Contech

advertisement
CON-TECH PVT. LTD.
CLASS "A" CONTRACTOR
COMPANY PROFILE
FOR
CONSTRUCTION WORKS
SUBMITTED BY:
Con- Tech Pvt. Ltd.
Class "A " Contractor for all Civil Work
sg–6]s k|f=ln=
Address : GPO Box 3167, Tinkune, Kathmandu, Nepal.
Tel.: 01- 4112435/38
Fax: 977-1-4112437
Email : khanal@contech.com.np
1.
Individual Bidders or Individual Members of Joint Venture
-CON-TECH PVT. LTD.
1.1
Constitution or legal status of Bidder
Place of Registration
:
HMG/N, MINISTRY OF INDUSTRY
DEPARTMENT OF INDUSTRY
TRIPURESHWOR, KATHMANDU.
PVT. LTD. NO. 1701/050/51
MINISTRY OF WORK & TRANSPORT
CONTRACTOR CLASSIFICATION SECTION
BABARMAHAL, KATHMANDU
LICENSE . NO. 3280/054/6/15
MINISTRY OF FINANCE
INLAND REVENUE OFFICE
BABARMAHAL, KATHMANDU
PAN NO. : 300064414
Principal place of business :
TINKUNE, SUVIDHANAGAR,
KATHMANDU, NEPAL.
Power of attorney of signatory of Bid:
ATTACHED
Enclosure:
1.
Attested copies of HMG Registration Certificates i.e. PAN, License, Industry
Registration Certificates Tax Clearance etc.
Name of Applicant
: CON-TECH Pvt. Ltd.
Tinkune, Suvidhanagar
Kathmandu, Nepal
1.2 Total annual volume of construction work performed in last Ten Years.
Annual Turnover Data for the Last 10 Years (Construction only)
Year
National Urban
Consumer Price
Index Base Year
(2005/6=100)
Turnover Amount
(NRs.)
Present Price Index is Taken Month of
Nov. F.Y. 2012/ 2013 ( 069/70 )
2068/069
( 2011/2012)
2067/068
( 2010/2011)
2065/066
( 2008/2009)
2064/065
( 2007/2008)
2063/064
( 2006/2007 )
2062/063
( 2005/2006)
2061/062
(2004/2005)
2060/061
(2003/2004)
2059/060
(2002/2003)
Total:-
Present Turnover with
respect to current index and
corresponding index of the
fiscal year (NRs.)
Reference to
supporting document
180.50
33,952,025.46
165.40
9.13
37,051,636.01
120,958,017.75
152.60
18.28
143,072,884.69
81,149,634.86
139.40
29.48
105,075,388.04
57,984,211.04
127.20
41.90
82,281,054.19
130,897,885.80
113.00
59.73
209,089,100.77
111,844,417.54
105.90
70.44
190,631,892.03
111,758,636.19
100.00
80.50
201,724,338.32
38,992,234.89
92.60
94.92
76,005,382.26
78,971,622.46
88.60
103.72
160,884,625.89
61,774,047.77
85.20
111.85
130,871,075.38
As per attached Audited balance sheet
2066/067
( 2009/2010)
Increasing %
of Index for
Present Value
969,206,414.66
706,366,245.22
Best 3 Years over the last Ten years:
Year
2063/064
( 2006/2007 )
2062/063
( 2005/2006)
Total of best
three years
National Urban
Consumer Price
Index Base Year
(2005/6=100)
Increasing %
of Index for
Present Value
Present Turnover with
respect to current index and
corresponding index of the
fiscal year (NRs.)
130,897,885.80
113.00
59.73
209,089,100.77
111,844,417.54
105.90
70.44
190,631,892.03
111,758,636.19
100.00
80.50
201,724,338.32
354,500,939.53
601,445,331.12
200,481,777.04
Average Annual Turnover
Turnover 69 NRB Index
Reference to supporting
document
As per attached
Audited balance
sheet
2064/065
( 2007/2008)
Turnover Amount
(NRs.)
Con-Tech Pvt. Ltd.
