Exhibit: SUPPLIER DEVIATION REQUEST TYPE OR PRINT (BLACK INK ONLY) A: To Be Completed By Southern California Edison SDR/ACOD No. _____________________________ Procurement Agent: ________________________________ B: To Be Completed By Supplier (see instructions on the back of this form) ____________________________ Request for Proposal (RFP) No. Purchase Order (PO) No. _________________________________________ ___________________________________________ Supplier Name Supplier's Technical Representative _________________________________________ ___________________________________________ Address Supplier's Technical Representative's Title _________________________________________ ___________________________________________ City, State, Zip Code Supplier's Technical Representative's Telephone 1. Nomenclature Change ONLY (NO Configuration Change)--------------> see Form 26-468 Page 1 only TYPE OF DEVIATION 2. Item with CONFIGURATION CHANGE----------------------------------> see Form 26-468 Page 2 of 2 3. Other Exception/Deviation/Discrepancy to RFP/PO Requirements----> reference other attachments SUPPLIER'S RECOMMENDED DISPOSITION AND JUSTIFICATION: YES PREVIOUSLY ISSUED SDRs: ITEM NO. # # MATERIAL CODE NO. NO REQUESTED PART NO. PREPARED BY: __________________________________________ CORRECT PART NO. ____________________ Signature - Supplier's Technical Representative Date C: To Be Completed By Southern California Edison DISPOSITION ACTION: Edison Specification No. _______________________________________ (When Applicable) Approved as Recommended Disapproved Substitution Evaluation No. (S.E.E.) _____________________________________________________ (When Applicable) Change Order to PO or Revision to Release Authorized As Below: (Use separate sheet if necessary) DISPOSITION APPROVED BY: (Requires PQS T2PE09) _____________________________________ Procurement Engineering PQS T2PE09 VERIFIED BY: (initials) ______________ Date _____________________________________________ Other _____________________________________________ Other (Below verification for spec impact only) PQS T3EN74 VERIFIED BY: (initials) Other ______________ Date ______________ Date ______________ Date The issuance or acceptance of this request in no way affects the warranty provisions of the order. This request shall not establish a precedent or obligation to accept similar conditions in the future. Approval of this deviation does not preclude negotiation of a price reduction in connection herewith at a later date. PAGE ____ OF ____ Exhibit D – Supplier Deviation Request SCE 26-468 Rev. 5 2/13 [SO123-XXXII-2.27] SUPPLIER DEVIATION REQUEST (SDR) ATTACHMENT FOR ITEMS REQUIRING CHANGE(S) IN CONFIGURATION The difference(s) between the proposed substitute and the item ordered by SCE is detailed below and certified by signature/title/date on SCE Form, 26-468 (SDR). Fully describe and reference further information on an attachment if space provided below is insufficient or if the form does not provide an adequate format to document changes to configuration and effects on the part. PART CONFIGURATION CHANGE DATA ITEM NUMBER MATERIAL CODE NO. OLD PART NO. NEW PART NO. Describe any PHYSICAL differences between old and new items (e.g., weight, dimensions, material) or state "NONE". Describe any differences in PERFORMANCE or state "NONE". State and Describe basis for any change in RELIABILITY or state "NONE". Describe any change in the FUNCTION of the item or state "NONE". Identify any CODES or STANDARDS used to Manufacture and/or Test the substitute item that differ from those used for the original item or state "NONE". Describe any differences that may be significant to the ENVIRONMENTAL or SEISMIC QUALIFICATION of the item or state "NONE". Identify SPECIFICATIONS, DRAWINGS and MANUALS affected by the change in the item or state "NONE". SDR No. ________________________________ Exhibit D – Supplier Deviation Request PAGE ____ OF ____ SCE 26-468 Rev. 5 2/13 [SO123-XXXII-2.27] Supplier Instructions for Preparation of Supplier Deviation Request (SDR) Section B - Supplier Responsible to Complete Information The supplier shall use the SDR form to submit technical and quality deviations from a Request for Proposal/Quotation (RFP) or Purchase Order (PO) requirements. Resolution shall be accepted by Southern California Edison (SCE) prior to performing services or shipping material to San Onofre Nuclear Generating Station (SONGS). The supplier shall complete an SDR for EACH deviation from the RFP/PO requirements to permit the prompt resolution of the various deviations by allowing each to be individually dispositioned. The supplier is responsible for the completeness and accuracy of all information in SDR Section B and all attachments. All attachments shall be referenced on the SDR. Number all pages consecutively with the SDR as page one (1). Please print, using black ink, or type. Enter your company name and address along with the technical representative's name, title and phone number in the spaces provided. Indicate the deviation type by checking the appropriate block. Deviation types are explained below with clarifying examples and attachment requirements. Reference to part numbers should be interpreted to include other relevant nomenclature necessary to maintain configuration control. Nomenclature Change Only (Box 1): part number(s) cited by SCE has been changed and does not involve a change in form, fit, function, or material of part(s). The part must be identical in all aspects (dimensions, operation, construction, mounting and internal parts) except nomenclature. Complete and attach a Form 26-468, Page 1 only. Item With Configuration Change (Box 2): recommended deviation does involve a change in form, fit, function, or material of part(s). Complete and attach a Form 26-468 Page 2. The Supplier must provide SCE with a complete description of the physical, performance, reliability, functional, code, standard, qualification, drawing and manual differences associated with the substitute item. It is recommended that any information which will assist SCE in assessing the acceptability of the substitute part be provided with the SDR to ensure a prompt resolution. Explain fully if the substitution is an alternate for the original part or if special circumstances warrant a one-time substitution. Other Exceptions/Deviations/Discrepancies to RFP/PO Requirements (Box 3): describe the condition on an attachment. Reference the attachment in the supplier's recommended disposition section on the SDR. Ensure exception / deviation / discrepancies do NOT conflict with SCE’s commitments to codes and standards. If the Form 26-468 does not provide an adequate format, you may use an alternate document of your own design providing that ALL information requested on the respective forms is included in your SDR attachment. The SDR must reference all pertinent attachments which support your substitution recommendation. Identify the SDR number(s) of any previously submitted SDR(s) that pertain to the subject of this SDR in the space provided, or state "NONE." Provide signature/title/date of authorized supplier technical representative in the spaces provided. Mail this form and all attachments to the Southern California Edison procurement agent. When the approved SDR is returned by SCE, review the disposition and take appropriate action. NOTE: The Substitution Evaluation is an SCE internal evaluation document which determines the acceptability of a configuration change and does not require supplier review. Exhibit D – Supplier Deviation Request SCE 26-468 Rev. 5 2/13 [SO123-XXXII-2.27]