CON-TECH PVT. LTD. CLASS "A" CONTRACTOR COMPANY PROFILE FOR CONSTRUCTION WORKS SUBMITTED BY: Con- Tech Pvt. Ltd. Class "A " Contractor for all Civil Work sg–6]s k|f=ln= Address : GPO Box 3167, Tinkune, Kathmandu, Nepal. Tel.: 01- 4112435/38 Fax: 977-1-4112437 Email : khanal@contech.com.np 1. Individual Bidders or Individual Members of Joint Venture -CON-TECH PVT. LTD. 1.1 Constitution or legal status of Bidder Place of Registration : HMG/N, MINISTRY OF INDUSTRY DEPARTMENT OF INDUSTRY TRIPURESHWOR, KATHMANDU. PVT. LTD. NO. 1701/050/51 MINISTRY OF WORK & TRANSPORT CONTRACTOR CLASSIFICATION SECTION BABARMAHAL, KATHMANDU LICENSE . NO. 3280/054/6/15 MINISTRY OF FINANCE INLAND REVENUE OFFICE BABARMAHAL, KATHMANDU PAN NO. : 300064414 Principal place of business : TINKUNE, SUVIDHANAGAR, KATHMANDU, NEPAL. Power of attorney of signatory of Bid: ATTACHED Enclosure: 1. Attested copies of HMG Registration Certificates i.e. PAN, License, Industry Registration Certificates Tax Clearance etc. Name of Applicant : CON-TECH Pvt. Ltd. Tinkune, Suvidhanagar Kathmandu, Nepal 1.2 Total annual volume of construction work performed in last Ten Years. Annual Turnover Data for the Last 10 Years (Construction only) Year National Urban Consumer Price Index Base Year (2005/6=100) Turnover Amount (NRs.) Present Price Index is Taken Month of Nov. F.Y. 2012/ 2013 ( 069/70 ) 2068/069 ( 2011/2012) 2067/068 ( 2010/2011) 2065/066 ( 2008/2009) 2064/065 ( 2007/2008) 2063/064 ( 2006/2007 ) 2062/063 ( 2005/2006) 2061/062 (2004/2005) 2060/061 (2003/2004) 2059/060 (2002/2003) Total:- Present Turnover with respect to current index and corresponding index of the fiscal year (NRs.) Reference to supporting document 180.50 33,952,025.46 165.40 9.13 37,051,636.01 120,958,017.75 152.60 18.28 143,072,884.69 81,149,634.86 139.40 29.48 105,075,388.04 57,984,211.04 127.20 41.90 82,281,054.19 130,897,885.80 113.00 59.73 209,089,100.77 111,844,417.54 105.90 70.44 190,631,892.03 111,758,636.19 100.00 80.50 201,724,338.32 38,992,234.89 92.60 94.92 76,005,382.26 78,971,622.46 88.60 103.72 160,884,625.89 61,774,047.77 85.20 111.85 130,871,075.38 As per attached Audited balance sheet 2066/067 ( 2009/2010) Increasing % of Index for Present Value 969,206,414.66 706,366,245.22 Best 3 Years over the last Ten years: Year 2063/064 ( 2006/2007 ) 2062/063 ( 2005/2006) Total of best three years National Urban Consumer Price Index Base Year (2005/6=100) Increasing % of Index for Present Value Present Turnover with respect to current index and corresponding index of the fiscal year (NRs.) 130,897,885.80 113.00 59.73 209,089,100.77 111,844,417.54 105.90 70.44 190,631,892.03 111,758,636.19 100.00 80.50 201,724,338.32 354,500,939.53 601,445,331.12 200,481,777.04 Average Annual Turnover Turnover 69 NRB Index Reference to supporting document As per attached Audited balance sheet 2064/065 ( 2007/2008) Turnover Amount (NRs.) Con-Tech Pvt. Ltd. Tinkune, Kathmandu Detailed Annual Turnover (Sole & J/V turnover) over the last 10 years:Fiscal year 068-69 ( 2011/2012) Civil works- Con-Tech Pvt. Ltd. Single Single 3,830,070.00 3,830,070.00 RIP/Exim/01 