Tinkune, Kathmandu
Detailed Annual Turnover (Sole & J/V turnover) over the last 10 years:Fiscal year
068-69
( 2011/2012)
Civil works- Con-Tech Pvt. Ltd. Single
Single
3,830,070.00
3,830,070.00
RIP/Exim/01
72,221,025.98
28,166,200.13
RCSP/ICB/DJ-2
9,778,776.66
1,955,755.33
85,829,872.64
33,952,025.46
23,122,410.60
upgrading of Sanfebagar-Martadi Road
Project
upgrading of Dhalkebar-Janakpur Road
Project
Civil works- Con-Tech Pvt. Ltd. Single
Single
23,122,410.60
upgrading of Sanfebagar-Martadi Road
Project
RIP/Exim/01
178,948,232.53
upgrading of Dhalkebar-Janakpur Road
Project
RCSP/ICB/DJ-2
121,330,116.14
Babai Irrigation Project
Babai-P4/065/66
7,559,546.48
Civil works- Con-Tech Pvt. Ltd. Single
Single
Sole Contract(s)
Madhucon-Contech--Lumbini
J/V:51%:39%:10%
Shrestha-Lumbini-Contech
J/V:40%:40%:20%
Sole Contract(s)
69,789,810.69 Madhucon-Contech--Lumbini
Shrestha Lumbini Contech
24,266,023.23 Shrestha-Lumbini-Contech
J/V:40%:40%:20%
3,779,773.24 Jayee:Contech::50%:50%
330,960,305.75
120,958,017.75
25,229,196.34
25,229,196.34
Sole Contract(s)
upgrading of Sanfebagar-Martadi Road
Project
RIP/Exim/01
96,967,965.90
37,817,506.70
upgrading of Dhalkebar-Janakpur Road
Project
RCSP/ICB/DJ-2
90,514,659.10
18,102,931.82 Shrestha-Lumbini-Contech
SUB-TOTAL:065-66
(2008/2009)
Role of Contract
J/V:51%:39%:10%
SUB-TOTAL:-
066-67
(2009/2010)
Con-Tech
Turnover Portion
(NRs.)
Contract No.
SUB-TOTAL:-
067-68
(2010/2011)
Amount as per
Balance Sheet
NRs.
Name of Project
Babai Irrigation Project
Upgrading of Dhalkebar-Janakpur Road
Project
Civil works- Contech Single
115,743,855.44
Babai-P4/065/66
7,034,996.00
RCSP/ICB/DJ-2
30,352,418.54
48,396,229.33
85,783,643.87
SUB-TOTAL:Adit Access Road-Gyalthum Section
MDS/AAR-02
38,329,278.97
Madhucon-Contech--Lumbini
J/V:51%:39%:10%
J/V:40%:40%:20%
81,149,634.86
3,517,498.00 Jayee:Contech::50%:50%
6,070,483.71
Shrestha-Lumbini-Contech
J/V:40%:40%:20%
48,396,229.33 Sole Contract(s)
57,984,211.04
19,164,639.49 Jayee:Contech::50%:50%
CWE-GLOBAL-CTPL
064-65
(2007/2008)
Grid Substation Reinforcement Project
MDS/GSR/2005-2006-01
169,304,938.11
40,633,185.15 J/V:50%:26%:24%
RNDP/LCB/MK-09
35,456,915.25
59,399,279.14
302 490 411 47
11,700,782.03 34%:33%:33%
59,399,279.14 Sole Contract(s)
130 897 885 80
Jayee:Contech::PS JV::
Road Network Development Project
Civil works- Contech Single
SUB TOTAL:
Con-Tech Pvt. Ltd.
Tinkune, Kathmandu
Detailed Annual Turnover (Sole & J/V turnover) over the last 10 years:Fiscal year
063-64
(2006/2007)
Name of Project
Grid Substation Reinforcement Project
Contract No.
MDS/GSR/2005-2006-01
Reinforcement & Construction of substation
RNDP/LCB/MK-09
060-61
(2003/2004)
059-60
(2002/2003)
Role of Contract
CWE GLOBAL CTPL
7,233,750.00
1,736,100.00 J/V:50%:26%:24%
5,962,739.44
70,170,488.98
159,307,227.50
1,967,704.02 34%:33%:33%
70,170,488.98 Sole Contract(s)
111,844,417.54
Adit Access Road-Gyalthum Section
Civil works- Contech Single
TS/CD-060/061-2
80,472,196.92
MDS/AAR-02
53,118,996.96
44,963,039.25
178,554,233.13
Sole Contract
30,957,866.33
16,068,737.11
47,026,603.44
30,957,866.33 Sole Contract(s)
8,034,368.56 Contech:Jayee::50%:50%
38,992,234.89
78,971,622.46
78,971,622.46 Sole Contract(s)
78,971,622.46
78,971,622.46
Sole Contract
58,278,918.58
58,278,918.58 Sole Contract(s)
RMDP/PM-3/NCB-13
8,737,822.97
67,016,741.55
3,495,129.19 Jayee:Contech::60%:40%
61,774,047.77
SUB-TOTAL:061-62
(2004/2005)
Con-Tech
Turnover Portion
(NRs.)
