MCCL Company Profile 2013 - Manarah Al

advertisement
[
Company Profile
Manarah Al-Jubail Const.
Co. Ltd.
(Civil Electro-Mechanical Construction)
P.O. Box 997, Al-Jubail 31951, Kingdom of Saudi Arabia
Tel: +966 3 362 4006 (8 Ext.) | Fax: +966 3 361 7991
Email: info@manarahglobal.com
Website: www.manarahglobal.com
Contents
1. Mission
2. Introduction
a. Company Information
b. Location Map
c. Customer Approval
3. Services
4. Policies
a. Quality Policy
b. Health, Safety & Environment Policy
c. Recruitment Policy
5. Management
a. Responsibilities
b. Organization Chart
6. Experience
a. On-going Projects
b. Completed Projects
7. Human Resources
8. Equipment
9. Legal Certificates
10. Customer Appreciation/Project completion Certificates
11. ISO 9001, OHSAS 18001, ISO 14001 Certificates
Mission Statement
To be the preeminent provider of superior construction services by consistently
improving the quality of our product; to add value for clients through innovation,
foresight, integrity and aggressive performance; and to serve with character and
purpose that brings honors to God.
Philosophy
The philosophy of Manarah Al-Jubail Const. Co. Ltd. (MCCL) is to perform work for
selected group of clients and target projects, and to ensure that necessary attention is
provided on each project we undertake. Our goal on all of our projects is to obtain our
client's complete satisfaction by performing our work for the most competitive price,
with the highest quality construction with stringent safety standards and within the
schedule requirements. We take all steps necessary to ensure that these four goals
are met and that at the end of each project, our client is more impressed with MCCL
than they were at the first interview. With the market of work we target, customer
satisfaction, repeat business, and excellent referrals from previous projects are the
keys to our continued success.
These philosophies have been in place for 16 years now at MCCL and have resulted in
our continuous growth and success. Although MCCL has achieved a remarkable
growth during this short span of time, but our philosophy remains client driven rather
than revenue driven. We are still providing construction services for the same
companies we worked with during the first year of our establishment, which we feel
speaks for itself in the quality of work we provide.
Introduction
Introduction
Company Information
Location Map
Customer Approval
Introduction
Manarah Al-Jubail Construction Company Limited (MCCL) is a joint venture company
established in the year 1995 initially with the name of Manarah Al-Jubail Contracting
Corp. Later on the company transformed into a Private Limited Company under the
name of Manarah Al-Jubail Construction Company (MCCL).
The major business of the company is directed towards the industrial civil
construction, Mechanical Erection, Electrical Construction, General Maintenance,
Equipment, Manpower Rental, and Geomembrane & Geosynthetic Installation services
etc.
The achievements of various targets are made by the responsibility of specialized
technically qualified persons and their pervasiveness of planning, execution,
controlling of various firm specializing in the Industrial Civil Construction, Mechanical
and Industrial Plant Erection, Structural Fabrication and related maintenance services.
MCCL offers a wide range of proven technical experience in every aspect of civil,
electro-mechanical construction and its related services.
The nature of MCCL’s activities places particular emphasis on experience, expertise,
capability, performance, and quality. The objectives of the management of MCCL are
to provide these services in a manner, which conforms to the contractual
requirements of its purchasers and all applicable statutory regulatory requirements
with objective documented evidence.
Quality Assurance, essential in maintaining today’s demanding standards, is ensured
through implementation of an effective Quality Management System, rigorous
inspection procedures and state of the art quality control equipment.
The Safety and Health of employees and the protection of the Environment are of the
highest concerns to the MCCL management. A comprehensive HSE program has been
integrated into the work ethics, so that each employee understands his responsibility
from the safety of himself, others, equipment and property.
Company
Information
Company
:
Manarah Al-Jubail Construction Company Limited
Address
:
P.O.Box: 977, Al-Jubail 31951, Kingdom of Saudi Arabia
Telephone No.
