Shield Arc® HYP

advertisement
Shield Arc ® HYP
High strength cellulosic electrode
Classification
AWS A5.5-96
EN 499-94
: E7010-G
: E 42 2 Mo C 25
S M AW
General description
Cellulosic coated electrode for vertical down pipe welding
Suitable for pipe with strengths X52 trough X65
Popular with welders
Easy operability
Low susceptibility to wagon tracks, windows and pinholes
Welding positions
Current type
DC electr. +
ISO/ASME PG/5Gdown
Approvals
LR
3,3Y
TÜV
+
Chemical composition (w%), typical, all weld metal
C
0.12
Mn
0.35
Si
0.12
Mo
0.35
V
0.02
Mechanical properties, all weld metal
Condition
Required: AWS A5.5-96
EN 499-94
Typical values
AW
0.2% Proof strength
(N/mm2)
min. 390
min. 420
430
Tensile strength
(N/mm2)
min. 480
500-640
520
Elongation
(%)
min. 22
min. 20
26
Impact ISO-V(J)
-20°C
-30°C
not required
min. 47
75
50
Packaging, available sizes and identification
Unit: Metal can
Identification
138
Diameter (mm)
Length (mm)
Pieces / unit (nominal)
Net weight/unit (kg)
Imprint: 7010-G SAHYP
2.5
350
440
6.9
3.2
350
325
8.4
4.0
350
195
7.8
Tip colour: none
5.0
350
130
8.1
Shield Arc® HYP: rev. EN 15
Liability: All information in this data sheet is based on the best available knowledge, is subject to change without notice and can
only be considered as suitable for general guidance Fumes: Consult information on Welding Safety Sheet, available upon request
www.lincolnelectriceurope.com
Shield Arc ® HYP
Materials to be welded
Code
EN 10208-2
EN 10216-1 / 10217-1
API 5LX
Gaz de France
Type
L 360, L 415
P 355
X52, X 56, X60, X65
X52, X63
S M AW
Steel
Pipe material
Calculation Data
Sizes
Diam. x length
Current
range
Current
type
(mm)
2.5x350
3.2x350
4.0x350
5.0x350
(A)
40-70
75-130
90-185
140-225
DC+
DC+
DC+
DC+
Arc time
Energy
Dep.rate
- per electrode at max. current (s)*
E(kJ)
H(kg/h)
Weight/
1000 pcs.
(kg)
15.7
26.0
40.0
62.3
Electrodes/ kg Electrodes/
kg weldmetal kg weldmetal
B
1/N
* stub end = 35 mm
Welding parameters, optimum fill passes
Welding position:
Diameter (mm)
2.5
3.2
4.0
5.0
PG/5G down
Current (A)
65
110
150
165
Application Advice
Preheating pipe material L360 and L415 (X56 t/m X65) required (acc. EN 1011-1).
Pipeclamps to be removed after finishing root pass, start welding”hot pass” immediately (within 5 min.) after root pass.
Use electrode directly from metal cans.
Use Fleetweld® 5P for lower hardness in the root pass
139