Boral Boral Goncrete Concrete Additional Charges The following Schedule of Additional Charges is applicable to all purchases of concrete. The rates herein are effective from 1 APRIL 2009, and are SUBJECT TO CHANGE WITHOUT NOTICE. BORAL RESOURCES (VIC) PTY LIMITED GST NOT INCLUDED. Telephone (03) 9508 71 I 1 Fax Number (03) 9508 71 75 Email concrete.sales.melb@boral.com.au 1. ABN 87 004 620 731 I Glenferrie Road Malvern Private bag 10, Malvern Vic 31¡14 NORMALWORKING HOURS Monday to Friday: Saturday: 6.15am to 4.00pm 6.1 Sam to 1 2.00pm (noon). Note: Plant deliveries normally start at 7.00am unless early deliveries have been confirmed the previous day. 2. CHARGES FOR DELIVERIES OUTSIDE NORMAL HOURS Weekdays: 4.00pm to $16.00 per m' (minimum charge $48.00) 6.00pm $24.00 per m'(minimum charge $72.00) All other times: PLANT OPENING FEES ln addition to the above cartage overtime rates, a charge of $750.00 shall be applied for each 4 hours or part thereof that the plant remains open to service requirements outside normal working hours. Also, $300.00 per truck per 4 hours or part thereof, less cartage and penalties eamed. DISCHARGE TIME A period of 25 minutes is allowed, after arrival on site, to discharge load. Excess discharge time is payable under the terms of the TWU Cartage Agreement after 25 minutes and will be charged as follows: During NormalWorking Hours: $1.70 per minute Outside Normal Working Hours: $3.40 per minute TRUCK STANDBY The appropriate number of trucks required to seruice a customer's pour will automatically be placed on standby at expiry of normal working period. Each 30 minutes thereafter, until truck despatched, a further unit of standby will be applied as follows: Each 30 minutes or part thereof: $45.00 per unit (30 minutes) RETURNED CONCRETE ENVIRONMENTAL DISPOSAL FEE Over ordered or surplus concrete can be returned from site in the delivery vehicle for dumping if no facility is provided on site. Returned concrete will be charged at the rate of $85.00 per m3 or part thereof for both Maxi and Mini trucks. MTNTMUM LoAp {SHoRT LoAp) Prices are based on loads of three cubic metres. For smaller loads, extra cartage charges will be applied at the following rates: $30.00 per m3 up to 16km plus $1.50/m'/km up to 32km plus $3.00/m'/km thereafter, for the undelivered portion of three cubic metres. 7. LONG DISTANCE DELIVERIES Unless specifically quoted, deliveries in excess of 16km in the metropolitan area will attract a per metre surcharge as follows: 17-32kn: 8, $1.50/m'/km Over 32km: $3.00/m'/km PLANT MIXING FEE A charge of $150.00 per load is applied to ex plant purchases. 9. TRUCKWASHOUT FEE A charge of $30.00 per load is applied where the customer requests the addition of any chemical, colouring agent or fìbrous material, either at batch plant or on site, or to avoid contamination to mixes other than "N" class concrete. BORAL RESOURCES VIC PTY LTD. ABN 84 OO4 620 731 4 OF 6 E&OE LAST REVISED: 02-04-09 Boral 10. Concrete MANUAL HANDLING FEE Addition of customer supplied products will incur a fee of $50.00 per load. BORAL RESOURCES (VrC) PTY LTM|TED ABN 87 004 620 731 11. SETTING TIMES Setting times may be enhanced by selecting the following products: Winterslab Winterslab Max Winte¡slab SuperMax no additional charge + $ 4.001m¡ + $ 8.oo/m3 I Glenferrie Road Malvern Private bag 10, Malvern Vic 31¡14 Telephone (03) 9508 71 1 1 Fax Number (03) 9508 71 75 Email concrete.sales.melb@boral.com.au 12. SLUMPS Concrete ordered over 80mm slump will incur the following additional costs: $3,00 per additional 20mm slump 13. GP SURCHARGE lf Boralspec concrete is ordered, the quoted price will apply. lf you specify that the concrete must be supplied with straight GP (Boralspec may contain blended cement) then a surcharge will be applied. 20Mpa 25MPa 32MPa 40MPa 50MPa + + + + + $2.00/ms $2.50/m¡ $3.00/m3 $3.50/m¡ $4.00/m¡ 14. LATE CANCELLATION FEE A fee of $1,000 will be charged when orders of more than 75m3 are cancelled later than 2:30pm the day before the pour other than where wet or hot weather causes the cancellation. 15. ADMIN FEE A charge of $5,00 per copy will be levied where invoices or dockets are re-printed. 16. PAYMENT BY CREDIT CARD Credit card surcharge of 1.5% (for Visa and MasterCard) or 3.0% (for AMEX and Diners) on the GST inclusive value of the transaction. BORAL RESOURCES VIC PTY LTD. ABN 840O4620731 5 OF 6 LAST REVISED: 02-04-09 Boral Boral Concrete Concrete Testing Charges BORAL RESOURCES (VIC) PTY LIMITED ABN 87 004 620 731 I Glenferrie Road Malvern Private bag 10, Malvern Vic Telephone (03) 9508 71 31¿14 11 Fax Number (03) 9508 7175 Email concrete.sales.melb@boral.com.au The rates herein are effective from I APRIL 2008 and are SUBJECT T0 CHANGE WITHOUT NOT|CEI GST NOT INCLUDED. SAMPLING & TESTING Minimum 3 cylinders unless otherwise specified $50.00 / Cylinder MINIMUM SITE VISIT $150.00 (Except Sundays and Public holidays which are $4fl1,00) EXTRA SLUMPS $30.00/Test OUTSIDE NORMAL WORKING HOURS + 50% over normal charges lNormel test¡no hours a¡e 7:00a.m. to 4:00o.m. weekdavs onlvl SURCHARGE Sunday & Public Holidays + 100% over normal charges SHRINKAGE (3 Prisms) $350.00/Test FLEXURE Small (Per set of 3) Laroe lPer set of 3) INDIRECT TENSILE $240.00/Beam $600.00/Beam $1 00.00/Cylinder VOLUME PERMEABLE VOIDS (per 2 cylinders) $250.00 AIR CHECKS $75.00 YIELD CHECKS $75.00 (Min. charge $450.00) 'TEST|NG 0NLY', (CLtENT CASTS CYLINDER) Pick Uo $30.0O/Cylinder S40 00/Cvlinder SAMPLE 0NLY (BoRAL CASTS CYLINDER 0NLY) $30.0O/Cylinder SUPERPLASTICISER ADDITION Minimum site visit POA SITE POUR SUPERVISION / TECHNICIAN WAITING TIME $60.00/Hour MOULD LOST OR DAMAGED ON SITE $1 SCHMIDT HAMMER TESTING $250,00 Delivered BORAL RESOURCES VIC PTY LTD, ABN 84 $160.00 lLess cost of SP added) OO4 620 731 6 OF 6 E&OE 25.00/Hour LAST REVISED: 02-04-09