:
+966 (0)3 3624006 (8 lines)
Fax
:
+966 (03) 3617991
E-Mail
:
info@manarahglobal.com
Web
:
www.manarahglobal.com
Ownership
:
Joint Venture
Commercial Registration Number
CR No.
:
2051037869
Date of Issue
:
1415-07-22
Place of Issue
:
Dammam
Location Map
Customer Approval
Saudi Aramco
Vendor No.:
10042225
Sabic
Vendor No.:
501165
Sceco
Vendor No.:
32327
Sasref
Vendor No.:
1002423
Epcc
Vendor No.:
9719
Marafic
Vendor No.:
3267
Satorp
Vendor No.:
11970
Services
Civil Construction
Mechanical Construction
Electrical Construction
IT Solution Services
Geomembrane Installation Services
Plant Maintenance Services
Infrastructure Development, Site Development & Road
Construction
Heavy & Light vehicle Rental
Industrial Support Services
Services
MCCL from its facility located at Al-Jubail provides following general contracting services:
Civil Construction
All civil works and industrial construction.
Construction of multistoried Commercial and Residential Buildings.
Construction works as per international standards/specifications
requirements.
and
customer
Mechanical Construction
Installation of petrochemical process plant and Equipment meeting ASTM/API
Standards, Condition/Vibration monitoring of rotating Equipment, Fabrication of process
piping system up to 32” dia., Bulk Storage Tanks as per API 650 A, Vessels, Furnace,
Silos , Structural steel fabrication, Grit Blasting & painting, pressure testing &
commissioning of process plant , Installation of Firefighting system, Erection of Pre
Engineered Buildings, Space Frame structures etc. to name a few .
Electrical Construction
Installation of Power Plant Equipments and its maintenance.
All sorts of electrical wiring related to industrial plants and facilities.
All type of electrical construction works.
Installation of captive power generation system.
IT Solution Services
Provide a range of solutions absolutely tailored to suit for the business needs:
From IT Hardware sales, Network management and Web Presence.









Hardware Installation and Configuration
Network Design and Implementation
LAN / WAN Optimization
Wireless Networks
Satellite Internet Connection
EPABX Implementation
IT Cabling Infrastructure
Setup of any IT equipment
Hardware procurement Support
Geomembrane Installation Services
We specialize in the installation of High Density Polyethylene (HDPE) and
Polypropylene (PP) geomembranes, also offers the field installation of key
Geosynthetic products including geotextiles, geonets, geosynthtic clay liners (GCL)
and geocomposites for containment industry.
Plant Maintenance Services
Handling all types of short-term and long-term plant maintenance works related to
Civil, Electrical, and Mechanical disciplines.
Infrastructure Development, Site Development & Road Construction
Providing necessary infrastructure for Industrial facilities such as Roads, Culverts ,
Drainage system , Sewer system , concreting & Asphalting , power supply system
, RO Plants & water distribution system, firefighting system , HVAC, Car parking
facility , temporary portable cabin facilities for large project sites to house
thousands, overall site development , Landscaping & gardening and all type of
ornamental/decorative work of arts as per client’s requirements.
Heavy & Light vehicle Rental
Providing services on rental basis for following equipment:










Cranes
Loaders
Dump trucks
Trailers.
Compressors, Generators, and welding machines.
Bobcat
Excavators & Backhoes
Buses of 55-Seater, 25-Seater and 15-Seater
Pick-up single cabin and double cabin
Core Drilling Heads.
Industrial Support Services
Providing manpower services for the operational functions of industrial plants and
offices.
Categories of manpower include skilled technicians, technical generics, Machinists,
sand blasters, surveyors and Engineers.
Policies
Quality Policy
Health, Safety & Environmental Policy
Quality Policy
MCCL is committed to providing Civil, Electro-Mechanical Construction and Services
as per Customer requirements in a consistent, reliable, efficient and timely manner.
