Recessed: G = gyp ceiling / RG = regressed gyp ceiling Installation Drawing Applicable luminaires: ACL5 | D5 | D7 | E5 | G5 A 2 GYP BLOCKING B 1. For cutout length, consult sizing chart (page 2) and/or submittal drawings. 1. Remove the lens or louver. 2. Wood or steel studs may be used. 1 • Apply suction cup (provided) to one end and carefully pull lens out. 3. Install gyp board, then cut opening. 1 3 4. Cut-out widths: ROUGH OPENING 4 Blocking as seen from above • Louvers should be carefully removed by hand. 2 Series Min Max ACL: 2.45” 2.70” D: 3.75” 4.00” E: 2.20” 2.45” G: 5.25” 5.50” 2. Remove reflectors and LED gear tray or ballast kits by unfastening hardware. D ck ing C 1. Lift fixture into place and draw flange up snuggly under bottom of gyp board. 2. Connect wiring between housings using the provided quick connects. ck Blo Gypsum 1 NOTE: A perture size must be maintained (do not stretch side flanges). 4. Secure extrusions with joiner brackets using a threaded rod or bolt with flange nuts (provided). 3 3. Attach fixture to blocking (through gyp) with #8 drywall screws in the pre-drilled holes in side flanges. Fixture must be fastened to blocking through holes at a minimum of every 8” or less. 4. Attach tie-off cables (by others) to fixture endcap holes and to structure as per code. 3. Line up pins and bang extrusion pieces together using a mallet until no gap remains. 4 1 ing 1. When rows are ordered: row sections will be labeled in sequence. Position sections in proper order prior to installation. (ie: Place 1 next to 1). 2 2. Wire fixture through KO hole per local codes. Blo Rows: FLANGES SHOULD BE BENEATH WALL/CEILING SURFACE E 1. Mud over side and end flanges to edge of fixture. Finish should just cover bottom extrusion edge so it is not seen. 2 1 MUD Blocking 2. Tape off and paint wall/ ceiling up to and including extrusion edge. 3. Install LED or fluorescent gear tray and reflectors. Install lamps in fluorescent fixtures (by others.) 4. Insert lens or louver. Lens may have optical inserts. 3 Gypsum 4 ATTENTION: *CONSULT LOCAL BUILDING CODE AUTHORITIES FOR INSTALLATION REQUIREMENTS AND APPROVALS. *WARNING: RISK OF FIRE AND ELECTRICAL SHOCK. FIXTURE INSTALLATION REQUIRES KNOWLEDGE OF FLUORESCENT LIGHTING ELECTRICAL SYSTEMS. IF NOT QUALIFIED, DO NOT ATTEMPT INSTALLATION. CONTACT A QUALIFIED ELECTRICIAN. *WARNING: RISK OF FIRE AND ELECTRICAL SHOCK. FIXTURE BALLAST WIRE, OR OTHER ELECTRICAL COMPONENTS MAY BE DAMAGED WHEN DRILLING FOR INSTALLATION OF FIXTURE TO WALL OR CEILING. CHECK FOR ENCLOSED WIRE AND COMPONENTS. *WARNING: TO PREVENT WIRE DAMAGE OR ABRASION, DO NOT EXPOSE WIRES TO EDGES OF SHEET METAL OR OTHER SHARP OBJECT. DO NOT MAKE OR ALTER ANY OPEN HOLES IN AN ENCLOSURE OF WIRE OR ELECTRIC COMPONENT DURING FIXTURE INSTALLATION. LED D5 fixture shown 3728 mari time way oceans ide , ca 9205 6 p. 760.727.7675 a·light | © Nov 2014 Recessed: G = gyp ceiling / RG = regressed gyp ceiling Applicable luminaires: Installation Drawing ACL5 | D5 | D7 | E5 | G5 | G6 Notes Applicable Luminaires * Always consult submittal drawings (if applicable) for run length cutouts as special lengths may have been ordered. G gyp RG regressed gyp ACL5 ACL5 D5 D5 * When ordering, note the difference between aperture length and cut-out length in areas with tight architectural constraints. * For staggered lamping, note that almost any target length is possible by varying stagger length and lamp size, so consult factory for special sizes. * IMPORTANT: Aperture size MUST be maintained. Do not stretch Sizing Chart for Cutout Lengths n/a D7 a·light reserves the right to make improvements E5 E5 G5 G5 G6 G6 w w w. a l i g h t s . c o m