Jayee:Contech::PS JV::
Road Network Development Project
Civil works- Contech Single
SUB-TOTAL:062-63
(2005/2006)
Amount as per
Balance Sheet
NRs.
Civil works-Contech Single
Extension of Runway
y at TIA
SUB-TOTAL:Civil works-Contech Single
Sole Contract
SUB-TOTAL:Civil works-Contech Single
Amar khola - Baglung Road
SUB-TOTAL:GRAND TOTAL:-
1,451,684,517.25
40,236,098.46 SC: CTPL:50%:50%
26,559,498.48 Jayee:Contech::50:50%
44,963,039.25 Sole Contract(s)
111,758,636.19
828,282,733.76
Name of Partner of a J/V: CON-TECH PVT. LTD., Partner
1.3 Road Works Performed as a prime Contractor on works of a Road Works and volumer over the last 10 (Ten) years.
Project Name & Country
1. Sanfebagar-Mangalsen -Martadi Road
Project , Contract No. RIP/EXIM/SMT-01
Madhucon-Contech- Lumbini J/V: 51% ,39% ,10%
2. Dhalkebar-Janakpur Road Project
Contract No. RCSP/ICB/DJ/02.
Shrestha-Lumbini-Contech J/V : 40% ,40% ,20%
3. Melamchi Water Supply Project
Gyalthum Adit Access Roads Contract No.:
MDS/AAR 002
JayeeContech J/V::50%:50%
Type of Work Performed
Name of Client and
Contact Person
Upgrading of Sanfebagar Martadi Road ( Ch. 0+000 to
Project Road
29+300 )under Contract No. RIP/EXIM/SMT-01.
Details of works : a) Earthwork : 4,07,267.87/cum.
Improvement Project,
b) Bituminous works , Otta Seal : 1,81,209/-Sqm.
DOR, Babarmahal, Ktm,
c) Sub Grade : 76,234 m3 d) Crusher Run Sub Nepal.
Base : 36,162 m3 sqm. etc.
April, 2009.
Nov, 2011
399,168,307.63
July, 2008.
May, 2011
207,862,617.00
Melamchi Water Supply
Development Board
Naya Baneshwor, KTM
March 2005
May 2007
Project Directorate Project (
ADB) Bishalnagar,
Kathmandu, Nepal
Nov 2006
31 Dec,2009
Upgrading of Dhalkebar-Janakpur Road under
Road Connectivity Sector I Project; Contract No.
Project Directorate Project
RCSP/ICB/DJ/02. Details of Works : i) DBST
( ADB) Bishalnagar,
Works: 91,630 Sq.m., ii) CSB Works : 20,301
Kathmandu, Nepal
m3, iii) Sub Base Works : 41,031 m3, iv) Brick
Masonar
Gyalthum Adit Access Roads . Contract No.:
MDS/AAR 002
Excavation in rock using
hydraulic hammer- 1,44,326 m3, Common
excavation- 78,602 m3, Stone masonry drains,
retaining walls, gabion walls, crush drains- 4.5 Km.
Improved subgrades- 2500 m3 etc.
Agreement Completion Value of Contract
(NRs.)
Date
Date
209,961,799.68
Earth work,Excavation Embankment Filling,
4. Mudhe Sanischare- Khandbari Road
Contract No. RNDP/LBC/MK-9
Jayee- Contech -PS. J/V:34% ,33% ,33%
Masonary Side Drain Stone Masonary Retenning
Structure, Stone Filling to Gabions, Capping Layer,
53,067,931.52
Water Bound Macadam, Bio-engineering works etc.
5. Tribhuwan International Airport
Asphalt concrete - 486m3 , Subbase course,
Extension of Turning Pad at Runway 20 END, TIA. Crushed stone base , Draingage and ducting work etc.