These shall be achieved by:
 Ensuring that quality objectives are established, reviewed, maintained and
communicated at all levels of the organization, with the aim of continual
improvements in our processes in order to enhance customer satisfaction, and
the processes operates efficiently and effectively.
 Achieving compliance with the requirements of the quality management
system as well as applicable legal and statutory requirements by continually
reviewing and improving its effectiveness so that all customer and relevant
stakeholder requirements are met.
 To understand and satisfy our customer requirements through communication
and skills to achieve the ultimate aim of zero defects.
 Ensuring that all our personnel understand and fully implement our Company's
policies and objectives and are able to perform their duties effectively through
an ongoing training and development programed.
P.V. SASI
Managing Director
Health, Safety and Environment (HSE) Policy
MCCL is committed to providing a safe and healthy workplace
and conducting its business activities in a manner that protects
the environment, overall welfare of all our personnel, customer,
subcontractors and communities. To achieve these objectives,
all company projects shall adhere to the following principles:








Identification and evaluation of all HSE hazards or
aspects and the management of those risks to reduce
their impacts to acceptable levels.
Compliance with all applicable HSE legislation.
Prevention of incidents, injuries, and pollution.
Intolerance of the conditions and behavior’s that
contribute to incidents and injuries.
Reduction of waste and conservation of resources.
Recording and communicating HSE performance
throughout the organization.
Ensuring proper training, resources & engineering
design if required.
Continual improvement of HSE performance.
The Managing Director together with the senior management
shall visibly uphold these principles throughout the company
and integrate them into the company’s HSE policy and
management system and regularly review HSE performance.
Management and supervisory personnel shall be responsible for
implementing and maintaining the Company’s HSE policy and
Quality, Health, Safety and Environmental Management System
(QHSE). Regular QHSE audits shall be done to determine
conformance to the QHSE Management System.
Each employee, whose work may create a significant HSE
impact shall be trained and held accountable for complying with
the Company’s HSE Policy and related procedures, practices,
instruction and rules. Working safely and in an environmentally
appropriate manner are conditions of employment. Each
employee has duty to report workplace conditions or practices
that pose a safety hazard or threaten the environment and to
take reasonable actions to alleviate such risks.
Employee is responsible for recognizing that by risking incident
or injury, they are putting in jeopardy what they value and
those they care for.
P.V. SASI
Managing Director
Our mission “The work
is never so urgent that
we cannot take the time
to do it safely. It is the
responsibility of each
individual that everyone
leaves the job in the
same condition they
arrived”.
Our vision is an incident
and injury free
workplace, with no
harm to people while
protecting the
environment
“It is Everyone’s Job to
Protect the
Environment”, “Protect
the land, the air, and
the water by preventing
or reducing pollution”
Management
Responsibilities
Organizational Chart
Management
Managing Director
Responsible for overall management in the total function of the company.
Director Operations
Responsible for all correspondences related with each projects, Procurement, and
General Co-ordination between Client, Consultant and MCCL management. The
Director Operations is authorized to act on behalf of the Managing Director of the
company.
General Manager Technical
Responsible for the technical issues of all the ongoing projects and is assisted by a
team of qualified engineers.
General Manager Commercial
Responsible for all the commercial and financial issues of the company, and dealing
with the sub-contractors, suppliers, government agencies etc. on behalf of the
company.
Project Managers
Responsible for ensuring all construction activities on a specific project are carried out
on time, at the budgeted level, to the required specification, at the required level of
quality.
Manager Quality Assurance
Responsible for the development and implementation of the Quality Management
Systems in the organization in accordance with ISO 9001-2008.
Manager Quality Control
Responsible for controlling and maintaining the quality of the work and the product as
per established standards and up to the satisfaction of the client.
Manager HSE
Responsible for the overall safety and environmental issues on all the ongoing projects.
Ensure the implementation of company Safety Manual during the construction process
in order to meet the client’s requirements regarding safety and environment.
Manager Business Development
Responsible for the marketing and business development of the services provided by
the company.
