Modern Hadron Therapy Gantry Developments 16th Jan 2014 IBA ProteusONE Protect, Enhance, and Save Lives -2- THE TREND: MORE COMPACT, CHEAPER Access to PT is key ProteusPLUS 18000 ft² / 1672 m² ProteusONE 3600 ft² / 334 m² PROTEUS® ONE, THE SAFEST WAY TO COMPACT IMPT • Proven – Proteus PBS Technology • IGPT - Enabled • Patient and Staff Centric • ALARA – Neutron Sources Shielded • Small footprint • Patient and Staff Centric • Pencil Beam Scanning PROTEUS® ONE, THE SAFEST WAY TO COMPACT IMPT IMPT powered by PBS 3D Cone-Beam CT* ImageGuided PT Patient and staff-friendly open environment The early concept Protect, Enhance, and Save Lives -6- TREATMENT MODE SPECIFICATIONS Treatment mode Type Field size Patching fields Distal fall-off Lateral Penumbra (spot size) Several Spot Tune ID Treatment time Dose Accuracy SAD Range and modulation Accessory Holder Active Scanning allowing at least lateral multiple repainting and potentially volumetric repainting 20 cm X 20 cm minimum à 20 X 25 cm ideally with 25 cm in the Y direction (// to the axis of the GTR or horizontal in a FBR) Yes (and well managed by TPS and PTS) Maximum 2 mm above physical limit No degradation compare to Proteus 235 Yes to increase the spot size when needed (same Proteus 235) No degradation compare to Proteus 235 / at least (1 liter, 2 min, 2 gray) and the goal will remain at 1 min No degradation compare to Proteus 235 At least 2 m Max range is 32 gr/cm² Min range will be 0.5 g:cm² with the use of accessories for ranges lower than 7.5 gr/cm² and to keep the width of any proton peak always equal or greater than 5 mm. An accessory drawer must be installed at the end of the nozzle It will be remotely controlled as to a) tune the distance between the drawer and isocenter b) insert / retract the accessory in the beam path The Early sketch… (Summer 2009) SCANNING PROPERTIES Final magnet EFB at 120 cm from patient Combined scanning magnet upstream Treatment field of 22 x 25 cm at isocenter Pole faces of the 60°magnet adjusted to have an identical SAD of 3.15 m in both H & V planes (changed later) Ion chambers and telescopic accessory drawer on the exit of the last 60° dipole ProteusPLUS – 1 ROOM ONLY provides simplification opportunities 55.8 ft / 17 m 62.3 ft / 19 m COMBINING THE ESS IN THE GANTRY SIZE COMPARISON ProteusPLUS 18000 ft² / 1672 m² ProteusONE 3600 ft² / 334 m² Development Protect, Enhance, and Save Lives - 13 - IT STARTED WITH OPTICS… Combining ESS and gantry was never done before D E G R Q 1 G 1 Q 2 G 1 P 1 G 1 B 1 G 1 Q 3 G 1 P 2 G 1 Q 4 G 1 Q 5 G 1 Q 6 G 1 Q 7 G 1 P 4 G 1 B 2 G 1 B 2 G 1 B 3 G 1 I C 1 I S O C Doubly achromatic Dispersion: ~3 cm/% SS LL II XY S L I T S C A N … AND A FIRST LARGE GAP MAGNET MODEL Upstream scanning was new to IBA – This magnet is key for gantry dimensioning (and power) IT QUICKLY BECAME MORE COMPLICATED « Compact » also means new problems to solve New magnets: Rotating quads, stronger than standard quads Scanning magnets Bending magnets models Spot size vs. scan angle and magnet crosstalk! Gantry structure Impact on instrumentation Stray fields MT23 Poster & article AT A GLANCE Scan magnets and quads Scanning magnets Combined XY vs. twins Compactness, field quality & power consumption => Two magnets selected Entrance rotating quads optimization Small diameter Grooves are for pipings AT A GLANCE Bending magnets 40°- 70°: 1.5 m radius, small gap, 1.53 T, #blocks 60°: 1.6m radius, large gap, 1,4 T INTEGRATED INTO GANTRY It is crowded but everything fits in IN THE MEANTIME Industrialization Subcontracting Integration of imaging V&V as well as QC procedures … Patient enclosure Procurement plan for the next ones! Patient experience (colors) Protect, Enhance, and Save Lives - 21 - PATIENT CHOOSES THEME Welcome MEDICAL ENV. AS USUAL Set-up Prepare Irradiation PATIENT CHOOSES THEME Welcome THE PATIENT CHOOSES ! Set-up Prepare Irradiation PATIENT CHOOSES THEME Welcome DESIGNED FOR KIDS Set-up Prepare Irradiation Integration Belgium - Shreveport Protect, Enhance, and Save Lives - 25 - ASSEMBLY, MECHANICS AND INTEGRATION IN BELGIUM Mechanics integration, GRF, cabling, testing – shipping in a single box TRANSPORT AND RIGGING Shipment in October 13 - Here’s the box SHREVEPORT RIGGING Protect, Enhance, and Save Lives - 28 - SHREVEPORT RIGGING Protect, Enhance, and Save Lives - 29 - Shreveport Rigging SHREVEPORT RIGGING Protect, Enhance, and Save Lives - 30 - Shreveport Rigging SHREVEPORT RIGGING Protect, Enhance, and Save Lives - 31 - SHREVEPORT RIGGING Protect, Enhance, and Save Lives - 32 - SHREVEPORT RIGGING Protect, Enhance, and Save Lives - 33 - SHREVEPORT RIGGING Protect, Enhance, and Save Lives - 34 - SHREVEPORT RIGGING Protect, Enhance, and Save Lives - 35 - Integration Beam tests started Protect, Enhance, and Save Lives - 36 - MECHANICS & ROTATION 1ST BEAM @ISOCENTRE End December 2013 - On second shift because of an unfortunate beam dump! CURRENT STATUS Now, we’re busy with models vs. experiment crosschecks (we have to deal with ESS = losses along the line => beam size) Approvals and commisionning (CGBL FDA filing OK) => Multi-site, multi department and interdisciplinary teamwork 1st patient expected before ASTRO 2014… which means: exactly 5 years after first concept drawings! THANK YOU FOR YOUR ATTENTION