72,221,025.98 28,166,200.13 RCSP/ICB/DJ-2 9,778,776.66 1,955,755.33 85,829,872.64 33,952,025.46 23,122,410.60 upgrading of Sanfebagar-Martadi Road Project upgrading of Dhalkebar-Janakpur Road Project Civil works- Con-Tech Pvt. Ltd. Single Single 23,122,410.60 upgrading of Sanfebagar-Martadi Road Project RIP/Exim/01 178,948,232.53 upgrading of Dhalkebar-Janakpur Road Project RCSP/ICB/DJ-2 121,330,116.14 Babai Irrigation Project Babai-P4/065/66 7,559,546.48 Civil works- Con-Tech Pvt. Ltd. Single Single Sole Contract(s) Madhucon-Contech--Lumbini J/V:51%:39%:10% Shrestha-Lumbini-Contech J/V:40%:40%:20% Sole Contract(s) 69,789,810.69 Madhucon-Contech--Lumbini Shrestha Lumbini Contech 24,266,023.23 Shrestha-Lumbini-Contech J/V:40%:40%:20% 3,779,773.24 Jayee:Contech::50%:50% 330,960,305.75 120,958,017.75 25,229,196.34 25,229,196.34 Sole Contract(s) upgrading of Sanfebagar-Martadi Road Project RIP/Exim/01 96,967,965.90 37,817,506.70 upgrading of Dhalkebar-Janakpur Road Project RCSP/ICB/DJ-2 90,514,659.10 18,102,931.82 Shrestha-Lumbini-Contech SUB-TOTAL:065-66 (2008/2009) Role of Contract J/V:51%:39%:10% SUB-TOTAL:- 066-67 (2009/2010) Con-Tech Turnover Portion (NRs.) Contract No. SUB-TOTAL:- 067-68 (2010/2011) Amount as per Balance Sheet NRs. Name of Project Babai Irrigation Project Upgrading of Dhalkebar-Janakpur Road Project Civil works- Contech Single 115,743,855.44 Babai-P4/065/66 7,034,996.00 RCSP/ICB/DJ-2 30,352,418.54 48,396,229.33 85,783,643.87 SUB-TOTAL:Adit Access Road-Gyalthum Section MDS/AAR-02 38,329,278.97 Madhucon-Contech--Lumbini J/V:51%:39%:10% J/V:40%:40%:20% 81,149,634.86 3,517,498.00 Jayee:Contech::50%:50% 6,070,483.71 Shrestha-Lumbini-Contech J/V:40%:40%:20% 48,396,229.33 Sole Contract(s) 57,984,211.04 19,164,639.49 Jayee:Contech::50%:50% CWE-GLOBAL-CTPL 064-65 (2007/2008) Grid Substation Reinforcement Project MDS/GSR/2005-2006-01 169,304,938.11 40,633,185.15 J/V:50%:26%:24% RNDP/LCB/MK-09 35,456,915.25 59,399,279.14 302 490 411 47 11,700,782.03 34%:33%:33% 59,399,279.14 Sole Contract(s) 130 897 885 80 Jayee:Contech::PS JV:: Road Network Development Project Civil works- Contech Single SUB TOTAL: Con-Tech Pvt. Ltd. Tinkune, Kathmandu Detailed Annual Turnover (Sole & J/V turnover) over the last 10 years:Fiscal year 063-64 (2006/2007) Name of Project Grid Substation Reinforcement Project Contract No. MDS/GSR/2005-2006-01 Reinforcement & Construction of substation RNDP/LCB/MK-09 060-61 (2003/2004) 059-60 (2002/2003) Role of Contract CWE GLOBAL CTPL 7,233,750.00 1,736,100.00 J/V:50%:26%:24% 5,962,739.44 70,170,488.98 159,307,227.50 1,967,704.02 34%:33%:33% 70,170,488.98 Sole Contract(s) 111,844,417.54 Adit Access Road-Gyalthum Section Civil works- Contech Single TS/CD-060/061-2 80,472,196.92 MDS/AAR-02 53,118,996.96 44,963,039.25 178,554,233.13 Sole Contract 30,957,866.33 16,068,737.11 47,026,603.44 30,957,866.33 Sole Contract(s) 8,034,368.56 Contech:Jayee::50%:50% 38,992,234.89 78,971,622.46 78,971,622.46 Sole Contract(s) 78,971,622.46 78,971,622.46 Sole Contract 58,278,918.58 58,278,918.58 Sole Contract(s) RMDP/PM-3/NCB-13 8,737,822.97 67,016,741.55 