Procurement Manager
Responsible for all the procurements as per the company policy and directives of
MD/Director Operations.
Preparation of various Procurement notices
Invitation of Bids (IFB), Request for Quotation (RFQ) and Expression of
Interest (EOI), Purchase Orders (P.O) etc.
Manager Administration & Government Relations
Responsible for all the day to day administrative matters of the company and also
handling the government and public relation matters.
Organizational Chart
Managing Director
Executive Director
General Manager
Technical
General Manager
Commercial
Operational
Manager
Administration
Engineering
Division
Accounts Division
Projects &
Development
Estimation &
Costing
Design &
Implementation
Budgetary &
Commerce
Manpower &
Services
Experience
Ongoing Projects
Completed Projects
Major Ongoing Projects
SL.No.
1
Client
Project
Advanced Petrochemical Company (APC)
Civil Construction & Modification Works
Petrofac Saudi Arabia Ltd./ARAMCO
TSF for Rabigh II Project (UO2 and UO3)
2
DAELIM Saudi Arabia Ltd./SABIC
TSF for Saudi Elastomer Project of SABIC
3
Petrosteel / SATORP
JERP PKG-6 Refinery Tank Form
Project. Al-Jubail – Saudi Arabia
4
Dayim Punjlloyd / SATORP
JERP PKG-9 Project – Port Facilities
5
Matar Mubarak Al-Khaldy
Flange Factory
6
DAELIM
Yanbu Export Refinery (YERP) PKG-3 (Saudi
Aramco)
8
DAELIM
Yanbu Export Refinery (YERP) PKG-4 (Saudi
Aramco)
Brief Description of works
Building facilities
Structural concrete
Electrical, communication,
instrumentation, Fire alarm system
Building facilities
Structural concrete
Electrical, communication,
instrumentation, Fire alarm system
Building facilities
Structural concrete
Electrical, communication,
instrumentation, Fire alarm system
Concrete – 40,000 M³
Piping RTR,FRP,STEEL–1,50,000 inch dia
Fire Fighting Works.
Concrete – 20,000 M³
Piping-RTR,FRP,STEEL-100,000 inch dia
Steel Structure – 1,000- Ton
Electrical & Other – Lot – 1
Fire Fighting & FM 200-Novec System.
RCC Building – 1200 M²
Metal Workshop Building – 1800 M²
Fire Fighting Systems
Electrical & Telecommunication
Fire Alarm Systems
Building Facilities – 6200 m²
Fire-Fighting & Fire Alarm, Wet
Sprinkler System, Fire Hydrants & Fire
Hose Cabinet
Building Facilities – 4000 m²
Fire-Fighting & Fire Alarm, Wet
Sprinkler System, Fire Hydrants & Fire
House Cabinet.
Target Completion Date
2013
2013
2013
2012
2012
2011
2011
2011
9
Dayim Punj Lloyd
Yanbu Export Refinery (YERP) PKG-4 (Saudi
Aramco)
10
Saudi Kayan
Amines Project
11
McConnell Dowell
Maaden Smelter Project
Building facilities – 3170 m²
Structural concrete – 6000 m³
Electrical, communication,
instrumentation, Fire alarm system
Building facilities – 5000 m²
Electrical, communication & fire alarm
system
Building facilities – 1320 m²
Electrical & fire alarm system
2011
2011
2011
Major Completed Projects
SL. No.:
Client
1
M.M.Mohammed Al-Qathani Est.
2
SADAF / SABIC
3
L & T / SATORP
4
Petrosteel / SATORP
5
Dayim Punjlloyd / SATORP
6
Project
Brief Description of Works
Metal Fabrication Workshop building
RCC Building – 625 M²
Metal workshop Building – 1200 M²
Fire Fighting Systems
Electrical & Telecommunication
Fire Alarm Systems
2011
Civil, Electro-Mechanical and Instrumentation Works
2010
Potable Building – 2000 M²
HVAC Systems, Roads and Pavements.
