MULTI-UNIT RESIDENTIAL, INDUSTRIAL, COMMERCIAL APPLICATION Write neatly in BLOCK LETTERS with a black or blue ballpoint pen only. Write X in ALL appropriate boxes. You must answer all questions marked *. A4 or A3 site plans must accompany this application (where indicated). Plans larger than A3 must be digital. Visit the Knowledge Hub at www.yvw.com.au/easyaccess/knowledgehub or email us at easyaccess@yvw.com.au for more information. SITE ADDRESS AND DEVELOPMENT DETAILS Lot no.* eg. 10 Plan no.* eg. PS406988 Street no.* Suburb* Development type* Residential Industrial/Commercial Owners corporation?* Yes Estate name No Street name* Postcode* Melway ref No of lots* Size of each lot (m2) Stage name Site plan requirements Site plans must show an outline of all proposed structures, details of any site cuts, driveway position and water meter location. Plans detailing landscaping etc. are not required. APPLICANT AND/OR PLUMBER DETAILS Applicant’s name* Applicant’s business name* Phone no.* Postal address* P/code* Applicant’s email* Applicant’s easyACCESS account no. Applicant’s ABN Plumber’s name Plumber’s phone no. Plumber’s licence no. SERVICES REQUIRED - SELECT ONE OR MORE Sewer Connection /Alteration PLAN REQUIRED Sewer Disconnection (Cut and Seal) Size of water services to be connected (mm) General Supply Size of water services to be disconnected (mm) General Supply Build Over Easement/Yarra Valley Water Assets PLAN REQUIRED New Sewer Branch PLAN REQUIRED In-Line Booster Pump (separate form required) Hydrant/Hose Reel Fire Sprinkler Hydrant/Hose Reel Fire Sprinkler Build Over Easement description Water meter selection and backflow prevention (Contact your appropriately qualified licensed plumber to obtain this information) Each lot in this development requires a water meter. The standard size is 20mm. Indicate the number of each meter size required. No. of meters required Hazard rating 25mm 20mm Low hazard 32mm Medium hazard 40mm 50mm Greater than 50mm High hazard If a meter larger than 50mm is required please provide a reason Water meter installation and access All water meters and associated products must be fitted in accordance with the Water Metering and Servicing Guidelines which can be downloaded from www.yvw.com.au. Water meters must be accessible for reading at all times. In circumstances where these conditions cannot be met, remote meters must be fitted at your cost. Meters must not be fitted inside units/dwellings or in any location that can only be reached via a gate or door, whether it be locked or unlocked. Please note: properties located in a mandated Recycled Water area will have additional water servicing requirements. Do you require remote meters? Yes No APPLICATION CONDITIONS AND SIGNATURE* All fees must be paid before booking a connection. New Customer Contribution fees (where applicable) must be paid within 90 days from the issue date of your Conditions of Connection. If your New Customer Contribution fees are not paid within 90 days, your application will expire and you will need to re-apply. By signing this application, I declare that the information supplied is true and correct. I am the owner of the property, or I am authorised by the owner to make this application on their behalf and agree to pay all fees relating to this application. Site plans attached* SIGN HERE Privacy Statement Yarra Valley Water collects personal information for the purposes of providing water and sewer related services and products, promoting such services and market research. We may disclose your personal information to our contractors for these purposes and other third parties including Melbourne Water and the Minister for Environment and Conservation relating to Parks Victoria services. You may request access to your personal information that we hold by writing to the Privacy Officer at the address below. Please note we may charge you the reasonable cost of providing you with access to your personal information. Yarra Valley Water ABN: 93 066 902 501 Postal: Private Bag 1 Mitcham VIC 3132 Phone: 1300 651 511 Date