3,495,129.19 Jayee:Contech::60%:40% 61,774,047.77 SUB-TOTAL:061-62 (2004/2005) Con-Tech Turnover Portion (NRs.) Jayee:Contech::PS JV:: Road Network Development Project Civil works- Contech Single SUB-TOTAL:062-63 (2005/2006) Amount as per Balance Sheet NRs. Civil works-Contech Single Extension of Runway y at TIA SUB-TOTAL:Civil works-Contech Single Sole Contract SUB-TOTAL:Civil works-Contech Single Amar khola - Baglung Road SUB-TOTAL:GRAND TOTAL:- 1,451,684,517.25 40,236,098.46 SC: CTPL:50%:50% 26,559,498.48 Jayee:Contech::50:50% 44,963,039.25 Sole Contract(s) 111,758,636.19 828,282,733.76 Name of Partner of a J/V: CON-TECH PVT. LTD., Partner 1.3 Road Works Performed as a prime Contractor on works of a Road Works and volumer over the last 10 (Ten) years. Project Name & Country 1. Sanfebagar-Mangalsen -Martadi Road Project , Contract No. RIP/EXIM/SMT-01 Madhucon-Contech- Lumbini J/V: 51% ,39% ,10% 2. Dhalkebar-Janakpur Road Project Contract No. RCSP/ICB/DJ/02. Shrestha-Lumbini-Contech J/V : 40% ,40% ,20% 3. Melamchi Water Supply Project Gyalthum Adit Access Roads Contract No.: MDS/AAR 002 JayeeContech J/V::50%:50% Type of Work Performed Name of Client and Contact Person Upgrading of Sanfebagar Martadi Road ( Ch. 0+000 to Project Road 29+300 )under Contract No. RIP/EXIM/SMT-01. Details of works : a) Earthwork : 4,07,267.87/cum. Improvement Project, b) Bituminous works , Otta Seal : 1,81,209/-Sqm. DOR, Babarmahal, Ktm, c) Sub Grade : 76,234 m3 d) Crusher Run Sub Nepal. Base : 36,162 m3 sqm. etc. April, 2009. Nov, 2011 399,168,307.63 July, 2008. May, 2011 207,862,617.00 Melamchi Water Supply Development Board Naya Baneshwor, KTM March 2005 May 2007 Project Directorate Project ( ADB) Bishalnagar, Kathmandu, Nepal Nov 2006 31 Dec,2009 Upgrading of Dhalkebar-Janakpur Road under Road Connectivity Sector I Project; Contract No. Project Directorate Project RCSP/ICB/DJ/02. Details of Works : i) DBST ( ADB) Bishalnagar, Works: 91,630 Sq.m., ii) CSB Works : 20,301 Kathmandu, Nepal m3, iii) Sub Base Works : 41,031 m3, iv) Brick Masonar Gyalthum Adit Access Roads . Contract No.: MDS/AAR 002 Excavation in rock using hydraulic hammer- 1,44,326 m3, Common excavation- 78,602 m3, Stone masonry drains, retaining walls, gabion walls, crush drains- 4.5 Km. Improved subgrades- 2500 m3 etc. Agreement Completion Value of Contract (NRs.) Date Date 209,961,799.68 Earth work,Excavation Embankment Filling, 4. Mudhe Sanischare- Khandbari Road Contract No. RNDP/LBC/MK-9 Jayee- Contech -PS. J/V:34% ,33% ,33% Masonary Side Drain Stone Masonary Retenning Structure, Stone Filling to Gabions, Capping Layer, 53,067,931.52 Water Bound Macadam, Bio-engineering works etc. 5. Tribhuwan International Airport Asphalt concrete - 486m3 , Subbase course, Extension of Turning Pad at Runway 20 END, TIA. Crushed stone base , Draingage and ducting work etc. ( Contech-Jayee J/V::50%:50% ) 6. Amar Khola- Baglung Sector of Pokhara- Baglung Road Contract No. RMDP/PM-3/NCB-13 Jayee- Contech J/V::60%:40% 7. Green house under Everest Floriculture Project , Nepal. (sole Contract ) Construction of Earth work, gabion work, concrete