2010
Civil, Electro-Mechanical works – M² - 12,000
2010
Civil, Electro-Mechanical Works – M² - 1,500
2010
SABIC Security Enhancement Project
– Al-Jubail, Saudi Arabia
JERP PKG-5 A-Temporary Site
Facilities – Al-Jubail, Saudi Arabia
PMT, CMT offices Facility Project –
ERP PKG-6
PMT, CMT Offices Facility Projects –
JERP PKG-9
Petrosteel / Saudi Kayan
Later need Tankage Project
7
GULF FARABI
Security Enhancement Project.
8
Dayim Punj Lloyd Fluor/Saudi
Kayan
Early Need Tankage
Concrete – 15,000 M³
Piping RTR,FRP,STEEL-75,000-Inch dia
Steel Structures – 1,000-Ton.
Piping, Electrical & Instrumentation Works.
Concrete
Piping RTR, FRP, STEEL
Steel Structures
Year of
Completion
2010
2010
9
STESA/SABIC
10
KBR/Saudi Kayan
THERMOMECHANICA Saudia
Co.Ltd
11
Global Security Enhancement Project
– Al-Jubail, Saudi Arabia.
Saudi Kayan Olefins Project
Construction of Factory Facility – AlJubail, Saudi Arabia.
Construction of Chemical Factory
Facilities Project.
12
EURO GULF
13
Daelim NCP
Daelim South Plot Project
14
SADAF/SABIC
Global Security Enhancement Project
15
Daelim/Saudi Kayan
Saudi Kayan Poly Carbonate Project
16
Daelim/Saudi Kayan
Saudi Kayan Poly Carbonate Project
17
CAPE FECILITY
Construction of Factory and office
Facility @Al-Jubail 12Industrial City
18
DAELIM/SABIC
19
DAELIM/SABIC
20
Royal Commission
Temporary Facility
Saudi Kayan Project Temporary
Facility
Construction of Industrial School
21
Al-Suwaidi/RC
Fabrication Factory Facility
22
SABIC
23
SADAF / NCC
24
25
TASNEE / STESA
DAELIM PUNJLLOYD
UPS Room
Styrene-1 reliability improvement
project
Integrated security system
Saudi Kayan Project
26
BINSAGAR
Construction of Factory and Office
facility @ Al-Jubail Industrial City
RCC Building – 520M²
Security Fencing SSD1 – 2100M
Duet Bank – 220M
Electrical Cabling – 5000 M
Switch Gears – 3 Nos.
Integrated Security Camera Systems – 20 Nos
Civil, Electro-Mechanical and Instrumentation Works.
2010
2010
Civil, Electro Mechanical Works – 3,000 M²
2010
Civil Electro-Mechanical Works – 5000 M²
2010
Construction of all the Temporary
Facilities
SADAF Main gate shade structure & Lighting
Transportation, Installation, Fabrication of
Precast Cable Trench Cover
Civil U/G Piping and Building Works @ SKPC
RCC Building – 700 M²
Pre-Engineered Building Factory – 1000 M²
Ware House – 2000 M²
Fire Fighting System, HVAC System, Instrumentation, and Fire
Alarm System – For the entire Area.
Expansion of PP-111 Project
2010
2010
2010
2010
2008
2008
Poly Carbonate Project
2008
Apartment & Housing Facility
Civil and Electro Mechanical Works of the entire Project.
Installation of Overhead Crane and Steel Structure
Pre-Engineered Steel Building – 4,800 M²
Electrical system installation includes Panel Board, Switch Gears
Etc.
Construction of UPS room at Sabic headquarters-Jubail
Construction of 3 car carriage foundation, construction of new
mosque
Civil works for integrated security
Civil works at Saudi Kayan project
Civil and Electro Mechanical Work of the entire Project.
Ware House – 3200 M²
Factory – 1800 M²
RCC Building – 1300 M²
2008
2008
2008
2008
2008
2008
2007
27
SVA/HADEED
HADEED Expansion Project
28
UHDE / SAFCO.
