, Omicron
Susan Hildebrand, Scott Construction
Mike Holloway, Assertive Excavating and Demolition
Shawn Hull, Red House Construction
Brent Mann, NSD Disposal Ltd.
Pete McGee, Greenworks
Murray McKinnon, Ledcor Construction
Jim McQuade, Massachusetts Department of Environment
Dave Pearson, Jack’s New & Used
Ted Reiff, The Reuse People
Tom Riessner, Restore
Kim Rishel, Ellis Don Construction
Amika Scott, Western Reclaimed Timber
Todd Senft, reVISION Custom Home Renovations
Peter Simpson, Greater Vancouver Home Builders Association
Hannah Sokol, University of Chicago
Diane Switzer, Vancouver Heritage Foundation
Tom Tanton, Performance Builders
Tyler, RichVan Holdings Ltd.
Mat Turner, Lanefab Homes
Kevin Urbas, GBL Architects
Wade, Surrey New & Used
Prepared for Metro Vancouver by Kane Consulting, LOCO BC, Restraint Consulting, and Urban Fabric
February 2012
Market Analysis of Used Building Materials in Metropolitan Vancouver
75
Appendix V – Material Categories & Waste Generation Composition Studies
The material categories utilized in Section I of this report were taken from Franklin Associates (1998), which in turn
utilized a waste stream composition study completed by Cunningham Environmental Consulting for the City of Seattle
(Cunningham 1997). The material categories are detailed below:
Glass
• Containers and bottles
• Window glass
• Mirror glass
• Other glass
Hazardous Waste
• Used oil
• Vehicle batteries
• Household batteries
• Latex paint
• Wood preservatives
• Varnishes and finishes
• Solvents/thinners
• Adhesives/glues
• Cleaners and corrosives
• Pesticides/herbicides
• Gas/fuel oil
• Antifreeze
• Medical waste
• Asbestos
• Other hazardous
Metals
• Aluminum cans
• Other aluminum
• Tinned food cans
• Other ferrous
• Galvanized steel
• Other tinned cans
• Other nonferrous
• Mixed metals
• Insulated wire/cable
• Electric motors
• Aerosol cans
• CFC compressors
Mineral Aggregates
• Asphaltic concrete
• Built-up roofing
• Shingles
• Tarpaper/felt
• Concrete with rebar
• Concrete without rebar
• Bricks
Prepared for Metro Vancouver by Kane Consulting, LOCO BC, Restraint Consulting, and Urban Fabric
February 2012
Market Analysis of Used Building Materials in Metropolitan Vancouver
76
• CMU
• Masonry tile
• Mortar
• Plaster
• Clay roofing tile
• Slate/quarry tile
• Mineral wool
• Fiberglass insulation
• New gypsum scrap
• Mixed/demo gypsum scrap
Other Materials
• Ashes
• Non-distinct fines
• Sand
• Topsoil
• Gravel
• Furniture/mattresses
• Small appliances
• Large appliances
• Ceramic tile
• Kitchen ware
• Porcelain
• Miscellaneous inorganics
Other Organics
• Food wastes
• Textiles/clothes
• Carpet
• Upholstery
• Textile related products
• Disposable diapers
• Rubber products
• Tires
• Animal carcasses
• Animal feces
• Wax
• Miscellaneous organics
Plastics
• PET #1 bottles
• HDPE #2 bottles
• 5 gallon #2 with handles
• 5 gallon #2 without handles
• Other containers
• Polystyrene foam
• Polystyrene insulation
• Film and bags
• Other packaging
• PVC pipe
Prepared for Metro Vancouver by Kane Consulting, LOCO BC, Restraint Consulting, and Urban Fabric
February 2012
Market Analysis of Used Building Materials in Metropolitan Vancouver
77
• ABS pipe
• Polyurethane foam
• Thermoset products
• Other plastic materials
• Laminate/Formica
• Fiberglass ceiling panels
• Structural fiberglass
• Linoleum
Wood Waste
• New lumber
• New panel board
• Demolition lumber
• Demolition panel board
• Remanufactured scrap
• Creosote wood
• Pressure-treated wood
• Painted/stained wood
• Contaminated demolition wood
• Other wood materials
• Wood roofing and siding
• Unfinished furnishings
• Finished furnishings
• Pallets and crates
• Sawdust
• Other wood
The Cunningham (1997) study was based on the following number of waste audits in Seattle, Washington:
•
•
•
•
•
•
New Construction, Residential: 14
New Construction, Commercial/Institutional: 28
Remodelling, Residential: 48
Remodelling, Commercial/Institutional: 35
Demolition, Residential: 25
Demolition, Commercial/Institutional: 59
Prepared for Metro Vancouver by Kane Consulting, LOCO BC, Restraint Consulting, and Urban Fabric
February 2012
Download