AIG-ADIA Drilling for Geology seminar 1/8/2014 DRILLING HOLES DRILLING INDUSTRY SECTORS Geotechnical Mineral exploration/investigation Oil and gas Environmental Water bores Foundation/Construction Blast hole/seismic 1 AIG-ADIA Drilling for Geology seminar 1/8/2014 DRILLING IS ESSENTIAL Resources Industries • mineral rich • gas rich Construction Industry • build infrastructure Rural Industries/Communities • water supplies Monitoring • water resources • environmental COMMON TO ALL TYPES OF DRILLING • A hole has to be drilled • Most rocks we drill into contain groundwater • May penetrate more than one geological formation • May penetrate more than one aquifer • Drilling introduces foreign material into the hole 2 AIG-ADIA Drilling for Geology seminar 1/8/2014 GROUNDWATER • 22% of Australia’s annual water consumption • Main source of drinking water for many cities and towns • Only reliable water supply for much of Australia’s inland areas • 33% of Queensland's stock/domestic use • Two thirds of Western Australia’s entire water requirements • Bottled from natural springs, used to make soft drinks and beer RISKS TO GROUNDWATER Holes left open: • provide a conduit for surface water runoff • provide a vertical connection between aquifers • create pathways for gas And may result in: • contamination/pollution • loss of pressure • water supply problems • safety issues 3 AIG-ADIA Drilling for Geology seminar 1/8/2014 SURFACE WATER RUNOFF INTERMIXING 4 AIG-ADIA Drilling for Geology seminar 1/8/2014 Gas WHAT COULD WE DO Drive away and hope no one notices, or Design drilling program to prevent: • entry of surface water runoff • intermixing of fluids and pressures between aquifers • fugitive gas emissions • injury and harm to people and animals 5 AIG-ADIA Drilling for Geology seminar 1/8/2014 WE DO NOTICE • On major road • More than 100 metres deep • Hutton Sandstone STANDARDS/CODES IN QLD Code of environmental compliance, exploration and mineral development projects. Code of Practice for constructing and abandoning coal seam gas wells and associated bores in Queensland. (COP) Minimum Construction Requirements For Water Bores in Australia. (MCR) Minimum standards for the construction and reconditioning of water bores that intersect the sediments of artesian basins in Queensland. All are legislative requirements in QLD 6 AIG-ADIA Drilling for Geology seminar 1/8/2014 MCR Minimum Construction Requirements For Water Bores in Australia. • nationally endorsed standard for water bore construction • first published in 1997 • edition 3 current version • legislation in QLD The MCR has principles that could be applied across any drilling sector. SEALING HOLES Holes must be sealed to: • protect groundwater from contamination • maintain aquifer pressure & quality • not allow fugitive gas emissions We can do this by either: • casing and sealing the annular zone • sealing the drilled hole 7 AIG-ADIA Drilling for Geology seminar 1/8/2014 CASING AND SEALING ANNULAR ZONE The casing and seal must be installed so that: • there is no vertical connection of aquifers • it does not allow ingress of surface water • the casing is capped at the surface If the result is a water bore it must be constructed by: • licensed driller • petroleum company under the COP CASED & SEALED HOLE 8 AIG-ADIA Drilling for Geology seminar 1/8/2014 DECOMMISSIONING THE HOLE Various methods: • Depends on type: • single aquifer non flowing • multiple aquifer non flowing • flowing Combination clean fill and sealing materials MATERIALS Clean uncontaminated fill • sand • coarse gravel • clay • drill cuttings Sealing materials • grout • bentonite grout • bentonite pellets/chips • concrete 9 AIG-ADIA Drilling for Geology seminar 1/8/2014 PREFERRED METHOD • Fully grouted from the top to the bottom of the hole. GROUTED FROM TOP TO BOTTOM 10 AIG-ADIA Drilling for Geology seminar 1/8/2014 LINKS to STANDARDS/CODES • http://www.ehp.qld.gov.au/licencespermits/compliance-codes/pdf/code-explorationmineral-development-em586.pdf • http://www.dnrm.qld.gov.au/__data/assets/pdf_file/001 1/119666/code-of-practice-csg-wells-and-bores.pdf • http://www.dnrm.qld.gov.au/__data/assets/pdf_file/000 9/99765/minimum-construction-req-au.pdf • http://www.dnrm.qld.gov.au/__data/assets/pdf_file/000 7/99763/minimum-standards-bores.pdf QUESTIONS ? 11