( Contech-Jayee J/V::50%:50% )
6. Amar Khola- Baglung Sector of
Pokhara- Baglung Road
Contract No. RMDP/PM-3/NCB-13
Jayee- Contech J/V::60%:40%
7. Green house under Everest Floriculture
Project
,
Nepal. (sole Contract )
Construction of Earth work, gabion work, concrete
work, sub-base, base course, hot premix patching
work, slurry sealing work, bituminous maintenance
work, traffic safety works, single bituminous work,
bituminous surface treatement etc.
Earthwork filling-129,662.03 m3, Trench excavation,
river training work, Green house foundation, Drainage
works and access road etc..
SUB- TOTAL:-
Civil Aviation Office of
Nepal , Gauchar,
Kathmandu
DOR/ RMDP/IDA Mr. H.R.
Srivastav
Division Chief
Everest Floriculture Pvt.
Ltd. Mr. Madhu Lamsal,
CEO
th
14 July 2004 12th July 2005
March 2002
15 April 2003
June 24, 2002 Dec. 13, 2002
18,157,672.99
13,346,235.00
19,361,332.36
920,925,896.18
Name of Partner of a J/V: CON-TECH PVT. LTD., Partner
1.3 Similar works ( Electrial , Building and Lime Stone Works ) executed during the last ten years
Project Name & Country
Type of Work Performed
Name of Client and
Contact Person
Agreement
Date
Completion Value of Contract
(NRs.)
Date
Nepal Electricity Authority
Durbarmarg, Kathmandu
February 2005
September 2006
June 2006
March 2008
2060/1/30
2059/3/12
5,290,552.67
February 2000
December 2001
28,432,580.00
ELECTRICIFICATION WORKS:1. Reinforcement & Construction
of Substation
Contract No.: TS-CD/060/061-2
SC-CTPL J/V::50%:50%
Construction of Control Building, Structural Works, Supply
Installation & Erection of Substation Equipments and other
civil works etc.
2. Grid Substation Reinforcement ProSupply, Installationa and erection of of 132/66, 132/33, & 1 Nepal Electricity Authority
Project
Substation (Power Transformers, VCBs, CT etc.), foundatio Durbarmarg, Kathmandu
Contract No.: TS-CD/060/061-2
structure works, gantry structures and other civil works etc.
89,996,775.60
198,776,250.34
CWE:Global:CTPL J/V:: 50%:26%:24%
2. DEO Building Project
at Lalitpur District
Sole Contract
3. Kathmandu Residency Project
Sole Contract
RCC frame structures, finishing works, electrical works, wa
supply & sanitory, boundary wall & surrounding site imprv.
4. Multipurpose R.C.C. Building
Sole Contract
Earthwork, Boulder Soling, PCC, RCC for footing, Raft Bea HULAS Wire Industries (P) Ltd.
Slab, and Lintels, Brickwork, Form work, Reinf. & gravelling
Mr. S.N. Baidhya, GM
5. Kia Plaza Showroom Building
Complex Project
Sole Contract
QUARRY/EXCAVATION WORKS:01. Production, Crushing &
Transportation of Limestone
Contract No.: 22/063/064
Sole Contract
Earthwork, PCC, RCC for footing, Raft, Beams and Lintels Continental Trading Ent. Pvt. Ltd. 16 January 2002 12 June 2002
Brickwork, Form work, Reinforcement, structural steel work
Kamaladi, Kathmand.
CGI Roofing etc.
Mr. S.R. Ghimire, President
NEPAL
02. Production, Crushing &
Transportation of Limestone
Contract No.: 32/059/060
Sole Contract
RCC frame structures, finishing works, electrical works, wa
supply & sanitory, boundary wall & surrounding site imprv.
HMG/MOES/DDE
District Education Office
Lalitpur
Fast Food Nepal Pvt. Ltd.
Mr. Sunil Agarwal
General Manager
th
15 Sept. 2001
th
th
15 July 2002
th
Removal of Over- Burden (Earthwork in excavation on Hetauda Cement Udhyog Ltd.
hard soil and boulder/ rock mixed soil), Crushing of
Produciton Chief
Limestone on crusher machine & Transporation.
Breaking of Hard Rock by Using Rock Breaker etc.
