Electric Multiple Units and Locomotives Manufacturer

advertisement
Electric Multiple Units
and
Locomotives
Manufacturer
SOFTRONIC
www.softronic.ro
SOFTRONIC HOLDING
SOFTRONIC
Electric Multiple Units, Railway
Equipments and Locomotives
Manufacturer
CMF
Metallic Construction of Large and
Small Subassemblies
SOFTRANS
Railway Passenger and
Freight Transport Operator
2 www.softronic.ro
SOFTRONIC
CRAIOVA, ROMANIA
Softronic deals with rail rolling stock construction, modernization,
repairs and upgrades.
Established in Craiova Romania in 1999 with the main purpose of
modernizing locomotives and producing railway safety equipment,
Softronic is today the only Southeastern’s Europe manufacturer
of Electric Multiple Unit trains and electric locomotives.
Softronic proudly continues the city’s tradition in the locomotive
manufacture, our top engineers coming from the former
Electroputere plant where over 3000 electric and diesel – electric
locomotives were built.
With more than 200 locomotives modernized, 23 new locomotives
built and over 400 employees, Softronic provides tailored and
environmental friendly solutions to more and more clients.
Softronic values its employees (most of them young and top
graduated from Universities) recognizing their importance helping
them develop further, sustaining together the growth.
www.softronic.ro
3
OUR TIMELINE
For Softronic and Softrans
2008
1999
Softronic
Company
is
founded
2013
2010
2004
First
locomotives
are modernized
The first AC - DC
loco, PHOENIX, is
produced after 1990
200 locos were
modenized
The first AC - AC loco,
TRANSMONTANA, is
produced
6 Phoenix locos were built
2014
The first low floor
train, HYPERION,
is produced in
Romania
17 Transmontana locos are built
2004
Softrans
company is
founded with
the initial
purpose
of testing
Softronic’s
rail vehicules
4 www.softronic.ro
2005
Softrans
obtains
authorization
for freight
transportation
2010
Softrans
begins freight
transport in
Romania
2013
Softrans
obtains
authorisation
for passenger
transportation
2014
Softrans begins
operating passenger
train Hyperion
PRODUCTION FACILITIES
Our production capabilities are able to create high precision products
Softronic has fully integrated production capabilities to manufacture locomotives and EMUs from the
ground up and to provide complete overhaul upgrade, maintenance and testing services including all
support systems in their entirety.
www.softronic.ro
5
OUR GOAL
Our key to success is to develop rail vehicles for european clients capable to operate between Austria and Turkey
Partners
ƒƒ DB Schenker (Romania)
ƒƒ Garanti leasing
ƒƒ Unicredit leasing
ƒƒ JME Consulting (Sweden)
ƒƒ BCR leasing (Erste Group)
ƒƒ Raiffeisen leasing
ƒƒ Transilvania Bank
Main clients
ƒƒ DB Schenker (Romania) 6 Softronic locos
ƒƒ DB Schenker (Hungary) 9 Softronic locos
ƒƒ MMV (Hungary) 5 Softronic locos
ƒƒ CFR (Romania Rail States) 3 Softronic locos
ƒƒ Cargotrans Vagon (Romania)
ƒƒ Transferoviar Group (Romania)
Main Markets
6 www.softronic.ro
Future Markets
STATISTICS - OUR PROGRESS
Millions
Softronic Turnover
€25.00
€20.00
€15.00
€10.00
€5.00
€0.00
2008
2009
2010
2011
2012
2013
Softronic turnover
For the last three years, Softronic has had a steady growth as we have increased significantly, thanks to the
confidence that our clients have shown.
For 2014 we expect to grow by 30% on the strength of the investment in our training programs under expert
management and by the increasing number of locomotives and EMUs operating.
www.softronic.ro
7
BI-SYSTEM LOCOMOTIVE TRANSMONTANA
TRANSMONTANA SOFTRONIC
Description
INNOVATIVE ENGINEERING
EXPERIENCE
BI-SYSTEM
By combining experience with
innovations systematically oriented
to client benefit and cost effective
in 2010, Softronic built the first
locomotive in Romania with
asynchronous traction motors .
The locomotive, equipped with
regenerative braking (20%
economy), is powered with 15 kV
AC an 25 kV AC, capable of reaching
speeds of 120 km/h when operating
freight services and 160 km/h for
passenger traffic.
CLIENT’S NEEDS
Understanding the needs of
transport operators we are able
to offer a modern and reliable
locomotive Transmontana
specifically adapted for country
conditions like: Romania, Hungary,
Slovakia, Austria and Turkey etc.