work, sub-base, base course, hot premix patching work, slurry sealing work, bituminous maintenance work, traffic safety works, single bituminous work, bituminous surface treatement etc. Earthwork filling-129,662.03 m3, Trench excavation, river training work, Green house foundation, Drainage works and access road etc.. SUB- TOTAL:- Civil Aviation Office of Nepal , Gauchar, Kathmandu DOR/ RMDP/IDA Mr. H.R. Srivastav Division Chief Everest Floriculture Pvt. Ltd. Mr. Madhu Lamsal, CEO th 14 July 2004 12th July 2005 March 2002 15 April 2003 June 24, 2002 Dec. 13, 2002 18,157,672.99 13,346,235.00 19,361,332.36 920,925,896.18 Name of Partner of a J/V: CON-TECH PVT. LTD., Partner 1.3 Similar works ( Electrial , Building and Lime Stone Works ) executed during the last ten years Project Name & Country Type of Work Performed Name of Client and Contact Person Agreement Date Completion Value of Contract (NRs.) Date Nepal Electricity Authority Durbarmarg, Kathmandu February 2005 September 2006 June 2006 March 2008 2060/1/30 2059/3/12 5,290,552.67 February 2000 December 2001 28,432,580.00 ELECTRICIFICATION WORKS:1. Reinforcement & Construction of Substation Contract No.: TS-CD/060/061-2 SC-CTPL J/V::50%:50% Construction of Control Building, Structural Works, Supply Installation & Erection of Substation Equipments and other civil works etc. 2. Grid Substation Reinforcement ProSupply, Installationa and erection of of 132/66, 132/33, & 1 Nepal Electricity Authority Project Substation (Power Transformers, VCBs, CT etc.), foundatio Durbarmarg, Kathmandu Contract No.: TS-CD/060/061-2 structure works, gantry structures and other civil works etc. 89,996,775.60 198,776,250.34 CWE:Global:CTPL J/V:: 50%:26%:24% 2. DEO Building Project at Lalitpur District Sole Contract 3. Kathmandu Residency Project Sole Contract RCC frame structures, finishing works, electrical works, wa supply & sanitory, boundary wall & surrounding site imprv. 4. Multipurpose R.C.C. Building Sole Contract Earthwork, Boulder Soling, PCC, RCC for footing, Raft Bea HULAS Wire Industries (P) Ltd. Slab, and Lintels, Brickwork, Form work, Reinf. & gravelling Mr. S.N. Baidhya, GM 5. Kia Plaza Showroom Building Complex Project Sole Contract QUARRY/EXCAVATION WORKS:01. Production, Crushing & Transportation of Limestone Contract No.: 22/063/064 Sole Contract Earthwork, PCC, RCC for footing, Raft, Beams and Lintels Continental Trading Ent. Pvt. Ltd. 16 January 2002 12 June 2002 Brickwork, Form work, Reinforcement, structural steel work Kamaladi, Kathmand. CGI Roofing etc. Mr. S.R. Ghimire, President NEPAL 02. Production, Crushing & Transportation of Limestone Contract No.: 32/059/060 Sole Contract RCC frame structures, finishing works, electrical works, wa supply & sanitory, boundary wall & surrounding site imprv. HMG/MOES/DDE District Education Office Lalitpur Fast Food Nepal Pvt. Ltd. Mr. Sunil Agarwal General Manager th 15 Sept. 2001 th th 15 July 2002 th Removal of Over- Burden (Earthwork in excavation on Hetauda Cement Udhyog Ltd. hard soil and boulder/ rock mixed soil), Crushing of Produciton Chief Limestone on crusher