March,2007
May,2008
Removal of Over- Burden (Earthwork in excavation on Hetauda Cement Udhyog Ltd.
hard soil and boulder/ rock mixed soil), Crushing of
Produciton Chief
Limestone on crusher machine & Transporation. Breaking
of Hard Rock by Using Rock Breaker etc.
Dec. 2003
May 2004
11,621,333.00
7,430,076.00
81,863,130.24
65,868,000.00
Name of Partner of a J/V: CON-TECH PVT. LTD., Partner
1.3 Similar works ( Electrial , Building and Lime Stone Works ) executed during the last ten years
Project Name & Country
Type of Work Performed
Name of Client and
Contact Person
Agreement
Date
Completion Value of Contract
(NRs.)
Date
NEPAL
03. Production, Crushing &
Transportation of Limestone
Contract No.: 18/060/061
Sole Contract
NEPAL
Removal of Over- Burden (Earthwork in excavation on Hetauda Cement Udhyog Ltd.
hard soil and boulder/ rock mixed soil), Crushing of
Produciton Chief
Limestone on crusher machine & Transporation. Breaking
of Hard Rock by Using Rock Breaker etc.
Jan. 2004
June 2004
20,196,000.00
04. Production, Crushing &
Transportation of Limestone
Contract No.: 15/060/061
Sole Contract
NEPAL
Removal of Over- Burden (Earthwork in excavation on Hetauda Cement Udhyog Ltd.
hard soil and boulder/ rock mixed soil), Crushing of
Produciton Chief
Limestone on crusher machine & Transporation. Breaking
of Hard Rock by Using Rock Breaker etc.
Feb. 2002
Nov. 2003
21,725,000.00
05. Production, Crushing &
Transportation of Limestone
Contract No.: 41R/060/061
Sole Contract
NEPAL
Removal of Over- Burden (Earthwork in excavation on Hetauda Cement Udhyog Ltd.
hard soil and boulder/ rock mixed soil), Crushing of
General Manager
Limestone on crusher machine & Transporation. Breaking
of Hard Rock by Using Rock Breaker etc.
September 2004
June 2005
22,437,500.00
06. Production, Crushing &
Transportation of Limestone
Contract No.: 41R/060/061
Sole Contract
NEPAL
Removal of Over- Burden (Earthwork in excavation on Hetauda Cement Udhyog Ltd.
hard soil and boulder/ rock mixed soil), Crushing of
General Manager
Limestone on crusher machine & Transporation. Breaking
of Hard Rock by Using Rock Breaker etc.
Dec. 2005
Feb 2007
54,282,375.00
GRAND TOTAL OF ALL PAGES (OTHER THAN ROADS):-
Name of Applicant : CON-TECH PVT. LTD., Partner
1.3: Details of work under way or committed including expected completion date
PROJECT NAME
NAME OF CLINET AND
CONTACT PERSON
TYPE OF WORK PERFORM
NONE
TOTAL VALUE OF
CONTRACT
(NRs.)
VALUE OF
REMAINING WORK
CON-TECH PVT. LTD.
TINKUNE, SUBIDHANAGAR, KATHMANDU
1.4 List of Construction Materials , Plant Machineries Possesses
and Proposed for execution of Works:
A. CONSTRUCTION EQUIPMENT (OTHERS):
Owned
/Leased
Capacity
Condition
Year of
Manufacture
Owned
Owned
Owned
Owned
20-30 m3/h.
30 m or 50m3/h
14-20 m3/h
Very Good
Very Good
Very Good
Very Good
2013
2005
2012
2012
Owned
20-30 m3/h
Very Good
Indian
Owned
Screw Fix Type
Very Good
2006
Owned
Owned
Metal Hard
103 HP
Very Good
Very Good
2006
2005
Owned
250 KVA
Good
2002
10
6
7
3
4
1
Japanese
Komatsu, EC105Z-1
Crompton Greaves,
India
Xuhou, China
Kirloskar, India
Honda, Ashok
Indian
Showfou, Korea
Chinese
Owned
Owned
Owned
Owned
Owned
Owned
Upto 350 amp.