SAFCO-IV expansion Project
29
NCC/ HADEED
HADEED- Expansion Project.
30
UHDE / SAFCO.
SAFCO-IV expansion Project
31
ARABIAN PIPES CO.
32
SAFAMI/RC
33
AL-BERRI GAS PLANT ARAMCO
34
ARAMCO/TECHNIP
35
SABIC/ARRAZI
Construction of 3 nos. X-Ray Rooms
and for the new factory in the
Industrial city of Jubail
Construction of Fabrication facility at
Al- Jubail Industrial city.
QATIF FACILITIES /AL-BERRI GAS
PLANT ARAMCO
QATIF FACILITIES /AL-BERRI GAS
PLANT ARAMCO
Beach Camp
Qatif Facilities /AL-BERRI GAS PLANT
ARAMCO
36
ARAMCO/TECHNIP
37
Installation of Guard Posts for
Plant Roads
Steam Drum Structure
38
STESA/ SADAF
Communication System
39
JUPC/ SABIC
Industrial Port- Misc. Works
40
IBNSINA/SABIC
Heavy Equipment Parking Shelter
41
ARAMCO/TECHNIP
42
Arabian pipe coating
Complete Fire proofing work at 400,
500 & 300 area.
Laboratory Building construction
43
SABIC/STESA
Installation of security system
44
Jubail Governor’s Office
45
46
SIEMENS/AL-KHAFJI JOINT
OPERATIONS
ARAMCO/TECHNIP
Construction & Renovation of
Governor’s Office Facilities
Construction of Switch Gear Station 2
Nos.
Civil, Mechanical & Insulation
Fire Fighting system, Fire Alarm, HVAC System, Electrical &
Instrumentation Roads & Area development – 25,000 M²
Dismantling, Fabrication and Installation of Miscellaneous Steel
Structure
Concrete cable trench , Road works, storm water drain, buildings
2007
2007
Structural Design, Fabrication and erection of Reincuperator
structure for furnace#2
Pre-fabrication and erection of RCC elements for various
structures.
2006
Construction of X-Rooms including Civil and related electrical
works and prefabricated roofing system.
2006
Complete package within 40,000 M² Area.
Road marking and sign board installation
Road marking and sign board installation
2006
2006
2005
2005
Housing Facility
2005
Installation of Guard Posts for Plant Roads
2005
Structural Design and construction of Steam Drum Structure and
foundations, cable trench and related electrical works.
Cable pulling and termination from SADAF substation up to
SCECO South East Substation.
Miscellaneous Civil, Electrical and Communication works
Design and construction of Heavy equipment parking Design and
construction of Heavy equipment parking structure, civil and all
electrical works.
2005
2005
2005
2005
Complete Civil & Mechanical
2005
Civil, Architectural & Electrical work
Civil, Electrical and instrumentation package
2005
Construction of Annexure Building & Renovation of existing
Office
Complete Civil & Mechanical
Work includes construction of vessel foundations, erecting 110-
2005
2005
2005
2004
47
Royal Commission
46
SWCC
47
48
49
Shinkawa Japan/ARRAZI
MIS ARABIA
ARRAZI
Housing Project
Modification of Existing 2500mm dia.
Pipe
Instrumentation/Electrical
Construction of vessel foundation
Construction of fm2000 buildings
50
SWCC
Repair of main water line
51
52
53
NCC
SIPC
SADAF / SIEMENS
Construction of Substation building
SIPC Complex Project.
Temporary Facility
54
SIPC
SIPC COMPLEX PROJECT.
