PPMC BRIEF TO HONOURABLE MINISTER OF PETROLEUM RESOURCES PPMC (A Subsidiary of NNPC) INCORPORATED IN MARCH 1988 VISION PPMC WILL BE THE DOMINANT SUPPLIER OF REFINED PETROLEUM PRODUCTS TO THE EXISTING DOMESTIC AND GROWING EXPORT MARKETS WITHIN THE WEST AFRICAN SUB-REGION. MISSION TO SUPPLY PETROLEUM PRODUCTS TO THE DOMESTIC MARKET AT A MINIMUM OPERATING COSTS. TO PROVIDE EXCELLENT CUSTOMER SERVICE BY EFFICIENTLY TRANSPORTING CRUDE OIL TO THE REFINERIES AND MOVING PETROLEUM PRODUCTS TO THE MARKET. TO MARKET SPECIAL PRODUCTS COMPETITIVELY IN THE DOMESTIC AND INTERNATIONAL MARKETS. PPMC’s RESPONSIBILITIES TRANSPORTATION OF CRUDE OIL TO THE REFINERIES EVACUATION OF PRODUCTS FROM THE REFINERIES DISTRIBUTION OF PETROLEUM PRODUCTS NATIONWIDE PRODUCT QUALITY ASSURANCE SAFE OPERATIONS AND MAINTENANCE OF THE 5,120KM PIPELINE NETWORK MARKETING OF SPECIAL PRODUCTS OPERATION OF PRODUCTS IMPORT TERMINAL AT ATLAS COVE OPERATION OF CRUDE OIL TERMINAL AT ESCRAVOS PPMC INFRASTRUCTURE 5,120 km PIPELINE NETWORK 22 STORAGE DEPOTS 14 PUMP STATIONS 9 LPG DEPOTS 4 JETTIES - APAPA, WARRI, OKIRIKA AND CALABAR IMPORT TERMINAL AT ATLAS COVE CRUDE OIL TERMINAL AT ESCRAVOS OPERATION OF AN IMPORT BERTH PLATFORM FOR IMPORTED CRUDE OIL (OFFSHORE ESCRAVOS) PETROLEUM PRODUCTS SUPPLY & DISTRIBUTION NETWORK Lake Chad N Gusau Maiduguri Kano Biu [6”] Zaria Kaduna Minna 10” 12” 168 km 8” 72 km 6” Jos 8” 765 km Gomb e Yola Suleja 12” 299 km Ilorin Ibadan Mosimi Apapa/satelite Atlas Cove LEGEND Auchi [6”] 12” 169 km Ore Benin City 12” 8” 180 km 107 km Warri Enugu 12 ” Aba Bight of Benin 8” 170 km [12”] 156k m Calabar Port Harcourt Makurdi Destination depots-bridging Source depots- bridging Refinery and Depot Distribution Depot Booster Pipeline Pipelines prone to vandalism New Tankage Location PPMC ORGANOGRAM PPMC BOARD MANAGING DIRECTOR EXEC. DIRECTOR OPERATIONS EXEC. DIRECTOR SERVICES EXEC. DIRECTOR FIN. & ACCOUNTS EXEC. DIRECTOR COMMERCIAL PPMC AREA OFFICES PPMC COMPRISES OF FIVE (5) AREA OFFICES VIZ. MOSIMI KADUNA WARRI PORT HARCOURT GOMBE MANPOWER STAFF STRENGTH OF PPMC IS 1,785 106 MANAGEMENT STAFF 1,231 MIDDLE LEVEL MANAGEMENT 448 JUNIOR STAFF CURRENT STATUS OF OPERATION CRUDE OIL IMPROVEMENT IN CRUDE OIL SUPPLY FROM CNL TO ESCRAVOS PPMC TERMINAL. ESCRAVOS-WARRI REFINERY CRUDE PIPELINE RUNS AT 80% CAPACITY UTILISATION. SECTIONAL REPLACEMENT CONCLUDED AT ZAGAZAGA, KAZAI & KUNAI ON THE WARRI – KADUNA CRUDE OIL PIPELINE. SECTIONAL REPLACEMENT IN PROGRESS AT OVIRI-OKPE IN DELTA STATE ON THE WARRI – KADUNA CRUDE OIL PIPELINE. CURRENT STATUS OF OPERATION PRODUCTS PRODUCT LOADING IN MOSIMI, SATELLITE, IBADAN, ILORIN, ORE, PORT HARCOURT, CALABAR, WARRI, KADUNA AND KANO DEPOTS IS ON-GOING. GOMBE AREA IS FULLY SUPPORTED BY BRIDGING FROM OTHER PPMC OPERATIONAL LOCATIONS. RECENT ACHIEVEMENTS PPMC RECENT ACHIEVEMENTS CAN BE SUMMARIZED AS FOLLOWS: CRUDE SUSTAINED DELIVERY OF CRUDE OIL ON SYSTEM 2C (ESCRAVOS-WARRI AND WARRI-KADUNA). SUSTAINED DELIVERY OF IMPORTED CRUDE TO KADUNA FOR THE LUBES PLANT. SUSTAINED CRUDE DELIVERY TO PHRC FROM BONNY TERMINAL RECENT ACHIEVEMENTS PRODUCT ROBUST SUPPLY OF PETROLEUM PRODUCTS NATIONWIDE. PUMPING OF PRODUCTS THROUGH SYSTEM 2E TO ABA AFTER 18MTHS OF PIPELINE INACTIVITY. PUMPING OF PETROLEUM PRODUCTS TO KANO DEPOT AFTER TWO AND