3” dia and 4 ‘ dia
40mm dia Needle
25 mm Needle
5 HP
1.5m3
Good
Very Good
Good
Very Good
Good
Very Good
2003
2005
2006
2008
2001
2006
2
China
Owned
-
Good
2000
Item of Equipment
No
Concrete Pump
Dragline Crain
Pile Boring
Concrete Batching Plant
Concrete pump 100m
Pipe
Metal Pipe Support with
all accessories
Containers
Air Compressor
1
1
2
1
1
Diesel Generator
2
Welding Machine
Water Pump
Vibrator (Needle/Plate)
Vibrator
Sumersuble Pump
Weight Mix Plant
High Pressure Mud
Pump
3000
7
3
Make & Model
Indian -2013
2004-2005
Indian - 2012
Indian -2012
A. CONSTRUCTION EQUIPMENT (OTHERS):
Item of Equipment
Concrete Mixture
Concrete Vibrator
Earth Compactor
Plate Compactor
Building Hoist
Shuttering Materials
B. SURVEY
EQUIPMENT
Total Station with stand
Auto Level Machine
Density Testing
Machine
Thedolite Set
Lab Equipment
C. OFFICE
EQUIPMENT
Photocopier
No
Owned
/Leased
Make & Model
Capacity
Condition
Year of
Manufacture
Chinese, Indian
Owned
10/7,14/10 Cft.
Good
5
3
2
2
3000m2
Indian
Indian
Indian
Local Made
Local Made
Owned
Owned
Owned
Owned
Owned
30,60,90 mm. dia
2 HP
1.5 feet
500 Kg
-
Very Good
Very Good
Very Good
Very Good
Very Good
2001
2005
2006
2006
2002~2005
2
4
Sokkia,
Fuji, Sokkia
Owned
Owned
10 Kms.
Auto
Very Good
Very Good
2
Japan
Owned
2002
2003
2000
4
2
Sokisha DT2, 1999
Various
Owned
Owned
DT-2, set 5W
-
Very Good
Very Good
2005
1996
2
Cannon, Kyocera
Owned
Very Good
2005
Intel
Owned
Very Good
2005-2010
Canon
Owned
NP 1215, KM1635
Pentium IV, Dual
Core, Cor 2 Duo
-
Very Good
2005
7
Computers
15 set
Fax Machine
2
Very Good
2005
Item of Equipment
N
o
Make & Model
Owned
/Leased
Capacity
Condition
Year of
Manufacture
Owned
150 HP/ 8.0 Cu.m.
Very Good
2006
Owned
130 HP/8.0 Cu.m.
Very Good
2002
Very Good
2002
Very Good
2003
D. CONSTRUCTION HEAVY EQUIPMENT:Hydraulic Excavator
10
Hydraulic Excavator
1
Vibrator Roller
3
Pneumatic Roller
2
Wheel Loader
3
Backhoe Loader
1
Bulldozer
3
Motor Grader
3
Water Tank
2
Komatsu, PC300/200-7
Komatsu, PC 228
USLC-1
Caterpiller/Dynapac/
JV40CW-2
Sakai/ Xuzhou, YL-16
Komatsu,
WA400/350/100
L&T
Komatsu, D53A17/D53SP-18/ D41
Xuzhou 135/ GD405
Mitsubishi,
FK315D/TATA
Owned
27.6 -138HP/ 8-20
Tones
80 HP/ 10 Tones
Owned
85 HP/ 1.2 Cu.m.
Very Good
2006
Owned
4412 CC/ 0.8 Cu.m.
VeryGood
2010
Owned
124 HP/
Very Good
2007
Owned
115HP-155 HP
6557 CC/ 5000 12000Ltrs.
Very Good
2009
Very Good
2005
Owned
Owned
E. VEHICLES, TRUCKS:TATA Tippers
23
Telco, SK1613/
SK1615/ Hino/ Ashok
leyland
Flat Truck
4
TATA/ HINO/ DONG
FENG/ISUZU
Owned
2
Indian
Owned
Owned
5883 CC/ 8.0 Cu.m.
Very Good
2004~2009
6961 CC/13.5 Cu.m
Very Good
2009
Very Good
2010
F. CRUSHER PLANT
Our owned Crusher
Plant
The above machineries are in good operating condition with Con-Tech Pvt. Ltd.
Certified By: Ishwor Bajracharya ( M.E.)
CONTECH PVT. LTD.
