Apparatus & Equipment Sheet, Complete a sheet for each Apparatus Fire Department: _______________________________________________ Apparatus Unit Number: _________ Unit Type: Engine: _____ Tanker: _____ Ladder: _____ Service: _____ Brush: _____ Other: _________ Station Location: _________________________________________ Manufacturer (ex:- E-One): __________________________________________ Year of Manufacture: _________ Make and Model (ex: - Freightliner FL80): ___________________________________ Pump GPM: __________, Baffled Tank: Rated GVW: __________________ Quick Dump: ________, Loaded Weight: ___________________ 3 Most Recent Pump Service Test Dates: Attack Hose Carried: ________, Supply Hose Carried: _________ ft. of 2½”, _________ Four Wheel Drive: _________ _________ ft. of 1¾”, _________ ft. of 2”, _________ ft. of 2½” _________ ft. of 3”, _________ ft. of 4”, __________ ft. of 5” All attack/supply hose up to 3” is tested at ________ PSI, If Unit includes an Aerial Device (circle which type): Last 3 Aerial Test Dates: ______________ Large Diameter Hose (4” & 5”) is tested at ________ PSI / 3 Most Recent Hose Test Dates: Engine Company with Jet Assist: _________________ / ________________ / _______________ _________ ft. of 1½” , Booster Tank (300 gallon minimum) Tank Capacity: _________ Ladder / Platform , Length of Aerial Device: ________ ft. / ______________ / ______________ Last NDT Date: ___________ Needed 300 15’ of Soft Suction hose or 20’ of Hard Suction Hose 15’/20’ 2 -- 1½” , 1¾” or 2” - 200’ Preconnected attack lines 400’ Carried Ladder / Service Company Needed Carried SCBA (30 minute minimum) 4 SCBA extra cylinders 4 Salvage Covers: minimum size of 12’ x 14’ 6 1 Master Stream Appliance (1,000 GPM) 1 Electrical Generator: 3,000 Watt 2½” Playpipe with shutoff and 1”, 1- 1/8”, and 1¼” tips 1 Portable Floodlight: 500 Watt each 3 2½” Playpipe with fog nozzle with shutoff 1 Smoke Ejector or PPV fan: 5,000 CFM 1 1½” or 1¾” Combination Fog Nozzle with shutoff 2 Portable Thermal Cutting unit 1 SCBA (30 minute minimum) 4 Power Saw (chain saw or rotary saw) 1 SCBA extra cylinders 4 Hand Lights, Rechargeable, suitable for hazard areas 4 Salvage Covers: minimum size of 12’ x 14’ 2 Pike Pole or Plaster Hook 3’ or 4’ 2 Hand Lights, Rechargeable, suitable for hazard areas 2 Pike Pole or Plaster Hook 6’ or longer 4 Hose Clamp (2½”, 3” or LDH) 1 Mounted Radio 1 Hydrant Hose Gate (2½”) 1 Portable Radio 1 Gated Wye (2½” x 1½” x 1½”) ) Mounted Radio 1 24’ Extension Ladder 1 1 16’, or longer, Roof Ladder 1 Portable Radio 1 10’, or longer, Attic Ladder 1 12’ to 16’ Roof Ladder 1 14’, or longer, Combination Ladder 1 24’, or longer, Extension Ladder 1 Additional equipment for Ladder companies Additional 9S equipment (for first out Engines only) Rope (100 ‘ minimum of ½” minimum diameter) 100’ 16’, or longer, Roof Ladder 1 35’, or longer, Extension Ladder 1 Axes 1 Elevated Stream Device (mounted on aerial apparatus) 1 Bolt Cutters: (14” or longer handles) 1 Large Spray Nozzle: 1,000 GPM 1 Claw Tool: (Haligan tool can replace claw tool) 1 Crow Bar: (Haligan tool can replace crow bar) 1 Additional Equipment Carried - Substitutions First Aid Kit 1 Thermal Imaging Camera Pike Pole (8’ minimum length) 1 Hydraulic or Pneumatic Cutting Tool Shovels 2 K-12 Circular Saw with Composite Blade Fire Extinguishers: minimum of 20 lbs. each, class B-C 2 Booster Line or 3 Exhibit 2 rd 200’ Preconnected attack line 200’