machine & Transporation. Breaking of Hard Rock by Using Rock Breaker etc. March,2007 May,2008 Removal of Over- Burden (Earthwork in excavation on Hetauda Cement Udhyog Ltd. hard soil and boulder/ rock mixed soil), Crushing of Produciton Chief Limestone on crusher machine & Transporation. Breaking of Hard Rock by Using Rock Breaker etc. Dec. 2003 May 2004 11,621,333.00 7,430,076.00 81,863,130.24 65,868,000.00 Name of Partner of a J/V: CON-TECH PVT. LTD., Partner 1.3 Similar works ( Electrial , Building and Lime Stone Works ) executed during the last ten years Project Name & Country Type of Work Performed Name of Client and Contact Person Agreement Date Completion Value of Contract (NRs.) Date NEPAL 03. Production, Crushing & Transportation of Limestone Contract No.: 18/060/061 Sole Contract NEPAL Removal of Over- Burden (Earthwork in excavation on Hetauda Cement Udhyog Ltd. hard soil and boulder/ rock mixed soil), Crushing of Produciton Chief Limestone on crusher machine & Transporation. Breaking of Hard Rock by Using Rock Breaker etc. Jan. 2004 June 2004 20,196,000.00 04. Production, Crushing & Transportation of Limestone Contract No.: 15/060/061 Sole Contract NEPAL Removal of Over- Burden (Earthwork in excavation on Hetauda Cement Udhyog Ltd. hard soil and boulder/ rock mixed soil), Crushing of Produciton Chief Limestone on crusher machine & Transporation. Breaking of Hard Rock by Using Rock Breaker etc. Feb. 2002 Nov. 2003 21,725,000.00 05. Production, Crushing & Transportation of Limestone Contract No.: 41R/060/061 Sole Contract NEPAL Removal of Over- Burden (Earthwork in excavation on Hetauda Cement Udhyog Ltd. hard soil and boulder/ rock mixed soil), Crushing of General Manager Limestone on crusher machine & Transporation. Breaking of Hard Rock by Using Rock Breaker etc. September 2004 June 2005 22,437,500.00 06. Production, Crushing & Transportation of Limestone Contract No.: 41R/060/061 Sole Contract NEPAL Removal of Over- Burden (Earthwork in excavation on Hetauda Cement Udhyog Ltd. hard soil and boulder/ rock mixed soil), Crushing of General Manager Limestone on crusher machine & Transporation. Breaking of Hard Rock by Using Rock Breaker etc. Dec. 2005 Feb 2007 54,282,375.00 GRAND TOTAL OF ALL PAGES (OTHER THAN ROADS):- Name of Applicant : CON-TECH PVT. LTD., Partner 1.3: Details of work under way or committed including expected completion date PROJECT NAME NAME OF CLINET AND CONTACT PERSON TYPE OF WORK PERFORM NONE TOTAL VALUE OF CONTRACT (NRs.) VALUE OF REMAINING WORK CON-TECH PVT. LTD. TINKUNE, SUBIDHANAGAR, KATHMANDU 1.4 List of Construction Materials , Plant Machineries Possesses and Proposed for execution of Works: A. CONSTRUCTION EQUIPMENT (OTHERS): Owned /Leased Capacity Condition Year of Manufacture Owned Owned Owned Owned 20-30 m3/h. 30 m or 50m3/h 14-20 m3/h Very Good Very Good Very Good Very Good 2013 2005 2012 2012 Owned 20-30 m3/h Very Good Indian Owned Screw Fix Type Very Good 2006 Owned Owned Metal Hard 103 HP Very Good Very Good 2006 2005 Owned 250 KVA Good 2002 10 6 7 3 4 1 Japanese Komatsu, EC105Z-1 Crompton Greaves, India Xuhou, China