Operating Procedure Attachment Load Shed Calculation Guideline (Formerly E-508A) Procedure No. 4510A Version No. 10.2 Effective Date 4/20/16 Distribution Restriction: None Fixed Pro Rata Shares UDC / MSS Anaheim Azusa Banning Corona Lassen NCPA Pasadena Pacific Gas & Electric Port of Stockton Riverside SCE SDG&E VEA Vernon Fixed Pro-Rata Share 1.20% 0.13% 0.08% 0.03% 0.06% 2.08% 0.63% 41.79% 0.0080% 1.18% 42.29% 9.93% 0.23% 0.35% Pro Rata Load Shedding CAISO System Operator Actions If fixed pro rata Load-Shedding by all UDCs and MSSs is required, then determine the amount and location of Load to be reduced, and, to the extent practicable, allocate a portion to each UDC/MSS based on the results shown in the Load Shedding Tool. Calculation used in the Load Shedding Tool Load Shedding Responsibilities = UDC or MSS demand at the time of the CAISO BA annual peak for the previous year/ Total BA annual peak Demand for the previous year taking into account system considerations. Example: When a sudden multiple Contingency or an ISO Grid reserve deficiency requires Load-Shedding assistance from the entire CAISO Balancing Authority to Stabilize the grid. Page 1 of 2 Operating Procedure Attachment Load Shed Calculation Guideline (Formerly E-508A) Procedure No. 4510A Version No. 10.2 Effective Date 4/20/16 Distribution Restriction: None Version History Version 10.0 10.1 10.2 Change Updated load shedding Fixed Pro-Rata Share % based on 2013 CAISO BA peak load data. Clarified Instructions in "Calculation Without RA" and "Calculation With RA" tabs to identify instructions implemented in the Excel formulas vs. instructions to be car... Updated the percentages to reflect Peak Loads in 2014. Changed instances of prorata to pro rata. Updated the percentages to reflect Peak Loads in 2015. By Date 4/9/14 4/14/15 4/20/16 Technical Review Reviewed By Content Expert Operations Procedures Real-Time Operations Signature Date 4/04/16 4/15/16 Page 2 of 2