55
IBN AL-BAYTAR-SAFCO
(SABIC)
Modification of maintenance
workshop
56
NIGC/S.A.KENT
(SABIC)
Nitrogen Compressor Extension
Project
57
ARRAZI/SABIC
58
INVENSYS/ARRAZI/SABIC
59
60
SABIC Fire Training Centre/SABIC
ARRAZI SABIC
Cable pulling & terminations inside
substation No.:1, 2 & 3
Installation of trisen system control
panel and related instrumentation,
Electrical and Civil works
Tank Insulation
Construction of Warehouse
61
IBN SAHR/STESA
Modification of Security Systems
62
Jubail Governor’s Office
63
64
65
SIPC/S.A.KENT
JUPC
NIGC/SIEMENS
66
ARRAZI/SABIC
67
ARRAZI
68
SFIC/SABIC
Construction and Renovation of
Governor’s Office Facilities
Tank Insulation
Polyethylene Field Coating
Cable Trenches
Modification of Flare rack Piping and
Insulation
Cable revamping Project: work
Includes construction of concrete
cable trench, pilling, shoring and
dewatering etc.
Removal and modification of new Air
meter height stack including insulation and structural erecting.
Housing Project
2004
Mechanical and Piping Package
2003
Installation of trysen system
Civil construction
Civil, electrical and fire fighting
SWCC plant to Housing main water line repair
including complete procurement & Commissioning
Civil work including Complete finishing
Construction of tank farm facility.
Civil, Electrical and Communication Works
Installation of telecommunication facility inside the SIPC complex
project
Architectural & Buildings
2003
2003
2003
2003
2003
2003
2003
2003
2003
Demolition existing 50ton Nitrogen Compressor foundation using
water jetting, Construction of new foundation and associated
works
2002
Electrical & Instrumentation
2002
Electrical and Instrumentation
2002
Coating Package
Mechanical Package
Construction of Foundation, Manhole, Cable laying, Installation
of central rooms, Parking sheds and Commissioning
2002
2002
Complete building construction and renovation of existing offices
2002
Insulation Package
Jubail united Project
Excavation, cable laying, backfilling and termination works
Modification of existing flare rack piping including construction of
foundations and installation of steel structure
2002
2002
2002
Civil Construction
2001
Complete Mechanical Package
2001
2002
2002
pipe line
Supply and installation of aluminum
cladding for flare stack and piping
69
ARRAZI/SABIC
70
SAFCO/SABIC
Fire water facility
71
72
TEKFEN/ARAMCO
HADEED/NCC
ARRAZI/SABIC
Dewatering Services
Construction of Cable Trench
Construction of vertical pump,
foundation and Installation of
Vertical Pumps
73
74
AYTB/KEMYA(SABIC)
Kemya olefins project
75
ARRAZI/SABIC
Air Intake unit HVAC System for CCR2 and CSS-1 buildings
76
Al-Youseif
Military Bunker Project
77
SABIC/ ARRAZI
Cromaglass septic tank & associated
project.
78
Al-Youseif est.
79
SABIC IBN ZAHR
Substation revamping of at Naval
base
Construction of fire training centre
80
SABIC SAMAD
Samad 2-eH Project
81
NIGC SABIC
Nitrogen Compressor Extension
Project
Complete Insulation package
Construction of Fire water foundation, safety barricade
foundation in various locations, construction of maintenance
facility and related works
Pipe Installation-dewatering services
Civil Works
Excavation up to 5m depth, Construction of pump foundations
including earth works, dewatering and shoring
Construction of miscellaneous civil structure, Construction of
acid loading bay, Electrical installations, termination and gravel
paving
Supply and installation of new AHU, Fabrication and installation
of Duct, relocation of existing AHU to new location with shelter,
Electrical installation and termination
Construction of Military Bunkers at Half Moon Beach Dammam