Kirloskar, India Honda, Ashok Indian Showfou, Korea Chinese Owned Owned Owned Owned Owned Owned Upto 350 amp. 3” dia and 4 ‘ dia 40mm dia Needle 25 mm Needle 5 HP 1.5m3 Good Very Good Good Very Good Good Very Good 2003 2005 2006 2008 2001 2006 2 China Owned - Good 2000 Item of Equipment No Concrete Pump Dragline Crain Pile Boring Concrete Batching Plant Concrete pump 100m Pipe Metal Pipe Support with all accessories Containers Air Compressor 1 1 2 1 1 Diesel Generator 2 Welding Machine Water Pump Vibrator (Needle/Plate) Vibrator Sumersuble Pump Weight Mix Plant High Pressure Mud Pump 3000 7 3 Make & Model Indian -2013 2004-2005 Indian - 2012 Indian -2012 A. CONSTRUCTION EQUIPMENT (OTHERS): Item of Equipment Concrete Mixture Concrete Vibrator Earth Compactor Plate Compactor Building Hoist Shuttering Materials B. SURVEY EQUIPMENT Total Station with stand Auto Level Machine Density Testing Machine Thedolite Set Lab Equipment C. OFFICE EQUIPMENT Photocopier No Owned /Leased Make & Model Capacity Condition Year of Manufacture Chinese, Indian Owned 10/7,14/10 Cft. Good 5 3 2 2 3000m2 Indian Indian Indian Local Made Local Made Owned Owned Owned Owned Owned 30,60,90 mm. dia 2 HP 1.5 feet 500 Kg - Very Good Very Good Very Good Very Good Very Good 2001 2005 2006 2006 2002~2005 2 4 Sokkia, Fuji, Sokkia Owned Owned 10 Kms. Auto Very Good Very Good 2 Japan Owned 2002 2003 2000 4 2 Sokisha DT2, 1999 Various Owned Owned DT-2, set 5W - Very Good Very Good 2005 1996 2 Cannon, Kyocera Owned Very Good 2005 Intel Owned Very Good 2005-2010 Canon Owned NP 1215, KM1635 Pentium IV, Dual Core, Cor 2 Duo - Very Good 2005 7 Computers 15 set Fax Machine 2 Very Good 2005 Item of Equipment N o Make & Model Owned /Leased Capacity Condition Year of Manufacture Owned 150 HP/ 8.0 Cu.m. Very Good 2006 Owned 130 HP/8.0 Cu.m. Very Good 2002 Very Good 2002 Very Good 2003 D. CONSTRUCTION HEAVY EQUIPMENT:Hydraulic Excavator 10 Hydraulic Excavator 1 Vibrator Roller 3 Pneumatic Roller 2 Wheel Loader 3 Backhoe Loader 1 Bulldozer 3 Motor Grader 3 Water Tank 2 Komatsu, PC300/200-7 Komatsu, PC 228 USLC-1 Caterpiller/Dynapac/ JV40CW-2 Sakai/ Xuzhou, YL-16 Komatsu, WA400/350/100 L&T Komatsu, D53A17/D53SP-18/ D41 Xuzhou 135/ GD405 Mitsubishi, FK315D/TATA Owned 27.6 -138HP/ 8-20 Tones 80 HP/ 10 Tones Owned 85 HP/ 1.2 Cu.m. Very Good 2006 Owned 4412 CC/ 0.8 Cu.m. VeryGood 2010 Owned 124 HP/ Very Good 2007 Owned 115HP-155 HP 6557 CC/ 5000 12000Ltrs. Very Good 2009 Very Good 2005 Owned Owned E. VEHICLES, TRUCKS:TATA Tippers 23 Telco, SK1613/ SK1615/ Hino/ Ashok leyland Flat Truck 4 TATA/ HINO/ DONG FENG/ISUZU Owned 2 Indian Owned Owned 5883 CC/ 8.0 Cu.m. Very Good 2004~2009 6961 CC/13.5 Cu.m Very Good 2009 Very Good 2010 F. CRUSHER PLANT Our owned Crusher Plant The above machineries are in good operating condition with Con-Tech Pvt. Ltd. Certified By: Ishwor Bajracharya ( M.E.) CONTECH PVT. LTD. 1.5 Tinkune, Kathmandu Key site personnel proposed for execution of the Civil Construction Project Section Name Age Total Experience (Yrs) Relevant Experience (yrs) Education General Management Suhrid Ghimire Madhusudan Bhandari