NORTHROP GRUMMAN Marine Systems 401 E. Hendy Avenue P.O. BOX 3499 Sunnyvale, Ca. 94088-3499 Quality Assurance Specification QSR-1 Rev. A Quality System Requirements Release Date: March 1996 Approved: __Signature on File__________ D. L. Airola, Manager Product Quality Engineering _____________ Date QSR-1 Rev. A March 1996 Page 1 of 3 1.0 Scope This document establishes the minimum requirements for a supplier’s quality system. It identifies the elements of a system to be established and maintained by the supplier to substantiate product conformance to Northrop Grumman purchase order requirements and applies to all materials and services when referenced in a purchase order. 2.0 Quality System Requirements: 2.1 Documented Procedures: The supplier shall establish and maintain procedures that define how each of the following sections are to be controlled. The forms used must be referenced in the procedures and a copy included where possible. The Suppliers Quality System shall be available for review by Northrop Grumman and the Government. 2.2 Contract Review and Control: The supplier shall establish and maintain a method for reviewing and controlling a Northrop Grumman purchase order (P.O.). This system must include: 2.2.1 Who receives P.O. 2.2.2 How and who reviews the P.O. requirements and converts it to a document that will be used by Production and Inspection. 2.3 Manufacturing and Inspection Documentation: The supplier shall use a document (herein called a Traveler) that identifies and controls the manufacturing and inspection operations of Northrop Grumman products. This traveler will be the primary document that provides objective evidence and traceability that manufacturing and inspection operations have been completed per Northrop Grumman P.O. requirements. This traveler must include and/or make reference to the following: 2.3.1 Applicable drawings and/or specifications/standards. 2.3.2 Traceable to the Northrop Grumman Purchase Order Number, Part Number, and Revision Level. 2.3.3 Manufacturing Instruction. (Shall be left to the supplier to determine manufacturing sequence and detail necessary to product to P.O. requirements.) QSR-1 Rev. A March 1996 Page 2 of 3 2.3.4 Inspection points: When Northrop Grumman hold points or Government hold points are specified by P.O. requirements, provisions on the traveler must reflect these requirements. Final inspection per P.O. requirements is mandatory for all Northrop Grumman products. 2.3.5 The manufacturer must be able to provide objective evidence of satisfactory completion of each inspection/manufacturing step performed. Verification of inspection or manufacturing shall be denoted by a signature or stamp and date. 2.4 Records: The supplier shall maintain records of Northrop Grumman Purchase Order documentation, manufacturing and inspection travelers, certifications and other records required to produce Northrop Grumman products for a minimum of seven (7) years or as specified by P.O. requirements. These records shall be made available to Northrop Grumman or to the Government on request. 2.5 Receiving Inspection: 2.5.1 All materials procured to produce Northrop Grumman products must be inspected to Northrop Grumman P.O. requirements. Verification of inspection shall be denoted by a signature or stamp and date. 2.5.2 Product or services performed outside (e.g., nondestructive testing, heat treating, chemical and physical testing, machining, fabrication, etc.) must be inspected and/or verified to Northrop Grumman requirements. There must be objective evidence documenting the acceptance of the product or service procured. The applicable certification of conformance for test and/or special processes must also indicate acceptance evidence. 2.6 Nonconforming Material: (Any item not meeting Northrop Grumman design requirements). All nonconforming material must be immediately identified and removed from the manufacturing flow. Reference to the nonconformance shall be documented on the traveler. The supplier has the following options with the nonconforming material: QSR-1 Rev. A March 1996 Page 3 of 3 2.6.1 Scrap. 2.6.2 Rework to Purchase Order specifications - reinspection of the rework must be documented with a signature or inspection stamp and date. 2.6.3 For rejects other than scrap or rework, record the nonconformance on a “Northrop Grumman Supplier Nonconformance Report” (SNR) and forward to the Northrop Grumman Purchasing Buyer form formal disposition. 2.7 Measuring and Test Equipment: The supplier must have the capability and equipment available to inspect or test what he produces to Northrop Grumman P.O. requirements. If the supplier does not have the capability to test or inspect the product to Northrop Grumman Purchase Order requirements, outside sources may be utilized, provided that Para. 2.4 and 2.5 are adhered to. 2.8 Calibration: The supplier shall establish and maintain a system insuring that all gages, measuring devices, and test equipment used for product acceptance are calibrated at specified intervals against certified standards which have known valid relationships to those of the National Institute of Standards Technology (NIST). The calibration status of calibrated measuring tools and test equipment shall be indicated by labels or some other suitable means. A method shall be established for monitoring the equipment to assure adherence to calibration schedules. The calibration status shall indicate the date of last calibration, by whom calibrated and when the next calibration is due. 2.9 Northrop Grumman Furnished Material: The supplier shall identify and examine all Northrop Grumman furnished material upon receipt. Any material found damaged, malfunctioning or otherwise unsuitable for use must be documented on the Northrop Grumman SNR and Northrop Grumman notified. 2.10 Sampling Inspection: All critical, major, and selected minor characteristics must be 100% inspected by the supplier. The remainder of minor characteristics may be sample inspected. Sampling inspection procedures used by the supplier to accept minor characteristics shall be from MIL-STD-105D, General Inspection Level II, single normal plan, 1.0 AQL. Other sampling plans are permissible upon Northrop Grumman approval.