Construction of concrete chamber and installation of cromaglass
septic tank with cabling and termination, fabrication and
erection
2001
2001
2001
2001
2000
2000
1999
1999
1999
Electrical and Civil Package
1998
Excavation, grading, construction, fabrication and installations
Stripper bottom tank foundation, pumps and pipes, Compressor
shelter roofing including foundations and grade beam, pipe rack
foundations and floor slabs
Construction of Compressor foundation, Manholes, Compressor
shelter roofing including foundations and grade beams, pipe rack
foundations and floor slabs
1998
1995
1995
Human Resources
Management Personnel
Engineers & Supervisors
Office Staff
Crafts Man
Human Resources
Management Personnel
Chairman
Managing Director
Executive Director
General Manager Technical
General Manager Commercial
Project Managers
Manager QA
Manager QC
Manager HSE
Manager Marketing
Manager Procurement
Manager Administration
01
01
01
01
01
07
01
04
05
01
01
01
Engineers & Supervisors
Project Engineers
28
Mechanical Engineer
15
Piping Engineer
08
Civil Engineers
59
Electrical Engineers
14
Instrument Engineers
04
Field Engineer
45
Safety Personnel
49
Q/C Engineers/Inspectors
35
Surveyor
16
Field Supervisors
Geomembrane Supervisors
115
08
General Foremen
144
Office Staff
Design Engineers
Planner/Scheduler
05
12
Draftsmen
Purchase Officers
Accounts Officers
Marketing Executives
Public Relations Officers
14
08
10
03
12
Secretary/ Data Processors
Office Boy
24
02
Craftsmen
Seamers & Technicians
Equipment Operator
Masons
Cement Finishers
Shuttering Carpenters
Finishing Carpenters
Plumbers
Painters
Sand Blasters
Drivers
Electricians
Pipe Fitters
Welders
Steel Fixers
Steel Fabricators
Mechanic
Labors/ Helpers
20
72
400
25
650
57
22
50
04
180
44
38
41
600
17
18
800
Equipment
Equipments
Welding & Testing Equipment
Vehicles
Equipments
Crane-25T
Crane-50T
Poclain with Rock Breaker
Rubber Tired Backhoe
Rubber Tired Front End Loaders
Fork Lift (6 Tons)
02
01
19
08
19
03
Compressor (150 cfm)
Boom Truck
Electric Welding Machines (300 amp. & Larger)
Concrete Mixer
Sand Blasting Machine
Roller Compactor
Dozer
Grader
Water Truck) (5000 Gallons & Larger)
Dump Truck
30 M³
Dump Truck 15M³
Pay loader
Dewatering pump
Asphalt / Concrete Cutter
Plate load Compactor
Vibrator
07
03
08
03
02
18
02
06
17
15
28
08
18
16
29
10
Geomembrane Welding & Testing Equipment
Fusion double wedge welder
25
Extrusion welder
15
Air pressure testing kit
25
Vacuum box seam tester
10
Tansiometer
05
Spark tester
05
Sample cutter
05
Hot air welding gun / blower
20
Portable hand grinders
15
Tools
15
Vehicles
Lexus
Land Cruiser
Armada
Nissan Cars
Mitsubishi Canter
Camry
Corolla
Trailer
Truck
Nissan Van
GMC Bus
Toyota Single Cabin Pick-Up
Nissan Pick-Up
01
01
02
45
22
04
14
08
28
12
12
28
55
Legal Certificates
Company Registration
Sagia
Asharqia Chamber 2010 (Chamber Registration)
Gosi
Zakat
Saudization
Certificate of Registration
SAGIA Certificate
CHAMBER OF COMMERCE
GOSI Certificate
Saudization Certificate
Customer Appreciation/
Project completion
Certificates
Daelim/NCP South Plot Project
Daelim/Saudi Kayan
DPL/Saudi Kayan
DPL/Saudi Kayan Petrochemical
Daelim/Saudi Kayan Project
SDEC/EGCC
Saudi Aramco/Fire Proofing
Saudi Consulting Services/Khafji Site Office
Philippine Institute of Civil Engineers
KBR/Saudi Kayan Olefins Project
Butler
Saudi methanol Company
Olayan Descon Industrial Co.Ltd.
PETROL Steel Co.Ltd./Package 6
KBR/Saudi Kayan Olefins Project
Quality, Health, Safety
and Environmental
Certificate
ISO 9001:2008 Certificate
ISO 14001:2004 Certificate
OHSAS 18001:2007 Certificate