HALF YEARS. RECENT ACHIEVEMENTS PRODUCT PUMPING OF PRODUCTS TO BENIN DEPOT. REDUCTION IN DEMURRAGE COST ON VESSELS AWAITING TO DISCHARGE. REPAIR AND SUSTENANCE OF ATLAS COVE – MOSIMI PIPELINE AND OTHER PIPELINES WITHIN MOSIMI AREA. RECENT ACHIEVEMENTS OTHERS HARMONIOUS WORKING RELATIONSHIP WITH THE IN-HOUSE UNIONS (NUPENG & PENGASSAN). ISSUES AND CHALLENGES PIPELINES WILLFUL DAMAGE TO PIPELINE PRODUCT THEFT THROUGH PIPELINE VANDALISM LACK OF OPERATIONAL/PIPELINE FLEXIBILITY INCREASING COST OF PIPELINE REPAIRS MANAGEMENT OF PIPELINE NETWORK WITH DOUBTFUL INTEGRITY CRUDE OIL THEFT THROUGH BUNKERING ESCRAVOS – WARRI PIPELINE PERFORMANCE DECEMBER 2008 35,500 MEETING BETWEEN MGT & COMMANDER JTF TO REGISTER PPMC CONCERN IN RESPECT OF MASSIVE CRUDE LOSSES --DEC 12TH 2008 30,500 QUANTITY (m3) 25,500 20,500 15,500 10,500 5,500 DATES . PUMPED (m3) RECEIVED (m3) 1-Jan 31-Dec 30-Dec 29-Dec 28-Dec 27-Dec 26-Dec 25-Dec 24-Dec 23-Dec 22-Dec 21-Dec 20-Dec 19-Dec 18-Dec 17-Dec 16-Dec 15-Dec 14-Dec 13-Dec 12-Dec 11-Dec 10-Dec 9-Dec 8-Dec 7-Dec 6-Dec 5-Dec 4-Dec 3-Dec 2-Dec 500 ISSUES AND CHALLENGES FACILITIES AGED EQUIPMENT/FACILITIES, (MOST ARE OVER 28 YEARS) INADEQUATE STORAGE AT ATLAS COVE LEADING TO HIGH DEMURRAGE COST. INADEQUATE STORAGE AT ESCRAVOS CRUDE TERMINAL LACK OF FISCALISATION EQUIPMENT LONG LEAD TIME IN EQUIPMENT AND SPARE PARTS PROCUREMENT ISSUES AND CHALLENGES OTHERS INADEQUATE FUNDING AND FUND RELEASE FOR ASSET REPLACEMENT AND MAINTENANCE LONG AND CUMBERSOME APPROVAL CYCLE SUGGESTED WAYS FORWARD IMPROVED AND SUSTAINED FUNDING FOR PIPELINE SECURITY/COMMUNITY POLICING. STRENGTHENING VANDALS PROSECUTION PROCESS WITH THE DIRECTOR OF PUBLIC PROSECUTION AND THE POLICE HQ. PHASED REPLACEMENT OF FAILED AND OR VANDALPRONE PIPELINE SEGMENTS NATIONWIDE USING HORIZONTAL DIRECTIONAL DRILLING (HDD) METHOD SUGGESTED WAYS FORWARD COMPLETION OF 3NOs “ABANDONED STORAGE TANKS AT ATLAS COVE TERMINAL (IPCO PROJECT). REVAMPING OF ATLAS COVE TERMINAL FACILITIES. REVAMPING OF ESCRAVOS CRUDE TERMINAL FACILITIES INCLUDING IMPORT BERTH PLATFORM. PHASED ASSET REPLACEMENT (PUMPS, POWER PLANTS ETC) SUGGESTED WAYS FORWARD REHABILITATION OF FAILED TANKER LOADING AREAS REHABILITATION OF FAILED/COLLAPSED TANKS AT VARIOUS LOCATIONS PROVISION OF FIRE FIGHTING FACILITIES IN THE DEPOTS. PROVISION OF PHCN POWER SUPPLY TO ATLAS COVE. PROVISION OF 3.3KV POWER PLANT AT IBADAN TO ENHANCE PRODUCT SUPPLY TO ILORIN EXPANSION OF CALABAR LOADING GANTRY TO IMPROVE LOAD-OUT RATE TO THE NORTH EAST REHABILITATION OF PHC & WARRI DEPOT ACCESS ROAD TO IMPROVE LOADING TURN-AROUND TIME PPMC REQUIRES MASSIVE CAPITAL INJECTION FOR ASSET REPLACEMENT VISUALS STORAGE TANKS LOCATION INSTALLED CAPACITY (M3) AVAILABLE CAPACITY (M3) ATLAS COVE 70,292 41,747 MOSIMI 163,653 23,710 SATELLITE 12,009 12,009 REMARKS Currently using the ethanol dedicated tanks (57,000m3) Grossly inadequate ASSET DETERIORATION ASSET DETERIORATION ASSET DETERIORATION ESCRAVOS CRUDE TANK ASSET DETERIORATION ESCRAVOS CRUDE TANK ASSET DETERIORATION ESCRAVOS CRUDE TANK WILLFUL DAMAGE PRODUCT THEFT THROUGH VANDALISM CRUDE OIL BUNKERING INTEGRITY ISSUES WITH PIPELINES PIPELINE INTEGRITY ON-GOING PIPELINE SECTIONAL REPLACEMENT – OVIRI-OKPE PIPELINE ROW & EROSION PIPELINE ROW ENCROACHMENT THANK YOU FOR LISTENING