POWERFUL SIX AXLE
Transmontana is a 6000 kW electric
six axle vehicle with a modern
design meeting all technical
parameters and the following
standards: EN, ISO, UIC and is
registered at the ERA (European
Railway Agency) database.
www.softronic.ro
9
QUALITY SUPPLYERS
CMF – SOFTRONIC HOLDING
(Romania)
Carbody
ABB
(Switzerland)
Bi-system transformer
STEMMANN TECHNIK
(Germany)
Pantograph
SOFTRONIC
(Romania)
Driver Desk
SOFTRONIC
(Romania)
Complete traction equipment
EST EISENBACH
(Germany)
Crash buffer
CMF – SOFTRONIC HOLDING
(Romania)
Boogie
10 www.softronic.ro
KNORR BREMSE
(Germany)
Braking system
TECHNICAL DATA
Bi-system six axle locomotive
Train loads as function of
different gradient and
speed
Train loadsoperating
as a function of gradient
and operating speed
Tractive effort at start-up
F [kN]
435
400
380
388
360
340
320
300
280
260
245.3
240
220
200
180
160
140
120
100
80
60
40
20
15
71
93
tons
10000
9500
9000
8500
8000
7500
7000
6500
6000
5500
5000
4500
4000
3500
3000
2500
2000
1500
1000
500
0
10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 V [km/h]
v=100 km/h
v=80 km/h
v=60 km/h
Traction engine
6 x 1000 kW
Power
6000 kW
Design speed
120 / 160 km/h
Tractive force at
Start-up
435 kN
Traction Voltage
25 kV-50 Hz /
15 kV 16.7- Hz
Safety Systems
PZB Indusi,
EVM120, MIREL,
LS90, WSP (Wheels
anti slide and slip)
Control system
Micro-controllers
and microprocessors
based
v=40 km/h
v=20 km/h
v=10 km/h
v=120 km/h
v=140 km/h
v=160 km/h
2
4 6 8 10 12
15
20
25 ‰
www.softronic.ro
11
ADHESION = MAIN ADVANTAGE
Six Axle Locomotive
Six axle locomotive Transmontana capable of towing trains up to 2800 tons
2800 tons, 650 m corn transport
4 axle locomotive capable of towing up to 1860 tons trains
1860 tons, 430 m corn transport
2800 tons trains needs two 4 axles locomotives increasing costs and reducing profit
2800 tons, 650 m corn transport
12 www.softronic.ro
CONCLUSIONS
MAIN FEATURES
99 Regenerative braking
99 New design
99 One hour power 6600 kW
99 Bi-system
99 AC engines
99 Led headlamps
99 Six axle
99 Large cabins
99 Low maintenance costs
TRANSMONTANA
Bi-system Transmontana authorized in Romania and Hungary.
It is equiped with Mirel safety system in standard configuration.
www.softronic.ro
13
OUR GALLERY
TRANSMONTANA locomotive
14 www.softronic.ro
SOFTRONIC HOLDING
For Softronic and Softrans
HYPERION ELECTRIC MULTIPLE UNIT
www.softronic.ro
15
HYPERION SOFTRONIC
INNOVATIVE ENGINEERING
BI-SYSTEM EMU
COMFORT AND SAFETY
Softronic’s newest product,
Hyperion, is an electric multiple unit
train bi-system capable to operate
both 25 kV AC and 3 kV DC.
Hyperion is the first electric low
floor train ever built in Romania,
aiming to reduce costs and increase
efficiency.
Comfort and safety are key aspects
of our train offering open-space
compartments, free internet access,
diffused lighting systems and
comfortable seats. All of these turn
short and long journeys into an
enjoyable and recreational travelling
experience.
NEW PROJECT
EU NORMS
The train was built using cutting
edge technologies after a 2012
project. In the same time it is
based on our previous experience
in railway vehicles manufacture and
equipped with high quality electrical
and mechanical components.
16 www.softronic.ro
The train meets the specific
requirements of all European
Standards (EN and UIC) and
the technical specifications for
interoperability (TSIs) and is
regitered at the 2014 ERA (European
Railway Agency) database.