1.5
Tinkune, Kathmandu
Key site personnel proposed for execution of the Civil Construction Project
Section
Name
Age
Total
Experience
(Yrs)
Relevant
Experience
(yrs)
Education
General
Management
Suhrid Ghimire
Madhusudan Bhandari
Uddhav Prasad Bhandari
Prusotam Poudel
Gokarna Khanal
55
59
54
52
50
30
25
25
25
27
15
25
25
25
27
M. A.
Graduate
Diploma in Civil Engg.
MBA
MSC
Administration
Kishwor Neupane
Surya Poudel
Narayan Wagle
Janak Shrestha
Sndip DC
Gopal Kunwar
Nikhil Saudth
Ganesh Mainali
Rajaram Bhattarai
Pradeep Regmi
Bhawana Badthaula
Jeet Bdr. Karki
Resham B. Tamang
28
30
26
39
25
43
28
38
35
33
30
31
31
4
5
8
18
5
20
5
18
10
12
8
6
12
4
5
6
18
5
20
5
9
10
10
8
6
10
B.E Civil/MBA
M.Com.
B.B.S.
B.Com.
B.Com
B. Com.
B. Com.
B. Com.
B.Com.
I.Com.
B. Com.
I. A.
I.Com.
Sanjay Nakarmi
Ram Kumar Thakur
Manoj Kumar Jaiswal
Suraj Mudhbari
Jhabindra Poudel
Tej Raj Bhatta
Raj Kumar Pokhral
Indra Bhysan Yadav
Rohit Kumar Khatri
Baikuntha Pokharel
Ajay Adhikary
Ram Krishna Bhattarai
Hom Bdr. Thapa
Sailendra Mann Singh
Basnet
Shree Bhandari
46
45
44
42
27
35
30
29
45
43
42
35
50
20
20
20
21
3
14
4
5
22
22
21
15
25
35
32
8
8
/ Finance
Others
Technical
Section
Site
Supervision
Peon-5 Persons Guards- 10 persons
15
B.E. (Civil Engineering
20
B.E. (Civil Engineering
20
M.Sc. (Civil Engineering)
18
B.E. (Civil Engineering
3
B.E. (Civil Engineering)
11
B.E. (Civil Engineering)
4
B.E. (Civil Engineering)
B.E. (Elec. Engineering)
22
Diplima in Civil Engg.
22
Diplima in Civil Engg.
21
Diplima in Civil Engg.
14
Diplima in Civil Engg.
25
Diplima in Civil Engg.
8
8
I.Com
I. Com.
Available
Personnel
with the
firm
Full time
Full time
Full time
Full time
Full time
Managing Director
Director
Director
Director
Director
Full
Full
Full
Full
Full
Full
Full
Full
Full
Full
Full
Full
Full
time
time
time
time
time
time
time
time
time
time
time
time
time
Manager
Account Manager
Executive Officer
Account Officer
Accountant
Cashier/ Accountant
Accountant
Workshop Manager
Site Accountant
Admin. Officer
Office Secretary
Field Officer
Office Executive
Full
Full
Full
Full
Full
Full
Full
Full
Full
Full
Full
Full
Full
time
time
time
time
time
time
time
time
time
time
time
time
time
Project Manager
Site Engineer
Construction Manager
Sr. Site Engineer
Site Engineer
Sr. Civil Engineer Civil
Civil Engineer
Electrical Engineer
Sr. Overseer
Sr. Surveyor
Sr. Civil Overseer
Sr. Civil Overseer
Sr. Overseer
Full time
Full time
Designation
Supervisor In-charge
Supervisor In-charge
Mechanical
Section
Rajaram Karki
Mahendra Bhandari
Narayan Pandit
Prabhu N. Sah
Rakesh Kumar Sah
Ramesh Narayan Sah
31
35
27
31
23
27
8
15
6
6
5
5
8
8
6
6
5
5
Ishwor Bajracharya
Govinda Dhungel
Mechanic & Helper
Welder
Electrician
Lathe Operator
Operators & Helpers
36
45
7
20
7
20
I. A.
SLC
SLC
TSLC
TSLC
TSLC
B.E. (Mech. Engineering)
SLC
24 Persons
10 Persons
4 Persons
3 Persons
100 Persons
Full
Full
Full
Full
Full
Full
time
time
time
time
time
time
Full time
Full time
Site
Site
Site
Site
Site
Site
In Charge
Supervisor
Supervisor
Supervisor
Supervisor
Supervisor
Mechanical Engineer
Head Mechanic
Name of Applicant or Partner of a J/V: CON-TECH PVT. LTD.