Uddhav Prasad Bhandari Prusotam Poudel Gokarna Khanal 55 59 54 52 50 30 25 25 25 27 15 25 25 25 27 M. A. Graduate Diploma in Civil Engg. MBA MSC Administration Kishwor Neupane Surya Poudel Narayan Wagle Janak Shrestha Sndip DC Gopal Kunwar Nikhil Saudth Ganesh Mainali Rajaram Bhattarai Pradeep Regmi Bhawana Badthaula Jeet Bdr. Karki Resham B. Tamang 28 30 26 39 25 43 28 38 35 33 30 31 31 4 5 8 18 5 20 5 18 10 12 8 6 12 4 5 6 18 5 20 5 9 10 10 8 6 10 B.E Civil/MBA M.Com. B.B.S. B.Com. B.Com B. Com. B. Com. B. Com. B.Com. I.Com. B. Com. I. A. I.Com. Sanjay Nakarmi Ram Kumar Thakur Manoj Kumar Jaiswal Suraj Mudhbari Jhabindra Poudel Tej Raj Bhatta Raj Kumar Pokhral Indra Bhysan Yadav Rohit Kumar Khatri Baikuntha Pokharel Ajay Adhikary Ram Krishna Bhattarai Hom Bdr. Thapa Sailendra Mann Singh Basnet Shree Bhandari 46 45 44 42 27 35 30 29 45 43 42 35 50 20 20 20 21 3 14 4 5 22 22 21 15 25 35 32 8 8 / Finance Others Technical Section Site Supervision Peon-5 Persons Guards- 10 persons 15 B.E. (Civil Engineering 20 B.E. (Civil Engineering 20 M.Sc. (Civil Engineering) 18 B.E. (Civil Engineering 3 B.E. (Civil Engineering) 11 B.E. (Civil Engineering) 4 B.E. (Civil Engineering) B.E. (Elec. Engineering) 22 Diplima in Civil Engg. 22 Diplima in Civil Engg. 21 Diplima in Civil Engg. 14 Diplima in Civil Engg. 25 Diplima in Civil Engg. 8 8 I.Com I. Com. Available Personnel with the firm Full time Full time Full time Full time Full time Managing Director Director Director Director Director Full Full Full Full Full Full Full Full Full Full Full Full Full time time time time time time time time time time time time time Manager Account Manager Executive Officer Account Officer Accountant Cashier/ Accountant Accountant Workshop Manager Site Accountant Admin. Officer Office Secretary Field Officer Office Executive Full Full Full Full Full Full Full Full Full Full Full Full Full time time time time time time time time time time time time time Project Manager Site Engineer Construction Manager Sr. Site Engineer Site Engineer Sr. Civil Engineer Civil Civil Engineer Electrical Engineer Sr. Overseer Sr. Surveyor Sr. Civil Overseer Sr. Civil Overseer Sr. Overseer Full time Full time Designation Supervisor In-charge Supervisor In-charge Mechanical Section Rajaram Karki Mahendra Bhandari Narayan Pandit Prabhu N. Sah Rakesh Kumar Sah Ramesh Narayan Sah 31 35 27 31 23 27 8 15 6 6 5 5 8 8 6 6 5 5 Ishwor Bajracharya Govinda Dhungel Mechanic & Helper Welder Electrician Lathe Operator Operators & Helpers 36 45 7 20 7 20 I. A. SLC SLC TSLC TSLC TSLC B.E. (Mech. Engineering) SLC 24 Persons 10 Persons 4 Persons 3 Persons 100 Persons Full Full Full Full Full Full time time time time time time Full time Full time Site Site Site Site Site Site In Charge Supervisor Supervisor Supervisor Supervisor Supervisor Mechanical Engineer Head Mechanic Name of Applicant or Partner of a J/V: CON-TECH PVT. LTD. 1.6: Proposed subcontracts and firms involved:Sections of the Works Value of Subcontract None ` Subcontractor (Name and Address) Experience in Similar Works Name of Applicant or Partner of a J/V: CON-TECH PVT. LTD., Partner 