TECHNICAL DATA
Hyperion Motor Bogie
Knorr Bremse
Braking system
Voith Turbo
Gearbox
EMU layout
ABB 430 kW traction motors
Catenary supply voltage
25 kV - 50 Hz AC / 3 kV DC
Axle arrangement
Bo’2’2’2’Bo’
Number of vehicles
4
Seating capacity
188
Standing capacity (4 ppl/m2) 215/225
Floor height:
600 mm
Entrance doors
1300 mm
Number of entrances
1 entrance per car side (8 doors total)
Overall length
69 935 mm
Vehicle height
4230
Tare weight
134,6 t
Maximum acceleration
0.85 m/s2
www.softronic.ro
17
CONCLUSIONS
MAIN FEATURES
99 Regenerative braking
99 New design
99 Light weight steel
construction
99 Bi-system
99 Carefully designed
aerodynamics
99 Led headlamps
99 Seat number optimized
99 Low maintenance costs
HYPERION
Bi-system Electric Multiple Unit
First electric low floor train ever built in Romania
Competitive Price
18 www.softronic.ro
HYPERION GALLERY
www.softronic.ro
19
VEHICLE MONITORIZATION AND DIAGNOSIS BY GSM
Quick access to 5 depots in
Romania and one in Hungary
(Budapest end of 2014)
24/7 Supervision and tracking
of locomotives
Mobile service specialists
based in Romania
Softronic’s advanced monitorizing
programe using GPRS
1.TM 001 CFR
1. PH 001 DB
2.TM 002 MMV
2. PH 002 MMV
3.TM 003 DB
3. PH 003 DB
4.TM 004 DB
4. PH 004 CFR
5.TM 005 DB
5. PH 005 CFR
6.TM 006 DB
6. PH 006 DB
7.TM 007 MMV
8.TM 008 DB
1. EMU 001 ST
9.TM 009 DB
10.TM 010 DB
11.TM 011 ST
12.TM 012 DB
13.TM 013 DB
14.TM 014 DB
15.TM 015 ST
TM - Transmontana
16.TM 016 ST
PH - Phoenix
Preassembled spares and wear
parts for periodic maintenance
minimizing downtimes
20 www.softronic.ro
Maintenance concepts and
documentation
Short delivery for spare
parts
SOFTRONIC’S TARGETS
ƒƒ Delivering strong and reliable locomotives
capable to in between Austria, Hungary,
Romania, Bulgaria and Turkey
ƒƒ Entering the swedish market with new
locomotives
ƒƒ Developing the freight traffic in the space of
15 kV 16,7 Hz (Austria)
ƒƒ Extending our product range with the DMU on
the same basis as the EMU
ƒƒ Opening a new depot in Budapest for
locomotive maintenance and upgrades
ƒƒ Building a new plant in Turkey in collaboration
with a turkish partner
www.softronic.ro
21
CLIENTS
SUPPLIERS
Transportation Equipment GmbH
GUMMI-METALL-TECHNIK
22 www.softronic.ro
QUALITY CERTIFICATES
1. Locomotive commissioning
authorization
2. Locomotive certification
3. EMU commissioning
authorization
4. EMU certification
1
2
5
3
6
5. Mechanical processing
certificate according to
EN ISO 3834-2
4
7
8
6. Quality management systems
certificate according to
SR EN ISO 9001
7. Safety management systems
certificate according to
SR OHSAS 18 001
8. Environmental management
system certificate according to
SR EN 14001
www.softronic.ro
23
Bruxelles/Brussel
Praha (Prague)
UKRAINE
LUX
Luxemburg
CZECH REPUBLIC
Paris
SLOVAKIA
MOLDOVA
Wien
FRANCE
Bratislava
Chişinău
AUSTRIA
Bern
Budapest
HUNGARY
Vaduz
LICHTENSTEIN
SWITZERLAND
ROMANIA
SLOVENIA
Ljuljana
Zagreb
CROATIA
Beograd (Belgrade)
BOSNIA
AND HERZEGOVINA
Sarajevo
ITALY
Craiova
SERBIA
MONTENEGRO KOSOVO
Andorra la Vella
ANDORRA
Bucuresti (Bucharest)
Sofiya (Sofia)
BULGARIA
Pristina
Pogorica
Skopje
SPAIN
Roma (Rome)
MADRID
Tirana
CONTACT US
MACEDONIA
ALBANIA
Softronic Ltd.
Electric Multiple Units and
Locomotives
Alger
TUR
GREECE
Address
40 Calea Severinului st., Craiova
Dolj County, Romania
Web
Athina (Athens)
www.softronic.ro
www.softrans.ro
Phone
Tunis
ALGERIA
Softrans Ltd.
Railway freight and passenger
transport
+40 351 40 91 51;
+40 351 40 91 52 MALTA
Vallelta
TUNISIA
Email
softronic@softronic.ro
Softronic
Softrans
Tripoli
Cairo
www.softronic.ro
Download