1.6: Proposed subcontracts and firms involved:Sections of the Works
Value of Subcontract
None
`
Subcontractor
(Name and Address)
Experience in Similar
Works
Name of Applicant or Partner of a J/V: CON-TECH PVT. LTD., Partner
1.7 Financial Reports for the last 10 (ten) years (Summary):
Financial
Information
in Rupees
equivalent
Actual previous ten years
068/69
(2011/2012)
1. Total Assets
2. Current Assets
3. Total Liabilities
4. Current Liabilities
5. Profit before Taxes
6. Profit after taxes
7. Net Worth ( 1-3)
8. Working Capital ( 2-4)
067/68
(2010/2011)
204,579,618.86
255,900,376.38
51,337,864.86
114,556,392.92
87,223,687.03
101,801,918.87
25,170,655.17
61,505,924.01
(36,742,525.77)
(27,280,989.72)
(36,742,525.77)
(27,280,989.72)
117,355,931.83
154,098,457.51
26,167,209.69
53,050,468.91
066/67 (2009/2010) 065/66 (2008/2009) 064/65 (2007/2008) 063/64 (2006/2007)
228,850,783.69
306,969,626.29
266,993,026.58
237,549,504.78
231,378,486.82
175,973,489.25
131,913,608.90
163,263,730.63
86,823,705.70
122,536,961.85
78,041,382.25
51,682,086.75
45,085,688.74
33,691,287.55
95,837,449.96
125,344,383.07
68,353,120.25
137,438,256.50
100,693,596.86
73,204,790.92
218,449,764.39
63,443,446.64
45,795,975.00
76,798,855.70
65,740,044.63
100,161,032.47
67,336,670.98
48,250,059.74
52,326,135.32
30,443,446.64
1,125,155.99
13,822,651.02
3,456,346.86
4,424,687.79
2,873,520.72
1,902,690.49
4,995,169.09
3,471,354.19
822,181.57
8,815,502.22
2,540,414.94
3,252,145.53
2,112,037.73
1,395,306.36
3,746,376.82
2,603,515.64
181,379,447.24
180,557,265.66
160,497,663.44
169,531,369.79
166,299,429.72
164,344,713.86
12,928,722.43
112,530,042.61
86,117,633.90
86,464,874.93
21,083,661.07
22,375,929.38
10,704,711.27
3,432,027.01
400,000,000.00
26,167,209.69
2. Working Capital
Total :-
426,167,209.69
1.9 Name, address, telephone, telex and fax numbers of the Bankers:
Name of Banker:
Banker
Address of Banker:
Telephone:
Facsimile:
059/60
(2002/2003)
305,901,648.73
Amount-NRs.
1. Revolving Line of Credit
061/62 (2004/2005) 060/61 (2003/2004)
277,216,897.20
1.8 Evidence of access to financial resources to meet the qualification requirements: Lines of Credit
Sources of Financing:-
062/63
(2005/2006)
Nepal Investment Bank Limited
Durbar Marga, Kathmandu.
977-1-4005058 Contact Name and Title: Mr. Jyoti Pandey, General Manager
977-1-4005063 Telex: 2435, 2328 NIBLNP
Note:
Please refer attached Audited Balance Sheet for the last Ten years & Revolving Line of Credit provided by Bank.
(7,240,446.58)
3,247,840.91
Name of Partner of a J/V: CON-TECH PVT. LTD.,Lead Partner
1.10 : Litigation History
Years
Award for or against Applicant
1
2
3
4
5
6
None
Name of Clint , Cause of Litigation,
Disputed amount
and matter in dispute
NRs.
Name of partner of a J/V: CON-TECH Pvt. Ltd., Partner
1.11 Statement of compliance with the requirement of Sub- Clause
3.2 of the Instruction to Bidders:We, Con-Tech Pvt. Ltd. is not associated, nor has been associated in the past,
directly, or indirectly, with the consultant or any other entity that has prepared the
design, specification, and other documents for the project or being proposed as
Project Manager for the Contract. A firm that has been engaged by the Borrower to
provide consulting services for the preparation or supervision of the Works, and
any of its affiliates, shall not be eligible to bid.
Download