1.7 Financial Reports for the last 10 (ten) years (Summary): Financial Information in Rupees equivalent Actual previous ten years 068/69 (2011/2012) 1. Total Assets 2. Current Assets 3. Total Liabilities 4. Current Liabilities 5. Profit before Taxes 6. Profit after taxes 7. Net Worth ( 1-3) 8. Working Capital ( 2-4) 067/68 (2010/2011) 204,579,618.86 255,900,376.38 51,337,864.86 114,556,392.92 87,223,687.03 101,801,918.87 25,170,655.17 61,505,924.01 (36,742,525.77) (27,280,989.72) (36,742,525.77) (27,280,989.72) 117,355,931.83 154,098,457.51 26,167,209.69 53,050,468.91 066/67 (2009/2010) 065/66 (2008/2009) 064/65 (2007/2008) 063/64 (2006/2007) 228,850,783.69 306,969,626.29 266,993,026.58 237,549,504.78 231,378,486.82 175,973,489.25 131,913,608.90 163,263,730.63 86,823,705.70 122,536,961.85 78,041,382.25 51,682,086.75 45,085,688.74 33,691,287.55 95,837,449.96 125,344,383.07 68,353,120.25 137,438,256.50 100,693,596.86 73,204,790.92 218,449,764.39 63,443,446.64 45,795,975.00 76,798,855.70 65,740,044.63 100,161,032.47 67,336,670.98 48,250,059.74 52,326,135.32 30,443,446.64 1,125,155.99 13,822,651.02 3,456,346.86 4,424,687.79 2,873,520.72 1,902,690.49 4,995,169.09 3,471,354.19 822,181.57 8,815,502.22 2,540,414.94 3,252,145.53 2,112,037.73 1,395,306.36 3,746,376.82 2,603,515.64 181,379,447.24 180,557,265.66 160,497,663.44 169,531,369.79 166,299,429.72 164,344,713.86 12,928,722.43 112,530,042.61 86,117,633.90 86,464,874.93 21,083,661.07 22,375,929.38 10,704,711.27 3,432,027.01 400,000,000.00 26,167,209.69 2. Working Capital Total :- 426,167,209.69 1.9 Name, address, telephone, telex and fax numbers of the Bankers: Name of Banker: Banker Address of Banker: Telephone: Facsimile: 059/60 (2002/2003) 305,901,648.73 Amount-NRs. 1. Revolving Line of Credit 061/62 (2004/2005) 060/61 (2003/2004) 277,216,897.20 1.8 Evidence of access to financial resources to meet the qualification requirements: Lines of Credit Sources of Financing:- 062/63 (2005/2006) Nepal Investment Bank Limited Durbar Marga, Kathmandu. 977-1-4005058 Contact Name and Title: Mr. Jyoti Pandey, General Manager 977-1-4005063 Telex: 2435, 2328 NIBLNP Note: Please refer attached Audited Balance Sheet for the last Ten years & Revolving Line of Credit provided by Bank. (7,240,446.58) 3,247,840.91 Name of Partner of a J/V: CON-TECH PVT. LTD.,Lead Partner 1.10 : Litigation History Years Award for or against Applicant 1 2 3 4 5 6 None Name of Clint , Cause of Litigation, Disputed amount and matter in dispute NRs. Name of partner of a J/V: CON-TECH Pvt. Ltd., Partner 1.11 Statement of compliance with the requirement of Sub- Clause 3.2 of the Instruction to Bidders:We, Con-Tech Pvt. Ltd. is not associated, nor has been associated in the past, directly, or indirectly, with the consultant or any other entity that has prepared the design, specification, and other documents for the project or being proposed as Project Manager for the Contract. A firm that has been engaged by the Borrower to provide consulting services for the preparation or supervision of the Works, and any of its affiliates, shall not be eligible to bid.